SHEET : 1 OF 74
PILING PROJECT QUALITY PLAN
RESID FLUIT CATALYTIC CRACKING
PT. PERTAMINA UP-IV CILACAP
TABLE OF CONTENT
INTRODUCTION…………………………………………………………………………………………..……3
OBJECTIVES………………………………………………………………………………...........................3
REFERENCES…………………………………………………………………………………………….…....4
DEFINITION………………………………………………………………………………………….………….4
ORGANIZATION AND RESPONSIBILITIES……………………………………………………………..….4
PROJECT QUALITY EXECUTION PLAN……………………..………………………………………..……5
ATTACHMENT
ATTACHMENT 1. QC ORGANIZATION CHART
ATTACHMENT 2. INSPECTION AND TEST PLAN ( ITP ) AND FORM
ATTACHMENT 3. EQUIPMENT AND MATERIAL SPESIFICATION
ATTACHMENT 4. WPS
ATTACHMENT 5. CRANE AND OPERATOR CERTIFICATE
Page 2 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
1. INTRODUCTION
Purpose
The Purpose of this Project Quality Plan (PQP) is to define the project quality
system, activities, procedures, practices, resources and responsibilities for achieving
quality and the quality assurance and quality control activities to be performed by the
Subcontractor for the Project. This Quality Plan is basis for executing the quality
activities to be performed during the project stage including the continuous quality
improvement.
Scope
The Project Quality Program that will be described in this Project Quality Plan
comprised
of quality activities to be performed and document to be produced during the project
from the initial stage to the completion of project.
Also this Project Quality Plan (PQP) shall govern the following:
a) QC Organization (see Attachment-1) and Responsibilities (See Point 2.0 –
Organization & Responsibilities)
b) Coordination between the construction group and quality group within
Subcontractor organization, and Client / Owner’s Inspectors.
c) Quality Control including test and inspection reporting and recording /
Inspection Test Plan. d) Inspection tools
The Project Control will assist the Project Manager in making periodic
documented reviews to ensure current quality requirements have been
considered and incorporated where applicable. The Project Manager or his
designated, to identify the recipients and to indicate the latest revision status, and
maintains a master distribution list.
Control is also implemented for the mechanism and implementation stage of the
Quality Program for these Project activities which is depicted in the relevant
quality system element, activity addressed procedure, responsible personnel, of
activity and evidenced document for the activity.
2. OBJECTIVES
Page 3 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
3. REFERENCES
The following documents shall be referred and part of this PQP (Project Quality Plan):
4. DEFINITION
The following words shall have the meaning indicated when used herein:
Project : RESID FLUIT CATALYTIC CRACKING
PT. PERTAMINA UP – IV CILACAP
Company : PT. PERTAMINA UP - IV
Contractor : GS ENGINEERING AND CONSTRUCTION Corp.
Sub Contractor : PT.PAKUBUMI SEMESTA
5.1. Organization
Contractor Overall QC project organization is shown in the Organization Chart
Attachment – 1 shows the reporting relationship of the Project Quality personnel
who manage, perform and verify work – affecting quality.
5.2. Responsibilities
5.2.1.Project Manager
The Project Manager is responsible for the quality of the project
management process. This includes the implementation, execution and
maintaining effectiveness of the project quality system. The Project
Manager has overall responsibility for ensuring that the project will meet
the client’s requirements. He approves the Project Quality Plan and
ensures that all members of the Project Team fully understand the
principles of the quality process.
Page 4 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
5.2.3.QC Supervisors
QC Supervisors shall be responsible to run all QC activities within the
project in accordance with this plan (PQP)
The daily inspection activities for the next coming week shall be prepared
on the Weekly Inspection Schedule (based on the overall QC Schedule)
andsubmitted to the Client’s relevant inspector for information. Application
for inspection witness by Client shall be forwarded at least one daybefore
the test / inspection date as reference.Copy of approved inspection
Page 5 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Inspectors for their file at the latest one-day after the test/inspection
completiondate. All original records shall be logged properly for later
transmission by the Site Manager to Client upon or after completion of the
project; one complete set copy shall be handled over to Contractor’s
Quality Assurance Department.
6.3.1. Subcontractor will make available all inspection equipment and tools
needed to ensure proper implementation of QC activities, i.e.:
- Piling crane,Hydraulic Hammer, Welding Engine
Page 6 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
ATTACHMENT - 1
QC ORGANIZATION CHART
Page 7 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
QC ORGANIZATION CHART
Project Manager
T. Bintang S
Office ( Jakarta )
Site ( Cilacap )
Site Manager
Victor Saputra
QC Supervisors
Agus Purwanto
Page 8 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
ATTACHMENT - 2
INSPECTION TEST PLAN ( ITP ) AND FORM
Page 9 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 10 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 11 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 12 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 13 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 14 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 15 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 16 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 17 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
ATTACHMENT - 3
EQUIPMENT AND MATERIAL SPECIFICATION
Page 18 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 19 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 20 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 21 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 22 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 23 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 24 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 25 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 26 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 27 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 28 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 29 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 30 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 31 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 32 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 33 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 34 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 35 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 36 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 37 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 38 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 39 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 40 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 41 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 42 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 43 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 44 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 45 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 46 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 47 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 48 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 49 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 50 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 51 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 52 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 53 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 54 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 55 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 56 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 57 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 58 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 59 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 60 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 61 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
ATTACHMENT - 4
WPS
Page 62 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 63 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
ATTACHMENT - 5
CRANE AND OPERATOR CERTIFICATE
Page 64 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 65 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 66 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 67 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 68 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 69 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 70 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 71 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 72 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 73 of 74
RFCC PT. PERTAMINA Project
PROJECT QUALITY PLAN
Page 74 of 74