MH Fabrication of Steel (condensed)
Table 1.7 . 1. 7a , 1.7b LPT MH, Mlsceffaneous Carpentry, Masonry
1.7c, 1.7d, 1.7e, 1.71 Concrete. Tinsmffhry, Earthwork,Asphalting
1.79 Bloc k Paving. Plumbing. Piping. Insulation
Fireproofing, Fencing and Airconditionin g 1,
Table 1.8, 1.80, 1.9 M achine Time for Shapero Lathe Machine
1.10 ondDrifl 21

Ta b le 1.9 LPT MH, Stripping of Metal Forms, Steel


Ere'ction for Multistorev Prefab Building
Frome. MechanIzed Operation 23

Table 1.10 LPr MH, Steel Erec tion (OF Miff or Ccmmercial
Prefab, Mechanized 24
Table 1.11 Project Sc hedule Balancing 25

CHAPTER 2 - EQUIPMENT

DISCUSSIONS: ACEL GUI DE BOOK 27


Equipmen t Rental Escalation Formula 28
Acquisition Costs; Maintenance Cost. Opera tion Cost 29 ·
In-House Escalation Formu la 32

Tables:
Table 2. 1 Rental Rate Curve - Tractors. Crawlers .
Dozers , Compac tors and Rollers 33
TABLE OF CO NTENT S

PAGE

Haufe rs, Alr Equipment, Gensets 34

UfUng and PJfe DrivIng Equipment 35

:::::..:~~:::~ ofDepreciation
36
Rental Ra te 37-38
C ommon Equipment Ownership I
Operaling Cost. 39

Small Hond Tools Ownership I Operating Cost 40

Common Machine Shop Equipment Ownershlp/


Operallng Cost 41

Equipment ConsumptJon GuldeJfnes 42

Common Equipment Gas I DIesel Fuel


Consumption 43

Common Tools and Devices for Steel


Sforage Tanks (5000 - 10000 MT) 44

Common Engine· Driven Equipment


Ownership I Operating Cost 45

DIRECT COST: OVERHEAD COST AND CONTINGENCY

.......,..:1. = 'icotion 46 -47


48-49
Jobsite Overhead C hec klist

Home Office Overhead Checklist 50

TypIcal FIeld Organlgram 51

TypIcal Field Organ/gram


{with Clientele Relationship] 52

.5moI Projec ts Overhead 53


~ .3.5 Typical Statement of Income 54

-~3 6 Typical Project Income Statement 55


CHAPTER 1

LAflOR PRODUCTIVITY

Labor force is the most valuable asset of production in any


~ at anytime, probably anywhere, notwithstanding the
em application of automated operation and computer tech-

In this study, labor productivity analysis is based on per-


.. nce of a crew with a set of equipment for a given job. The
o production tables which a re mostly interfaced with a list of
:-:opriate tools and equipment are statistical figures gathered
:-::.ugh monitoring feedbacks from different projects performed
::uierent places in the Philippines and from few Asian countries.
- --e selection of manhours for a specific item of work the esti-
_ shall base his judgment on the following factors that
- .... ~ productivity. if and when the average value is doubtful:

a) Condition of Present Economy - good economy usually


means high employment opportunities. When employ-
ment is hi!;h, the demand for good labor is also high and
your standard of production has to be" adjusted accord-
dingly.
b) Skilled Labor AlXlilabilit)" - estimator may have to
attune labor cost estimate against locally available
skilled labor if and when mobilization of skilled labor
from main base becomes more expe nsive.
c) Supervision and Project M anagemen t - as in the case
of (b), local supervisors and managers may have to be
hired within the vicinity of the jobsite.
d) Construction Methods and Equipment - A weH-planned
method and efficient, good conditioned set of appro··
priate equipment bring about high labor productivity
and minimize idle time.
e) Job Conditions - example of bad job conditions are
working in a fertil izer plant amidst emission of suffoca-
ting fumes in the atmosphere (S02) and other chemical
gases, perennial brownouts, jobs located in remote areas
where logiitics can be a problem . A machine shop with-
Qut proper ventilation is a"-lOther example.
f) Weather Condition - the estimator should refer to the
rainfall data, wind rose and typhoon history of the area
where the job is located . Conditions of access roads and
hridges should be assessed.

To compute the- percentage composite efficiency of a labor


crew, the estimator should develop a percentage value [or each of
the six (6) production factors enumerated and discu ssed above
bar.ed on actual assessment and calculate the average yalue. Con-
I
sidered to be high is when the over-all efficiency is within the
range of 90-100; average, 75-90 and the low range between 60-75_

Example 1:

With reference to table 1.6 select the composite manhours


and equipment hours in fabricating H & W substitutes with sizes
200mm to 300mm under the following percentages of production
factors :

Present Economy 90
Skilled Labor Availability 75
Supervision/Project Management 76
Methods and Equipment 90
Job Conditions , 90
Weather Condition~ .i 85
Total 505

Average = 505/6 = 84.16% which is between the high and the


average ranges in which case the values in the !,able can be inter-
polated as follows:

High - man hours 300 90%


Average - manhours 400 75%
100 15
Adjusted manhours - 400 (84.16 -75) 1~~
400 - 61.06 = 338.93

say- 340 m.h. ans.

High equipment hours - 210


Average equipment hours 280
70
70
Adjusted equipment hours - 280- (84_16 -75)
15

280- 42.74 = 237_25


say 240 e.h. - ans.

EXAMPLE 2:

What is the manhours and equipment hours for the same job
as in Example 1 where the production factors average is 7590?

2
eitimator uses his pe rso nal intuitive judgment in selc c-
;xiate manhours and equ ipment hours sin ce 75 % is
;Lc boundary bet ween t he low and the average. Most
....==:z ':lSe the average range - ans.

AGE SCALE

1.3 are prod ucts of a co mpany's wage


.::==~tio n system. It is always the desire of mo st c o mp<lllics
;. a wage scale that is fa ir and equitahle to rn inimize if no t
~:£:T _ preclude demoralizatio n am o ng e mployees. In most. ca,",s
c:iI"'I'lII.ilies hire outside consul ta nts to conduct wage study :lnd
~ recommendations on job evaluation method. The aforc-
n1=;,oned tables show predete rmined ranges of salaries. An em -
~ salary is determined by poin t or grading system. Factors
~ as educational attainment, expe ri ence, trade test results and
atner co nsiderations that a particular job may require consistent
. - policy and applicable laws are graded and the weighted ave·
~..., grade computed. The result ing average grade is the n plotted
the predetermined salary range for the job. The salary amount
:.. the n recommended. This salary is what we call direct labor
charge . The estimator should alway s reme mber that there are.
o:.her components of costs as far as labor is concerned, one of
..-hich is a set of payroll add itive s as illustrated in the later pa rt
o f t his chapter.

EFFECTIVE DIRECT LABOR COST

Tables l.4a, l.4b and 1.4 c categorize labor skills and show
wage levels. At the bottom of each skill class under this table is
shown the totai of effective wage which a given skill is actually
entitled to. This is equal to the basic wage plus all the payroll ad·
ditives. Some estimators treat payro ll additives separately because
casual or temporary employees may not be entitled to oth~r
benefits that regular employees enjoy. Payroll additives as shown
comprise mostly the basic additional benefit that the employee is
entitled to legally. Other benefits may be induded in accordance
to company-drawn policy.
Example 1:
Using table 1 .4a. 1.4b and l.4c compute the following for
foreman in H)86:
a) percentage of payroll addit ives wi th respect to effective
total compensation,
b) percentage of payroll additive with respect to basic wage,

3
c) multiplying factor applied on basic wage (direct labor co, ·
to obtain the total effective labor cost.

Solution:

effedive total ~ basic (5252.32 - 35(0)


a) p.a. (100) " 33.36%
e ffective total 5252.32

e ffective tot al - basic (5252.32 - 35(0)


b) p .•. (100)" 50%
basic 3500

effective w tal 5252.32


c) f 1.50
basic 3500

Example 2:

The total effective direct labor cost involving only weIde"


(skilled) is P25,776. If t his work was accomplished in 1985 for on1 ~
2400 welder hours compute the : a) effective cost per welder hour, 1:
total basic salary, c) total payroll additives.

25,776
aj CosUwelder hour PlO.74
2,400

11 70
b) Basidtot al - --(100)" 61.28%
1909.21

Total basic =0.6128 x 25 ,776 =P15,795.53


c) Payroll additives total = 25,776 - 15,795.53 = P9,980.47

CREW RATE
Crew rate is the combined rate of a team of workers organizec
for a particular job under the supervision of a foreman or a leadman
The rate is usually expressed per hour basis and easily convertible
to per manhour r ate to match up with the production tables whicl:
are expressed in manhours.

Example:

Compute the crew r a te and the composite rate per manhour .oi
P. team ~omposition show n below for erecting 200 rut of fab ri·

4
Jse tables l.4b and lAc for the salary of each
==.". JIt :",36 rates.
l6.66/m.h.
Operator 12-.27
:nan 9.25
64.38
64.38
10.73
""=1cian 10.73
"'" ;>en or laborers 98.04

:UTAL I' 286.44/crew hour

~ore. crew rate = 2.86.44


= P9.88/m.h. - ans.
29

-:.e total manhour figures as derived from the tables should


Czcked against manpower loading within the project timetable
.. =zplified under table 1.11.
Table 1.11 shows direct and indirect labor and the total man·
is represented in the area under the "bell curve". This area
es idle time, rest periods, overtime, and non~working
ys.

5
y :;A~IPL ING

_ ;;amples or observations are required to be sure


proportion is within 2% accuracy, given that 95%
"","""C71'",'
~;:::; Jirr.,! is re quired? Set of sa mples such as those for the
- :crmining perce nt unproductive work likely behave in
-c=""''''''''' .-.:h the No rmal Distribution Curve. To determine the
~=!!!:l =oai'JE T of samples given required accuracy and level of
'"'" recomme nd the follo w ing formula:

2 X F ( 1 - F)
=

rr-p.E:

number of observat ions required

F = percentage of activity observed

= value obtained from statistical table which


depends upon level of confidence required
for the estimate : 2 corresponds to 95%
confidence level

A = percent limit of accuracy required

~p le :

Compute the total number of observations required to deter-


mine the proportion of ineffective time within ~ 5% accuracy with
95% confidence when a set of previous observations revealed that
time spent on stripping form works was 40% of working time.
Solution :

S = 2, 95% confidence

F = 0.40

A = 0.05

4 X 0.40 (1 - 0.40)
N = = 384 observations
0.05 2

11
LABOR PRODUCTION TABLE
FABRICATION OF MISCELLANEOUS STEELWORK

LOW AVERAGE
D£ 8ClU'PTION OF
WORK KAMIOURB !tQUIF'T. "DVM MANHOlJRjj !';QUIrT H OURB HAHO ~

L ROLLED S HAPES, BU I L.T· IN


SU I:ISTITUTE
1.1 IOOtn.ln. 200"""
1.2 200m,., · 300....., ""
"".,. '"
".
,,,
".
.,. ".
".
...
,",.
1.3 30On=· BlOOER
"" ""
,.
,.
STERL LOUV RRS l,bun· 2Irun THI CK.
PRAMED W.I!.l..DED CON NECTI ON

SPH1?JUC ....t.. AN[lI()R HEMI SP HeRICAL


'""' ;0' '''' , . ,.
.,. ,..
(S HOP FABRICATION)

•.
GA,,,. -
3. 1 l~lIn THI CK
3 .2 lZnun. UQl.D1 THI CK
3.326 ....... THICKER

CONV EYOR PU LLEY PABRICATION


60Omm. _ 1000= dI ....
('00

.,.
'"' "
,,,
.
3 (,1)

,'" "'"
,".
U.""
'"
,".
,".

'"
",.
'''' ''''
CONV EYO R P.oLt..&RS
60Otnru· IOOOnun BELT WIDTH
'''''' '''' "" '''' ''''
•. BASE PLATES
12mm· u.,un1'HICK WITH
4-BOLT HOLItS ,". ",.
,. '" '" ""
SMALL CYLINDRICAL TAN K
PLAT COVSRED RNOS ,". ,'" ". ,,. ,".

S. LIGHT TRUSSES CONN ECTION ANOULAR


BAILS (SHOP WITHOUT GUSSET PUTRS
FABRICAT ION)
". " '''' .. .
9. HItAVYTRUSSES, WITH ANGULAR 8AR WEB
AND OUSSZT PLATES (SH OP FABRICATI ON)
'" " .. " "
lO . BIG CYLINDRICAL STORAGE TANK PER API

n.
DESIGN CONED GROU ND LINII:L (SHOP
PABRlCATIQ/I! AND PlaO RREeTION)

PROCESS PIPES, SPOOL PABRICATION AND


". '" '" .. .
ERECTIO N 1.0·2.0 M2TRE ABOVE GROUND,
WELDED BeH. ..a ASTM AH ORADE B.
11.1 60mm· \60alDl di ...
." .., ..
,,,,
'" ""
IU11 60zwu. 300= <Ii ••
u .a 1I00aun· "",OlUDl di ..
11.4 -450.."". 6OO1I.1m eli .. ..
'00
,". '"".
>2. ""
".
'"
'"
"
'"
,"..
NOTES:
(A) FOR FJELD PABRICArlON JNCRltASE VALUES BY 10.161. DBPENDING ON LOCATIONS, W8.ATIIERCONDTTIONS AND SKI LU
(b) VALU ES EXCLUDE SOPHISTICATED FINI SHINQ WORKS SUCH AS BUPPING, SANDBu.8TINO , AN D PAINTING WITH EPOn -
ALSO BXCLUDE RBWORK:3 DUE TO REJBCTION, KYtIROTEST AND RAD!OCltAPHY.
Ie) VALUES ARE F OR "MILD STE EL' OR ASTM A36 ORSIS SS41 MATJ.RIALS USING EGOXX SltIUKS WELDING ELECrROOE:S. FO: -
SfE ltL TNCRRASE LABOR COMPON ENT BY 101Ii.
Cd) VALUES AL!O EXCLUDE STANOBT RQUlYMENT IIOUM ANO IDLE MANHOURS.

Tabl.1.6

12
LABOR PRODUCTION TABLE

MANHOURS PER QUANTITY


J[ D ~S C RIPTION
LOW AVERAGE HIGH

....aR.. ~'''R\' WORKS

..
LO SUl<S
ELlOS I NSTALLATION
ON GRO UND
:cLABOVE GRO UND

CD"...J.Il,INS
4.00 MH,s.M .
4. 10 MHtS.M
ii. lf MHIS .M .
4.10 MHtS.M.
2.00 MHiS.M.
2.35 MHIS .M.
3.0ij MHIS.M.
2.35 MHIS .M.
1.60 MHIS .M.
1.8B MHIS .M .
2. .ojij MHIS .M .
1.88 MHIS .M.
U Sl!SP.E'...... OE.D SLAB
18 1 3,3<1 MH IS .M. 1.67 MHIS .M. 1.34 MHIS .M .
!O3 6! UP 6. CIi MHIS.M. 3.33 MHIS .M. 2.06 MHIS.N.
U ~-VATEDAND SHORED
SlA.3 f'O R....UNG
Ul FORM ING ONLY 11.20 MHtS.M . 8.60 MH IS.M. 6.88 MHIB.M .
..02 f O RMING and SHO RING 22.00 MHIS .M. 11.00 MH iS .M . 8.80 MH/S.M.
- . WOOD WALL and PARTITIO NS 1.00 MIlIS .M . 0.60 MHJS .M . 0.40 MIlIS .M.

.. TD:&M WORKS FABRICATION 2 15 MHIS .M . 1.08 MHIS.M. 0.86 MHtS.M .

C. S'!'3J.PPI NG Oil' FORM WORKS


La WA LL ON GROUND 0. 60 MH r.5 .M. 0.2.6 M.J-W.M. 0.20 MHIS.M .
1.0 WALL ABOVE 10 1 2.58 MHIS .M. 1.29 MHIS .M. 1.03 MHIS.M.
3_0 BEAMS 2..06 MHIS. M. 1.03 MHIS. M. 0.82 ·MHIS.M.
4..0 COLUMNS 1.70 MH IS. M. 0.86 MHIS .M. 0.6/:1 MHIS.M.
$.0 SUSPENDED SLAB
O TO 18' 1. 61 MHIS. M. 0.83 MHIS.M. 0.67 MHIS .M.
18 TO 36 1 UP 2.1 6 MH IS .M. 1.08 MH IS.M. 0.86 MHIS .M.
6.0 ELEVATED and SHORED SLAB
F'ORM INC-.ST RIP OF FORMS 7.00 MII IS .M. 3.50 MHIS.M . 2.80 MHIS.M.
7.0 FLOOR SLAB AT GRADE:.
STRIP OF FORMS 6.60 K..lwIH/S.M . 2.80 MHIS.M. 2.24 MH IS.M.

D. INSTALL ATION OF' CARP~NTRY


WORKS I
1.0 PLYWOOD PARTITION 2.00 MH IPC 1.00 MHIPC 0.80 MHIP~
2.0 T lind G FLOORING ,00 SIDING 0.29 MIIIB .r . 0.14 MHIB.F. 0.11 MHIB.F.
3.0 CEILING FRAME WORK 0.73 MHIB.F. 0. 36 MHIB.F. 0.29 MHIB.F.
4.0 SIDING FRAME WORK 0.53 MHIB.F. 0.27 MHIB.F. 0.21 MHIB.F.
5.0 FLOORING FRAMING 1.94 MHIB.F. 0.97 MHJB.F. 0.77 MHJB. t".
6.0 WOOOEN POST ERECT ION 0.86 MHlB .F. 0.43 MHIB.F. 0.34 MHIB.r.
7.0 TRUSS fABRI CAT ION 0.70 MHID.F. 0.S5 MHJB. F. 0.28 MHIB .F.
8.0 TRUSS INSTALLATION 1.60 MHIB.F. 0.80 MH/B.F. 0.64 MHIB.F.
9.0 SIRT lNSTAI.LAT1ON O . ~S MH IB.F. 0.21 MHIB.r. 0.17 MHIB. F.
10.0 PLATES INSTALLATI ON 0.27 MHIB.F. 0.13 MHIB.F. 0.11 MHIB.F.
11.0 PURLING INSTALLATION 0. &3 MHIB.F. 0.27 MHIB.F. 0.21 MHIB.F.
12.0 FACLA BOARD INSTALLATI ON 0.91 MHIB.F. 0.~6 MHIB.F. 0.36 MHIB.F.
13 .0 u,," or 3/04" thk. PLYWOOD
" CUTTING BY MANUAL 2.00 MHIPC 1.00 MH/PC 0.80M MHIPC
. ASSEMB LY 0.83 MHIS .M . 0.42 MHIS.M. 0.33 MH IS.M.

Table 1.7

13
LABOR PRODUCTION TABLE

MANIIOURS PER QUANTITY


WORK DES CRIPTION

14 .0 CEILING
LOW AVERAGE
-
IIIGH

. FRAME INSTALLATION 2.66 MHIS.M. 1.33 MHIS.M . 1.06 MH~.M .


- PLYWOOD INSTALLATION 2.00 MHIS. M. 1.00 MH,s.M 0.80 MBIS.M.
15.0 CABINET BOARDING 0.26 MH/B.F. 0. 13 MHI1U'. 0. 10 MHIB.F. I
I
16.0
17.0
CABI NET FRAMING
WOOD WALL PARTITIONS
0.36 MHIB.F.
1.00 MHIS .M .
0. 18 MHIB.F.
0.50 MH,s.M . I 0. 14
OAO
MHIB.F.
M HIS.M.
18.0
19.0
PANEL WALL
FORMING WEIGHT ANCH OR
BOLTS
14.00 MH IS .M .

9.00 MHIS.M.
7.00 ~fHlS.M .

4.50 MHIS.M.
I 5.60 MHIS. M.

3.60 MIl IS .M.


2C.O NET FORMING 7.00 MH IS .M. 3.50 MHIS.M . 2.80 MIlIS.M.

E. DOORS and WINOOWS


l.0 W-PANEL INSTA LLATION 0.80 MHIPC 0.40 MIl/PC 0.32 MHIPC
2.0 STEEL WINDO WS
INSTALLATION 4.00 MHIPC 2.00 MHlPe 1.60 fo,fHlPC
3.0 LOtNER WINDOWS
INSTALLATION
3.01 FIXED ASBESTOS 9.26 MHfS .M. 4. 63 MHIS.J.L 3.70 M HIS.M.
3.02 FIXED METAL LOUVERS 6.24 MHtS .M. 3. 12 MHtS.M. 2.60 MHfB .M.
3.03 FIXED 0.1. SHEET 9.26 MHIS .M. 4.63 MHtS.M. 3 .70 MUIS .M.
3.04 FIXED GLASS 6.24 MHtS.M . 3.12 MHiS.M. 2.60 MHIS .M.
3.05 FIXED WOODEN 6.76 MHIS .M. 3.38 MHIS.t.! . 2.70 MHIS.M.
4.0 ALUMINUM FRAM ED
WINDOWS 20.00 MHIEACH 10.00 MHIEACH 8.00 Mil lEAC H
5.0 SLIDING GLASS DOOR 24.00 MHIEACH 12.00 MHIEACH 9.60 MHIEACH
6.0 HOLLOW METAL DOOR 20.00 MHIEACH 10.00 MHIEACH 8.00 MHIEACH
7.0 ROLLING DOORS 60.00 MHIEACH 25.00 MHIEACH 20.00 MHIEAC H
8.0 FIXED WINDOW 0.63 MHIS.F. 0.31 MHIS.F. 0.25 MHIS .F.
9.0 DOOR LOCKSET 3.20 MHISET 1.60 MHISET 1.28 MHIS ET
10.0 DOORJAMB: fABRICATION 0,44 MIIIS.F. 0.22 MHfB.F. 0. 18 MHfD.r .
INSTALLATION 0.66 MHIB.F. 0.33 MHIB.F. 0.26 MHIB.F.
11.0 CYCLONE WIRE INSTALLATION G.24 MHIS.M. 3. 12 MHIS.M. 2.50 MH IS .M.

n. TRADE: MASCAR I WORKS


1.0 GROUTING .. nd
TOL PLASTERING 3.34 MH IS .M. 1.67 MHIS.M. 1.34 MHIS.M.
2.0 PEBBLE FINISHED 2.86 MH,s.M . 1.43 MH,s.M . 1.14 MHIS.M.
3.0 MARBLE INSTALLATION 4.00 MHIS.M. 2.00 MRS.M. 1.60 MHIS .M.
4. 0 U4"x2 x8REDBRICKS 10.00 MHIS.M . 6.00 MHtS.M. 4.00 MHiS .M.
5.0 GLAZED TILES 2 1.06 MHtS.M . 10.53 MHIS.M. 8,42 MHIS.M.
6.0 UNGLAZED TILES 8.70 MJiIS.M. 4.36 MHIS.M. 3.48 MHIS.M.
7.0 GLAZED T ILE WALL 6.00 MHIS.M. 3.00 MHtS.M. 2,40 MHIS.M.
8.0 CONC. BLOCK EXT. WALL 9.00 MHI~Ud. 4.&1 MHIS.M. 3.60 MHIS.M.
9.0 CONe. BLOCK INT. WALL 8.00 MHt.3.M. 4.00 MHiS.M. 3.20 MHiS.M.
10.0 BRlCKWORK 1.00 MHIS..M. 0.60 MlLS.M. 0.40 MHIS.M.
11.0 PLASTER WALL and CEILING 6.00 MHIS.M. 3.00 MHIS.M. 2.40 MHIS.M.
12.0 HOLLOW TILE WALL 4.00 MHIS.M. 2.00 MHIS.M. 1.60 MHIS.M.
13 .0 ACOUSTICAL CEILING 2.40 MHIS.M. 1.20 MHIS.M. 0.96 MHIS.M.
14.0 VINYL FLOOR TILE 3.60 MHIS .M. 1.80 MHIS.M . 1.44 MHIS.M.
16.0 UNGLAZED OR MOSAIC
FLOOR TILE 17.00 MHfS.M. 8.50 MHIS.M. 6.80 MHIS.M.
16.0 LAYING OF CHB and ~BE 2.28 MHIS.M. 1.14 MHIS.M. 0.91 MHIS.M.

Table 1.7a

14
LABOR PRODUCTION TABLE

MANHOURS PER QUANTITY


• • -CIIPTIO N
LOW AVERAGE RIGH

1.4:'1 MHIS.M . 0.72 MHIS.M. 0.57 MHIS.M.


BLOC KS

3.20 MHIS_M . 1.60 MIlIS.M . 1.28 MHIS .M .


2.66 MHlS.M . UJ MHIS .M. 1.06 MIIIS .M.
4.00 MHIS.M . 2.00 MHIS .M . 1.60 MHIS .M .
10. 66 MHIS .M. 6.33 MHIS .M. 4.26 MHIS .M.
11.9-4 MH IS.M. 6.97 MH IS.M. 4.78 MHIS .M.

2.16 MlilS .M. 1.08 MHIS.M. 0.86 MHIS.M .


6.12 MHIS.M. 3.06 MHIS.M. 2.45 MHIS.M .

2.00 MHISHT 1.00 MHISHT 0.80 MIIISIiT

1-60 MH ISHT 0.80 MHISHT 0.64 MHiSHT


c::JD?PZR CLADDING
'MXH'" DECK 1.01 MHIL.M 0 .6 \ MHfL.M . 0.40 MHIL.M .
U D.3.- Of" G.I. GUTTER 6.94 MHISHT. 3. 47 MH!SHT. 2.78 MHlSllr.
& G...;...SH~ ET ROO FING 1.6-4 MHIS .M 0.82 MH,s .M . 0.66 MHIS .M.
TAlL Of' G.1. GUTTER 1.06 MHIL.M. 0.63 MHIL.M_ 0.'12 MHIL.M .
• S'AB.. Of OO WNSPOUT 1.94 MH IL.M . 0. 97 MH IL. M . 0.78 MH IL.M.
a CLTTER CUT and SHAPE 0.32 MHIL.M . 0. 15 MHIL.M. O.IS MHIL.M.
.f [SST. OF GUTTER 1.18 MHIL.M. 0.89 MHIL.M . 0.71 MHIL.M .
OOWI\'SPOUT CUT a n d SHAPE: 0.59 MH fL.M. 0.30 MHfL.M . 0.24 MllfL.M.
~ OOWNSPOUT INSTA LLATION 0.27 MHfL.M. 0 .13 MHIL.M. 0. 11 MHIL.M.
:.J. CORR. G. I. ROOFING 3.60 MHIS.M. 1.80 MHIS.M . 1.44 MHIS.M.
~u COM. ALUMINUM ROOfiNG 3.60 MHIS.M. 1.80 MHIS.M. 1.44 MHIS .M.
u..o BUJLT·UP ROOFING 4·P LY 17.00 MHIS.M . 8.60 MHIS .M. 6.80 MlIlS.M .
• i...O PROTECTED METAL 4.00 MHIS.M. 2.00 MH/S.M . 1.60 MH IS. M.
Ir.o CORR. ASBESTOS INST.,
LI FTING, HAULING 3.40 MH IS.M. L70 MHIS .M . 1.36 MHIS .M.
LB.Q LEADERS and GUTTERS 1.20 MH,s.M. 0.60 MHIS.M. 0.48 MHIS.M .

7KADE.: CO NCRETE WORKS


1.0 PLACING CONC.
1.01 SLAB ON FILL 10.00 MHIC.M. 5.00 MH IC.M. 4.00 MHIC.M.
1.02 SLIP fORM 60.00 MHIC.M. M.OO MHIC.M. 20.00 MHIC.M.
1.03 FLR. FINISH
UNHARDENED 2.00 MHIS .M. 1.00 MHIS.M. 0.80 MHIS.M.
1.04 CONC. FINISH HARDENED 2.86 MH IS.M. 1A3 MHS.M. l.14 MHIS.M .
2.0 REBAR WORKS
2.0 1 GROUND F'LR.
INSTALLATION 0.14 MH IKs:. 0.07 MHIKg. 0.06 ~mlKg .
2.02 UPPER FLR.
INSTALLATION 0.16 MHlKg. 0 :08 MHlKg. 0.06 MHlKg.
2.03 FABRICATION 0.2() MHlKg. 0.10 MHlKg. 0.08 MUlKg.
3.0 MIXING MANUAL 32.00 MH ICM. 16.00 MfUCM 12.80 MBICM.
4.0 MIXING MACHIt-.""E 3.60 MHICM. 1.8{l MHICM. 1.44 MHICM.

Table 1.7b

15
LABOR PRODUCTION TABLE

MANROURS PER QUANTITY


WORK DES C RIPTION
LOW AVERAGE HIGH

5.0 MORE THAN 1.80 em. POUR


5.0\ CHUTE FROM TRUCK 14.00 MH IC M. 7.00 MHIC M.
I 5.60 MHICM
6.02 CRANE.nd BUCKET 28.00 MH ICM. 14.00 MUIC M. Il.ZO MH ICM
6.03 WHEELI NG 54 .00 MHIC M . 27.00 MHIC M . 2 l.GO MH ICM
6.(l..i FINISHI NG 5 .GO MHIS .M. 2.80 MHIS .M. 2.21 MHIS .M
6.0 CONCRET E POUR ON
I El.EVATED and SHORED SLAB
f ORMI NG, CHlITE and BUCKET 4 2.00 MHICM . 21.00 MIVCM. 16.80 MUICM.
7.0 PLACEMENT OF REBARS
ON fOOTING MH~ .
8.0 fiELD FABRI CATION OF
LOG MHIK!:. 0 .53 MHlKg.
I 0.12
REBARS 0.66 MHlKg. 0.33 MHIKg. 0.26 MH/Kt.

v. TRADE: EARTHWORKS:
1.0 MACHI NE EXCAVATION
1.01 SAND 1.20 MHICM . 0.60 MHICM. 0.48 MHICM.
1.02 SAND and MARL I.GO MH ICM. O.8() MHIC M. 0.6-4 MHICM.
1. 03 MARL 2.20 MH IC t.! . l. 10 MilICM. 0.1!8 MHICM.
2.0 GRANULAR BACF1LL 2.40 MHICM . 1.20 MHICM. 0.96 MH /CM.
3.0 GRANULAR SOIL BACKFILL 3 .00 MH IC M. 1. 50 MHICt.!. 1.20 MH /Ct.!.
4.0 MANUAL FOUNDATION
EXCAVATION and BACKFILL
4.01 SA ND 8.00 MHICM . 4.00 MH JC M. 3.20 MHICM .
4.02 EXCAVATIO N OF SAND
and MAfU.. \3.00 MH /CM. 6.50 MH ICM. 1>.20 MH ICM.
4.03 EXCAVATION OF MARl. 21.00 MIl ICM. 10. 50 MHJCM. 8.40 MH ICM .
4.04 BACKFILL OF SANl) 11.00 MH IC M. 5_50 MH JCM 4.4.0 MH ICM.
4.05 BACKFILL SAND 8nd
MARL 16.00 MHICM. 8.00 MHICM. 6.40 MUICM .
4.06 BACKFI LL MARL 24.00 MHlCM. 12.00 MHICM. 9.60 MH ICM.
5.0 FLOORSLAB and MANUAL
5.0 1 GRADING, MANUAL 2.60 MHtS .M. 1.30 MHIS.M. 1.04 MHtS .M.
5.02 EXCAVATION and
BACKFILL 36. 00 MH/CM . 18.00 MH IC M. 14 .40 MHIC M.
fl.O FINE GRADING a nd
FINlSHING
6.01 GRADI!'I G 0.90 MH IS.M. 0.4 5 MHIS.M . 0.36 MHIS .t.1.
6.02 FINISHING SO IL SURfACE: 1. 10 MHiS .M. 0. 55 MIiIS .M. O. H MHIS .M.
6.03 Dl:{ES 2.40 MH IC M. 1.20 MIi IC M. 0.96 MIiIC M.
6.04 ROAD WORKS
• BASE COlJRSE 0.24 MHIS.M . 0.12 MlIIS.M. 0.10 MHIS .M.
• CURSES a nd G UTTERS 3.60 MHICM. L80 MHICM. l.44 MHICM .
·4- thk. ROAD 2.60 MHIS .M. 1.30 MHIS.M. 1.04 MIiIS .M.
• 6" thk. ROAD 2.BO MHIS .M. lAO MHIS.M. 1.12 MHIS.M.
• 8" thk. ROAD :1.00 MHIS .M. 1.50 MHIS.M. 1.20 MHIS.M.
• TROWEL FINISH 0.64 MHIS .M. 0.32 MIIIS .M. 0.26 MHIS .M.
• SPECIAL TO PPING 2.40 MHIS.M . 1.20 MHIS.M. 0.96 MHIS .M.
• 'I " STONE OR
S HELL ROAD 0.64 MHIS.M. 0.32 MHIS.M. 0.26 MHIS .M.
·6" STONE OR
S HELL ROAD O.SoI MHIS.M. 0.42 MHIS.M. 0.S4 MHIS .M.
·8" STONE OR
S Ii ELL ROAD 1.04 MHIS.M . 0.52 MHIS.M. 0.42 MHIS .M.
• ACID PROOFING 1.20 MHICM . 0.60 MHICM. 0,48 MH ICM.
7.0 ASPHALT PAVING
1.01 FINE GRADING 0.B1 MHIS.M . 0,4 2 MHIS.M. 0.34 MIiIS .M.
1.02 PLACE BASE COURSE 0.40 MIiIS.M . 0.20 MHJS.M. 0.16 MHIS .M.
1.03 ASPHALT 0.40 MIiIB.M . 0.20 MHIB .M. 0. 16 MHIS.M .
I
Tablel .7c

16
!..ABOR PRODUCTION TABLE

MANHOUItS PER QUAN1' ~J


aJPTIO N
_._~OW AVF.ltAC:~_! ~~~
I .
0 .H4 MIlIS.M 0.~2MH IS .M. I 0.:14 MIlIS .M .

.-:~:;;-;.~; SHELL
" 1:1.40 t-.l ll lS.M C!O Mn r.;. M. ;1.36 MIi IS. M.

O. IH 'llI/S .l>! Il.:l:! MH Il-;.M. I 0.1r. Mfl/S .M

0.84 Mil lS M . 0.·12/1-1 I1 IS.M. I' 0.:14 MHI$ .M.


1.04 MHIS.l>L 0.,, 2 MIi IS. M . . O.~2 MIIIS,M.

:::iol:l!U:-;S lAO MIiICM 0.70 :-.!tl tC M 0.:;(, MllfCM .


- RETAINER
0.40 MHIS.!I! . 0.20 MHIS.M. 0.16 f-!! i:'S. M .
4.00 MWCM 2.00 M~I !cM. I.GO Mil /e M .
WANUAI.
... EARTII 16.00 M )-I K:M fI .OO MH ICM. 6.40 MllfCM .
ot'SAtiD 2.62 /lili/eM l.a ] Mil /e M. 1.05 MH IC M.
"'HEAVY SOli. 3. 28 MHrcM . 1.(;4 MIl tt.: fl.1. 131 MJlK:M
fi.ZC MllfCM. 2.GJ MH ICM. 210 MH /C M

1:l.:l4 MIIICl\!. 6.67 MH ICM. I! 534 MlI /C M


33.34 MHICM. 16.67 MHJC M . 13 34 MH IC M

1.64 Mll tCM . 0.1'12 M I l lC M . 0.C6 MII IC M.


10.00 Mltle~1. :;.00 MII IC M. '1.00 MlIlCM

2.50 MIl !L M. 1.25 MH /L.M. 1.00 MHIL .:-'f .


",TS DEPT H 3.3-1 l'>1Hr~.M . \.61 MIIII •. M. 1.34 MIfII. .M.
• )(TS DEPTH 5.00 MHIL.M. 2.50 MH IL. M. 2.00 MllfL.M.
.~ 5 ).ITS. DEPTH 6. fi6 M!lIl •. M . 3.33 MlI lL. M. 2.66 MHIl •. M.
0.21 MH/cM . 0.11 MIl IC M. O.OS MHICM .
0-42 MIIICM 0.2 1 MB!CM . 0. 17 MH IC M .
SF"U:ADl~G.JA MP]NG lind
..rM:-oC
Io(E.('HA~IC.-..L
COMPA CT ION, I
I 0.96 MH,s .M 0.48 MHI5.I\1 . 0.38 MHlS.M .

"",Jt.7ECOMPACT!ON ! 0. 11 :\!H/CM. 0.06 MH ICM. 0,04 MUtCM .


"S"uALCLEARI~G 9nd I
QUB.UNG
nEAR ING UNDERGROWTH
.a::! TREES - 12- I 0.10 MIIIS./I-I. 0.05 to.!U ,S. M . 0.04. M II IS. II1 .
~LEARJNG UNO!::RGROWTH snd!
.5HRUBS 0.06 MlilS.M 0.03 MlI tS. M. 0.02 MIIIS .M .
DlSPOS .... L 01-- SOIL
!!.: H.-\ULIl\G Of SOIL
I 3.38
2.00
MHIC:\f.
MHICM.
1.69 MHICM.
1.00 MHICM .
1.:13 MHICM
0.80 M II /c ~t.
_ ~ GRAVEL fiLL 4..14 M HICM. 2.07 MHICM . 1.66 MHICM.
_;".11 EXCAVATION· CRANE and
CLA.~I PS HRLL WITH 8·MEN
• nd 2 CARPENTERS 2.14 MHICM. 1.07 MlIICM . 0.86 MIIIC M .

<L0E.. UNDERGROUND PIPING 8 nd


-...L~BING WO RKS
_.0 L.... yING ASBESTOS PIPES
lI'l " dill. :'32 MHILM 0.66 MHILM. 0.63 MHILM.
3/4- dia. 1.32 MII ILM. 0.66 MHILM. 0.53 MHILM.

Table 1.7d

17
LABOR PRODUCTION TABLE

MANHOURS PER QUANTI T Y


WORK DESCRIPTION
LOW AVERAGE HI GE
I - - - - -- - - - - - - j - -- -t - ------j,- -- -
1"· If"" dia. lAB MHILM. 0.74 MHI1M. 0.59 M H.:"'"
11112"·2" dia 1.64MHfLM. 0.82 MHILM. 0.66 MH..:"'"
21m" dia . 1.97MHfLM. 0.98 MHILM 0 .79MH :.....
3" diD 2. 16
MHlLM. 1.08 MHILM. 0.86 M H '
3/112" dill.. 2.30MHfLM l.15 MHILM. o.n M H :"-
4" dill . 2.64MHI"LM 1.32 J\.Hln,M . L06 M tl :'"
2.0 CAST fROM PIPE
2" dia. 4.38 MUILM. 2.19 MHlLM . 1.75 M H :"
4" dia. G.58 MH/LM . 3.29 MHILM. 2,63 M H ~
13" di .... 9.B4 MH/LM . 4.92 MHfLM. 3.94 M H :'"
S" dia. IJ.14 M!-IILM. 6 .57 MHfLM. 5. 26 M H ':"-
10" diD. 19.70 MHiLM. 9.85 MHfLM. 7.88 MH :'"
12' dia. 20.62 MHILM . 10.31 MHn,M . 8.25 M H ".....
14" dill. 24.10 MHfLM. 12.05 MHILM. 9.64 M W ';..Joo..
16" dia. 27.38 MIIILM . 13.69 MHILM. 10.95 MH :""
18" dia. 30.68 MHILM . 15.34 MHfLM 12.27 MH "
20" dill.. 32.B6 MUfLM 16.43 MHfLM. 13 . 14 M H :""
24" dill. 36.14 MIlILM 18.07 MHfLM. 14.46 M Hi'.....
ao' dio . 41.08 MHILM. 20.54 MHILM. 16.43 MH.:'"
3.0. LAYING PVC PIPE
112" - 3/4" dill. 0.38 MHILM. 0.19 MHILM. 0.15 M Hf ......
1" ·1I1/"" dill. 1.48 MHILM. 0.74 MHI1M . 0.69 ?fH r_
11112"·2" dis.. 1.64 MHILM. 0.82 MHfLM. 0.66 MH.:....
21 112" di a \.96 MHILM. 0.98 MHILM . 0.781>1 H :'-
3" di a. 2.16 MHILM. LOS MHILM. 0.8Ci M H :"
4" dis 2.62 MHILM . i.31 MHILM. 1.05 MH,:"'-'
5 " dia . 3.28 MHILM. 1.64 MHlLM . 1.31 M H :'"
6" dis. 4.92 MHil.M 2.46 MH,1.M. 1.97 MH.:""
4.0 LAYING ReP 8·MEN (1 TEAM)
2,," dia. 8.00 MHILM. 4.00 MH/LM 3.20 KH fLJI
36" dill.. 12.80 MHILM . 6.40 MHILM. 5,12 MHI1...o
48" dio, 21.34 MHILM 10.67 MHILM. 8.501 l>{H,---.
6"'IS" d ia. 2.66 MHILM . 1.33 MHILM. 1.06 MHii...
5.0 LAVATORY \6.00 MHIEACH 8.00 MHIEACH 6.40 MH E-
6.0 WATER CLOSET 21.00 MHfEACH 12.00 MHIEACH 9.60 MHF
7.0 URINAL UTILITY STALL 48.00 MHIEACH 24.00 MH/EACH 19.20 MH iE.....
8.0 URINAL, PEDESTAL TYPE 3200 MHfF.ACH 16.00 MHIEACH 12.80 MH;E..~
9.0 SHOWER and STALL 20.00 MHIEACH to.oo ~HIEACH 8.00 M HfL!..;;:;
W.O 5-MAN GROUP SHOWER 72.00 MHIEACH 36.00 MHIEACH 28.80 MH£.!,.:I
1l.0 BATH TUBS 48.00 Mil/EACH 24.00 Mil/EACH 19.20 MH ~
12.0 SLOPE SINK 28.00 MHIEACH 14.00 MH/EACH 11.20 M Hi!:h.3
13.0 HOT WATER HEATER 28.00 MHIEACH 14.00 MHIEACB 11 .20 MHi£ ...:3
14.0 6-PERSON WASH S INK 52.00 ~tHIEACH 26.00 MHIEACH 20.80 M Hf ::a.::l
15.0 DRINKING FOUNTAIN 26.00 MHHJEAC 13.00 MHIEACH 10.40 MH ~
16.0 EYE WASH 16.00 MHIEACH 8.00 MHIEACH 6.10 MHr::.;.:1,
17.0 MISCELLANEO US FIXTURF..5 4.00 MHfEACH 2.00 MHIEACH 1.60MH~
18.0 PARTITIONS 16.00 MHIEACH 8.00 MHIEACH 6AO M HIE
19.0 LAYING OF 24" dia. Rep 8.00 MHIPIPE 4.00 MHIPIPE 3.20 MHr?::':
20.0 LAYING OF 36" dill. Rep 12.80 MHIPIPE 6.10 MHIPIPE 5. 12 M HJ?:.II't
21.0 LAYING OF 4S" dill. RCP 21.32 MHIPIPE \0.66 MHIPIPE S.53 MHif~
-

Table 1.7e

18
LABOR PRODUCTION TABLE

. DE S C RIPTION
LOW
MANU OURS PER QUANTITY

AVERAGE mCD

~T ION:
• INSTALLATION
_I, ~. E XC HANGERS .. nd

!lELD fA BRICATIO N
· ".s ULATI ON 5.00 MH,s.M . 2.50 MHIS .M. 2.00 MHIS . M.
FJELD fA BR ICATION
53&1' ME;TAL COVER 24.00 MHt.:i.M . 12.00 MUIS.M . 9.60 MHt.5 .M
APPLY I NS ULAT ION 10.00 MIl r.U.' . 6.00 MHIS.M . ~ . OO MH IS. M.
APPLY S HEET :.lETAL
COVER 10.00 MH IS .M . 5.00 MHIS .M . 4.00 MH IS. M.
:lIPS, COM PRESSORS lind
-_~IS ES
.... . FABRICATE 34 .00 MHIS .M . 17.00 MHIS.M. 13. 60 MH IS. M.
_ R APPLY 60.00 MHIS.M . 30.00 MHIS .M. 24.00 MJiIS .M.
~~ .nd COMPONEI'IT
I!f05'L-UTI ON
l.1! FIELD FABRICATE 8.00 MHIFLG . 4.00 MUffLe . 3.20 MHIFLO .
.: I'l FIELD FABRIC;,.,.E SHT.
YETA LCOVER 1.60 MHIS .M . 0.80 MHIS.M. 0.64 MHIS.M.
li e AP PLY INSULATION 5.40 MHIL M . 2.70 MHtL.M. 2. 16 MHIL.M.
1~ APPLY SHEET VETAL OR
PAPER COVER 3.00 MH/£.'\CH 1. 50 MIVEACH 1. 20 ~1HfEACH
l.M FABRICATE INSTRlJM El\'T
COV ER 16. 00 MH /EACH 8.00 MHIEACH 6AO MJIfEACH
:! 06 ["'STA LL INSTR!JMENT
COVER 12.00 MHIEACH f,.00 MHIEACH 4.80 MHIEACH
1.01 liiSU LATE PIPE HANGERS 8. 00 MH /EACH 4.00 MH/EACH 3.20 MHIBACIl
1.06 FOR STEAM TR.>\C ED
LI NES 7.'10 MII /l..~\1 . 3. 70 MHIL.M. 2.96 MHn...M.
11)9 RE MOVAL OF OLD OR
EX ISTlNG INSULATION !I .oo MUIL.M . 1.50 MHIL.M. 1.20 MHIL.M.

":U!E. fi RE PROOFING
L.) L"'-STALL STUDS 1. 00 MHIEACH 0.50 MHIEACH OAO MUIEACH
l...l u>STALL MESH 2.40 MHIS.M . 1.20 MHIS.M. 0.96 MHIS.M.
!.oJ POURE D:
3 .01 FO R.'I11NG 28.00 MfllS.M . 14.00 MHIS .M. 11.20 MHt'S.M.
3.02 STRIP FORMS 12.00 MHIS .M. 6.00 MHIS.M. 4.80 MRIS .M.
J 03 POUR CONCP.ET2 140.00 MHIL.M. 70.00 MlI/L.M. 66.00 MHIL.M.
3.04 CURINGIPATCHING I 1.20 MH/S.M . 0.60 MHIS .M. 0.48
0.66
MHIS .M.
MalS.M.
:5 05 FINISHING
,,-.) T ROWEL, PLASTERED
I 1.40
5.40
MHIS .•\f.
MHIS ..\{ .
0.70
2. 70
MHIS.M.
MAlS.M . 2.16 MHIS. M.
5.') PNEUMATIC APPLIc..~T ! ON
&.01 GUNlTE
ILl) APPLY FlNEBRICKOR BLOCK
I 2.40 MHIS.)!: .
1.60 MHIPC.
1.20 MHIS.M.
0.80 MHIPC.
0.96 MBIS.M.
0.&4 MHIPC.
7.0 REMOVA L OF EXlSTr ~G
OR OLD fIREPROOf~ :SG 6.00 MIIIS.)i . 2.50 MHIS.M. 2.00 MBIS.M.
8.0 APPLY FIREPROOFING PAINT 6.00 MHIS .)I . 3.00 MHIS .M. 2.40 MHIS.M.

FnlE PROTECT ION;

LO FIRE PROTECTiON
EQUIPMENT INSTALLATION
1.01 MONITOR 10.00 MHIEACH 6.00 MHtEACH 4.00 MHIEACH

Table 1.7f

19
LABOR PRODUCTION TABLE

MANHOURS PER QUANTITY


WORK DESCRIPTION
LOW AVERAGE mell

1.02 HOSE REELS lind CARTS :10.00 MHIEA CII I &.OU MHfEACIi ]2.00 MH.fEAC
1.03 FI RE &xTINGUISII ERS ]0.00 MIlfE.A Cl! 5.00 MHfl<:ACIl 4.00 MH /EA C'
2.0 !'ERSONAL EQUIPMENT
2.01 EY E MASH 20.00 MHtr.:ACH 10.00 MHIEACH 8.00 MH/EAC c
2..02 SAFETY SHOWERS 20.00 MHIEACH 10.00 MIlIEACH 8.00 Mll fEA l
2.03 lJRF..ATHlNG APPARATUS 10.00 MH IF...AC H 5.00 MII!E..4,.CII 4.00 Mil lEt\(>
:1.0 S PRINKLER SYSTEM
3.01 SPRAY NOZZLES 2.00 MII IE.AC Il 1.00 MII/EACH
5.00 Mil /EACH
I 0.80 MHn.:t.C'
4.00 MII /E.A<'
3.02 WATER CANNONS 10.00 ~H IEAC II
--
IX. TRADE: PERMANENT ~'ENCI NC
- - ---- -!------~ --
I
-

1.0 INSTALL fENCE 2.10 MHIL.M . 1.20 MJIIL.M. 0.96 MHIL. M


2.0 INST ALL GATES G.OO MHlL.M . 3.00 MHIL.M. 2.40 l'olH IL./'.!
3.0 TO RAIL O.GO MHfL.M . 0.30 MII /L.M 0.24 MHIL. M
4.0 BARBWIRE, 3-STRANDS 0.60 MHIL .M . 0.30 MHll..M 0.24 MIIIL.M

x. TRAD8: PAINTING WORKS


1.0 NBW STRUCTURAL. STEEL 20.00 MH trON 10.00 MHfTOr-;
I 8.00 .MHfTON
2.0 OLD STRUCTURAL. STEEL
3.0 NEW FLAT PLATES
1.10 MlilS . M.
0.&1 MHIS .M.
0.55 MHIS .M.
0.32 MHIS.M. i 0.44 MH tS .M.
0.26 MH IS.M
4.0 SURFACE PREPARATION
4.0 1 IN TERMS OF WEIG TH 16.00 MHtrON 8.00 MHffON 6.40 MHfT Ol"
4.02 IN TERMS OF AREA 0.86 MfllS.M. 0.43 toHlIS.M. 0.34 MHtS .M .
!"i.0 SA ND PREPARATION 60.00 MHrrON :10.00 ?-.l!UfON , 24.00 M1I(1" 0;-":

XI. THADE : HEATING VENTILATING snd I


AI R CONDITIONING
1.0 HACV PIPING
2.0 DUCK WORK INSTAL.L
7.00 MHIL. M.
12.00 MHIS .M.
I 3.&0 MIlIL.M.
6.00 MIi IS. M. I
2.80 MHIL.l'<1.
4.80 MII tS.M
3.0 DUCK WORK FA ll. 36.00 ~iH ,S.M . U~.OO MHIS .M. 14.40 MH fS.M
4.0 PACK.-'l.GE U"",T AIR
CONDITIONER 48.00 MHIEr\CH 24.00 MIl(E.A.CH \9.20 MHIEA CH
5.0 UNIT BEATER 24.00 MHIEACH 12.00 MlI1EACIi 9.00 MIlIEACH
6.0 FlfIo'NEDCONVERTER 10.00 MHIEACH 5.00 MI·IIEACH 4.00 r.mIEA CH
7.0 EXHAUST fAN, PROPELLER 16.00 MHIEACH 8.00 MH/E.ACH 6.40 MHIEACH
8.0 GRAV ITY ROOF VENT 14.60 MHlL.M. 7.30 MHIL.M. 0.84 MHIL.M.
9.0 POWER ROOF VENT 48.00 MllfEACH 24 .00 MHfEACH 19.20 MHIEACH
10.0 ROUND ROOF VE~'T 16.00 MHtEACIl 8. 00 MHfEACH 6.40 MHtEACH
11 .0 PLUMBING PIPING 7.flO MHIL .M. 3.60 MHfL.M. 2.80 Ml:IlL.M .

X1J.MISCELLANEOUS,
1.0 WATER STOP INSTA LLATION 1.34 MH /L.M. 0.67 MHIL.M. 0.54 MHIL.M.
2.0 CAULINS-SLABJOINT 0.40 Mll iL.M . 0.20 MH IL. M. 0.16 MHIL. M.
3.0 ASPHAL.TING 1.60 MH IS.M. 0.80 M IIIS.M. 0.&1 MHtS .M .
4.0 G~OU1'ING snd TOOL
P L.ASTERING 3.34 MHIS .M. 1.67 MHIS.M. 0.8-4 MHIS .M.
5.0 WATER PROOFING RUBBERIZE 1.10 ~1II1S . M. 0.55 MHIS.M . 0.28 MHIS .M.
6.0 COPPER CLADDING ROO!<' DEC 1.00 MHIL .M. 0 .60 MHIL.M. 0.25 MHIL.M .
7.0 WATER PROOFING FL.INKOTE 0.54 MIItS.M. 0.27 MHtS.M. 0.14 MHtS .M.
8.0 DEMOLITION OF ADOBE WALL 3.20 MHICM. 1.60 MHICM. 0.80 MHICM .
9.0 PAINTING 0.68 MHf.LM. 0.34 MHIS.M. 0.17 MHIS.M .
10 .0 COPPER WATER STOP·CUT
sndSHAPE 0.11 MHIL.M . 0. 06 MH/L.M. 0.03 MHIL.M.
11.0 COPPER"WATER STOP·Ctrr
INSTALLATION 0.22 MHIL.M. 0.11 MHIL.M. 0.06 MH IL. M.
12.0 SETTING ANCHOR BOLTS 0.97 MHlKg. 0.49 MIIlKg. 0.24 MHlKg.
13 .0 SETT ING ANCHOR BOXES 3.64 MHICM . 1.82 MHICM .. 0.91 MH ICM.

Table 1.7g

20
LABOR PRODUCTION TABLE
A- HHAPER

S'TROKE-71 Imrn MATERiAL CUT - A.'S'l'M A:~6


DRIVE HP - 12 CUTT ING DEJYrll - 3mm

IIISUTES

WID TH TRAVEL ( mm)

100 150 200 250 30() :ISO 400 150 500 :

-"
,,- 30B 1 . \0 5 . 1{) 6.20 7 ZO ij :10 9.40 10.40 I IA O

.-•
4.70 6.50 R.40 lCl.20 12 . 10 1:3.90 15 .80 17 .60 19 .50
~ 6.30 890 11.60 14.20 1690 \9 .50 1£.00 24.80 2740
790 IlAO 1·1 .80 18.40 2180 25 .:W 28.70 :12.20 35.70
9.50 13.80 18.90 22.00 27 .60 31.90 J.5.00 39.00 4.3.70
-SO 12.10 17.00 22.20 27.00 32.40 ;'j7AO 42.4() 47.40 52.50
-'"
.., 13.90
15.30
19.80
22.00
25 .80
28.60
31.70
:is.ao
:17.70
42.00
43.60
4860
49.60
55.50
55.50
tiJ.OO
62.0 0
74 .00
_SO
.., 17.40
18.60
24.80
27.00
:12.40
as.40
39.80
43.60
47.60
52.00
55.00
63.00
64 .00
7 4.00
76.00 88.00
88.00 102 .00
1_ 22.40 32 .'1 0 42.40 52.00 6:i 00 79.00 95 .00 112.00 128.00

B· L ATHE MACHINE

SWI NG - 533mm MATERIAL - AsrM A36


DRIV E - 5 H .P. CU'ITING DEPTH · 3mrn

nKE IN MINUTES

S H AFT LENGTH (mm )

- 50

2 .(}.1
100

3.09
150

4. 1-1
200

5 . 18
2.'0

6.;l3
300

7.28
;jSO

8 .33
100

9 .38
450

lOAD
500 .

11.47
4.09 6.\ 8 7.28 9.37 1l.17 13.56 15.67 17 .70 \9.80 2 1.9 0
5.20 9.40 13 .60 17.80 22.00 26.20 30AO 33.70 38.90 43.10
7.20 13.50 19.70 26.00 32.20 38.50 44 .70 51.00 57.20 63.50
9.30 17 .60 26.00 34.30 4 2.60 51.00 59 .00 67.60 76.00 84.30
11.50 22. 10 32.60 43. 10 53.60 64.00 74 .60 85.20 95.70 106.30

.... 13.50
15.80
17.60
26.00
3 0 .60
33.30
38.50
45.00
5 1.00
51.00
60.20
67 .60
63.50
74.00
83.30
76.00 88.50
89.80 104 .70
101.00 117 .60
101.00
II8.SO
133.30
11 3.00
133.30
150 .00
126.00
147 . 10
166.60
19.00 3 7.30 55.50 73 .70 91.90 110.00 128.00 14 6.30 164.60 182.80
21.00 40.00 6 1.00 81.00 101.00 121.00 141.00 161.00 18 1.00 201.00

Table 1.8

21
LABOR PRODUCTION TABLE
C - DRlLL

TYPE - RADIAL MATERIAL- ASTM ASS


DRILL BIT - mGH SPEED srEEL

DRILLING TIME IN SECONDS

THICKNESS: DRILL BIT DIAMETER (mID)

(=) 3 6 10 13 : 16 19 22 26 28 38 44

3 4.00 5.00 5.00 6.00 6.00 7.00 8.00 9.00 11.00 13.00 20.OC
4 5 .00 6.00 5.00 6.00 6.00 8.00 10.00 11.00 13.00 15.00 22.OC
5 6.00 7.00 5.00 6.00 7.00 9.00 1UlO 13.00 15.00 17.00 24.OC
6 7.00 8.00 6.00 6.00 8.00 10.00 12.00 15.00 11-00 19.00 26.00
7 8.00 900 1.00 7.00 9.00 11. 00 13.00 \7.00 19.00 21.00 28.OC
8 9.00 10 .00 8.00 8.00 10.00 12.00 14.00 19.00 21.00 23.00 30.00
9 10.00 11.00 9.00 9.00 11.00 13.00 15.00 21.00 23.00 25.00 32.00
!O 11.00 12.00 10.00 11.00 12.00 14.00 16.00 23.00 25.00 27.00 34.00 -
11 12.00 13.00 11.00 12.00 13.00 15.00 17.00 25.00 27.00 29.00 36.00
12 13.00 14.00 12.00 13.00 14.00 16.00 18.00 27.00 29.00 32.00 38.00
13 14.00 15.00 13.00 14.00 15.00 17.00 19.00 29.00 32.00 35.00 40.00
14 15.00 16.00 14.00 15.00 16.00 18.00 20.00 31.00 35.00 37.00 42.00
16 16.00 17.00 15.00 16.00 17.00 19.00 21.00 35.00 37.00 a9.00 45.00
17 17.00 18.00 16.00 17.00 19.00 20.00 23.00 37.00 39.00 40.00 47.00
18 18.00 19.00 17.00 19.00 2l.00 22.00 25 .00 39.00 41.00 44.00 49.00 ~
19 19.00 21.00 19.00 20.00 22.00 23.00 30.00 41.00 43.00 46.00 51.00
20 20.00 22.00 21.00 23.00 24.00 25.00 32.00 43.00 45.00 48.00 53.00
21 21.00 23.00 24.00 25.00 26.00 29.00 36.00 45.00 47.00 50.00 55.00
22 22.00 24.00 25.00 27.00 29.00 30.00 3800 47.00 49.00 52.00 57.00
23 23.00 25.00 26.00 29.00 31.00 32.00 40.00 50.00 52.00 55.00 59.50
24 24.00 26.00 27.00 30.00 33.00 33.00 42.00 52.00 55.00 57.00 65.00 1-
25 25.00 27.00 30.00 33.00 34.00 35.00 45.00 64 .00 57.00 59.00 68.00 1

NOTES:
1) PREPARATION SET-UP MOUNTING AND IDLE TIME ARE EXCLUDED.
2) TIME ABOVE IS MINIMUM AND MAYBE ADJUSTED FOR ANY GIVEN MACH ll\
SITUATION AS RECOMMENDED BY SHOP SUPERINTENDENT.
3) TO DERIVE MANHOURS FROM ABOVE VALUES;

MANHOURS MAC HINE TIME X 1.20 + ESTIMATED PREPARATION,


SET-UP AND MOUNTING TIME

Tabl.1.8&

22
LABOR PRODUCTION TABLE

STRIPPING OF METAL FORMS


- P'ZRSQ. MBTRE OF CONTACT AR~

LO W AVERAGE HIGH

WOOD SHOREs, 215 TO 316 mm. FLOORS

• 0.22 0 . 16

••
0.59 0.23 0.16
0.60 0.2.1 O. J7
0.61 0.24 0.17
0. 64 0.25 0.18

WOOD S HORES, 368 TO 419 mm. FLOORS

•••
0.60 0.23 0.17
0.6\ 0.24 0.17
0. 64 0.26 O.la
0 . 66 0.25 0.18
0.'" 0.26 0.19

(6) TOOLS:

t.iI:PL,...,.ER LEAOMAN
_'IERS
OOUO-..&S

YS
.,.
80
8 ONE (1) LOT CARPENTRY 1'001..0$ · 8 TOOLS HOURS

MANHOURS

STEEL ERECTION f'OR MULTJ-STOR£Y BUIL DING FRAME


(P REFAB SECTIONS, HIGHLY MECHANIZED OPERATION)

PER TON ERECTED

LOW AVERAGE melt

MAl'o'lfOURS EQtnP7 HOURS MANHOURB EQUJPT HOURS MANHOURS gqUlP7110URS

~ 36.00 7.00 13.85 >6, 10.00 1.94


32. 73 6.36 12.63 2.46 9. 11 1.77
40.00 7.78 15.32 2.98 11.08 2.16

CREW COMPONENT (6) TOOLSIEQUIP'T.:

, L EADMAN 8 112 TOWER CRANE <I

, RlGGERS J2 2 WELDING TRANSFORMER


I..OTfOOLS
16
8
FITTERS
"
2


WELDERS
CRANE OPR'T
HELPERS .
\6
8 3.5 TOOLS DAYS 28 TOOL HOURS

MANDAYS MANlIOURS
'"
(C) MATERIALS:

ASTM·A36, WELDED CONNECTIONS.

Table 1,9

23
LABOR PRODUCTION TABLE

STEEL ERECTION FORCOMMI:mCIALAND MILL BUILDINGS


(PltEfAU SECTIUNS, HIGHLY MECHANIZED OPI::RATION)

MANtiOURS AND EQUIPMEN T HOURS PER TON ERECTED

LOW A ... ERAGY. 111(;11

MANJlOURS EQUIP'l' nouru; MANlIOUru; €QU1PT HOURS PrtA.IIOUHS EQU IP"":'

COM M ERCIAL TYPE BUILDll'GS

LIGHT ~'RAME '16.67 18.33 18.06 7, iO 13 .02


M EDIUM FRAM E
HEAVY FRAME
STE£LJOIST
'10.00
35.00
43.08
\5. 71
13.75
\6.97
15.56
13.33
16.47

M[LL TYPE BUILDINGS


6.11
5.24
6.47
11.20
9.66
11.91 ...-.
':" i

LIGHT FRAME
MEDIUM FRAME
35.00
3UI
13.75
12.22
\3.33
11.91
6.24
~.68
9.66
8.62 ,.
,~

HEAVY FRAME
STEEL JOIST
35.00
32.94
13.76
12.94
10.77
12.73
<.23
5.00
7.78
9.18 ;~:
NOTES:

\A) CREW: CREW COMPONENTS IB)TOOLSIEQUlPMET:

I LEAOMAN R 112 20 T CllANE 'I


2 RIGGERS 16 2 WELDING THANS}'ORMER 16
4 FITTERS 32 2 CUTTING OUTFIT 16
2 WELDERS 16 __'_ON E(\) un ~f1SC. 8
CRANE OPR,. 8
HELPERS n 6.S E~UIP'T DAYS 44 EQUlP7

14 MAI'IDAYS J 12 MAJ'..'HOURS

(C) MATERIAlS:

ASTM·A36, WEWEDCONNECTIONS.

TABLE 1.10

24
1'Il(ld l'H 'I ~ I IU ~ III Il I ' " ALAN I ItIH

'\\ Iblo 1. 11 III duri vutl from II (llIh ~ll llll !l 1l ti l II IIH" II I h /.IIIII I II willi 111 11 l UI 1'1 \ 1I1"1I1 111WII , 1!1l1 l hll ~ \" Io to tl " "ttl 11 11'1 , .. 101, lot 1\ 1· 1,1
or ganization for t ho job

Major Work Items % ll ndgehld Torn I Al lowlt ll t\cl 'lhi,,1


wt mh /lte m Budgeted mb mh
mh

1. 'lbmpo rllry fa cilities 2 812.2 812.2 143 955 .2


(lol)
2. Demoliti on : 15%of
.,.
Ql
work on new structure
3. Tank bollom work
15
7
6089.4
28 41 .7
6089.4
2841.7
1074.6
50 1. 5
7164,0
3343 .2
4. Tank shell work 58 :325 mh/ton 23545 .7 4155 . 10 27700 .8
5. Thmporary 8caffoldin ~ 5 0 .8 mhlm 2 20 29 .8 ;J58.2 2388 .0
6. Surface Preparation
and Painting 12 20.3 m h/ m 2 4.871. 5 859.7 5731.2
7. Clean-up 40 6 406 7 1. 6 ·177 .6

'fbtal M.H. 47760

Note: a) Man-month =8 x 30 =240 m.h.


bJ Allowance for manhounJ include unproductive
labor hours fLnd holidays.
oj Manhours were taken from the low pr()duction vlilucs
of labor production lable.
dJ Steel work involved 72.44 mt plSle work : r o\ling,
beveling and wclding.
.J SurfAce preparation was by sandblasting and 4 coats
anli-corroseivc pRints for 2534 m 2 ofo!'lecl surface area.
PROJECTED MAi'IPOWER
PROJECT. REPLACE BOTTOM PLATES 14 Units)
NSO, SU81e BAY, PHILIPPINES

1 A. INDIR~CL LOADING ~. N U M 8 E R OF MONTHS

+m=t I 'j=
o ESIC1NATI ONS I N( o 2 S 6 7 11 1Z \3 I~ IS 16 17 18 19 20
1 PROJECT MANA~
TPrNJE CTENGINEER--
A NlsfRATIVE oFFICE
1 !vh&t--+----1-f-I-
WATCHMAN I TIMEI<EEPE!
_!iJO_R~~li 1-.-1---1- --1--<--(- ,-- -- +-H-
Ill~~b~~\, 1-

1'0
'"'" A L

'<1'

IB,.p mECT LO"'.DING


DESIGNATIONS NOS .
~~
ADMAN
fA-N6~ _LASTERS
::'"RECl ORS
--~" "S
IN TERS
~s-----------r~
, L
~.'.

'
- ' ..; ,,,,/.'- -:-. .-
.....
~
• ~ •• ,. , .
..
" .~.
! '~ '-'-
~ A
~,-oo ~%~
l==='ll
CHAPTER 2

EQUIPMENT

-=s: popular local refC!"nce for rental ,ates of cquipmer:l


~2"nt G'"idebook which i3 regularly published by the
_ _.cCvnstruction Equipment Lessor" Inc. (ACEL).
_ ...... 1Ii'25 o rganized in 1966 h, response to or.e ot the most
~o:cms that beset the construction industry - huge
.~....,ment for owning heavy equipment. The association
."lEl!!c;.::e system of leasing equipment which is accepted to be
L-a!:1!ative to owning the m .
. eboo k gives not only ren tal rate data but also specifi·
~ :ru> differen t equipment, standard terms and conditions
. . . .:cent lease contract, the list of ACEL members, and the
. . . . . .IX : o=ula applicable to rental rates of equipment.
ACEL guidebook does not show the detailed breakdown
oedvation of the rates of leasing different kinds of equip-
..m eed by ACEL. However, the General Membership ap·
. ._ . : J. ~ormula which "very nearly approximates a lessor's own-

=::00k. operating costs" the result o f which are in the ACEL


ACEL rental rate derivation is based on six major cost

Acquisition Cost,
Depreciation Cost,
Replacemen t Cost,
Operators, !v1echanics' and Laborers' wages
POL prices
Others (no breakdown)
Tab!es 2.1, 2.2 and 2.3 are graphs showing the' monthly bare
rate hehaviour or trend starting 1976 for selected groups of
",,,,,,.'::::lent. You will notice that i.'l 1984, there was a sharp rise in
:;;:.", that forced ACEL, to prepare an Interim Equipment
. book. Among the major causes of the drastic increase in
:-::lent rental rates in 1984 are as follows:
L Devaluation of the Peso from PH.OO agalnst the U.S.
Dollar to Pl4.00, then allowed to float to become Pl8.00
per U.S. Dollar;
2.. Series of Wage Orders, which increased labor cost by
almost 50%;
3. Two rounds of increases in the price of Petroleum, Oil and
Lubricants which induced an over-aJ.] average effect of
70%;

27

S-ar putea să vă placă și