Sunteți pe pagina 1din 24

PROYEK PEMBANGUNAN

TERMINAL LPG REFRIGERATED


TANJUNG SEKONG

MECHANICAL COMPLETION PACKAGE

MCP 01 - 002 - 05
Propane (C3) Backloading to Jetty 3 Pump (P-204
System A/B)01
Refrigerated Propane
System

Book 01 of 01

HAND OVER PACKAGE NO.


LREF-00-MCP-01-001-03
MECHANICAL COMPLETION
PACKAGE

Sub System 002


Storage and Process Plant
Area Subsystem

Sub Sub-System 03
Propane Liquid Metering (LM-
201 A/B)

Book 01 of 01

HAND OVER PACKAGE NO.


LREF-00-MCP-01-001-03

PROYEK PEMBANGUNAN TERMINAL


LPG REFRIGERATED TANJUNG
SEKONG
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

Butane Backloading to Jetty 1 & 2 Pump (P-302 A/B/C)


System : 02 (Refrigerated Butane System)
Sub system : 002 (Refrigerated Butane - Pump and Heater Area Subsystem)
Package No. : LREF-00-MCP-02-002-03 Butane Backloading to Jetty 1&2 Pump(P-302 A/B/C)

TABLE OF CONTENT

No. Description
CIVIL
1.1 Reference Drawings V
1.2 Tool & Test Equipment Calibration Certificate V
1.3 Test Report
1.3.1 Material Certificate V
1.3.2 Pile Driving Record V
1.3.3 Penetrant Report V
1.3.4 Welding Traceability Report V
1.3.5 Pre-Pouring & Pouring Report V
1.3.6 Survey Report
MECHANICAL
2.1 Reference Drawings V

2.2 Test Report


2.2.1 Installation Report
2.2.2 Survey Report
ELECTRICAL / INSTRUMENT
3.1 Reference Drawings V

3.2 Tool & Test Equipment Calibration Certificate V

3.3 Test Report


3.3.1 Installation / Termination Report
3.3.2 Insulation Report
3.3.3 Continuity Report
3.3.4 Grounding Resistance Test & Installation check list
4.1 Punchlist
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.1 REFERENCE DRAWING

1. LREF-30-DWG-50-0037-A3 Rev. 2
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.2 TOOL & TEST EQUIPMENT CALIBRATION


CERTIFICATE
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.3 TEST REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.3.1 FIELD DENSITY TEST REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.3.2 MATERIAL CERTIFICATE


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.3.3 PRE-POURING & POURING REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.3.4 SURVEY REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

CIVIL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

1.4 PUNCHLIST
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.1 REFERENCE DRAWING

1. LREF-30-DWG-20-0004-A3 Rev 1
2. LREF-30-DWG-20-0007-A3 Rev 1
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.2 TOOL & TEST EQUIPMENT CALIBRATION


CERTIFICATE
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3 TEST REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.1 FABRICATION REPORT

1. Fabrication Procedure For Fuel Oil Tank (T-501)


2. Material Receiving Inspection Report
3. Dimensional Cutting & Rolling Inspection Report
4. Rubbing Name Plate
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.2 DIMENSION INSPECTION REPORT

1. Level Check at Lowest Shell


2. Plumbness Report
3. Roundness Report
4. Peaking & Banding Report
5. Manhole & Nozzle Orientation Report
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.3 FIT-UP & VISUAL WELDING

1. Welding Map & WPS/PQR Diesel Fuel Oil Tank (T-501)


2. Visual Examination Procedure Diesel Fuel Tank (T-501)
3. Welding Repair Procedure Diesel Fuel Tank (T-501)
4. Fit-up Inspection Report
5. Visual Welding Inspection Report
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.4 NDE REPORT

1. Prosedur Radiography Test (RT) Fuel Oil Tank (T-501)


2. Procedure Penetrant (RT) Diesel Fuel Oil Tank (T-501)
3. NDE Personel List for Diesel Fuel Oil Tank T-501
4. Vacuum Box Test Procedure Diesel Fuel Tank (T-501)
5. Air Leak Test Procedure at Reinforcing Pad Diesel Fuel Tank (T-501)
6. Radiography Test
7. Dye Penetrant Test
8. Vacuum Box Test
9. Air Leakage Test for Reinforcing Pad
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.5 WELDING TRACEABILITY REPORT


PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.6 HYDROSTATIC TEST REPORT

1. Hydrotest Procedure Diesel Fuel Tank (T-501)


2. Hydrostatic Test Report
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

MECHANICAL
System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

2.3.7 PAINTING REPORT

1. Painting Procedure Diesel Fuel Tank (T-501)


2. Painting Report
PROYEK PEMBANGUNAN
TERMINAL LPG REFRIGERATED
TANJUNG SEKONG

Fuel Oil Tank (T-501)


System : 14 (Power Generator And Diesel Fuel System)
Sub system : 001 (EDG And Diesel Fuel - Utility Area Subsystem)
Package No. : LREF-00-MCP-14-001-01 Fuel Oil Tank (T-501)

3.1 PUNCHLIST