Nombre del Proyecto: CONSTRUCCION DE CISTERNA LUNARENA Fecha : 5-Jan-19 Nº de Contrato. (Orden de Compra LAP): Modalidad del Cont Periodo : AL 05/01/2019 Contratista : ARKES CONTRATO ACUMULADO ANTERIOR PRESENTE PE ITEM DESCRIPCION TOTAL MONTO U.M CANT P.U CANT % CANT S/. S/. 1.0 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 1.1 OBRAS PROVISIONALES 1.1.1 CERCO PERIMETRICO ml 44.00 S/. 20.71 911.02 44.00 100.00% 911.02 0.00 2.0 CISTERNA 2.1 TRABAJOS PRELIMINARES 2.1.1 LIMPIEZA DE TERRENO MANUAL m2 51.20 S/. 1.23 62.76 51.20 100.00% 62.76 0.00 2.1.2 TRAZO, NIVELES Y REPLANTEO m2 51.20 S/. 1.99 101.78 51.20 100.00% 101.78 0.00 2.2 MOVIMIENTO DE TIERRAS 2.2.1 EXCAVACION MASIVA CONMAQUINARIAS EN TERRENO SATURADO m3 77.11 S/. 12.00 925.41 77.11 100.00% 925.41 0.00 2.2.2 BOMBEO DE AGUA, POR FILTRACION (01 BOMBA C/TUB 2") dia 30.00 S/. 104.00 3,120.00 30.00 100.00% 3,120.00 0.00 2.2.3 MEJORAMIENTO DE TERRENO CON OVER 2"-4", H = 0.40m m3 22.12 S/. 78.52 1,736.74 22.12 100.00% 1,736.74 0.00 2.2.4 CONFORMACION DE SUBRASANTE (AFIRMADO) m2 40.96 S/. 30.63 1,254.52 40.96 100.00% 1,254.52 0.00 2.2.5 COMPACTACION DE SUBRASANTE m2 40.96 S/. 13.00 532.48 40.96 100.00% 532.48 0.00 2.2.6 COLOCCION DE GRAVA 2"- 1", PARA FILTRO NATURAL m3 14.40 S/. 87.36 1,257.98 0.00 0.00% 0.00 14.40 2.2.7 ELIIMINACION DE MATERIAL EXCEDENTE CARGA MANUAL Y VOLQUETE (15M3) m3 104.09 S/. 10.19 1,060.93 104.09 100.00% 1,060.93 0.00 2.3 OBRAS DE CONCRETO SIMPLE 2.3.1 SOLADO 1:10, E = 4"; EN CISTERNA Y CUARTO DE MAQUINA m2 40.96 S/. 20.72 848.84 40.96 100.00% 848.84 0.00 2.4 OBRAS DE CONCRETO ARMADO 2.4.1 CISTERNA V.util= 75m3 2.4.1.1 CONCRETO F'c=210Kg/cm2 PARA ZAPATA CORRIDA m3 3.07 S/. 443.59 1,362.71 3.07 100.00% 1,362.71 0.00 2.4.1.2 ACERO ESTRUCTURAL Fy=4200Kg/cm2 PARA ZAPATA CORRIDA Kg 225.56 S/. 4.74 1,068.70 225.56 100.00% 1,068.70 0.00 2.4.1.3 CONCRETO F'c=210Kg/cm2 EN BASE DE CISTERNA m3 10.24 S/. 472.30 4,836.31 10.24 100.00% 4,836.31 0.00 2.4.1.4 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN BASE DE CISTERNA Kg 611.11 S/. 4.74 2,895.44 611.11 100.00% 2,895.44 0.00 2.4.1.5 CONCRETO F'c=210Kg/cm2 EN MUROS DE CISTERNA m3 15.36 S/. 472.30 7,254.47 0.00 0.00% 0.00 15.36 1 VALORIZACION N° 02 - CISTERNA - ARKES Nombre del Proyecto: CONSTRUCCION DE CISTERNA LUNARENA Fecha : 5-Jan-19 Nº de Contrato. (Orden de Compra LAP): Modalidad del Cont Periodo : AL 05/01/2019 Contratista : ARKES CONTRATO ACUMULADO ANTERIOR PRESENTE PE ITEM DESCRIPCION TOTAL MONTO U.M CANT P.U CANT % CANT S/. S/. 2.4.1.6 ENCOFRADO Y DESENCOFRADO NORMAL PARA MUROS DE CISTERNA m2 124.16 S/. 71.86 8,922.52 62.08 50.00% 4,461.26 62.08 2.4.1.7 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN MUROS DE CISTERNA Kg 1013.91 S/. 4.74 4,803.91 1,013.91 100.00% 4,803.91 0.00 2.4.1.8 CONCRETO F'c=210Kg/cm2 EN TECHO DE CISTERNA m3 8.93 S/. 472.30 4,218.55 0.00 0.00% 0.00 8.93 2.4.1.9 ENCOFRADO Y DESENCOFRADO NORMAL PARA TECHO DE CISTERNA m2 42.85 S/. 71.86 3,079.33 21.43 50.00% 1,539.67 21.43 2.4.1.10 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN TECHO DE CISTERNA Kg 602.41 S/. 4.74 2,854.22 301.21 50.00% 1,427.11 301.21 2.5 REVOQUES Y ENLUCIDOS 2.5.1 REVESTIMIENTO CON IMPERMEABILIZANTE EN CISTERNA m2 258.48 S/. 10.55 2,728.13 - 0.00% 0.00 0.00 2.6 JUNTAS 2.6.1 JUNTAS CON WATERSTOP 6" ml 100.67 S/. 14.95 1,504.85 50.00 49.67% 747.40 50.67 2.7 INSTALACIONES SANITARIAS Y METALICAS 2.7.1 CANASTILLA DE SUCCION D=3" und 2.00 S/. 51.96 103.93 - 0.00% - 2.00 2.7.2 CANASTILLA DE SUCCION D=2" und 3.00 S/. 41.20 123.60 - 0.00% - 3.00 2.7.3 UNION UNIVERSAL D=3" und 2.00 S/. 30.90 61.80 - 0.00% - 2.00 2.7.4 UNION UNIVERSAL D=2" und 3.00 S/. 20.60 61.80 - 0.00% - 3.00 2.7.5 VALVULA COMPUERTA D=3" und 2.00 S/. 128.75 257.50 - 0.00% - 2.00 2.7.6 VALVULA INTERRUPCION TIPO BOLA, D=2" und 3.00 S/. 87.55 262.65 - 0.00% - 3.00 2.7.7 VALVULA FLOTADOR D=2" und 1.00 S/. 133.90 133.90 - 0.00% - 1.00 2.7.8 TUBERIA PVC SAP- C-10 D=3", D=2" GLB 1.00 S/. 103.00 103.00 - 0.00% - 1.00 2.7.9 TUBERIA PVC SAP- C-10 D=6" PARA REBOSE Y VENTILACION GLB 1.00 S/. 51.50 51.50 - 0.00% - 1.00 2.7.10 TAPA DE REGISTRO 0.60x0.60m E = 1/8", INC. MARCO METALICO und 2.00 S/. 257.50 515.00 - 0.00% - 2.00 2.7.11 ESCALERA TIPO MARINERO DE F°G° D = 1 1/2", CON PASOS D = 3/4" CADA 0.30M und 1.00 S/. 875.50 875.50 - 0.00% - 1.00 2.7.12 ARANDELA DE ANCLAJE und 5.00 S/. 15.45 77.25 - 0.00% - 5.00 3.0 CUARTO DE BOMBAS - POZO SUMIDERO 3.1 TRABAJOS PRELIMINARES 3.1.1 LIMPIEZA DE TERRENO MANUAL m2 33.28 S/. 1.20 40.00 33.28 100.00% 40.00 0.00 1 VALORIZACION N° 02 - CISTERNA - ARKES Nombre del Proyecto: CONSTRUCCION DE CISTERNA LUNARENA Fecha : 5-Jan-19 Nº de Contrato. (Orden de Compra LAP): Modalidad del Cont Periodo : AL 05/01/2019 Contratista : ARKES CONTRATO ACUMULADO ANTERIOR PRESENTE PE ITEM DESCRIPCION TOTAL MONTO U.M CANT P.U CANT % CANT S/. S/. 3.1.2 TRAZO, NIVELES Y REPLANTEO m2 33.28 S/. 1.95 64.87 33.28 100.00% 64.87 0.00 3.2 MOVIMIENTO DE TIERRAS 3.2.1 EXCAVACION MASIVA CONMAQUINARIAS EN TERRENO SATURADO m3 10.04 S/. 12.00 120.45 10.04 100.00% 120.45 0.00 3.2.2 BOMBEO DE AGUA, POR FILTRACION (01 BOMBA C/TUB 2") dia 30.00 S/. 104.00 3,120.00 30.00 100.00% 3,120.00 0.00 3.2.3 MEJORAMIENTO DE TERRENO CON OVER 2"-4", H = 0.40m m3 10.02 S/. 78.52 786.53 10.02 100.00% 786.53 0.00 3.2.4 CONFORMACION DE SUBRASANTE (AFIRMADO) m2 33.28 S/. 30.63 1,019.30 33.28 100.00% 1,019.30 0.00 3.2.5 COMPACTACION DE SUBRASANTE m2 33.28 S/. 13.00 432.64 33.28 100.00% 432.64 0.00
3.2.6 ELIIMINACION DE MATERIAL EXCEDENTE CARGA MANUAL Y VOLQUETE (15M3) m3 13.55 S/. 10.19 138.09 13.55 100.00% 138.09 0.00
3.3 CONCRETO SIMPLE
3.3.1 CONCRETO F'c=175Kg/cm2 EN PISO, INC. ACABADO FROTACHADO m3 4.50 S/. 406.97 1,831.38 - 0.00% 0.00 0.00 3.3.2 CONCRETO F'c=175Kg/cm2 EN BASE DE ELECTROBOMBAS Y FILTROS m3 1.50 S/. 389.44 584.16 - 0.00% 0.00 0.00 3.4 CONCRETO ARMADO 3.4.1 CUARTO DE BOMBAS 3.4.1.1 CONCRETO F'c=210Kg/cm2 PARA ZAPATA CORRIDA m3 2.40 S/. 443.59 1,064.62 2.40 100.00% 1,064.62 0.00 3.4.1.2 ACERO ESTRUCTURAL Fy=4200Kg/cm2 PARA ZAPATA CORRIDA Kg 205.12 S/. 4.74 971.86 205.12 100.00% 971.86 0.00 3.4.1.3 CONCRETO F'c=210Kg/cm2 EN BASE DE CUARTO DE MAQUINA m3 8.32 S/. 472.30 3,929.50 8.32 100.00% 3,929.50 0.00 3.4.1.4 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN BASE DE CUARTO DE MAQUINA Kg 534.08 S/. 4.74 2,530.47 534.08 100.00% 2,530.47 0.00 3.4.1.5 CONCRETO F'c=210Kg/cm2 EN MUROS DE CUARTO DE MAQUINA m3 10.80 S/. 472.30 5,100.80 0.00 0.00% 0.00 10.80 3.4.1.6 ENCOFRADO Y DESENCOFRADO NORMAL PARA MUROS DE CUARTO DE MAQUINA m2 93.12 S/. 71.86 6,691.89 46.56 50.00% 3,345.95 46.56 3.4.1.7 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN MUROS DE CUARTO DE MAQUINA Kg 905.76 S/. 4.74 4,291.49 905.76 100.00% 4,291.49 0.00 3.4.1.8 CONCRETO F'c=210Kg/cm2 EN TECHO DE CUARTO DE MAQUINA m3 8.12 S/. 472.30 3,835.05 0.00 0.00% 0.00 8.12 3.4.1.9 ENCOFRADO Y DESENCOFRADO NORMAL PARA TECHO DE CUARTO DE MAQUINA m2 42.85 S/. 71.86 3,079.33 21.43 50.00% 1,539.67 21.43 3.4.1.10 ACERO ESTRUCTURAL Fy=4200Kg/cm2 EN TECHO DE CISTERNA Kg 584.31 S/. 4.74 2,768.46 0.00 0.00% 0.00 584.31 3.5 REVOQUES Y ENLUCIDOS 3.5.1 REVESTIMIENTO CON IMPERMEABILIZANTE EN CUARTO DE MAQUINA m2 239.28 S/. 10.76 2,575.49 - 0.00% - 0.00 1 VALORIZACION N° 02 - CISTERNA - ARKES Nombre del Proyecto: CONSTRUCCION DE CISTERNA LUNARENA Fecha : 5-Jan-19 Nº de Contrato. (Orden de Compra LAP): Modalidad del Cont Periodo : AL 05/01/2019 Contratista : ARKES CONTRATO ACUMULADO ANTERIOR PRESENTE PE ITEM DESCRIPCION TOTAL MONTO U.M CANT P.U CANT % CANT S/. S/. 3.6 JUNTAS 3.6.1 JUNTAS CON WATERSTOP 6" ml 84.66 S/. 15.24 1,290.50 42.33 50.00% 645.22 42.33 3.7 INSTALACIONES SANITARIAS Y METALICAS 3.7.1 ELECTROBOMBA CENTRIFUGA HORIZONTAL 2HP- 4LPS-40PSI und 3.00 S/. 1,872.00 5,616.00 3.00 100.00% 5,616.00 0.00 3.7.2 ELECTROBOMBA DE PRESION CONSTANTE 3HP- 4LPS-45.5PSI und 4.00 S/. 2,080.00 8,320.00 4.00 100.00% 8,320.00 0.00 3.7.3 FILTRO MULTICAPAS ARENA DE CUARZO 28m3/h und 1.00 S/. 520.00 520.00 1.00 100.00% 520.00 0.00 3.7.4 FILTRO CARBON ACTIVADO 28m3/h und 1.00 S/. 520.00 520.00 1.00 100.00% 520.00 0.00 3.7.5 DOSIFICADOR DE CLORO HTH INC. ELECTROBOMBA DOSIFICADORA und 1.00 S/. 1,248.00 1,248.00 1.00 100.00% 1,248.00 0.00 3.7.6 TANQUE PULMON PRECARGADO 32 GALONES und 1.00 S/. 728.00 728.00 1.00 100.00% 728.00 0.00 3.7.7 UNION UNIVERSAL D=3" und 3.00 S/. 31.20 93.60 3.00 100.00% 93.60 0.00 3.7.8 TABLERO DE CONTROL GLB 1.00 S/. 520.00 520.00 0.00 0.00% 0.00 0.50 3.7.9 TUBERIA DE F°G° GLB 1.00 S/. 884.00 884.00 0.00 0.00% 0.00 0.50 3.7.10 TUBERIA DE PVC GLB 1.00 S/. 520.00 520.00 0.00 0.00% 0.00 0.50 1 VALORIZACION N° 02 - CISTERNA - ARKES Nombre del Proyecto: CONSTRUCCION DE CISTERNA LUNARENA Fecha : 5-Jan-19 Nº de Contrato. (Orden de Compra LAP): Modalidad del Cont Periodo : AL 05/01/2019 Contratista : ARKES CONTRATO ACUMULADO ANTERIOR PRESENTE PE ITEM DESCRIPCION TOTAL MONTO U.M CANT P.U CANT % CANT S/. S/. 3.7.11 ACCESORIOS PARA DISTRIBUCION EN CUARTO DE MAQUINA GLB 1.00 S/. 3,120.00 3,120.00 0.00 0.00% 0.00 0.50 3.7.12 PUERTA METALICA INC. CANDADO GLB 1.00 S/. 4,368.00 4,368.00 0.00 0.00% 0.00 0.50 3.7.13 INSTALACION DE SISTEMA MECANICO ELECTRICO GLB 1.00 S/. 4,680.00 4,680.00 0.00 0.00% 0.00 0.50 TOTAL COSTO DIRECTO 137,373.51 74,689.64 GASTOS GENERALES 8.00% 10,989.88 5,975.17 UTILIDADES 8.00% 10,989.88 5,975.17 SUB TOTAL PRESUPUESTO 159,353.27 - - 86,639.98 IGV 18 % 18.00% 28,683.59 15,595.20 TOTAL PRESPUESTO 188,036.86 - - 102,235.18 MONTO ENTREGADO POR ADELANTO 37.23% 70,000.00 54.37% SIN IGV 59,322.03
CONTRATISTA INGENIERO RESIDENTE (A) TOTAL 86,639.98
(B) MENOS: ADELANTOS 32,253.24
(C) SUBTOTAL (A+B) 54,386.74
5-Jan-19 5-Jan-19 (D) IGV [18% of (C)] 9,789.61
Fecha: Fecha: GERENTE DE PROYECTOS GERENTE GENERAL (E) TOTAL (C+D) 64,176.35 (F) FONDO DE GARANTIA 5% 5,111.76 (H) FIEL CUMP. 10% (*) 10,223.52 (G) DETRACCION (4%)
(H) MONTO A PAGAR (E+F+G) 48,841.07
Fecha: Fecha: PRESUPUESTO ORIGINAL S/. 188,036.86 alidad del ContrSUMA ALZADORDENES DE CAMBIO S/. PRESUPUESTO ACTUAL S/. 188,036.86 PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL MONTO MONTO MONTO % CANT % CANT % S/. S/. S/.
PRESUPUESTO ORIGINAL S/. 188,036.86 alidad del ContrSUMA ALZADORDENES DE CAMBIO S/. PRESUPUESTO ACTUAL S/. 188,036.86 PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL MONTO MONTO MONTO % CANT % CANT % S/. S/. S/. 0.00% 0.00 33.28 100.00% 64.87 - 0.00% -
PRESUPUESTO ORIGINAL S/. 188,036.86 alidad del ContrSUMA ALZADORDENES DE CAMBIO S/. PRESUPUESTO ACTUAL S/. 188,036.86 PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL MONTO MONTO MONTO % CANT % CANT % S/. S/. S/.
DISTRIBUCION DE ADELANTO POR CA GASTOS GENERALES 6.08340% UTILIDAD 4.50000% IGV 18.00000%
RESUMEN PRESUPUESTO GASTOS G UTILIDAD SUB TOTAL
CASA HOUSE 372,985.84 22690.22 16784.36 412,460.42 CADSA TIPO 1.2 178.00 223,713.37 13609.38 10067.10 247,389.85 CASA TIPO 3 81.00 213,658.86 12997.72 9614.65 236,271.23
896,121.49
SUB-TOTAL S/. 896,121.49
IGV 18/ 161,301.87 TOTAL ### CION DE ADELANTO POR CASAS