Documente Academic
Documente Profesional
Documente Cultură
A GEOGRAPHIC A
NORTH
11
5 °
IMPZ.SS.06
TRUE
NORTH
5270
B SUPPLY FOR RC FIRE B
WATER TANK (600 GAL)
TRANSFER
ROOM ROOF
SECURITY
PUMP
3030
DOOR CANOPY
DOMESTIC WATER
TANK (1000 GAL)
2000
1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN M UNLESS OTHERWISE SPECIFIED.
2690
C C
2. HEIGHT OF THE BUILDING SHALL BE GOVERNED BY THE REQUIREMENT OF THE EQUIPMENT TO BE HOUSED
DOOR CANOPY
DOOR CANOPY
6980
2900
2900
3365
2000
STAIRCASE NO.1 3. THE WALLS AROUND THE TRANSFORMER/REACTOR SHALL BE FIRE PROOF.
5720
4. THE GROUND WATER TANK & TRANSFER PUMPS WILL BE INDICATED TENTATIVELY SUBJECT TO
1000
3720
980
5. THE CAPACITY OF FIRE WATER TANK WILL BE INDICATED AFTER THE FINALIZATION OF HYDRAULIC CALCULATIONS.
H&L 6560
DB 6. FOR CIVIL DEATILS, PLEASE REFER RELEVANT CIVIL ARCHITECTURAL DRAWINGS.
2745
2745
FIRE WATER TANK-1
950
35/50MVA-132/12kV 8. THE TRANSFORMER ROOF SHALL BE OF STEEL STRUCTURE. PROCEDURE FOR ERECTION AND DISMANTLING
10980
OF ROOF TRUSSES, SHEETING AND LOUVERS FOR TRANSFORMER TO BE SUBMITTED FOR APPROVAL
LVAC ROOM
2000
10980
VOID AREA 9. ALL BLOCK WALLS AND THERMAL INSULATED EXTERNAL WALLS ARE SHOWN WITH
INCLUDING PLASTERING THICKNESS
D D
2745
10. NO OF CABLE DUCTS LOCATION FOR THE INTERNAL CABLING OF THE SUB STATION SHALL BE
2745
MANHOLE
FDP
MUX
LVAC SWITCHGEAR
11. OPEN AREA INSIDE THE COMPOUND SHALL BE PAVED WITH 800mm THICK INTERLOCK PAVING.
13600
CAGE LADDER FOR 12. FIRE BARRIERS SHALL BE DESIGNED / INSTALLED GIVING DUE CONSIDERATION FOR
FUT.
8380
8850
ROOM
2920
2920
CORRIDOR
2000
1580
ROOF ACCESS
HVAC
2500
6600
4900
ET ROOM-1
4630
FAX
3600
MACHINE
500kVA 11 /0.4 kV
132kV GIS ROOM EARTHING LEGEND
4745
11kV BBP
132kV LI BBP
(+R15) (+R14)
4900
(+R16)
110V STATION
DZ-1
CHARGER-1
ET ROOM-2
FALSE CEILING
CORRIDOR
110V
EARTHING
132kV HI BBP
F
4818
TRANSFORMER
15000
RAISED FLOOR
IDT-3 ROOM
110V STATION 110V
CZ
35/50MVA-132/12kV
IDT1
+RLA3 +RTA2
F 290mm THK.
(+R11)
DZ-1
CHARGER-2
BATTERY
G 240mm THK. G
132kV PROTECTION PANELS
800
+AVR
1860
CONTROL & PROTECTION ROOM
240mm THK.
RYDA
+RTA5
110V EL.
4900
CHAR.
1414
ET ROOM-3
RECORDER PANELS
+RLA7 +RBC6
B/C
DFR3
DCDB
25120
EARTHING
REFERENCE DRAWINGS
SPCB
TRANSFORMER
DFR2
2076 859 1565 470 THK. WALL (300 THK RC WALL + 50 THK
CAVITY WITH APPROVED INSULATION +100 THK
7335
+RTA8
4500
IDT3
3230
2650
HANDRAIL
SPARE
+RLA9
CAGE LADDER
STAIRCASE NO.2
FUT2
R0 TPD / 132kV / FAY ROAD / SLD / 01 132kV SINGLE LINE DIAGRAM (TENDER DRAWING) --
H FIRE HOSE REEL CABINET (FHC)-CLASS-II
H
FUT1
R0 TPD / 11kV / FAY ROAD / SLD / 01 11kV SINGLE LINE DIAGRAM (TENDER DRAWING) --
SCMS PANELS
SURFACE MOUNTED
1800
CORRIDOR
+SLB3
2000
3000
ET EARTHING TRANSFORMER
F 1860 BATTERY ROOM-1 2500
+SLA2
REVISIONS
9650
7610
1000
2000
NRV
NRV
EYE WASH
CABLE
AND SINK
AND SINK
BUILT-IN
3680 EL-BATT 110V DC EMERGENCY LIGHTING BATTERY CHARGER No. PREPARED CHECKED STATUS
2480 CHAR.
CLIENT
1465