PROYECTO "MANTENIMIENTO DEL ESTADIO SILLKI, CHIMPA PAMPA DEL DISTRITO DE OROPESA-QUISPICANCHI-CUSCO"
TOTAL
ITEMS DESCRIPCION UND
PROGR
ITEMS DESCRIPCION UND TOTAL P.U. P.TOTAL
1 SEMANA 2 SEMANA 3 SEMANA
01.00 SECTOR DEL ESTADIO SILLKI
1.01.00 OBRAS PROVISIONALES
01.01.01 TRAZO Y REPLANTEO M2 3,000.00 S/. 1.35 S/. 4,050.00
01.02.00 OBRAS PRELIMINARES
01.02.01 DESBROCE DE VEGETACION O MALESA m2 3,000.00 S/. 2.40 S/. 7,200.00
01.03 ARQUITECTURA
01.03.01 RESANES
01.03.01.01 RESANES EN SARDINELES m2 80.00 S/. 29.35 S/. 2,348.00
01.03.02 PINTURAS
01.03.02.01 FORJADO DE MUROS CON YESO m2 8,000.00 S/. 4.02 S/. 32,160.00
01.03.02.02 PINTURA EN SARDINELES m2 380.00 S/. 9.14 S/. 3,473.20
01.04 VARIOS
01.04.01 DEMOLICION DE INFRAESTRUCTURA CONSTRUIDA m3 64.00 S/. 9.48 S/. 606.72
01.04.02 COSTRUCCION DE MUROS DE ADOBE m2 75.00 S/. 12.83 S/. 962.25
01.04.03 RETEJADO EN MUROS PERIMETRICOS m 980.00 S/. 9.85 S/. 9,653.00
01.04.04 ELIMINACION DE MATERIAL EXCEDENTE m3 45.00 S/. 11.85 S/. 533.25
01.04.05 LIMPIEZA FINAL m2 3,000.00 S/. 2.40 S/. 7,200.00
02.00 SECTOR DEL ESTADIO CHIMPA PAMPA
2.01.00 OBRAS PROVISIONALES
02.01.01 TRAZO Y REPLANTEO M2 500.00 S/. 1.35 S/. 675.00
02.02.00 OBRAS PRELIMINARES
02.02.01 DESBROCE DE VEGETACION O MALESA m2 500.00 S/. 2.40 S/. 1,200.00
02.03 ARQUITECTURA
02.03.02 PINTURAS
02.03.02.01 FORJADO DE MUROS CON YESO m2 2,000.00 S/. 4.02 S/. 8,040.00
02.04 VARIOS
02.04.03 RETEJADO EN MUROS PERIMETRICOS m 200.00 S/. 9.85 S/. 1,970.00
02.04.04 ELIMINACION DE MATERIAL EXCEDENTE m3 15.00 S/. 11.85 S/. 177.75
02.04.05 LIMPIEZA FINAL m2 500.00 S/. 2.40 S/. 1,200.00
HIMPA PAMPA DEL DISTRITO DE OROPESA-QUISPICANCHI-CUSCO"
PROGRAMACION DE OBRA