SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking.
OPERATING PROCEDURE -
SL. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer
DO’s :
1. Before starting, ensure that there is no/little settled sludge in the Concentrator Tank.
2. Before starting, ensure adequate flow & pressure of Flushing Water Pump.
DONT’s :
1. Don’t run the system in case heavy sludge accumulation in the Concentrator Tank.
2. Don’t run the system in case Mud Sump Pumps are not in operation.
3. Don’t run the system in case Concentrator Tank Discharge Line is chocked.