Sunteți pe pagina 1din 5

KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/HEC/01 (R1)


Power from knowledge
SOP For High Efficiency Concentrator
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 1 of 5

STANDARD OPERATING INSTRUCTION

FOR

HIGH EFFICIENCY
CONCENTRATOR

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Assistant Manager Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/HEC/01 (R1)


Power from knowledge
SOP For High Efficiency Concentrator
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 2 of 5

STANDARD OPERATING PROCEDURE FOR HIGH EFFICIENCY


CONCENTRATOR
OBJECTIVE: For Smooth Operation of high efficiency concentrator.

SCOPE: This SOP is applicable for 02 nos. of high efficiency concentrator.

INTRODUCTION High efficiency concentrator is a new type of ash/water concentration handling


equipment based on the design principle of superficial fluid and has advantages such as little occupancy, high
concentration efficiency, energy and water reservation, less environmental contamination, low project cost,
simple installation, operation and maintenance etc.
PRE CHECKS:
CONCENTRATOR TECHNICAL DATA:-
Model YD.GNJ15TB.0 Quantity 01 Nos./3Units.
Effective capacity 900m³ Ash content of intake < 2000 ppm
water
Ash content of ≤10ppm Flush water pressure 0.9 mpa
discharge water

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer.

SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Assistant Manager Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/HEC/01 (R1)


Power from knowledge
SOP For High Efficiency Concentrator
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 3 of 5

SAFTEY PPE’s: Safety Goggles, Hand Gloves, etc.

SPECIAL TOOLS/ EQUIPMENTS: NIL

PRECHECKS AND ACTION BY FIELD ENGINEER


SL Description Ok Not Ok Remarks
No
1 All permits and cross permits have been returned.
2 Area is clear of any other materials.
3 Check all the fixing bolt for Rotating Ram & lifting mechanism should
be tight properly.
4 Check Rotating Ram gear box oil level.
Check if there are foreign substances such as stick and block etc. and
5 prevent blockage of the rotation rake and slurry discharging pipe

PRECHECKS AND ACTION BY DESK ENGINEER


SL Description Ok Not Ok Remarks
No
1 Check MCC panel feeder is ready.
2 Check control supply is healthy.
3 Check local push button released.

OPERATING PROCEDURE -
SL. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Assistant Manager Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/HEC/01 (R1)


Power from knowledge
SOP For High Efficiency Concentrator
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 4 of 5

1 All permits and cross permits have been returned.


2 Power supply and control power supply available of agitator & lifting mechanism.
3 Tank is free from foreign particle.
SNo START UP SEQUENCE :
.
1 Close the sludge discharging valve at the bottom of concentrator
2 start the agitator motor
3 Open the BAOF intake pipe valve to fill water or slurry into the concentrator bin.
4 Open the sludge valve occasionally to drain the accumulated sludge.
SHUTDOWN SEQUENCE:
SNo 1.PLANNED SHUTDOWN :
.
1 The slurry intake valve should be closed and the concentrated sediment slurry is
fully discharged before shutdown.
2 For long shut down concentrator bin should be filled with fresh water.

ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer

DO’s & DONT’s :

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Assistant Manager Designation: Designation:
KSK Mahanadi Power Company Ltd.

6 X 600 MW Power Plant KMPCL/OPR/HEC/01 (R1)


Power from knowledge
SOP For High Efficiency Concentrator
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 5 of 5

DO’s :

1. Before starting, ensure that there is no/little settled sludge in the Concentrator Tank.

2. Before starting, ensure adequate flow & pressure of Flushing Water Pump.

3. Before starting, ensure that Flushing nozzle of Discharge Header is open.

4. Ensure periodical cleaning of sludge.

DONT’s :

1. Don’t run the system in case heavy sludge accumulation in the Concentrator Tank.

2. Don’t run the system in case Mud Sump Pumps are not in operation.

3. Don’t run the system in case Concentrator Tank Discharge Line is chocked.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Assistant Manager Designation: Designation:

S-ar putea să vă placă și