Documente Academic
Documente Profesional
Documente Cultură
FORMS
2 Aims and Objectives of the Proposed : Widening of existing Roing - Hunli Road from
Project Cl-9 specification to NHDL specification from
Km 6.00 and Km 16.00.
3 Location and Map (1:50,000 scale) of the : 82 P/15 and 82 P/16 Enclosed.
area duly authenticated by the competent
authority to be investigated/surveyed
ot required as the
ld life area. Mehao
away from project
PART-II
(To be field in by the Applicant)
1 Project details:
(i) Copy of the Investigation and Survey report. : The road is already existing as
(The report should include the dates of survey and specification. The proposed work for impro
the names of the investigators, surveyors and all widening of existing Roing-Hunli road from
officials of the concerned NP/WLS who remained to 16.00 does not fall in wildlife sanct
present during the period) Survey of the proposed road constr projec
carried out by DFO Mehao willife sanctury
Roing & DFO Dibang Forest Divison in y
accrodingly in principle (Stage-I) approval
clearance has already been granted b
Northeastern Regional Office Shillong vide
3-AN C 041/2013-SHI/1681-82 dated 12
(Copy enclosed).
(ii) Self contained and factual project report for which : All district HQs are to be linked with roads
NP/WLS area is required. specification as per SARDP programme of
(Enclose copy of the Project Appraisal document) as well as Infrastructural develop of the are
(v) Copy of the Bio diversity Impact Assessment report : Not required as the road project does n
in case the proposal involves diversion of more wildlife area.
than 50 ha. NP/WALS area.
2 Location of the project/scheme
3 Details of the area required (in Hectares only) : No wildlife sanctury /National Park area inv
(Providing break up of the land use under the project, e.g. Construction of dam, submergence, ho
staff, road etc.)
Signed by
Project Head
Name
Organization
ife Sanctuary
(To be completed by the Officer-In-Charge of the National Park/Sanctuary completed and submitte
Chief Wild Life Warden or officer authorized by him in this behalf within 30 days of the receipt of P
3 Total Area (Ha.) diverted from the NP/WLS so far for : 3.60 Ha for WLS area diverted for
development purpose of adjacent road sector Km 2.00 to
Roing-Hunli road from existing single
NHDL specifications.
4 List the past projects and the area (Ha.) diverted : Tabulated as under
6 Negative impact/s due to the diversion of area for the : Does not arise as the road is exist
projects referred to in column 4 above and work invlovs project does no
Wildlife sanctuary area.
Name of the Project (s) Negative Impact Scientific Basis of Assessmen
Widening of road Roing- Chances of killing Wildlife due to Widening of road will result spee
Hunli between Km 2.00 to speeding of vehicles. Damages to vehicles travelling on the road.
6.00 from existing single habited during constr perioed falling of
lane specn to double lane trees during construction Phase.
specn.
8 List Management actions taken/proposed to be taken in : The proposed road falls under Eco
the whole block/Zone in which the proposed area is zone & as per M plan the proposed
located are nataure trail development of infras
Eco-tourism as per chapter VII of M pl
9 Type of forest in which the proposed area falls : Tropical semi evergreen Forests w
forest density (0.20 density)
10 Location of the proposed area w.r.t. the critical/intensive : The proposed road area does not fal
wildlife management areas/ wildlife habitats (attach Map WLS area. But the project is 25 m
to scale) Mehao Wild life Sancturary.
11 List the likely POSITIVE AND NEGATIVE impact/s of the : Positive Impact - (i) Easy appr
proposed project giving scientific and technical santuary areas. (2) Less blocked
justification for each impact season due to land slides.
Negative Impacts- There will be n
negative impact as proposed project
fall in NP/WLS area. But as the Meh
Life Sancturay is 25 mtr from Proj
there may be chances of killing of wil
to speeding vehicles.
12 Provide COMPREHENSIVE details of the impact of the : The road exists prior to declaration
proposal in terms of sections 29 and/or section 35 (6) of forest as wildlife sanctury. It is the onl
the Wild Life (Protection) Act, 1972 as the case may be Dibang District Mehao RF was no
WLS in December 1980, where as t
was existing prior to that to width of 6.
13 Whether the project authorities have ever committed : No violation of wildlife protection A
violation of the Wild Life (Protection) Act, 1972 or Forest delected by project authorities.
Conservation Act, 1980. If yes, provide the EXHAUSTIVE
details of the offence and the present status of the case.
(Concealing or misrepresenting the facts will lead to
rejection of the case in addition to any other penalty as
prescribe under Law)
14 Have you examined the Project Appraisal document and : The road exists prior to Notification o
the alternatives as provided in PART-II ? RF as Mahao wildlife Sanctuary. The
any alternate road to Anini the
headquarter of Dibang Valley Di
Arunachal Pradesh State.
16 If yes, please give your comments on the : Does not arise. As the present propos
recommendations given in the report ? not falls with in NP / WLS area.
Part III 23
17 Dates and duration of your field visits to the proposed site : Joint inspection was conducted
________
18 Do you agree that the present proposal of diversion of : Diversion of NP/ WLS area not
NP/WLS area is the best or the only option and is viable However, Mehao Wild life Sanctuary
from Project boundary.
19 Any other information that you would like to bring to the : Nothing worth mentioning.
notice of the State Board for Wildlife, National Board for
Wildlife or its Standing Committee that may be relevant
and assist in decision making
Signed by
Diversion
val has been accorded
odal Oficer (FCA) letter
/2009/Pt-I/231-36 dated
enclosed) and Stage-II
de CCF(Cons) & Nodal
etter No. FOR-3-
3-48 dated 10 Feb 2017
is of Assessment
provide safe and smooth
defence vehicles in this
onneting to border areas
der.
r to declaration of this
tury. It is the only road to
ao RF was notified as
980, where as this road
hat to width of 6.10 mtr.
to Notification of Mahao
Sanctuary. There is no
to Anini the district
ang Valley District in
tate.
or diversion of WLS is
orad exists to 6.10 mtr
nt to NHDL specificaiton
WLS is expected as the
falls in NP/ WLS aera.
s)
s regard
PART IV
(To be completed by the Chief Wildlife Warden within 15 days of the receipts of
PART-II and PART-III)
Signed by
(To be completed by the Department in Charge of Forestry and Wildlife in consultation with the
State Board for Wild Life with in 30 days of the receipt of PART-II, PART-III and PART-IV)
Signed by
1 M/S KABANG GAMO AGENCY LTD 2300 2300 1950 2300 1500
Member : 1. _____________________________________________
Shri J.S.Bishit, AE (Civ)
2IC, 62 RCC (GREF)
2. ___________________________________________
Shri Katre Pawan Kumar
JE (Civ), 62 RCC (GREF).
Appendix -"'B"
MARKET RATE OF SUPPLY
S/No NAME OF SIPPLIER RATE QUOTED BY THE SUPPLIER
S/Chips S/Chips S/Metal S/Key Sand (
13.20 mm 11.20 mm 63-45 mm agge Rs /
( Rs / ( Rs / 13.20 mm Cum)
Cum) ( Rs / Cum) ( Rs /
Cum) Cum)
Member : 1. _____________________________________________
Shri J.S.Bishit, AE (Civ)
2IC, 62 RCC (GREF)
2. ___________________________________________
Shri Bijender Singh
JE (Civ),487 RMPL/ 62 RCC (GREF).
Appendix -"'B"
MARKET RATE OF SUPPLY
S/No NAME OF SIPPLIER RATE QUOTED BY THE SUPPLIER
S/Chips S/Chips S/Metal S/Key Sand (
13.20 mm 11.20 mm 63-45 mm agge Rs /
( Rs / ( Rs / 13.20 mm Cum)
Cum) ( Rs / Cum) ( Rs /
Cum) Cum)
Member : 1. _____________________________________________
Shri J.S.Bishit, AE (Civ)
2IC, 62 RCC (GREF)
2. ___________________________________________
Shri Bijender Singh
JE (Civ),487 RMPL/ 62 RCC (GREF).
PPLIER
F/Wood
( Rs /
Cum)
1610
1675
1650
________________
________________
PPLIER
F/Wood
( Rs /
Cum)
1450
1350
1380
_____________
________________
________________
PPLIER
F/Wood
( Rs /
Cum)
________________
________________