PROJECT: A PROPOSED WAREHOUSE RENOVATION

OWNER: ALPA LAND INC.


DATE STARTED: Jul-19
DEADLINE: Jul-19
TOTAL MONTHS: 2 WEEKS

TOTAL QUANTITY
ITEM DESCRIPTION
QTY UNIT WEEK 1
STEEL WORKS
30X30X12 mm baseplate 3.00 pcs
W10X39X12 m 1.00 L
25mm ø x 200 mm chemical achor 12.00 pcs
sika leveling grout 3.00 bags
HIT-V threaded rod 12 ø mm by 225 mm 22.00 pcs
HIT-HV 200 chemical injection 3.00 tubes
Hilty Drill 1.00 unit
Drill Bit 16mm ø 1.00 pcs
Drill Bit 28mm ø 1.00 pc
300x325x12 mm A 36 Shear Plate 3.00 pcs
200x250x12 mm A36 Shear Plate 3.00 pcs
W 12 x22 x 12 m 3.00 L
W 8x28x12m 2.00 L
2"X2"X1/4 Angle Bar 4.00 L
3"X3"X1/4 Angle Bar 1.00 L
2x4x2 C Purlins L

PAINTING WORKS
1 DRY WALL TOTAL PAINT 143 SQ. M
MARINE EPOXY A+ B 2 GAL
JOINT TAPE 2 ROLL
GYPSUM PUTTY 8 GAL
BOYSEN FLAT LATEX 1 COAT 10 GALS
BOYSEN TOP COAT 2 COATS 10 GALS
LIHA #36 4 SHEETS
LIHA #80 4 SHEETS
LIHA #120 4 SHEETS
7 " ROLLER W/ HANDLE 2 PC
4" ROLLER W/ HANDLE 2 PC
2.5 BRUSH 2 PCS
1" BRUSH 2 PCS
1"MASKING TAPE 4 PCS
4 " BRUSH 2 PC
2 CHB TOTAL PAINT 111.91 SQ. M
ACRYTEX PRIME (1 COAT) 4 GAL
ACRYTEX CAST 4 GAL
MASONRY PUTTY 4 GAL
BOYSEN PERMACOAT FAT LATEX(1 COAT) 4 GAL
BOYSEN TOP COAT COLOR (2 COATS) 8 GAL
LIHA #36 4 SHEETS
LIHA #80 4 SHEETS
LIHA #100 4 SHEETS
7 " ROLLER W/ HANDLE 2 PC
4" ROLLER W/ HANDLE 2 PC
2.5 BRUSH 2 PCS
1" BRUSH 2 PCS
1"MASKING TAPE 2 PCS
4 " BRUSH 2 PC

CARPENTRY WORKS
1 DRY WALL TOTAL AREA 130 SQ. M
METAL TRACKS 15 L
METAL STUDS 60 L
2X3 S4S GOOD WOOD UMBER 1 L
PAN HEADS SCREW 360 PCS
CONCRETE NAILS 1" HALF kgs
HARDIFLEX BOARD 45 SHEETS
HARDI SCREW 2900 PCS
2 CEILING (HARDIFLEX) 105 SQ. M
0.6 CARRYING CHANNEL 26 L
WALL ANGLE 36 L
SINGLE FARRYING HANGER 24 L
DOUBLE FARRYING 36 L
DOUBLE FARRYING CLIP 120 PCS
1" CONCRETE NAILS 1 KGS
DRIVE PIN CARTRIDGE 1" 152 PCS
ONE-HALF INCH PAN HEAD SCREW 844 PCS
HARDIFLEX BOARD 38 L
3/4 X 6 M HARDIFLEX SCREW 1680 PCS
PLYWOOD MARINE 3/4 21 PCS
TEX SCREW 2" 2000 PCS

TOTAL QUANTITY
ITEM DESCRIPTION
QTY UNIT WEEK 1
ELECTRICAL WORKS
TOTAL QUANTITY
ITEM DESCRIPTION
QTY UNIT WEEK 1
PLUMBING WORKS
JULY AUGUS
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6
JULY AUGUS
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6
JULY AUGUS
WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6
AUGUST SEPTEMBER
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11
AUGUST SEPTEMBER
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11
AUGUST SEPTEMBER
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11
EMBER OCTOBER
WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
EMBER OCTOBER
WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
EMBER OCTOBER
WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
NOVEMBER
WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20
NOVEMBER
WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20
NOVEMBER
WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20