CLIENT:XXXXXXX

SL NO ACTIVITY AND OPERATION


CHARACTERISTICS

1 2 3
1 General Requirements

1.00 a Setting up of FQA laboratory within ten


weeks from the LOA

Avaliability of requisite laboratory set up and


1.00 b equipment in good working condition well
before commencement of concerned
activity.
Submission of QA & QC manpower
1.01 a deployment schedule based on agreed L-2
network .

1.01 b Availability of QA & QC manpower based on


deployment schedule .

1.02 Sampling for testing of materials

Submission of schedule of tests to be done


1.03 -
monthly
2.0 Excavation and Filling
2.1 Type of soil / rock

2.2 Initial ground level

Marking layout of the


2.3 structure w.r.t the avaliable
TBM
Dimensions of excavated
2.4 footing

2.5 PCC bottom Lvl.

2.6 Side slope during excavation

Back filling
2.7 Degree of compaction of fill

Dry density by core cutter


a method
Or Dry density in place by
b sand displacement method

Relative density ( Density


c index)

Dry Density by Proctor


d Needle Penetration

2.8.1 Sand Filling Suitability of material used


2.8.2 Stone Filling Suitability of material used

3.0 Cast-in-situ Concrete and allied Works


3.01 Materials
3.01.01 Cement

i) Physicl and chemical


properties

ii)Normal consistency &


Setting Time

iii) Compressive Strength


v) Ensure that cement is
stored in weather tight
a) Storage covered storage on raised
platform.

3.01.02 Coarse Aggregate

i) Moisture content

Specific gravity,water
ii)
absorption
Particle size and shape
(Sieve analysis,
determination of material
iii) finer than 75 micron,
flakiness index, elongation
index, angularity)

Crushing value abrasion


iv) value and impact value

3.01.03 Fine Aggregates(Sand)

i) Bulkage, Moisture content

ii) Mortar making Properties

Silt , Clay content,


iii) deleterious materials,
organic impurities
All other tests similar to
iv) coarse aggregate as
mentioned above.

3.01.04 Water

Water is free from excess


acid, alkali or salt & harmful
I substances,within
Permissible limits of solids &
PH value

3.02.01 Concrete

i) Concrete Mix Design


Check whether the design
mix meets the requirement
ii) Validation of mix design of workability and
compressive strength

ii) Concrete Production a) Workability -

b)Crushing Strength

c) Water Cement Ratio

d) Cement content
iii) Admixtures for concrete Chemical Properties

Physical Properties

3.02.02 Concrete conveying,placing & compaction

i) Calibration of batching plant

Handling & transportation of


ii) concrete

iii) Placement of concrete


iv) Check for placement

v) Compacting

a) Check for curring duration


Execution and uniform curing of the
surface

b) Cleaniness, provision of
chute and arrangement for
vi) transportation & placement
of concrete

c) Check for the slope of


cold water basin
vii) Curing Minimum 14 days

3.02.03 Tests/Checks on RCC Strctures


Visual examination for
surface finish

Dimensional check on
i) finished structures &
dimensional tolerances

Water tightness test of liquid


ii)
retaining structures/ tanks

iii) As built survey of each lift of


shell
Check for verticality &
horizontalness of SS/Pre-
iv) cast channel support for PVC
fill.

3.03 Reniforcement Steel (CRS & hysd bars)


Mechanical & Chemical
i) properties

ii) Tolerance on mass

Freedom from cracks


iii) surface flaws, Lamination
(Visual Examination)

3.03.01 Placement of Reinforcement Steel


Check for bar bending
i) schedule with necessary
laps. Spacers & Chairs

Check for cover, spacing of


ii)
bars

iii) Check for bending of bars

Check for spacers and chairs


iv) after the reinforcement cage
is put inside the formwork.

v) Lappings of bars

vi) Check all joints, crossing


3.04 Staging And Form Work

3.04.01 Material and accessories

Soundness of staging,
i) shuttering and scaffolding

Connection between
individual scaffolding units
ii) and safe slenderness ratio.
Two independent safety
measures against collapse

Concrete strength during


iii) climbing process

Hoisting for personnel and


iv) material

3.05 Anchor Bolt Instalation inside concrete


i) Position and level of bolt

Position depth and size of


ii) bolt hole

3.06 Grouting
i) Grouting Pressure

ii) Composition of grout

3.07 Foundation
Open / Shallow Foundation

Check for the foundation


i) excavation - Location,
Layout, size, depth etc.
Check for the foundation
casting - Layout, shape,
ii)
dimensions,Reinforcement,
Concreting, curing etc.

7.00 Doors,Windows Ventilators & Grills

i) Materials and Accessories As Required

ii) Check for dimensions As Required

iii) Thickness of paint/ anodized coating As Required

iv) Workmanship As Required

v) Verticality & Alignment As Required


Performance fore smooth operable under all
vi) conditions
8.00.00 GI,CI,PVC PIPES AND FITTINGS
8.01.00 Material / components including valve
As Req
8.01.01 Surface finish freedom from cracks and
other defects
8.01.02 Dimension and construction
9.00 After Installation of Pipes
9.01 Water pipe and fitting
i) Hydraulic pressure test As Required

9.02 Water tightness Hydro test


10.00 Joints in Concrete
10.01 Materials
i) Bitumen Impregnated Board
ii) PVC water stops

iii) Bitumen Sealing compound

Two part Polysulphide


iv) sealant
v) Expanded polystyrene board
10.02 Installation and Fixing
4.00 Brick Masonary
4.01 Test on Bricks

Dimensions, compressive
i) strength, water absorption,
warpage, efflorescence

Compressive strength and


ii) Test in Mortar consistency

Workmanship, verticality
iii) Masonary construction and alignment

5.00 Finish Items

i) Ensure that the plastering


of brick walls shall be of min.
5.01 Plastering 18 mm thick for outside &
12 mm thick for inside face
ii) Ensure that the curing of
plastering surface are
carried out 7 days(Min.)

iii) Sand (Grading of sand)

5.02 Flooring & Finishing Work i) Check for levels slope

ii) Ensure that the floors are


chipped prior to
commencement of actual
finishing work

iii) Ensure that the cement


concrete floors are cured
minimum for 7 days.

iv) Check for laying of ifonite


flooring and metallic
hardner used in it.
Imp. notes:-Class of check: A-Critical , B-Major , C-Minor , SR-Site Register , TR-Test Repor
Log Book , IR -Inspection Report, PR -Protocol Report and BBs-Bar bending Schedule,P-Pe
S-Surveillance
MANUFACTURER'S NAME & ADDRESS

M/s XXXXXXX
Corporate Office
XXXXXXX,XXXXXXX

CLASS OF
INSTRUMENTS TYPE OF CHECK
CHECK
4 5 6

A Physical

A Physical
A Physical
As per required for lab.

A Physical

A Physical

A Physical

As required B Visual

Digital Total Station/ Auto Lvl. B Measurement

Digital Total Station C Physical


As per approved DWG. B Measurement

As per Dwg. B Measurement

As required B Measurement

B Physical

Core cutter, moisture metre and Balance A Physical


Steel tray, sieve, Cylinder, soil container,
balance and digging instrument A Physical

As required A Physical

Knife,sieve,ovencylindrical muold B Physical

As required B Physical
As required B Physical

A Review of MTC

Vicats apparatus A Testing/Outside lab.

Compressice test machine A Testing/Outside lab.


B Visual

oven andsample collect container, B Physical


balance

balance,oven ,sample container B Physical


Sieve,balance,steel tray B Physical

balance,sample container,cylindrical B Physical


mould,sieve

B Physical

B Physical

Oven,Balance,sieve,measuring cylinder
B Physical
B Physical

As required B Testing

As required A Review of report


As required A Physical

Slump test & Compacting factor test. B Physical

Compressice test machine A Physical

As required B Physical

As required B Physical
As required A Review of MTC

As required A Physical

As required A Physical

Transit Mixture machine B Physical

Jute/pumping B Physical
As required B Physical

Vibrator with niddle B Physical

As required B Physical

As required C Visual

As required B Measurement
hsian cloth/jute B Physical

As required C Visual

measuring tape B Measurement

As required A Test

As required B Physical
As required B Visual

A Review of TCS

B Measurement
Universal testing machine/MTC

B Visual
As required B Visual & Measurment

As required B Visual & Measurment

As required B Visual & Measurment

As required B Visual & Measurment

As required B Visual & Measurment

As required B Visual
As required B Visual

As required B Visual

as required B Visual

Plumbing B Physical Testing

As required B Visual
As required A Dimensional

As required A Dimensional

As required B Physical

As required B Physical

Excavator,level instrument B Physical


Measuring tape B Physical

as required B Review of MTC

B Physical

As per DWg. B Physical

As Required B Physical/ Visual

Plumbing B Physical

B Visual
B Review of MTC
As Required
B Visual
B Physical

A Physical

A Physical

A
Verfication of MFTC
A

A Verfication of MFTC
A
B Visual

A Measurement/ Physical Test

B Test

B Visual/ Physical

B Visual/ Measurement
B Visual

B Physical

B Measurement

C Visual

B Visual

B Physical
PREPARED BY
TR-Test Report , MTC-Manufacturer's Test Certificate , LB-
chedule,P-Perform, W-Witness , RW-Random witness &
FIELD QUALITY PLAN/QUALITY ASSURANCE PLAN

ITEM

CIVIL WORKS

QUANTUM OF CHECK REFERENCE DOCUMENT ACCEPTANCE NORMS

7 8 9

List of laboratory equipment Calibration and set up


100%
as per used for testing of equipments

100% calibration certificate


100%

100%

Once per source / on every As per IS code specification IS code specification


change of source given in belows mentioning in below

100% As per required

Random

100%

100%

As per approved DWG. As per approved DWG.


As per approved DWG. As per approved DWG.
100%

100%

Random

As per technical
Random specification IS 2720-P-4

i) For foundation back As per technical


filling,one for every 10 IS 2720 ( Part XXIX) specifications,
segments foundations for Construction Drawings
each compacted layer
i) For foundation back
filling,one for every 10
segments foundations for IS 2720 ( Part XXVIII)
each compacted layer

i) For foundation back As per technical


filling,one for every 10 specifications,
IS 2720 ( Part XIV)
segments foundations for Construction Drawings
each compacted layer

Random checks to be Standard practice


carried out for each As per ASTM D 1558
compacted layer

Random IS:2720, IS: 383

As per technical
specifications and
As per technical
specifications and
Random IS:2720, IS: 384 approved Methodology

Each lot IS 8112, IS:1489(Part-1)

Once per each lot and As per technical


IS 8112, IS:1489(Part-1) specification
grade

Once per each lot and IS 8112, IS:1489(Part-1)


grade
covered storage,
100% as per IS : 4083 weather tight on raised
platform

Once for each stack of 100


cum. or part there of. Except IS: 2386(part III), IS: 456, IS: IS: 2386(part III), IS:
during monsoon when this 383 456, IS: 383
has to be done every day
before start of concreting

Once for each source & for IS: 2386(part III), IS: 456, IS: IS: 2386(part III), IS:
every change of source 383 456, IS: 383
Once per 500 cum or part
thereof/ change of source, IS: 2386 Part-I, IS : 383 As per Relevant IS code
whichever is earlier

Once per source / on every IS: 2386(IV), IS:383 As per Relevant IS code
change of source

To be done every day before


start of work

Once per each source and


on every change of source

IS: 2386 (part- III), IS: 383 As per Relevant IS code


Once per each source and
on every change of source
Once per each source and
on every change of source

IS 456-1978, IS 3025, IS 526- As per Relevant IS code


Once per source 1959

Once per each per type and


grade IS 10262 , IS:456 As per Relevant IS code
For every mix design IS 10262 , IS:456 As per Relevant IS code

One sample for every 2


hours from every mixing IS: 456
plant.

One set per 100 cum or part


thereof for each grade of IS: 456, 516
concrete per shift whichever
is earlier. As per Relevant IS code

As per IS 1199
As per IS: 1199 and
approved mix design
As per IS 1199
Once pre type of lot/ IS 9103,ASTM C 494 MTC
Batch of supply

Once at the time of mix


design and thereafter once IS 9103,ASTM C 495 TR
per type of lot/ batchof
supply

To be calibrated at the time


of starting and subsequently Review of calibration chart / As per Relevant IS code
once in three months,and certificate, IS 457
shall confirm to IS:4925

100%
As per technical
specifications, erection As per IS code 456
100% methodology
specifications, erection As per IS code 456
methodology
100%
As per technical
Check for segregation as
Random specifications, Relevant
IS:456 IS code

As per technical
100% specifications
IS code 456

As per technical
Before clearance for
100% specifications, Relevant
concreting IS code

As per technical
100% IS 456
specifications
As per technical
Random IS 456
specifications

As per technical
100% IS 456
specifications

As per technical
Approved Drawing IS 456
specifications

As per technical
100% IS 3370
specifications

For each lift on the locations As per DWg As per approved DWg
as decided by E-I-C
As per approved
At Random As per approved drawings drawings

Each Consignment IS 1786, IS 432, IS 1566

As per IS 1852, IS 432,


At Random IS 1786, IS 432
As per technical
specification

As per IS 1852, IS 432,


100% IS 1786
IS 456 & 2502/
100% As per approved Drg Drawings & bar
bending schedule

IS 456 & 2502/


100% As per approved Drg Drawings & bar
bending schedule
IS 456 & 2502/
100% As per approved Drg Drawings & bar
bending schedule

IS 456 & 2502/


100% As per approved Drg Drawings & bar
bending schedule

As per Drawings & bar IS 456 & 2502/


100% bending schedule, Drawings & bar
specification bending schedule
IS 456 & 2502/
Random As per BBS Drawings & bar
bending schedule
Once

Once

Fortnight IS 456,IS 14687, IS


As per specification 3696

For each lift of shuttering

Fortnight
100%
As per DWg. As per DWg.
100%

at random Approved drawings Approved drawings

Each lot/Batch As per Dwg As per Dwg

Each Location

As per DWg As per DWg


As per DWg As per DWg

Each Foundation

As per IS 2202 (PT-II), IS


As per technical 1038, other relevant
Once per lot specifications codes & Approved
drawings
At Random

As per DWg As per DWg


At Random

100%

100% As per DWg As per DWg

100%
Each
IS 1729, IS 1536, IS
As per relevant IS codes .
10 % subject to a min. of 3 1230
nos. for each type of items

As per IS 2065 and


Each stretch As per specification Approved drawings
As per approved
Each As per approved drawings drawings

Once per lot


IS 1838
Once per lot

As per DWg
specification
Once per lot
IS 1838
IS 1838

Random

As per Tech. Specifications & IS 1077, IS 13757, IS


Table 1 of IS 5454 relevant IS codes 12894, IS 3495

At Random As per Tech. Specifications As per IS 2250

100% As per Tech. Specifications As per IS 2212,IS 1905

As Tech. specifications
100% As per Tech. Specifications IS 1661 and as per
approved drawings
As Tech. specifications
100% As per Tech. Specifications IS 1661 and as per
approved drawings

As Tech. specifications and


100 cum as per approved drawings
IS 1542
100% As per Drawings

100% As per Drawings

100% As per Drawings

Random/ Once per batch As per Drawings


For M/s XXXX XXXXXX
PREPARED BY REVIEWED BY/APPROVED BY
ASSURANCE PLAN
PROJECT:
QP-NO:XXX/XXX/XXX/XX
Rev. 0.0 JOB :
Date: XXX XXX XXX
CONTRACT No:
Page : 01 of 06
CONTRACTOR:

AGENCY
FORMAT OF RECORDS SUB
VENDOR TPIA CLIENT
VENDOR
10 11

P W RW S

calibration certificate P W RW S
P W RW S

P W RW S

SR/TR P W RW S

SR/TR P W RW S
P W RW S
P W RW S

P W RW S

P W RW S
Lvl. Sheet & Appd.
Dwg.
Lvl. Sheet & Appd.
Dwg.
P W RW S

P W RW S

P W RW S

Lvl. Sheet & Appd.


P W RW S
Dwg.
P W RW S

P W RW S
P W RW S

P W RW S
SR/TR

P W RW S

P W RW S
P W RW S

P W RW S
P W RW S
P W RW S

P W RW S

MTC P W RW S

P W RW S
SR /LB P W RW S

P W RW S

P W RW S

P W RW S
P W RW S

SR/TR
P W RW S

P W RW S

P W RW S

P W RW S

P W RW S
P W RW S

P W RW S

TR P W RW S

P W RW S

P W RW S

TR
TR

P W RW S

P W RW S

P W RW S

P W RW S

TR/SR
P W RW S
P W RW S

P W RW S

P W RW S

Calibration Cetrificate P W RW S

P W RW S

P W RW S
P W RW S

P W RW S

P W RW S

P W RW S

SR
P W RW S
P W RW S

P W RW S

P W RW S

P W RW S

P W RW S

P W RW S
P W RW S

P W RW S
P W RW S

P W RW S
MTC

P W RW S

P W RW S
P W RW S

P W RW S

P W RW S
PR/BBS

P W RW S

P W RW S

P W RW S
P W RW S

P W RW S

P W RW S

P W RW S

P W RW S

P W RW S

P W RW S
P W RW S
IR
P W RW S

P W RW S
P W RW S

MTC P W RW S

P W RW S
P W RW S

P W RW S
P W RW S

P W RW S

P W RW S

P W RW S

P W RW S
SR

P W RW S

P W RW S

P W RW S
P W RW S
P W RW S

P W RW S
P W RW S
P W RW S
P W RW S
P W RW S

P W RW S
P W RW S
P W RW S
P W RW S
P W RW S
P W RW S
P W RW S

P W RW S
P W RW S
P W RW S
P W RW S
P W RW S

IR P W RW S

IR P W RW S

SR/ LB P W RW S

P W RW S

SR/LB P W RW S
SR P W RW S

SR P W RW S

SR P W RW S

SR P W RW S

SR/LB P W RW S

SR/LB P W RW S
For TPI
Y/APPROVED BY
XXXX XXXX XXXX

XXXX XXXX XXXX

XXXX XXXX XXXX


XXXX XXXX XXXX
REMARKS

12

Functioning of laboratory equipment in


proper working condition to be verified
monthly basis.
Test report along with the
recommendations from specialist
institute, where the material shall be
tested as agreed in the LOA should be
submitted to Vedanta ltd

TBM confirm by client


Applicable where sand and stone is used
as filling material
Applicable where sand and stone is used
as filling material

Each consignment of cement obtained


shall be duly correlated with
manufacture's test certificate.
If cement is stored more than 60 days in
godown of contractor same shall be
retested for comp. strength & setting time

Accordingly water content of the concrete


will be adjusted

These tests will be carried out while


establishing design mix. and the results to
be intimated to client
Sieves should be confirming to IS-460-
1952. balance should be accurate to 0.1 %
weight of sample

Volume of sand and weight of water shall


be adjusted as per bulkage & moisture
content.

Acceptance limite as per IS:383

Acceptance limite as per IS code


Except test for flakiness index, elongation
index, angularity no ,abrsion value, impact
value, crushing value

Water will be provided by the client so


checks are not required, potable water
should be generally used.

Mix design needs to be repeated in case


of change of grade,change in workability
requirements, Change in source of
ingredients of concrete, change in
constituents of concrete(with fly ash /
without fly ash, with admixtures/ without
admixtures etc) change in exposure
conditions.
For trial mix min. of 6 cubes for each mix 3
specimen shall be tested at 7 days
remaining 3 shall be for 28 days comp.
strength

Three specimen shall be tested for 7 days


and remaining at 28 days.

According to mix design


Admixture of appd. Brand and tested
quality should be used. The chemical
properties of an admixture should be
tested once at the time of mix design

Cement consumption at batching plant


shall also be obtained through computer
Output. Provision of printer is mandatory.
The calibration shall be done by traceable
weights.

As per methodology.
To be checked before clearance for
concreting
For curing compound exposed concrete
surface shall be protected against drying
for atleast 72 hrs after placement,curing
compound may be used

Limit of permibility as per IS 2645 shall


also be met wiyh
To be checked at site. Steel collected from
source should be free from excessive rust.
To be stored as per Tech. Specifications
The cover block should have adequate
strength

Crossing of the bars are to be tied up


properly with right gauge of annealed
wire
Random to be checked by FQA

Lines and levels to be checked


Lines and levels to be checked. Concrete
Grade to be checked as per Mix Design.

MTC shouldl be corellated with the


consignment received.

All bulidings shall be providedwith


suitable anodised aluminium grill erection
shold be as per DWG.
MFTC shall be correlated with the
consignment
Tolerance limits as per relevant IS 1729, IS
1536, IS 1230
`
Effloresence shall be checked at each
source

The sand used for masonary work shall


cnform to IS 2116
No ponding of water on finished surfaces
to be ensured

Sueveillance by FQA
For Client
CLIENT- VEDANTA LTD., JSG

SL NO ACTIVITY AND OPERATION

1 2
1 General Requirements

1.00 a Setting up of FQA laboratory within ten


weeks from the LOA

Avaliability of requisite laboratory set up and


1.00 b equipment in good working condition well
before commencement of concerned
activity.

Submission of QA & QC manpower


1.01 a deployment schedule based on agreed L-2
network .

1.01 b Availability of QA & QC manpower based on


deployment schedule .
1.02 Sampling for testing of materials

Submission of schedule of tests to be done


1.03 monthly
2.0 Excavation and Filling
2.1

2.2

2.3

2.4

2.5

2.6
2.7 Degree of compaction of fill

2.8.1 Sand Filling


2.8.2 Stone Filling

3.0 Cast-in-situ Concrete and allied Works


3.01 Materials
3.01.01 Cement
a) Storage

3.01.02 Coarse Aggregate

i)

ii)

iii)
iv)

3.01.03 Fine Aggregates(Sand)

i)

ii)

iii)

iv)

3.01.04 Water

I
3.02.01 Concrete

i) Concrete Mix Design

ii) Validation of mix design

ii) Concrete Production


iii) Admixtures for concrete

3.02.02 Concrete conveying,placing & compaction

i)
ii)

iii)
iv)

v)

Execution

vi)
vii) Curing

3.02.03 Tests/Checks on RCC Strctures

i)

ii)

iii)

iv)

3.03 Reniforcement Steel (CRS & hysd bars)


i)

ii)

iii)

3.03.01 Placement of Reinforcement Steel

i)

ii)

iii)
iv)

v)

vi)

3.04 Staging And Form Work

3.04.01

i)

ii)
iii)

iv)

3.05 Anchor Bolt Instalation inside concrete

i)

ii)

3.06 Grouting
i)

ii)

3.07 Foundation
Open / Shallow Foundation
i)

ii)

7.00 Doors,Windows Ventilators & Grills

i) Materials and Accessories

ii) Check for dimensions

iii) Thickness of paint/ anodized coating

iv) Workmanship

v) Verticality & Alignment


Performance fore smooth operable under all
vi) conditions
8.00.00 GI,CI,PVC PIPES AND FITTINGS
8.01.00 Material / components including valve

8.01.01 Surface finish freedom from cracks and


other defects
8.01.02 Dimension and construction
9.00 After Installation of Pipes
9.01 Water pipe and fitting
i) Hydraulic pressure test

9.02 Water tightness


10.00 Joints in Concrete
10.01 Materials
i)
ii)

iii)

iv)

v)
10.02 Installation and Fixing
4.00 Brick Masonary
4.01 Test on Bricks

i)

ii) Test in Mortar

iii) Masonary construction

5.00 Finish Items

5.01 Plastering

5.02 Flooring & Finishing Work


For Vedanta LTD.

Signature
MANUFACTURER'S NAME & AD
TATA PROJECTS LTD
Corporate Office
1-7-80 to 87, Prenderghast R
Secunderabad -500003, Ind

CHARACTERISTICS

3
-

Type of soil / rock

Initial ground level

Marking layout of the


structure w.r.t the avaliable
TBM

Dimensions of excavated
footing

PCC bottom Lvl.

Side slope during excavation

Back filling
Dry density by core cutter
method

Or Dry density in place by


sand displacement method

Relative density ( Density


index)

Dry Density by Proctor


Needle Penetration

Suitability of material used


Suitability of material used

i) Physicl and chemical


properties

ii)Normal consistency &


Setting Time

iii) Compressive Strength


v) Ensure that cement is
stored in weather tight
covered storage on raised
platform.

Moisture content

Specific gravity,water
absorption

Particle size and shape


(Sieve analysis,
determination of material
finer than 75 micron,
flakiness index, elongation
index, angularity)
Crushing value abrasion
value and impact value

Bulkage, Moisture content

Mortar making Properties

Silt , Clay content,


deleterious materials,
organic impurities

All other tests similar to


coarse aggregate as
mentioned above.

Water is free from excess


acid, alkali or salt & harmful
substances,within
Permissible limits of solids &
PH value
Check whether the design
mix meets the requirement
of workability and
compressive strength

a) Workability -

b)Crushing Strength
c) Water Cement Ratio

d) Cement content

Chemical Properties

Physical Properties

Calibration of batching plant


Handling & transportation of
concrete

Placement of concrete
Check for placement

Compacting

a) Check for curring duration


and uniform curing of the
surface

b) Cleaniness, provision of
chute and arrangement for
transportation & placement
of concrete

c) Check for the slope of


cold water basin
Minimum 14 days

Visual examination for


surface finish

Dimensional check on
finished structures &
dimensional tolerances

Water tightness test of liquid


retaining structures/ tanks

As built survey of each lift of


shell

Check for verticality &


horizontalness of SS/Pre-
cast channel support for PVC
fill.
Mechanical & Chemical
properties

Tolerance on mass

Freedom from cracks


surface flaws, Lamination
(Visual Examination)

Check for bar bending


schedule with necessary
laps. Spacers & Chairs

Check for cover, spacing of


bars

Check for bending of bars


Check for spacers and chairs
after the reinforcement cage
is put inside the formwork.

Lappings of bars

Check all joints, crossing

Material and accessories

Soundness of staging,
shuttering and scaffolding

Connection between
individual scaffolding units
and safe slenderness ratio.
Two independent safety
measures against collapse
Concrete strength during
climbing process

Hoisting for personnel and


material

Position and level of bolt

Position depth and size of


bolt hole

Grouting Pressure

Composition of grout
Check for the foundation
excavation - Location,
Layout, size, depth etc.

Check for the foundation


casting - Layout, shape,
dimensions,Reinforcement,
Concreting, curing etc.

As Required

As Required

As Required

As Required

As Required
As Required

As Required

Hydro test

Bitumen Impregnated Board


PVC water stops

Bitumen Sealing compound

Two part Polysulphide


sealant

Expanded polystyrene board


Dimensions, compressive
strength, water absorption,
warpage, efflorescence

Compressive strength and


consistency

Workmanship, verticality
and alignment

i) Ensure that the plastering


of brick walls shall be of min.
18 mm thick for outside &
12 mm thick for inside face

ii) Ensure that the curing of


plastering surface are
carried out 7 days(Min.)

iii) Sand (Grading of sand)

i) Check for levels slope


ii) Ensure that the floors are
chipped prior to
commencement of actual
finishing work

iii) Ensure that the cement


concrete floors are cured
minimum for 7 days.

iv) Check for laying of ifonite


flooring and metallic
hardner used in it.

Imp. notes:-Class of check: A-Critical , B-Major , C-Minor , SR-Site Re


Book , IR -Inspection Report, PR -Protocol Report and BBs-Bar bend
Surveillance
MANUFACTURER'S NAME & ADDRESS
TATA PROJECTS LTD
Corporate Office
1-7-80 to 87, Prenderghast Road,
Secunderabad -500003, India

CLASS OF
INSTRUMENTS CHECK

4 5

A
As per required for lab.
A
A

As required B

Digital Total Station/ Auto Lvl. B

Digital Total Station C

As per approved DWG. B

As per Dwg. B

As required B

B
Core cutter, moisture metre and Balance A

Steel tray, sieve, Cylinder, soil container, A


balance and digging instrument

As required A

Knife,sieve,ovencylindrical muold B

As required B
As required B

Vicats apparatus A

Compressice test machine A


B

oven andsample collect container, B


balance

balance,oven ,sample container B

Sieve,balance,steel tray B
balance,sample container,cylindrical B
mould,sieve

Oven,Balance,sieve,measuring cylinder
B

As required B
As required A

As required A

Slump test & Compacting factor test. B

Compressice test machine A


As required B

As required B

As required A

As required A

As required A
Transit Mixture machine B

Jute/pumping B
As required B

Vibrator with niddle B

As required B

As required C

As required B
hsian cloth/jute B

As required C

measuring tape B

As required A

As required B

As required B
A

B
Universal testing machine/MTC

As required B

As required B

As required B
As required B

As required B

As required B

As required B

As required B

as required B
Plumbing B

As required B

As required A

As required A

As required B

As required B
Excavator,level instrument B

Measuring tape B

as required B

As per DWg. B

As Required B

Plumbing B

B
B
As Required
B
B

A
A

A
B
A

B
C

heck: A-Critical , B-Major , C-Minor , SR-Site Register , TR-Test Report , MTC


Report, PR -Protocol Report and BBs-Bar bending Schedule,P-Perform, W-W
S

CIV

TYPE OF CHECK QUANTUM OF CHECK

6 7

Physical 100%

Physical 100%

Physical 100%

Physical 100%
Once per source / on every
Physical change of source

Physical 100%

Visual Random

Measurement 100%

Physical 100%

Measurement 100%

Measurement 100%

Measurement Random

Physical Random
i) For foundation back
filling,one for every 10
Physical segments foundations for
each compacted layer

i) For foundation back


filling,one for every 10
Physical segments foundations for
each compacted layer

i) For foundation back


filling,one for every 10
Physical segments foundations for
each compacted layer

Random checks to be
Physical carried out for each
compacted layer

Physical Random
Physical Random

Review of MTC Each lot

Once per each lot and


Testing grade

Once per each lot and


Testing grade
Visual 100%

Once for each stack of 100


cum. or part there of. Except
Physical during monsoon when this
has to be done every day
before start of concreting

Once for each source & for


Physical every change of source

Once per 500 cum or part


Physical thereof/ change of source,
whichever is earlier
Once per source / on every
Physical change of source

To be done every day before


Physical
start of work

Once per each source and


Physical on every change of source

Once per each source and


Physical on every change of source

Once per each source and


Physical on every change of source

Testing Once per source


Once per each per type and
Review of report grade

Physical For every mix design

One sample for every 2


Physical hours from every mixing
plant.

One set per 100 cum or part


thereof for each grade of
Physical concrete per shift whichever
is earlier.
Physical As per IS 1199

Physical As per IS 1199

Once pre type of lot/


Review of MTC Batch of supply

Once at the time of mix


design and thereafter once
Physical per type of lot/ batchof
supply

To be calibrated at the time


of starting and subsequently
Physical once in three months,and
shall confirm to IS:4925
Physical 100%

Physical 100%
Physical 100%

Physical Random

Physical 100%

Visual 100%

Measurement 100%
Physical Random

Visual 100%

Measurement Approved Drawing

Test 100%

For each lift on the locations


Physical as decided by E-I-C

Visual At Random
Review of TCS Each Consignment

Measurement At Random

Visual 100%

Visual & Measurment 100%

Visual & Measurment 100%

Visual & Measurment 100%


Visual & Measurment 100%

Visual & Measurment 100%

Visual Random

Visual Once

Visual Once

Visual Fortnight
Physical Testing For each lift of shuttering

Visual Fortnight

Dimensional 100%

Dimensional 100%

Physical at random

Physical Each lot/Batch


Physical Each Location

Physical Each Foundation

Review of MTC Once per lot

Physical At Random

Physical At Random

Physical/ Visual 100%

Physical 100%

Visual 100%
Review of MTC Each

Visual 10 % subject to a min. of 3


nos. for each type of items
Physical

Physical Each stretch

Physical Each

Once per lot


Verfication of MFTC
Once per lot

Verfication of MFTC Once per lot

Visual Random
Measurement/ Physical Test Table 1 of IS 5454

Test At Random

Visual/ Physical 100%

Visual/ Measurement 100%

Visual 100%

Physical 100 cum

Measurement 100%
Visual 100%

Visual 100%

Physical Random/ Once per batch

, TR-Test Report , MTC-Manufacturer's Test Certificate , LB- Log


hedule,P-Perform, W-Witness , RW-Random witness & S-
FIELD QUALITY PLAN/QUALITY ASSURANCE PLAN
ITEM

CIVIL WORKS

REFERENCE DOCUMENT ACCEPTANCE NORMS

8 9

List of laboratory equipment Calibration and set up


as per used for testing of equipments

calibration certificate
As per IS code specification IS code specification
given in belows mentioning in below

As per required

As per approved DWG. As per approved DWG.

As per technical
specification IS 2720-P-4
As per technical
IS 2720 ( Part XXIX) specifications,
Construction Drawings

IS 2720 ( Part XXVIII)

As per technical
IS 2720 ( Part XIV) specifications,
Construction Drawings

Standard practice
As per ASTM D 1558

IS:2720, IS: 383

As per technical
specifications and
approved Methodology
As per technical
specifications and
IS:2720, IS: 384 approved Methodology

IS 8112, IS:1489(Part-1)

As per technical
IS 8112, IS:1489(Part-1) specification

IS 8112, IS:1489(Part-1)
covered storage,
as per IS : 4083 weather tight on raised
platform

IS: 2386(part III), IS: 456, IS: IS: 2386(part III), IS:
383 456, IS: 383

IS: 2386(part III), IS: 456, IS: IS: 2386(part III), IS:
383 456, IS: 383

IS: 2386 Part-I, IS : 383 As per Relevant IS code


IS: 2386(IV), IS:383 As per Relevant IS code

IS: 2386 (part- III), IS: 383 As per Relevant IS code

IS 456-1978, IS 3025, IS 526- As per Relevant IS code


1959
IS 10262 , IS:456 As per Relevant IS code

IS 10262 , IS:456 As per Relevant IS code

IS: 456

IS: 456, 516


As per Relevant IS code
As per Relevant IS code

As per IS: 1199 and


approved mix design

IS 9103,ASTM C 494 MTC

IS 9103,ASTM C 495 TR

Review of calibration chart / As per Relevant IS code


certificate, IS 457
As per technical
specifications, erection As per IS code 456
methodology

As per technical
Check for segregation as specifications, Relevant
IS:456 IS code

As per technical
specifications
IS code 456

As per technical
Before clearance for specifications, Relevant
concreting IS code

As per technical IS 456


specifications
As per technical
specifications IS 456

As per technical IS 456


specifications

As per technical IS 456


specifications

As per technical IS 3370


specifications

As per DWg As per approved DWg

As per approved
As per approved drawings drawings
IS 1786, IS 432, IS 1566

As per IS 1852, IS 432,


IS 1786, IS 432
As per technical
specification

As per IS 1852, IS 432,


IS 1786

IS 456 & 2502/


As per approved Drg Drawings & bar
bending schedule

IS 456 & 2502/


As per approved Drg Drawings & bar
bending schedule
IS 456 & 2502/
As per approved Drg Drawings & bar
bending schedule
IS 456 & 2502/
As per approved Drg Drawings & bar
bending schedule

As per Drawings & bar IS 456 & 2502/


bending schedule, Drawings & bar
specification bending schedule
IS 456 & 2502/
As per BBS Drawings & bar
bending schedule

IS 456,IS 14687, IS
As per specification 3696
As per DWg. As per DWg.

Approved drawings Approved drawings

As per Dwg As per Dwg


As per DWg As per DWg

As per IS 2202 (PT-II), IS


As per technical 1038, other relevant
specifications codes & Approved
drawings

As per DWg As per DWg

As per DWg As per DWg


IS 1729, IS 1536, IS
As per relevant IS codes . 1230

As per IS 2065 and


As per specification Approved drawings
As per approved
As per approved drawings drawings

IS 1838

As per DWg
specification

IS 1838
As per Tech. Specifications & IS 1077, IS 13757, IS
relevant IS codes 12894, IS 3495

As per Tech. Specifications As per IS 2250

As per Tech. Specifications As per IS 2212,IS 1905

As Tech. specifications
As per Tech. Specifications IS 1661 and as per
approved drawings

As Tech. specifications
As per Tech. Specifications IS 1661 and as per
approved drawings

As Tech. specifications and


as per approved drawings
IS 383
As per Drawings
As per Drawings

As per Drawings

As per Drawings

For Tata Proje


PREPARED BY
SURANCE PLAN
QP-NO.1
Rev.0
Date: 10.07.2018
Page : 01 of 06

AGENCY
FORMAT OF RECORDS SUB
VENDOR
VENDOR
10 11

P W

calibration certificate P W

P W

P W
SR/TR P W

SR/TR P W
P W
P W

P W

P W
Lvl. Sheet & Appd.
Dwg.
P W

P W

P W

Lvl. Sheet & Appd. P W


Dwg.
P W

P W

P W

P W
SR/TR

P W

P W
P W

P W
P W
P W

P W

MTC P W

P W
SR /LB P W

P W

P W

P W

P W

SR/TR
SR/TR
P W

P W

P W

P W

P W

P W

P W

TR P W
P W

P W

TR

P W

P W

P W

TR/SR
P W

TR/SR
P W

P W

P W

P W

Calibration Cetrificate P W
P W

P W
P W

P W

P W

P W

SR
P W
P W

P W

P W

P W

P W

P W

P W

P W
P W

P W
MTC

P W

P W

P W

P W

P W
PR/BBS
PR/BBS

P W

P W

P W

P W

P W

P W

P W
P W

P W

P W

P W
IR
P W

P W
P W

MTC P W

P W
P W
P W

P W

P W

P W

P W

P W
SR

P W

P W

P W
P W
P W

P W
P W
P W
P W
P W

P W
P W
P W
P W
P W
P W
P W

P W

P W
P W
P W
P W

IR P W

IR P W

SR/ LB P W

P W

SR/LB P W

SR P W

SR P W

SR P W
SR P W

SR/LB P W

SR/LB P W

For Tata Projects Ltd.


REVIEWED BY APPROVED BY
PROJECT:

JOB :

CONTRACT No:

CONTRACTOR:
AGENCY
TPIA CLIENT
11

RW S

RW S

RW S

RW S
RW S

RW S
RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S
RW S
RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S
RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S
RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S
RW S

RW S
RW S
RW S
RW S
RW S

RW S
RW S
RW S
RW S
RW S
RW S
RW S

RW S

RW S
RW S
RW S
RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S

RW S
RW S

RW S

RW S

APPROVED BY
Dross Processing Unit
Pilot Project

TATA PROJECTS LTD


REMARKS

12

Functioning of laboratory equipment in


proper working condition to be verified
monthly basis.
Test report along with the
recommendations from specialist
institute, where the material shall be
tested as agreed in the LOA should be
submitted to Vedanta ltd

TBM confirm by client


Applicable where sand and stone is used
as filling material
Applicable where sand and stone is used
as filling material

Each consignment of cement obtained


shall be duly correlated with
manufacture's test certificate.
If cement is stored more than 60 days in
godown of contractor same shall be
retested for comp. strength & setting time

Accordingly water content of the concrete


will be adjusted

These tests will be carried out while


establishing design mix. and the results to
be intimated to client

Sieves should be confirming to IS-460-


1952. balance should be accurate to 0.1 %
weight of sample
Volume of sand and weight of water shall
be adjusted as per bulkage & moisture
content.

Acceptance limite as per IS:383

Acceptance limite as per IS code

Except test for flakiness index, elongation


index, angularity no ,abrsion value, impact
value, crushing value

Water will be provided by the client so


checks are not required, potable water
should be generally used.
Mix design needs to be repeated in case
of change of grade,change in workability
requirements, Change in source of
ingredients of concrete, change in
constituents of concrete(with fly ash /
without fly ash, with admixtures/ without
admixtures etc) change in exposure
conditions.

For trial mix min. of 6 cubes for each mix 3


specimen shall be tested at 7 days
remaining 3 shall be for 28 days comp.
strength

Three specimen shall be tested for 7 days


and remaining at 28 days.
According to mix design

Admixture of appd. Brand and tested


quality should be used. The chemical
properties of an admixture should be
tested once at the time of mix design

Cement consumption at batching plant


shall also be obtained through computer
Output. Provision of printer is mandatory.
The calibration shall be done by traceable
weights.
As per methodology.

To be checked before clearance for


concreting
For curing compound exposed concrete
surface shall be protected against drying
for atleast 72 hrs after placement,curing
compound may be used

Limit of permibility as per IS 2645 shall


also be met wiyh
To be checked at site. Steel collected from
source should be free from excessive rust.
To be stored as per Tech. Specifications

The cover block should have adequate


strength
Crossing of the bars are to be tied up
properly with right gauge of annealed
wire
Random to be checked by FQA
Lines and levels to be checked

Lines and levels to be checked. Concrete


Grade to be checked as per Mix Design.

MTC shouldl be corellated with the


consignment received.

All bulidings shall be providedwith


suitable anodised aluminium grill erection
shold be as per DWG.
MFTC shall be correlated with the
consignment
Tolerance limits as per relevant IS 1729, IS
1536, IS 1230
`
Effloresence shall be checked at each
source

The sand used for masonary work shall


cnform to IS 2116

No ponding of water on finished surfaces


to be ensured
Sueveillance by FQA