DR.J N MEHTA GOV.

POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules WINTER-2016
Assignment No:01

Q.1 Write the types of wiring system.


Q.2 Draw symbol of ceiling fan and fuse.
Q.3 Draw and explain corridor lighting diagram.
Q.4 Draw and explain “dim full” wiring diagram.
Q.5 Draw panel wiring diagram of 3-Phase induction motor with star-
delta starter.
Q.6 Explain circuit continuity test.
MRELI
NT
Contracting
ER-2016

2
2
3
3
3

3
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules SUMMER-2017
ASSINGMENT No:02

Q.1 Explain mineral insulated copper covered wire (MICC) 2


Q.2 Draw stair case wiring diagram. 2
Q.3 State types of wiring and explain any one. 3
Q.4 Give list of tools used for wiring. 3
Q.5 Explain corridor lighting with circuit diagram. 4
Q.6 Explain (1) Earth continuity test (2) polarity test of single pole 4
switch.
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules WINTER-2017
ASSINGMENT No:03

Q.1 State the advantages of PVC wire.


Q.2 Give the definition of Service connection.
Q.3 State the tests of domestic wiring installation.
Q.4 Give the names of tools used for electrical wiring.
Q.5 Write down specifications of Main Switch.
Q.6 Give the differences between MCB and ELCB.
Q.7 State the points to be considered while deciding the types of house
wiring.
Q.8 Draw and explain Godown wiring.
Q.9 Draw and explain staircase wiring.
MRELI
NT
Contracting
ER-2017

2
2
2
2
2
2
3

3
3
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules SUMMER-2018
ASSINGMENT No:04

Q.1 Which factor to be considered in selection of wire? 2


Q.2 Draw wiring diagram of one lamp controlled by two switches. 2
Q.3 Write down specifications of celling rose. 2
Q.4 Compare different types of wiring. 3
Q.5 Give name of safety accessories and explain any two. 3
Q.6 3
Draw industrial panel wiring for 5 HP 415 V 3 phase induction
motor.
Q.7 Explain circuit continuity test in detail. 3
Q.8 Write any two IE rule for domestic wiring. 3
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules WINTER-2018
ASSINGMENT No:05

Q.1 Write down specification of TPIC switch.


Q.2 Draw wiring diagram of one lamp controlled by one single way
switch.
Q.3 Which factor to be considered in selection of wire?
Q.4 Explain function of MCB and ELCB.
Q.5 Draw symbol of ceiling fan and fuse.
Q.6 Explain use of any 8 tools used for wiring.
RELI
T
ntracting
-2018

2
2

2
2
2
3
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules
Assignment No:01

Q.1 Write the types of wiring system & Explain godown wiring
Q.2 Draw and explain corridor lighting diagram & dim full lighting diagram.
Draw panel wiring diagram of 3-Phase induction motor with star-delta
Q.3 starter.
Q.4 Explain mineral insulated copper covered wire (MICC)
Q.5 Draw stair case wiring diagram.
Q.6 Give list of tools used for wiring.
Q.7 State the tests of domestic wiring installation.
Q.8 Give the differences between MCB and ELCB.

Q.9 State the points to be considered while deciding the types of house wiring.
Q.10 Which factor to be considered in selection of wire?
Q.11 Draw wiring diagram of one lamp controlled by two switches.
Q.12
Draw industrial panel wiring for 5 HP 415 V 3 phase induction motor.
Q.13 Write any two IE rule for domestic wiring.
Q.14 Explain use of any 8 tools used for wiring.
Q.15 Draw and explain staircase wiring.
note:s-summer,w-winter middle no.is year and last is mark of
the question.
C AMRELI
TMENT
ng & Contracting
E rules
DR.J N MEHTA GOV. POLYTECHNIC AMRELI
ELECTRICAL ENGINEERING DEPARTMENT
SubCode & Name:3350901 Wiring Estimation Costing & Contracting
Chapter Name:01-Electrical Wiring and IE rules
Assignment No:01
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

S-ar putea să vă placă și