ENSO HOTEL CONNECTION ROOM PROJECT

BUDGET QUOTATION OF INTERIOR RENOVATION

No Item Works Size/Detail Area Vol Unit Price Total price


I Temporary work
Temporary Access
Contractor's Storage Sheds
Contractor's Site office
Temporary Screens
General Scafolding staging
Protection of the Work
Safety

II Room renovation of the room


1 Cutting wall for connecting door 3.00 m x 2.40 m Wall between room 1 & room 2 1 Ls
2 New frame of the wall after cutting 3.00 x 2.40 m Wall between room 1 & room 3 1 Ls
3 Wall paint for all the room interior Exclude wall paper cover area 84 m2
4 Demolish the ex shower wall + tiles Room no. 2 1 Ls
5 Clean the trash and waste of wall cutting 1 Ls
6 Ceilling treatment Box gyfsum for lighting on TV 1 Ls
7 Extend drop ceiling grill plenum
8 Install floor ceramic ex shower
9 Install floor ceramic ex wardrobe
10 Partition coffe table
11 Self leveling bottom carpet
12 Extend plafond ex shower
No Item Works Size/Detail Area Vol Unit Price Total price
II Furniture item
1 New wadrobe - bathroom area 1.00 m x 2.20 m 2.2 m2
2 Partition to bathroom area - sliding door Acrylic + sticker sandblast + aluminium 4.2 m2
3 TV rack
a. TV Credenza unit 1.50 m 1.50 m2
b. Wall treatment TV partition 1 set
c. TV round mechanical ascesories 1 set
4 Luggage rack Wall between room 1 & room 4 1 unit
5 Coat and shoes rack door cover 1.00 m x 2.20 m Only door & door frame + shelf 1 Ls
6 Sofa 2 seater big size 1 unit
7 Arm chair / single sofa 1 unit
8 Coffe table 80 cm x 80 cm Ex shower area of room no. 2 1 unit
9 End table 60 cm x 60 cm 1 Ls
10 Table lamp 1 unit
11 Standing lamp 1 unit
12 Study / working table 1 set

III Interior work


1 Wall paper for headboard Headboard side 2 roll
2 New carpette tiles - material 24 m2
3 Carpette tiles application cost 24 m2
4 titik lampu - track lighting set 2 lampu 1 set
5 Downlight 5 watt room no. 2 2 Ls
6 Lighting instalation 3 titik
7 Curtain wall
8 Felmet
9 Demolish skirting existing + Install

IV Elektrikal Type A & B


1 Modification of 2 Panels with 1 key tag
2 moved the receptacle from the side sopa chair to the
work desk
No Item Works Size/Detail Area Vol Unit Price Total price
3 add instalation power + receptacle for copy maker
4 add instalation power + receptacle for IP TV
V Mekanikal Type A & B
1 Move control remote AC be side soket outlet key tag
2 Diffuser & plenum AC to be add
3 Close and remove the used exhaust fan shower grill
which is converted to copy maker
4 Close and remove instalation clean water eks shower room
VI Elektronik Type A & B
1 Merger Data( internet ) /telepon/IP TV instalation from 2
ONT to 1 ONT
2 Move IP TV instalation TO Panel Rack TV rotation 180'0
3 moved the socket outlet data/Telepon from the side sopa
chair to the work desk
Total price
Total price
Total price
ENSO HOTEL CONNECTION ROOM PROJECT
BUDGET QUOTATION OF INTERIOR RENOVATION

No Item Works Size/Detail Area Vol Unit Price Total pric

I Temporary work
Temporary Access Ls
Contractor's Storage Sheds Ls
Contractor's Site office Ls
Temporary Screens Ls
General Scafolding staging Ls
Protection of the Work Ls
Safety Ls

II Room renovation of the room


1 Cutting wall for connecting door 3.00 m x 2.40 m Wall between room 1 & room 2 1.00 Ls
2 New frame of the wall after cutting 3.00 x 2.40 m Wall between room 1 & room 3 1.00 Ls
3 Wall paint for all the room interior Exclude wall paper cover area 84.00 m2
4 Demolish the ex shower wall + tiles Room no. 2 1.00 Ls
5 Clean the trash and waste of wall cutting 1.00 Ls
6 Ceilling treatment Box gyfsum for lighting on TV 1.00 Ls
7 Extend drop ceiling grill plenum (44cm + 50cm) x 300cm 2.82 m2
8 Install floor ceramic ex shower 1.06 m2
9 Install floor ceramic ex wardrobe 66cm x 61cm 0.40 m2
10 Partition coffe table 64cm x 2.4 m 1.536 m2
11 Self leveling bottom carpet 24 m2
12 Extend plafond ex shower 73cm x 20cm 0.73 m'
No Item Works Size/Detail Area Vol Unit Price Total pric
III Furniture item
1 New wadrobe - bathroom area 1.00 m x 2.20 m 2.20 m2
2 Partition to bathroom area - sliding door Acrylic + sticker sandblast + aluminium 4.20 m2
3 TV rack
a. TV Credenza unit 1.50 m 1.50 m2
b. Wall treatment TV partition 1.00 set
c. TV round mechanical ascesories 1.00 set
4 Luggage rack Wall between room 1 & room 4 1.00 unit
5 Coat and shoes rack door cover 1.00 m x 2.20 m Only door & door frame + shelf 1.00 Ls
6 Sofa 2 seater big size 1.00 unit
7 Arm chair / single sofa 1.00 unit
8 Coffe table 80 cm x 80 cm Ex shower area of room no. 2 1.00 unit
9 End table 60 cm x 60 cm 1.00 Ls
10 Table lamp 1.00 unit
11 Standing lamp 1.00 unit
12 Study / working table 1.00 set

IV Interior work
1 Wall paper for headboard Headboard side 2.00 roll
2 New carpette tiles - material 24.00 m2
3 Carpette tiles application cost 24.00 m2
4 titik lampu - track lighting set 2 lampu 1.00 set
5 Downlight 5 watt room no. 2 2.00 Ls
6 Lighting instalation 3.00 titik
7 Curtain wall 2.85m x 2.58m 14.706 m2
8 Felmet 10cm x 10cm 17.00 m'
9 Demolish skirting existing + Install

V Elektrikal Type A & B


1 Modification of 2 Panels with 1 key tag 1.00 Ls
2 moved the receptacle from the side sopa chair to the 1.00 ttk
work desk
No Item Works Size/Detail Area Vol Unit Price Total pric
3 add instalation power + receptacle for copy maker 1.00 ttk
4 add instalation power + receptacle for IP TV 1.00 ttk
VI Mekanikal Type A & B
1 Move control remote AC be side soket outlet key tag 1.00 Ls
2 Diffuser & plenum AC to be add 1.00 Ls
3 Close and remove the used exhaust fan shower grill 1.00 Ls
which is converted to copy maker
4 Close and remove instalation clean water eks shower room 1.00 Ls
VII Elektronik Type A & B
1 Merger Data( internet ) /telepon/IP TV instalation from 2 1.00 ttk
ONT to 1 ONT
2 Move IP TV instalation TO Panel Rack TV rotation 180'0 1.00 ttk
3 moved the socket outlet data/Telepon from the side sopa 2.00 ttk
chair to the work desk

Dipersiapkan Diperiksa Diketahui

(Noviandri Eka P.) (Saepul Hidayat) (Tri Ariyanto S.)


Total price
Total price
Total price