Sunteți pe pagina 1din 10

NOTES:

-All metering installation shall be bonded &


grounded per current N.E.C and local EPC
requirements.
-Working space of 36inches in all directions
shall be maintained around meterbase.This
space is to be kept clear of all obstructions
including landscaping and enclosures.

Project: NEP-DRD

Site Name: Bant Bway

Site ID: NEP-DRD

Address: Bant Bant Village


Longitude(dec): 96.08395 Latitude(dec): 21.97314
Altitude: 103m
Lease Area: 2.13m x 5.33m
DATE ITEM SIGN

REVISION
2015/08/07 V1.0

PROJECT

NEP 2020
CLIENT

DRD MYANMAR
CONTRACTOR

MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
-All metering installation shall be bonded &
grounded per current N.E.C and local EPC
requirements.
-Working space of 36inches in all directions
shall be maintained around meterbase.This
space is to be kept clear of all obstructions
including landscaping and enclosures.

DRAWING LSIT
DWG No. DRAWING TITLE SIZE SCALE
01 SITE LOCATION A3,PDF
02 SITE LAYOUT A3,PDF
03 SOLAR FOUNDATION DETAIL A3,PDF
03 CONTAINER FOUNDATION DETAIL A3,PDF
04 DG FOUNDATION DETAIL A3,PDF DATE ITEM SIGN
05 CABLE TRAY DETAIL A3,PDF

REVISION
2015/08/07 V1.0

06 DISTRIBUTION POLE DETAIL A3,PDF


07 MOUNTING DETAIL A3,PDF PROJECT

08 FENCE DETAIL A3,PDF NEP 2020


09 SINGLE LINE DIAGRAM A3,PDF CLIENT

10 GROUNDING DIAGRAM A3,PDF DRD MYANMAR


CONTRACTOR

MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:

Builder/Contractor & Sub-contractors shall:


1.Check & confirm all dimensions and levels
2000 on site prior to commencing any works,shop
drawings,fabracation and or installation.
2.Do not scale these drawings.Figure
2000 6000 dimensions take precedence.
600
3.All dimensions are in millimeter unless
1000 1100

800
3000
noted otherwise.
4.Any discrepancies shall be reported to the

90
4000
Wooden house to be
2500
superintendent for action & instruction.

2800
demolished without extra cost 5.This drawing to be read in conjunction with
250x4=1000
North all relevant drawings, specifications,
6000 shedules,reports,contracts.

Solar Foundation 5000


2500
2000 2000
400
1000

400
PV Panel
(1000x2000)
10000
2500

DATE ITEM SIGN

REVISION
2015/08/07 V1.0

PROJECT

NEP 2020
CLIENT

DRD MYANMAR
3000
CONTRACTOR

MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

Site Layout DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:

Builder/Contractor & Sub-contractors shall:


1.Check & confirm all dimensions and levels
on site prior to commencing any works,shop
drawings,fabracation and or installation.
40000
2000 2.Do not scale these drawings.Figure
dimensions take precedence.
3.All dimensions are in millimeter unless
2000 noted otherwise.

90
4500 5000
4.Any discrepancies shall be reported to the
superintendent for action & instruction.
2500 3000
North 5.This drawing to be read in conjunction with

3000

1250
Diesel Generator

Equipment all relevant drawings, specifications,

3000

5000
Container
1000mm

Wooden house to be shedules,reports,contracts.


demolished without extra cost
2500mm
5000

1000mm

Solar Foundation 5000


2500
2000 2000
400
1000

400
PV Panel
(1000x2000)
30000

10000

DATE ITEM SIGN


2500

REVISION
2015/08/07 V1.0
Wooden house to be
demolished without extra cost

PROJECT

NEP 2020
CLIENT

DRD MYANMAR
CONTRACTOR

3000

MODEL SITE TYPE

Site Layout DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
1.Do not scale these drawings.Figure
dimensions take precedence.
150 6000 2.All dimensions & levels are in millimeter
6000 600
unless noted otherwise.
C1 B1 150x300 3.Any discrepancies shall be reported to the
1000 1100

800
250x250 1
C1 C1
1 3000
superintendent for action & instruction.
4.Structure concrete shall be a minimum
compressive strength 21N/sq.mm & cushion

B2 150x300

B2 150x300
B2 150x300

4000
bedding concrete of 10N/sq.mm at 28 days.

2500
2 2

4000
3700

2800
5.Reinforcement steel should be minimum
yield strength of 280N/sq.mm.

1000
6.Concrete cover shall be 75mmm for slab
top & bottom ,50mm for sides & column.
B1 150x300
C1 C1 7.Backfill sand should be done in layers not
6000 exceeding 150mm measured as
250x4=1000 5700
6000 250x4=1000 compacted,and the backfill compacted to
95% Mod AASHTO.Natural plastic soil
should be mixed with at least 20% of good
sand for backfilling.
8.Presumptive soil parameters and
300 assumptions shall be validated for a specific
Concrete Platform site prior to installation.
B1 150x300
.

800
600
Foundation

800

DATE ITEM SIGN

REVISION
2015/08/07 V1.0
200
250
800

PROJECT

NEP 2020
500

C1 C2

CLIENT

DRD MYANMAR
600

Foundation

CONTRACTOR

250

MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

Container & DG Foundation Detail-Option(1)-Combined Pad DRAWING No.

SCALE:N.T.S NAME
AR-2

DATE SIGN
DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
1.Do not scale these drawings.Figure
dimensions take precedence.
2.All dimensions & levels are in millimeter
unless noted otherwise.
3.Any discrepancies shall be reported to the
superintendent for action & instruction.
4.Structure concrete shall be a minimum
5000 5000 compressive strength 21N/sq.mm & cushion
bedding concrete of 10N/sq.mm at 28 days.
1 1 5.Reinforcement steel should be minimum

C1

C1
1 C1 C1 1
yield strength of 280N/sq.mm.
6.Concrete cover shall be 75mmm for slab
top & bottom ,50mm for sides & column.

3000
7.Backfill sand should be done in layers not

B1 150x300
2 2
4500

exceeding 150mm measured as


2 2 compacted,and the backfill compacted to
C1 C1 95% Mod AASHTO.Natural plastic soil
should be mixed with at least 20% of good
B1 150x300 sand for backfilling.
8.Presumptive soil parameters and

C1
C1

assumptions shall be validated for a specific


site prior to installation.
.
250x4=1000

1000
250x4=1000

1000

200
300 250
Concrete Platform

800
B1 150x300 DATE ITEM SIGN
800

REVISION
2015/08/07 V1.0
500
C1 C2

600
Foundation
600

PROJECT

Foundation
NEP 2020
250 CLIENT

800
DRD MYANMAR
CONTRACTOR

Container & DG Foundation Detail-Option(1)-Separate Pad MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
1.Do not scale these drawings.Figure
dimensions take precedence.
2.All dimensions & levels are in millimeter
unless noted otherwise.
500
500 3.Any discrepancies shall be reported to the
125 superintendent for action & instruction.

500
126.5 150
4.Structure concrete shall be a minimum

400
125
compressive strength 21N/sq.mm & cushion
126.5 147

2000
400 bedding concrete of 10N/sq.mm at 28 days.
5.Reinforcement steel should be minimum
500
500 yield strength of 280N/sq.mm.
6.Concrete cover shall be 75mmm for slab

2500

2500
125

500
126.5
150

top & bottom ,50mm for sides & column.

400
125
500 500 7.Backfill sand should be done in layers not
126.5 147
2000 400 125
exceeding 150mm measured as

500
126.5 150

compacted,and the backfill compacted to

400
125 95% Mod AASHTO.Natural plastic soil
126.5 147
400

500
2500

2500
2000 500 should be mixed with at least 20% of good
sand for backfilling.
500 500
125 126.5
8.Presumptive soil parameters and

2500

2500
125
assumptions shall be validated for a specific

500
126.5 400 147
150

site prior to installation.

400
400
16 16 147
R7 n12 125
R7 500 500
35

125 126.5 150


126.5 147 400

500
2000 125

500
147

R7
R7 500 126.5 150
345
16

16
43

400
42.5 150 42.5
125
126.5 147
400

500
125 126.5 2000 500
400 147
400

125

2500

2500
126.5 150

16 16

R7
R7 500 500

35
147
n12 125

500
126.5 150

147

R7

R7

400
16

16
43

345
125
126.5 147
400 DATE ITEM SIGN

500
42.5 150 42.5
2000 500

REVISION
2015/08/07 V1.0 JING

Solar Foundation Detail PROJECT

PVMaxS 2V10_15° NEP 2020


CLIENT

DRD MYANMAR
CONTRACTOR

MODEL SITE TYPE

Solar Foundation Detail DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
-All metering installation shall be bonded &
grounded per current N.E.C and local EPC
requirements.
150 -Working space of 36inches in all directions
shall be maintained around meterbase.This
space is to be kept clear of all obstructions

1000
including landscaping and enclosures.
Lamp

1000
Junction Box

1000
Meter Box

9000

DATE ITEM SIGN

REVISION
2015/08/07 V1.0

PROJECT

NEP 2020
CLIENT

DRD MYANMAR
CONTRACTOR

MODEL SITE TYPE

270mm DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
Distribution Pole Elevation CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
-All metering installation shall be bonded &
grounded per current N.E.C and local EPC
requirements.
-Working space of 36inches in all directions
shall be maintained around meterbase.This
space is to be kept clear of all obstructions
including landscaping and enclosures.

600
650
Ø6@200MM 150
5-Ø10 300100
100

DATE ITEM SIGN

REVISION
2015/08/07 V1.0

200 300
PROJECT
4-Ø10

Ø6@150MM
NEP 2020
950 950
2400

300 CLIENT

300
500 DRD MYANMAR
CONTRACTOR

2000 1000 3000 1000 2000


600 100
MODEL SITE TYPE

DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY
NOTES:
-All metering installation shall be bonded &
grounded per current N.E.C and local EPC
requirements.
-Working space of 36inches in all directions
shall be maintained around meterbase.This
space is to be kept clear of all obstructions
including landscaping and enclosures.

4200
6000
200

3600
250

800

00
500

C1 C2

40
Foundation 600
DATE ITEM SIGN

REVISION
2015/08/07 V1.0
250

PROJECT

NEP 2020
CLIENT

DRD MYANMAR
CONTRACTOR

MODEL SITE TYPE


Concrete Equipment Pad with Shelter
DRAWING TITLE SITE DEVELOPMENT PLAN

DRAWING No. AR-2

SCALE:N.T.S NAME DATE SIGN


DRAWN BY Shoon 2018/12/18
CHECKED BY Sergey 2018/12/18
APPROVE BY

S-ar putea să vă placă și