Sunteți pe pagina 1din 8

New Operating Concepts-Management of Change (MOC) In Ship-

ping Industry. Are You Change Ready?


Author Name(s): Stavros Hatzigrigoris, Despina Moustaka
Greece, mail@kristennav.gr

Abstract One of the important principles in shipping is that we


have to take decisions quickly. But now TMSA asks for
To cope with a changing world, organisations must a more formalized and calibrated strategic decisions.
develop the capacity of shifting , of developing new
skills and attitudes; in short, the capability of learning The objective of this paper is to describe the practical
and managing change. Today with the heavy demands experience of Kristen Navigation on application of
made on the shipping industry, it is imperative we keep Management of Changes process in our daily routines ,
abreast with the constant changes in rules, commercial demonstrating the results of our accumulated experi-
changes and that we continually strive to improve our ence.
operations. With this in mind, Kristen Navigation has
created a “new management model” that meets or ex- 2. Management of Change Process
ceeds safety, environmental and customer requirements,
thus has established procedures, which ensure that Change is defined as “any new condition which might
proposed changes as well as future needs are evaluated affect Company’s activities” which justifies a structured
for technical and business exposure and managed to analysis in order to determine any further actions
ensure that risks arising from these changes, remain at needed.
an acceptable level. Change management is the process of identifying a
In this paper we are presenting briefly the program future desired state in the organisation, understanding
designed to handle the adverse effects of a change. the current state and constructing a transition plan to
attain the goal. (Fig.1)
Keywords
Policies/Procedures
Management of Change ; MOC; TMSA; Risk Assess- Methods
ment. Mechanisms Legislation
Training
1. Introduction Current State Future State
Change Identification Deliverable
The Management and Operation of vessels within a Change
Input Output
culture of safety and environmental excellence were
formalized with the introduction of the ISM Code.
People
OCIMF found necessary to supplement the ISM Code Infrastructure
and bring one more safeguard on all tankers they are Resources
Working Environment
vetting and chartering. TMSA was the answer. Time
Ever since all tanker companies started implementing Figure 1: Change Process
TMSA and oil majors used it as their key tool for as- Changes in shipping industry can result from new pro-
sessing the management of a company. cedures or personnel, changes to operating conditions,
But which on was of the lowest scoring TMSA element installation of new equipment, the consequences of new
in the begging of TMSA implementation ? This was regulations, etc. Change that is temporary in nature also
Element number 7 : Management of Change, which requires systematic review.
states: ” A change management process is in place The methodology designed by Kristen Navigation in
throughout the office/fleet and operates effectively to order to manage the change includes the following steps
reduce operational risks” . (Fig.2 and Fig.4):
• Identify the Change /projecting future needs

1
• Receive approval to continue with the change - ensure that all changes comply with regulations,
• Conduct Risk assessment (that includes con- industry standards and original equipment design
formity with regulations, effect on environ- specifications;
ment, effect on safety management system, - identify and document any training needs arising
competency of people, equipment specifica- from any changes and ensure that all appropriate
tions etc) personnel receives the required training within a
• Developing Actions plan specified period;
• Approve/verify the change
- ensure that appropriate drawing, procedures and
other technical documents are updated following
any change or modification;
- ensure that care shall be taken for issuance of work
Verify Identify permits before making changes to or working on
equipment etc;
- ensure that all changes are developed in consulta-
Risk Assessment tion with those who will have to implement them,
Evaluate the
in order to be better suited to their purpose, and
more readily accepted.
Effectiveness

4.1 Approval of Change


Deploy Plan Approved changes shall be completed within a defined
time limit. If the change is not completed within the set
time frame, then re-authorisation of the approval to
make the change is to be sought and the initial hazard
observation/risk assessment shall be revisited.

Figure 2: Change Management Cycle 4.2 Levels of Authority for approving a change
Responsibility for supervision and follow-up of each
3. Identification of changes approved change is assigned.
The levels of authority presented in the Table 1, define
How we identify Changes ? Identifying changes in the the minimum required for a change to be approved. The
shipping industry means to look ahead taking always detailed functions, responsibilities and authorities of all
into considerations the lessons leaned from the past. employees related with the approval of a change (e.g.
We cannot predict the future but we can get a handle on Financial Authority)are defined in the relevant job de-
trends, which is a way to take advantage of change and scriptions.
convert risks into opportunities. The experience and Table 1: Managers levels of authority for approving a
understanding of the Company staff is the main criterion change.
for identifying which changes will be handled. Such
Position Authority
changes could be:
The Technical Director: Changes new system or
- regulatory changes; equipment which may be
- commercial changes; installed on vessels , critical
- technical changes; equipment shutdown.
- operational changes; Operations Director: Operational and Commercial
Changes
- changes in the human resource profile;
- changes necessitated from gathered/new experi- Personnel Manager : Recruitment of Staff
ence, (e.g accidents). Quality Manager : Changes in the safety man-
agement system.
4. Evaluate the Change IT Manager: Changes to computer hard-
ware and software.
After a change need has been identified, the primary
objective is to evaluate the change and manage to help Master /Chief Engineer Changes on their Depart-
ensure that risks arising from this change remain at an ments, with the consultation
acceptable level.(See also the paragraph 5. Risk Identi- of the relevant Dept Man-
fication and assessment). ager.
During the evaluation of change we : The General Manager: Approval of any permanent
- review the safety, quality, health, and environ- change..
mental implications of change; As a general rule, persons directly involved in the
change shall not be involved in its approval.

2
This process is recorded in the Management of Change This process is recorded in the Risk Assessment
Form. forms/records.

5.Risk identification and Risk Assessment (RA) 6. Development, implementation and monitor-
ing
Every Change identified is analysed in order to deter-
mine any hazards/aspects and risks which may contain a It is a known fact that well organised planning, design-
danger to life, safety, quality, health, the environment or ing and implementation will produce the most effective
property or may adversely affect Company’s Custom- changes, therefore standard procedures have been de-
ers. The relevant Managers/Masters ensure that the veloped to ensure critical elements of change are always
potential consequences of the change are identified, addressed in a structured , timely and consistent manner.
together with any required risk-reduction measures. Outputs of the risk assessments and correc-
(Fig.3) tive/preventive actions aiming to bring the risks associ-
This process helps the Company to identify and priori- ated with the change to acceptable level are the tools
tise the most effective risk-reduction measures. It will used to develop an action plan.
also identify residual risks that require management
attention.
Identify the
Change

No
Approval to
Proceed?
Notify originator

Yes
Risk
Assessment

Develop Action
plan

Verify No
Approve the
Change

If time frame Yes


being
exceeded
Monitor
Implementation

No
Figure3: Risk identification and Risk Assessment (RA) Implemented
Change
effective?

- If aspects of the Change containing risk are identi-


fied (e.g. non routine tasks), a RA is carried out for
Yes
each of the identified risk aspect and the need for
further action is evaluated.
Change
- If no risk is identified no further actions are re- Closeout

quired.
The risk assessment may result to: Figure 4: Development , Implementation, Monitoring
- identification of resource needs; Flowchart

- identification of training needs;


The following elements should always be taken into
- revision of procedures; consideration during the developments of the change
- updating of PMS/spares requirements/drawings action plan:
and/or technical documents. ¾ what time is available to plan, design and imple-
ment the change?

3
¾ will the change require the purchase of equipment As a standard policy all newly joined personnel, or
or external services? (placing purchase or service personnel transferred to new assignments shall be famil-
orders with suppliers in a timely manner ) iarised to the SMS and their duties. In the case of the
¾ will the change involve the need for additional or new Fleet Manager a full review of the impact of this
re-shuffling of personnel/procedures? change was carried out in order to manage the associ-
¾ what costs will be involved? ated risks.
¾ who is most suitable to gather together all neces- The following were approved/decided
sary information and to design the change?
¾ when a follow-up review should take place, always • Review of Candidates Experience in the field
allowing enough time to get a clear picture of the of assignment -Technical Experience- on the
effectiveness of the change same type of vessel. Moreover the following
The person who is overall responsible for the correc- were checked:
tive/preventive actions shall actively monitor their o personality / attitude / courtesy - so-
timely implementation. If the proposed actions are not ciability - maturity
completed within the set time frame the change must be o age (physical condition)
reviewed and a new Risk Assessment / Action Plan may o communication skills
need to be conducted.
o safety awareness and commitment to
Important role on the monitoring of a change has the implement the Company’s policies
Management Review Committee. The Committee moni-
tors the effectiveness of this process to ensure that all o training requirements
the changes have met expectations and plans, via inter- o salary requirements
nal audits and ship inspections/visits. o fitness for duty
• A verification of the qualifications of new re-
7. Examples of changes cruit that are genuine. (Authenticity of Certifi-
cates from the issuing authorities as well as by
7.1 Changes to personnel contacting former employers for references
verifying the stated qualifications)
Changes in the human resource profile of the Company
and fleet are identified primarily by the department • Familiarisation related with all pertinent infor-
Heads (with respect to shore staff) and the Ships Per- mation on the duties, responsibilities (Job De-
sonnel Manager (with respect to the fleet). Such scription), condition of the vessels that he will
changes may be: assume, with particular emphasis on the safety
- major changes to shore organisation (i.e. replace- and environmental aspects, emergency proce-
ment of a department Manager or change of posi- dures and arrangements and watch keeping du-
tion within the organisation); ties, as well as with the policies and business
ethics of the Company was made.
- new Manning agent;
• A probationary period for 3 months was set, in
- new crew nationality;
order to ensure that his is settling-in as well as
- new requirements related to crew composition and to identify any additional training needs. The
competence, etc. Technical Director was responsible to monitor
Necessary levels of individual and collective experience and appraise his performance during this pe-
and knowledge should be carefully considered when riod.
personnel changes are made. The number, experience • A document Review in order to update the Or-
and skills of personnel should be sufficient under differ- ganisation chart, Emergency Plans, SMS Ref-
ent operational conditions. erences and Contact Lists.
For major changes to the shore Organisation such as
7. 2 Commercial Changes
changes in reporting relationships, elimination of posi-
tions, restructuring, etc. the system shall be reviewed for Changes in the commercial environment may be identi-
the impact to both the Organisation and the SMS. Man- fied by the General Manager, the other Managers, etc.
agers responsible for supervising or managing the func- Such changes may be:
tions undergoing change shall convene a Management - change in the market conditions which may neces-
Review Committee meeting in order to clearly reassign sitate a change in policy or change in the vessel
the responsibilities, as well as to review the impact of type operated;
all changes to the Company’s roles and responsibilities.
- change in the contractual agreements with custom-
Example Changes to Personnel: New Fleet Technical ers e.g. a fundamentally different Charter Party;
Manager
- a change in the political environment (e.g. war or
Due to Fleet expansion the need to hire additional Fleet recession) that affects Company’s business plans
Technical Manager was identified by the Technical and the security of assets, etc.
Director.

4
7.3 Technical Changes culation of midship section scantlings according to
Class requirements, estimation of required steel
Such changes are identified primarily by the Technical
weight, preliminary calculation of new light ship
Director, the Fleet Manager, the senior seagoing per-
weight and centres, preliminary calculation of new
sonnel, etc. Such changes may be:
cargo / ballast capacities, check of intact stability
- non routine maintenance tasks; and longitudinal strength, check of damage stabil-
- new system or equipment which may be installed ity.
on vessels (e.g. a new incinerator); 4. Review of vessel’s cargo capabilities (operational
- a new vessel entering fleet; aspects of the change) deriving from the prelimi-
nary plans.
- new classification regulations affecting the techni-
cal condition of vessels; 5. Message to all third parties concerned (majors,
charterers, flag administration, etc.) for the ves-
- new technological solutions available in the market sel’s intended conversion and any other informa-
(e.g. a new corrosion protection system), etc. tion required.
The Technical Director ensures that all applicable draw- 6. Appointment of an approved yard to carry out the
ings, procedures and other technical documents are conversion (in accordance with Company’s SMS
updated following any change or modification. relevant procedures described in Maintenance Pro-
cedures).
7.4 Regulatory Changes
7. Consideration of all safety and environmental
All department heads are responsible for tracking, iden- parameters to be followed during the conversion.
tifying and accessing applicable, forthcoming and po- 8. Appointment of Company’s’ representatives to
tential safety, quality, health, and environmental re- attend the vessel’s conversion and ensure that all
quirements, rules and regulations, guidelines and stan- procedures are complied with.
dards recommended by the IMO, Flag Administrations,
9. Preparation of the vessel prior to arrival in the
Classification Societies and industry organizations,
repair yard (cargo tanks/ ballast tanks/pipe tun-
pertaining to their area of interest, applicable to both
nels/cofferdams/empty fuel tanks in gas free con-
ship and shore based operations and evaluating their
dition, cargo tanks cleaned and free of residues,
potential impact on the Company’s operations. In this
cargo/vent/inert gas/COW lines together with
respect several techniques are employed, which include
cargo heating coils and lines flushed and/or venti-
commercial databases, information from the vessels’
lated, etc.
Classification Societies and industry associations and
direct communication with National and Flag State 10. Preparation of conversion drawings and manuals:
regulatory agencies. a. Detailed construction drawings (parallel body
The tracking of applicable and forthcoming regulations constructions and details, forward part con-
is an ongoing process however, prior to each Manage- struction and details, aft part constructions and
ment Review Committee, the department Heads, utilises details).
all sources of regulatory information and revises the list b. Amendment of applicable plans and manuals
of applicable and forthcoming regulations if necessary. (GA, Capacity, diagrammatic plans for
cargo/ballast piping, diagrammatic plans for
7.4.1 Example of a Commercial and Technical and tank sounding/venting piping, COW manual,
Regulatory Change: ODME manual).
Conversion of a VLCC from single to double hull c. Preparation of new ullage tables for affected
The need for change was initiated due to environ- cargo and ballast tanks.
mental reasons, compliance with international legisla- d. Preparation of preliminary and final Trim &
tion/requirements which will be implemented in the Stability booklet.
future (Marpol Annex I Regulations 13 F), in order to
extend Vessel’s trading line for commercial reasons. 11. Submission to Class of all above plans, manuals
Following thorough discussion between the General and drawings for review and approval. Follow up
Manager, Technical Manager, Operations Manage, and of relevant procedure to be carried out by the de-
the DPA on the operational and technical aspects of the signers.
imminent change the following were approved/decided: 12. Coordination with the yard for fabrication and
1. Selection of the most convenient designers to erection drawings.
perform the conversion. 13. Follow up of progress of repairs by Company’s
2. Determination of applicable rules and regulations representative and daily communication and coor-
apply for the subject change. dination with the Company’s Technical depart-
ment. (Project Plan was carried out)
3. Investigation of conversion feasibility (technical
aspect of the change) to be carried out by the se- 14. On completion of conversion, coordination with
lected designers including preliminary midship the vessel’s Class for the performance of the in-
section, development of inner hull geometry, cal-

5
clining experiment to determine new vessel’s • Officers and ratings fulfil the crewing require-
lightship, VCG and LCG. ments;
15. Issue or amendment of all appropriate certificates • all the required Company manuals, technical
(tonnage, load line, etc.) by the Class. books, drawings, etc. as indicated in the
16. Update of vessel’s loading program following the SMSM, are available on board and ashore in
update of loading manual. advance;
17. Notification to charterers / majors on the readiness
• the SMS Familiarization/ Manual distribution
of the vessel and its recent cargo capabilities / fea-
to shipboard personnel;
tures.
18. Training of vessel’s Master, Officers and crew • instructions, which have been identified as es-
involved in cargo operations on vessel’s new opera- sential to be provided prior to sailing, have
tional capabilities, features, loading/discharging been given to the crew;(e.g. Drills)
procedures, cargo lines, cargo ventilation, IGS,
• an internal audit of the shipboard SMS has
COW, cargo valves and other related equipment.
been planned to be carried out within the first
The change was well designed and the project was final- three months after the acquisition of the ship.
ized earlier than it was expected successfully. When the above conditions have been complied, the
DPA shall notify the certifying Authority to proceed in
7.5 Operational Changes the issuance of the interim SMC.
New types of Operations which may not be fully cov- From the initial construction, or acquisition of a vessel,
ered by the SMS may be identified by the Operations a historical record shall be maintained which indicates
Department, the senior seagoing personnel, etc. Such any structural or technical changes made, the current
operations may be: status of equipment, and how that status evolved from
the original design.
• navigating in areas with special conditions (e.g.
in rivers or in ice); 7.7.2 Vessels leaving management
• committing to carry a cargo with extra- Procedures have been established to Manage the
ordinary characteristics; Change when a ship leaves Company management.
The Company and the new managers / owners shall
• planning an un-usual cargo operation (e.g. to
agree arrangements for hand over of the vessel, includ-
un-load in barges), etc.
ing familiarisation period for joining crew, location and
7.6 New Experience timetable for hand over and any specific requirements at
hand over.
Experience gathered from the day-to-day operation,
In the event of a change in ownership, a copy of the
which indicates the existence of risk should be identi-
MOA shall be obtained and the Master given specific
fied and handled in accordance with this procedure.
instructions regarding inspections by the new owner’s
Such new experience may be:
staff.
• incidents, near misses, non conformities, de- Where possible the vessel’s Technical Superintendent
fects, etc.; shall attend the vessel at the time of hand over to co-
ordinate transfer of management. If his attendance is
• outputs from the Management Review Com- not practical, then the Master will receive instruction
mittee meetings, etc. regarding the hand over procedure.
Prior to hand over, the vessel’s Technical Superinten-
7.7 Other Changes
dent instruct the Master to prepare for landing Com-
pany documentation and rental equipment.
7.7.1 Introduction of newly acquired vessel into the
The Master shall ensure that all controlled documenta-
Fleet
tion and records relevant to application of the SMS on
The introduction of a new vessel in the existing com- board the ship is returned to the DPA. This documenta-
pany fleet is thoroughly reviewed, more specifically the tion shall be kept in the Company's file for a minimum
following a activities are followed/checked every time: of 2 years from the date the ship leaves the Company's
management. The certifying Authority must to be im-
• the type of vessel is included in the DOC is- mediately informed.
sued for the Company;
7.7.3 Change of vessel’s name
• Company Superintendents /Senior Officers
have become familiar with the vessel, its sys- In the event of the vessel's name changing, all certifi-
tems and equipment well in advance by visiting cates, documents, and manuals must be appropriately
the vessel or the new building yard; endorsed by Class or Flag State.

• training is provided, especially for new vessel’s 7.7.4 Change of vessel’s flag
type; In the event of the vessel's flag change, relevant certifi-
cates (i.e. Certificate of Registry, Continuous Synopsis

6
Records) should be issued by the new flag administra- agree.
tion. Any new Flag State requirements must be satisfied Active Resistance
and relevant certificates and documents must be appro- This is the extreme end of the spectrum of reactions
priately endorsed directly by the Flag administration or against a change. Such behaviour is normally obvious
through appointed Classification Society, duly author- and includes deliberate acts designed to sabotage the
ised by the administration to act on its behalf. change and prove it will not work.
Changes are resisted because people:
7.7.5 Changes which do not impact on Operations
Integrity • Perceive the change treating their basic secu-
rity in some way.
Changes that will not adversely affect Operations Integ-
rity do not require a Change Request Form and may be • When communication about the change--
approved without the need for review by the Manage- timetables, personnel, monies, etc.--has not
ment Review Committee. Examples of such changes been sufficient
would include but not be limited to the following:
• When the proposed users have not been con-
1. Telephone number, name and address changes in
sulted about the change, and it is offered to
manuals.
them as an accomplished fact. People like to
2. Typing errors and spelling mistakes in manuals and know what's going on, especially if their jobs
documents, etc. may be affected. Informed employees tend to
have higher levels of job satisfaction than unin-
8. The worst and the best practice in Managing formed employees .
Change
• When the change threatens to modify estab-
lished patterns of working relationships be-
In order the change to be effective we have to analyze
tween people.
why changes often fail and why people and organisation
resist changing. • When the benefits and rewards for making the
People reactions to change depend on how well they change are not seen as adequate for the trouble
perceive the change affecting them and their level of involved.
uncertainty. In the Management of Change process we .
have to consider the area of uncertainty and factors
affecting it in order to reduce the affect and to encour-
age a move from negative to appositive reaction.
Behavior Security
In the Figure 5: we present some of the areas where an
individual likely to feel to impacted on by a change
8.1 Reactions to a change Relationships
Typically reactions to change may fall anywhere within Status
the range of:
Enthusiastic Acceptance Employee
This is the ideal we should be aiming for when we plan impact of
a change. This reaction will only occur when people Change
perceive the change as substantially meeting their own Stress Values
needs or desires.
Conditional Co-Operation
People may well have reservations about the effects of a
change and be reluctant to commit themselves fully.
However, the will often be prepared to “go along with”
the change as long as none of their fears are realized. Recognition Motivation
Indifference
This reaction occurs when people do not see that the
change affects them in any way; or when they believe Figure 5: Impact of Change
that the change will be short-lived. They may entirely
ignore the change; or may become involved in appar- 8.2 The worst practice in Managing Change
ently associated matters that are, in fact, irrelevant.
Some of the biggest mistakes that can be made by the
Non Co-Operation
Senior Management when introducing changes are as
If people see a change as being to their disadvantage,
follows:
they may well decide not to co-operate in any way with
the implementation of the change. Examples of such • Not being directly involved with the project
behaviour are deliberate slowness in learning a new
procedure, or failure to draw attention to a potential • Dictating change without communicating the
problem they have foreseen. Such behaviour is really benefits
designed to sabotage a change with which they do not

7
• Failing to be kept informed of the project’s As Charles Darwin stated “ it is not the strongest species
progress and losing track of it that survive, nor the most intelligent, but the ones who
are most responsive to change”.
• Delegating their responsibilities to others and
not intervening soon enough when problems
arise
• Thinking they can pass the buck to a “cham-
pion” to fix it
• Losing interest once the project is started
• Forgetting the reason for the change
• Ignoring the impact of the change on employ-
ees and focusing on business issues only
• Changing priorities midstream in the project
(Diverting their attention to other areas before
the project is implemented)
• Not foreseeing and being prepared for resis-
tance during implementation period
• Not providing sufficient resources (people,
time, money) and failing to engage all man-
agement levels in the change
• Underestimating time and effort required
8.3 The Best practice in Managing Change
By eliminating the above mentioned worst practices
errors, we will empower the Management of Change
Process.
Summarizing, the key factors for success when imple-
menting change within an organisation are to:
• Demonstrate Senior management commitment
• Set realistic goals/targets
• Power for change – we need to provide the re-
sources: time and finance
• Establish a communication/education plan,
share vision. One of the best way to overcome
resistance is to educate people about the
change effort beforehand.
• Monitor the Changes Implementation and re-
align performance when necessary.

9. Conclusions

In today’s competitive world and with the heavy de-


mands made on the shipping industry we are going to
withstand relentless and constantly growing global
competition, if we wish to lead in the industry we need
to be different and we must learn to look on change as a
friend - one who presents us with an opportunity for
growth and improvement.
In this paper we described a new management model
that has been created, documented and tested, in order
to manage change, build trust among our employees,
drive out fear of failure and create productive environ-
ment in which everyone can offer their unique knowl-
edge and talents.

S-ar putea să vă placă și