GENERAL NOTES: CONCRETE NOTE : MATERIALS SPECIFICATION: DRAWING ABBREVIATION: PROJECT NAME

DESIGN DATA:
1. THIS IS A METRIC PROJECT. UNLESS OTHERWISE NOTED, ALL • CONCRETE IS SPECIFIED PER PERFORMANCE 1. CONCRETE CYLINDER STRENGTH ALT ALTERNATE
DIMENSIONS ARE IN MILLIMETERS. • STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE SPECIFICATION AS OUTLINED IN BANGLADESH 7, 14, 28 DAYS (ASTM C39/C39M-18) (B) BOTTOM JHILMIL
2. REVIEW STRUCTURAL DRAWINGS IN CONJUNCTION WITH THE NATIONAL BUILDING CODE (BNBC) 2017. BNBC BANGLADESH NATIONAL BUILDING CODE
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND LANDSCAPING
DRAWINGS PRIOR TO CONSTRUCTION. REPORT DISCREPANCIES

BANGLADESH NATIONAL BUILDING CODE (BNBC) 2017.
CONCRETE ELEMENTS ARE DESIGNED PER BANGLADESH • THE CONTRACTOR AND THE CONCRETE SUPPLIER TO 2. REINFORCEMENT COL
C/C
COLUMN
CENTER TO CENTER
RESIDENTIAL
NATIONAL BUILDING CODE (BNBC) DESIGN OF CONCRETE TEST ALL THE MATERIALS ACCORDING TO THE a. MATERIAL SPECIFICATIONS ASTM 706
BEFORE PROCEEDING WITH THE WORK.
3. COORDINATE ALL OPENINGS, SLEEVES AND EMBEDDED ITEMS WITH
STRUCTURES. STANDARDS PROVIDED IN THE MATERIALS
SPECIFICATION SECTION.
b. ELONGATION WITH TENSILE STRENGTH
ASTM A370-18B
CONC
DWG
CONCRETE
DRAWING
PARK
• THE VALUES FOR CLIMATIC DATA USED IN THE
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND LANDSCAPE DETERMINATION OF DESIGN LOADS HAVE BEEN OBTAINED • THE CONTRACTOR AND THE CONCRETE SUPPLIER TO c. END AND REBEND TEST: DIA, ø DIAMETER KERANIGANJ, DHAKA,
DRAWINGS. REPORT ANY ITEMS THAT ARE IN CONFLICT. FROM BANGLADESH NATIONAL BUILDING CODE (BNBC). MEET ALL CERTIFICATION, DOCUMENTATION, AND ASTM A370-18 f'c COMPRESSIVE STRENGTH OF CONCRETE BANGLADESH
4. VERIFY EXISTING DIMENSIONS AND CONDITIONS ON SITE PRIOR TO • SELF WEIGHT (SWT) OF BUILDING IS DUE TO THE WEIGHT QUALITY CONTROL REQUIREMENTS. fy YIELD STRENGTH IN MPa
CONSTRUCTION. OF THE STRUCTURE ITSELF. IT VARIES WITH THE • THE CONTRACTOR AND THE CONCRETE SUPPLIER TO 3. REINFORCEMENT MATERIAL kN KILO NEWTON
5. USE THESE DRAWINGS ONLY FOR THE PURPOSE IDENTIFIED IN THE STRUCTURAL SYSTEM. ENSURE THAT THE PLASTIC AND HARDENED MIX SPECIFICATIONS kN/m² KILO NEWTON PER METER SQUARED CLIENT
REVISIONS COLUMN. DO NOT CONSTRUCT FROM THESE DRAWINGS • SUPERIMPOSED DEAD LOADS (SDL) ARE NON-STRUCTURAL PROPERTIES MEET SITE REQUIREMENTS FOR PLACING, ASTM 706 kPa KILO PASCAL
UNLESS MARKED “ISSUED FOR CONSTRUCTION”. DEAD LOADS DUE TO NON-STRUCTURAL TOPPINGS, FINISHING, AND THE SPECIFIED PERFORMANCE 4. CEMENT ksi KIP PER SQUARE INCH
6. DO NOT USE INFORMATION ON THESE DRAWINGS FOR ANY OTHER FINISHES, PARTITIONS, ROOFING MATERIALS, SUSPENDED REQUIREMENTS. a. FINENESS MAX MAXIMUM
PROJECT OR WORKS. EQUIPMENT ETC. • CEMENT TO BE PORTLAND CEMENT TYPE CEM-I OR ASTM C115/C115M-10E1 MIN MINIMUM
7. DO NOT SCALE THESE DRAWINGS. • SUPERIMPOSED DEAD LOADS (SDL) IS APPLIED AS PER CEM-II UNLESS NOTED OTHERWISE OR REQUIRED BY ASTM C204-18 MPa MEGA PASCAL
8. UNLESS OTHERWISE NOTED ON DRAWINGS, FOLLOW TYPICAL DETAILS BANGLADESH NATIONAL BUILDING CODE (BNBC) 2017. EXPOSURE CLASS. b. SOUNDNESS MC MAIN COLUMN SVC JHILMIL
SHOWN ON S001 SERIES DRAWING(S). TYPICAL DETAILS SHOWING • DEAD LOAD (DL) IS THE SELF WEIGHT OF THE STRUCTURE • CONCRETE TO BE NORMAL DENSITY (MIN.2300 KG/M3) ASTM C151/C151M-18 MSW MAIN SHEAR WALL RESIDENTIAL BD LTD.
STRUCTURAL INTENT RATHER THAN ACTUAL CONDITIONS FOR THIS PLUS THE SUPERIMPOSED DEAD LOAD. UNLESS NOTED OTHERWISE. c. INITIAL & FINAL SETTING TIME mph MILE PER HOUR
PROJECT. • NOMINAL SIZE OF COARSE AGGREGATE TO BE 20 (3/4”) ASTM C191-18A PB PARKING BEAM
• LIVE LOAD (LL) IS APPLIED ON THE BUILDING AS PER
9. ALL SECTIONS, DETAILS, AND STATEMENTS NOTED AS “TYPICAL” APPLY BANGLADESH NATIONAL BUILDING CODE (BNBC) 2017 UNLESS NOTED OTHERWISE. d. NORMAL CONSISTENCY PSF POUNDS PER SQUARE FOOT
TO LIKE/SIMILAR CONDITIONS IN THE STRUCTURE. VARIES WITH OCCUPANCY. • CONCRETE STRENGTH TO BE IN ACCORDANCE WITH ASTM C187-10 PSI POUNDS PER SQUARE INCH CONSULTANT
10. DRAWINGS SHOW COMPLETED STRUCTURE ONLY. THEY DO NOT SHOW • LATERAL LOADS IN THIS STRUCTURE ARE RESISTED BY THE FOLLOWING SCHEDULE UNLESS OTHERWISE PW PARTITION WALL
e. COMPRESSIVE STRENGTH
TEMPORARY WORKS FOR WHICH THE CONTRACTOR IS RESPONSIBLE SHEAR WALLS AND MOMENT FRAMES, AND ARE NOTED: SB SPANDREL BEAM
ASTM C109/C109 M- 16A
AND WHICH MAY BE REQUIRED FOR EXECUTION OF THE PROJECT, DETERMINED AS PER BANGLADESH NATIONAL BUILDING ST STRAIGHT
f. COMPOSITION LIMIT OF CEMENT
INCLUDING TEMPORARY SHORING, BRACING, GUYS AND TIE DOWNS. CODE (BNBC) 2017 BASED ON THE WIND AND SEISMIC DATA SW SHEAR WALL
TABLE: GN-2 • CEMENT CLINKER: 65~79%
THE CONTRACTOR TO ESTABLISH CONSTRUCTION PROCEDURE BELOW. TB TRANSFER BEAM
• FLY ASH, SLAG, LIMESTONE: 21~30%
AND SEQUENCE TO ENSURE SAFETY OF THE WHOLE STRUCTURE AND TSB TRANSFER SLAB SPANDREL BEAM
• GYPSUM: 0~5% FLAT- 5B, 126/3,
ALL ITS COMPONENTS DURING CONSTRUCTION. 28 DAYS COMPRESSIVE (T) TOP
WIND LOAD: MONIPURIPARA,AIRPORT
11. CONSTRUCTION LOADS ON PERMANENT STRUCTURE NOT TO EXCEED ELEMENT REMARKS
DESIGN LOADS INDICATED ON DRAWINGS. FULL DESIGN LOADS MAY STRENGTH (MPa) 5. FINE AGGREGATE ROAD, TEJGAON,
WIND SPEED : 65.7 m/s a. SIEVE ANALYSIS
ONLY BE APPLIED AFTER THE CONCRETE REACHES ITS DESIGN SHEAR WALL 50 SEMI-BASEMENT TO 1st FLOOR DHAKA-1215
EXPOSURE TYPE : A ASTM C136/C136M-14
STRENGTH
WIND EXPOSURE PARAMETER : CASE - I COLUMN 50 SEMI-BASEMENT TO 1st FLOOR a. BULK DENSITY
12. DESIGN OF ALL TEMPORARY WORKS TO BE CARRIED OUT BY AN
ENGINEER RETAINED BY THE CONTRACTOR, LICENSED IN THE PLACE
CASE - II
BEAM 50 SEMI-BASEMENT TO 1st FLOOR ASTM C29-97 BUILDING INFO.
CASE - III a. b) MOISTURE CONTENT
WHERE THE PROJECT IS LOCATED. SLAB 50 SEMI-BASEMENT TO 1st FLOOR
CASE - IV ASTM C70-13
13. COOPERATE WITH CONSULTANTS DOING FIELD REVIEW AND WITH ALL ZONE NO : 01
TOPOGRAPHICAL FACTOR, kzt : 1 SHEAR WALL 30 2nd FLOOR TO ROOF a. c) SPECIFIC GRAVITY
INSPECTION AND TESTING AGENCIES, ASSIST IN THEIR WORK, AND
GUST FACTOR : 0.85 ASTM C127-15 BLDG. TYPE : A
PROVIDE SAFE ACCESS TO WORK AREAS AS REQUIRED. PROVIDE COLUMN 30 2nd FLOOR TO ROOF
DIRECTIONALITY FACTOR : 0.85
REASONABLE NOTICE (NOT LESS THAN 24 HOURS) PRIOR TO
WIND PRESSURE COEFFICIENT (WINDWARD) : 0.8 BEAM 30 2nd FLOOR TO ROOF 6. COARSE AGGREGATE BLDG NO : A-01
CONCEALING ANY WORK THAT REQUIRES INSPECTION, REVIEW, OR
WIND PRESSURE COEFFICIENT (LEEWARD) : 0.5 SLAB 30 2nd FLOOR TO ROOF a. SIEVE ANALYSIS
TESTING. SCHEDULE THIS WORK TO OCCUR DURING NORMAL
BUSINESS HOURS. WORK TO BE GENERALLY COMPLETE AT THE TIME PARTITION WALL 30 ALL FLOOR ASTM C136/C136M-14
OF THE REVIEW. SEISMIC LOAD b. BULK DENSITY
14. STRUCTURAL CONSULTANT WILL PROVIDE PERIODIC FIELD REVIEW OF ASTM C29-97
A REPRESENTATIVE SAMPLE OF THE STRUCTURAL WORKS DETAILED FACTORS: c. MOISTURE CONTENT
ON THESE DRAWINGS FOR GENERAL CONFORMANCE WITH CONTRACT ASTM C70-13
DOCUMENTS. THESE REVIEWS DO NOT REPLACE THE CONTRACTOR'S OCCUPANCY IMPORTANCE, : 1 REINFORCEMENT: d. SPECIFIC GRAVITY
RESPONSIBILITY TO IMPLEMENT AND MAINTAIN A QUALITY CONTROL RESPONSE MODIFICATION, R : 5 ASTM C127-15
PROGRAM. DEFLECTION AMPLIFICATION,C/d : 5 REBAR YIELD STRENGTH, FY = 413 MPA. e. MAXIMUM AGGREGATE SIZE
15. DO NOT CUT OR DRILL ANY OPENINGS IN STRUCTURAL MEMBERS SYSTEM OVER STRENGTH, OMEGA : 2.5 18MM DOWNGRADE
WITHOUT WRITTEN PERMISSION FROM THE STRUCTURAL REINFORCEMENT TO CONFORM TO THE FOLLOWING f. CRUSHING VALUE : ASTM
SEISMIC COEFFICIENT: STANDARDS: B ISSUE FOR 04.28.19
CONSULTANT. g. ABRASION VALUE : ASTM
16. MAINTAIN A QUALITY CONTROL PLAN FOR STRUCTURAL WORK, AND
APPROVAL
MAKE IT AVAILABLE TO THE CONSULTANT UPON REQUEST. AT A 0.2 SEC SPECTRAL ACCELERATION : 0.2 · THE RATIO OF ULTIMATE TENSILE STRENGTH FU NO. DESCRIPTION DATE
7. MEMBRANE
MINIMUM, THE PLAN TO INCLUDE: 1 SEC SPECTRAL ACCELERATION : 0.5 TO YIELD STRENGTH FY, SHALL BE AT LEAST 1.25
ASTM D7832/D7832-14
• NAMES OF PERSONNEL RESPONSIBLE FOR EXECUTION OF THE LONG PERIOD TRANSITION PERIOD : 12 sec
PLAN. · MINIMUM ELONGATION AFTER FRACTURE AND ISSUE DATE
SITE CLASS: MINIMUM TOTAL ELONGATION AT MAXIMUM FORCE IS 8. BRICK
• MEANS AND METHODS FOR CONFIRMING MATERIAL COMPLIANCE : SC
16% AND 8% RESPECTIVELY. BRICK PROPERTIES SHALL BE FOLLOWED 01.20.2019
WITH SPECIFICATIONS AND ASSOCIATED DOCUMENTATION SEISMIC ZONE: : 2
BNBC-2006 / BNBC-2017 (DRAFT).
PROCEDURES. a. CRUSHING STRENGTH
• PROGRAM FOR CONFIRMING AND DOCUMENTING COMPLIANCE ASTM C67/C67M-18
OF SUB-TRADE QUALIFICATIONS AND QUALIFICATION THEIR b. ABSORPTION CAPACITY
INDIVIDUAL EMPLOYEES AND SUB-CONTRACTORS.
ASTM C67/C67M-18
• PROCEDURES FOR REVIEWING FIELD COMPLIANCE WITH
CONSTRUCTION DOCUMENTS INCLUDING
9. GI WIRE
DOCUMENTATION OF LOCATIONS REVIEWED, PHOTOGRAPHS
ASTM B606
TAKEN, AND TIMING OF REVIEW. THE CONTRACTOR'S REVIEW TO
BE COMPLETED PRIOR TO REVIEW BY THE CONSULTANT.
10. ELECTRODE FILLER MATERIAL
• PROCEDURES FOR RECTIFYING DEFICIENCIES NOTED BY THE
a. YIELD STRENGTH
CONTRACTOR, CONSULTANTS AND INDEPENDENT INSPECTION
ASTM A706/A706M-16 DESIGNED BY
AGENCIES.
b) TENSILE STRENGTH
ASTM A706/706M-16

TABLE: GN-1 11. CONCRETE MIX DESIGN


CONCRETE MIX DESIGN SHALL BE FOLLOWED
ACI-211 TO CONFIRM CONCRETE
DRAWING COMPRESSIVE STRENGTH GIVEN IN TABLE
DRAWING DETAIL
SHEET ID NO. GN-2.
0 GENERAL DETAIL DRAWING'S SLUMP VALUE: DESIGN TEAM
1 SHEAR WALL & COLUMN DRAWING'S 150MM (ASTM C143/C143M-15A)
ADMIXTURE:
2 BEAM DRAWING'S ASTM C494/C494M-17 DR. AHMADUL HASSAN
PhD (BUET)
3 PARITITION WALL DRAWING'S WATER:
4 SLAB DRAWING'S ASTM C94/C94M-18 DR. MONJUR HOSSAIN
PhD (BUET)
5 STAIR & LIFT DRAWING'S MD. SAJAL KHAN
S 1 01
6 ROOF DETAIL DRAWING'S B.Sc. in Civil Engg. (BUET)

HAMIDUL AHASAN
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)
SHEET SERIAL NO.
ATIQUR RAHMAN
B.Sc. in Civil Engg. (CUET)

STRUCTURAL NAYAN ROY


B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

GENERAL NOTES

S-001
Scale As indicated
PROJECT NAME

TYPICAL DETAILS 1 NOTE : UNLESS OTHERWISE NOTED ON DETAILED DRAWINGS, THIS DRAWING SHALL BE APPLICABLE FOR CAST - IN - PLACE WORKS. JHILMIL
NOTATION TYPICAL LOCATION OF SPLICES FOR SHEAR WALL TRANSVERSE REINFORCEMENT REQUIREMENTS-RECTANGULAR HOOP FOR RESIDENTIAL
MEMBERS SUBJECTED TO BENDING AND AXIAL LOAD RECTANGULAR HOOP (SMF).
PARK
db1 KERANIGANJ, DHAKA,
d b : NOMINAL DIAMETER OF BARS
BANGLADESH
D : DEFORMED BAR
CL : if db1= db2, ld will be for db1or db2
CENTER LINE
CLASS "A" LAP SPLICE ONLY WITHIN CLIENT

ld
Fcu : SPECIFIED COMPRESSIVE STREGTH BY CUBIC MOLD if db1 > db2, ld will be for db1 CENTER HALF OF CLEAR COLUMN MAXIMUM SPACING 1/4 OF SMALLEST DIMENSION
HEIGHT.ONLY 50% OF THE BARS SPLICED AT OF TIES IN LAP LENGTH OF COLUMN BUT NOT GRATER
TEST FOR CONCRETE
if db2 > db1, ld will be for db2 ONE PLACE. THAN 100MM
Fy : SPECIFIED YIELD STRENGTH OF REINFORCEMENT
Lo : CLEAR SPAN LENGTH
db2 SVC JHILMIL
Ho :
RESIDENTIAL BD LTD.
CLEAR HEIGHT
L 1: SPAN LENGTH IN THE DIRECTION OF VIEW
L 2: TRANSVERSE SPAN LENGTH JOINT HOOPS MAY BE SPACED AT UP TO CONSULTANT
Lap Length for 30 MPa Lap Length for 40 MPa 150MM FOR THE DEPTH OF THE
S1 : ANCHORAGE LENGTH IN TENSION (GENERAL)
S2 :
SL. BarDia Lap Length SL. BarDia Lap Length A A SHALLOWEST BEAM WHEN BEAMS WITH
WIDTH > 3 TIMES THE WIDTH OF THE COLUMN
ANCHORAGE LENGTH IN TENSION (TOP REINFORCEMENT) 4
01 16mm 780mm 01 16mm 670mm FRAME INTO THE FOUR SIDES OF A
S3 : ANCHORAGE LENGTH IN COMPRESSION 02 20mm 1200mm 02 20mm 1040mm COLUMN. FOR ALL OTHER CONDITIONS,
S4 : LAP SPLICES LENGTH IN COMPRESSION 03 22mm 1320mm 03 22mm 1145mm USE HOOPS SPACED AT S0 ON CENTER. FLAT- 5B, 126/3,
04 25mm 1500mm 04 25mm 1300mm MONIPURIPARA,AIRPORT
S5 : LAP SPLICES LENGTH IN TENSION TYPES OF STIRRUPS & HOOPS 05 28mm 1675mm 05 28mm 1460mm Cross tie ROAD, TEJGAON,
P : DISTANCE BETWEEN REINFORCEMENT 06 32mm 1915mm 06 32mm 1665mm DHAKA-1215
JOINT HOOPS
R : INSIDE DIAMETER OF BEND
> 6 d (BUT NOT LESS > 6 db (BUT NOT LESS
b BUILDING INFO.

S0/2
: LOCATION OF CURTAILMENT THAN 50mm) Lap Length for 50 MPa
THAN 50mm) LARGER OF C1 OR C2
d : BEAM EFFECTIVE DEPTH SL. Bar Dia Lap Length l0 > 1 TH CLEAR HEIGHT 450MM
2 ZONE NO : 01
P
01 16mm 585mm Hoop

S0
h : BEAM DEPTH BLDG. TYPE : A

l0
02 20mm 910mm
R6 03 22mm 1000mm BLDG NO : A-01
ONE-QUARTER OF THE MINIMUM DIMENSION OF
04 25mm 1140mm COLUMN 6XSMALLEST LONGITUDINAL BAR
SPACER S0 < DIAMETER 100MM < S0 = 100+(350-hX)/3< 150MM
05 28mm 1275mm
MAX. 500 INTERVAL WHERE hX SHALL NOT EXCEED 350 MM

Clear height of column


06 32mm 1460mm
HOOP
STIRRUP
HOOKS AND BENDS

S<2S0
TYPICAL ANCHORAGE OF COLUMN REINFORCEMENT
* Corner bars
shall be hooked. WHEN WELDED SPLICES OR MECHANICAL
GENERAL FOR STIRRUP AND ANCHORAGE CONCRETE COVER TO REINFORCEMENT CONNECTIONSARE USED, NOT MORE THAN
ALTERNATE BARS MAY BE SPLICED AT ANY
> 8 db MEMBER SECTION WITH VERTICAL DISTANCE
180 135 90 COVER
BETWEEN SPLICES 600MM OR MORE. NO. DESCRIPTION DATE
1/
> 6 db 2 Ho+15db
PILECAP , FOOTING
AND FOUNDATION SLAB (*) 50mm
(TOP REINFORCEMENT) ISSUE DATE
Ho

S0
R > 4 db R R
FOUNDATION GIRDER
01.20.2019

l0
50mm a a< 1
AND FOUNDATION BEAM
D= 6
db db db BEAM , GIRDER AND COLUMN
40mm D
EXPOSED TO THE WEATHER L*
BEAM , GIRDER AND COLUMN 400
40mm
NOT EXPOSED TO THE WEATHER
SLAB AND WALL EXPOSED db db
40mm 135°6

°
90
TO THE WEATHER
6db
MINIMUM DIAMETERS OF BEND ( R ) ( ALTERNATE 90° AND 135° ENDS ON
SLAB AND WALL-NOT EXPOSED a a 1
(MEASURED ON THE INSIDE OF THE BAR) <
CONSECUTIVE CROSSTIES)
30mm D 6 DESIGNED BY
TO THE WEATHER
DIAMETER OF BEND
400 C1
GRADE OF BAR BAR SIZE
OUTSIDE -50mm L* S2
> 5 db UNDER GROUND WATER TANK D
250 10 , 12mm INSIDE -75mm L*
400
>
410 22mm > 5 db
OUTSIDE -37mm 6db extension
OVER HEAD WATER TANK <150
> 25mm > 6 db INSIDE -75mm
= Ash > 0.3shc[(Ag/Ach)-1](f'c/fyt)
PROVIDE ADDITIONAL TRANSVERSE 6db >75mm
0.09shcf'c/fyt
Ho REINFORCEMENT IF THICKNESS >100MM
1/2 Ho+15db
* THE COVER NOT CONTACT WITH SOIL : 40mm (BOTTOM
DESIGN TEAM

X
REINFORCEMENT)

C2
DR. AHMADUL HASSAN

X
TYPICAL LOCATION OF SPLICES FOR BEAM CONSECUTIVE CROSSTIES ENGAGING THE A sh1 x < 350 mm ON CENTER PhD (BUET)
CLEAR DISTANCE BETWEEN REINFORCING BAR SAME LONGITUDINAL BAR HAVE THEIR X X X A sh2 hx = MAXIMUM VALUE OF X ON DR. MONJUR HOSSAIN
150 S2 90° HOOKS ON OPPOSITE SIDES OF COLUMN PhD (BUET)
C1_ ALL COLUMN FACES
GIRDER, BEAM COLUMN MIDDLE-THIRD spacing of stirrups d/4 or 100 mm < sx =100+350-h x < 150 mm MD. SAJAL KHAN
100mm whichever is less * S2 AND D+400
. L >
Section A-A 3 B.Sc. in Civil Engg. (BUET)

Splice*
= HAMIDUL AHASAN
50mm ARRANGEMENT OF COLUMN HOOPS B.Sc. in Civil Engg. (AUST)

B1 MD. MUSTAFIZUR RAHMAN


GENERAL REQUIREMENTS AND TRANSVERSE REINFORCEMENT B.Sc. in Civil Engg. (CUET)
d

REQUIREMENTS FOR JOINTS NOT CONFINED BY STRUCTURAL MEMBER. ATIQUR RAHMAN


d

B.Sc. in Civil Engg. (CUET)

NAYAN ROY
db Min. 2h
C1XC2
P

B.Sc. in Civil Engg. (BUET)


S5

from face of support Splice* 8x LONG BAR DIAMETER


150mm ZINAN URMI
db P * AT LAP SPLICE SPACING OF HOOPS <= d/4 BUT ldh >
P

ƒydb B.Sc. in Civil Engg. (BUET)


NOT GREATER THAN 100 5.4√ƒ'C
500

P 0.3shc[(Ag/Ach)-1](f'c/fyt)
P

Ash > 0.09shcf'c/fyt


DRAWN BY
STANDARD HOOK
1.5P

IRAJ ZAHIR SHAMIM UDDIN


TOP BAR STIRRUP MAHADI HASSAN SHAMIM REZA
STIRRUP STIRRUPS MIZANUR RAHMAN

12d0
MEMBER CLEAR DISTANCE ( P ) MAXIMUM STIRRUP
DISTANCE d/4
MAXIMUM STIRRUP
DISTANCE d/4
MAXIMUM STIRRUP
DISTANCE d/4

L/4 L/3 L/3


1.5P

> 1.5 db AND


MAXIMUM STIRRUP DISTANCE d/2

GIRDER , BEAM > 30mm


ELEVATION PLAN
> 1.5 db AND
P

COLUMN AND OTHERS


> 30mm
MAX SLOPE OF
< 0.25(SMALLER OF C1 or C2
GENERAL NOTES
P

BOTT: BAR OFF-SET BEND 6x LONG BAR DIAMETER S0


6

HOOP BAR
NOTE : THE CLEAR DISTANCE ( P ) SHALL NOT BE LESS THAN 8x LONG BAR DIAMETER
P

1.25 TIMES THE MAXIMUM SIZE OF THE AGGREGATE. 150mm


1 ldh > ƒydb
5.4√ƒ'C

Bo S-002
Scale As indicated
PROJECT NAME
TYPICAL DETAILS 2
JHILMIL
ADDITIONAL REINFORCING BARS FOR OPENING TYPICAL REINFORCECEMENT OF BRICK WALL DETAIL OF LINTEL AND STUD
RESIDENTIAL
TYPICAL SLAB OPENING TYPICAL WALL OPENING P.S OPENING (MORE THAN 600 WIDE) PARK
2-D12 KERANIGANJ, DHAKA,
2-D16 FOR 70 THK. BRICK WALL BANGLADESH

S1
S1
CLIENT

S1
ALL

1-D12

S1 2-D12 EACH

250
BEAM
2-D12
BEND OR LAP WHERE SVC JHILMIL
ADJACENT OPENING 2-D12 EACH
RESIDENTIAL BD LTD.
INTERRUPT CONCRETE BEAM 80

1-D12
CONSULTANT

S1
2-D12 ST D10@200

S1

S1
□D10-200

S1
S1
FLAT- 5B, 126/3,
DEVELOP TO LINTEL MONIPURIPARA,AIRPORT

250
ADJOINING BEAM/GIRDER ROAD, TEJGAON,
DHAKA-1215
TYPICAL ANCHORAGE AND LOCATION OF SPLICES FOR SLABS TYPICAL REINFORCEMENT OF CANTILEVER SLAB STUD

250
BUILDING INFO.
H
TOP BEAM FOR 120 THK. INNER WALL
ZONE NO : 01
OPENING 2-D12
S2 BLDG. TYPE : A
D12 240 THK. OUTER WALL
S2 D12 □D10-200 BLDG NO : A-01
GREATER OF GREATER OF ALL
0.25Lo 0.3 Lo OR 0.3Lo' 0.3 Lo OR 0.3Lo' S3 2-D12
S3
(MAX.0.5 Lo) (MAX.0.5 Lo')
S2
D12 D12 D12

240
S4
SLAB BOLSTER 120
W
S3 0.15Lo 0.25 Lo 0.25Lo' 2-D12
D12

Lo Lo'/2 ST □ D10@200 NO. DESCRIPTION DATE


D12 4db
S2 ・ A*= H X W

END CENTER END END CENTER


S3
90 Hook
ISSUE DATE
2
・ A* SHALL BE SMALLER OR EQUAL TO 12m .
01.20.2019
50

TYPICAL DEPRESSED SLAB DETAILS TYPICAL ANCHORGE LENGTH OF BEAM

1) b ≧ D 2) b < D 3) IN THE CASE OF DIFFERENT LEVEL AT MID SPAN OUT END IN END
(CONTINU0US BEAM)
H≧D H<D S2 Lo/4 15d b 15d b
DESIGNED BY
B
>D16 D12 D12
B≧180
D12
2-D12
D12

H
b

H D

S2 S3
D

S2
b

D
D
S3

S2
300

D+50

>300 S2
2-D12
DESIGN TEAM
3H 20d b 20db
D
ST ST D10-200 Lo/6 Lo/4 DR. AHMADUL HASSAN
D10-200 ≧4H PhD (BUET)
Lo
DR. MONJUR HOSSAIN
PhD (BUET)
MISCELLANEOUS
MD. SAJAL KHAN
B.Sc. in Civil Engg. (BUET)
ADDITIONAL REINFORCEMENT TYPICAL ADDITIONAL CONCRETE OF BEAMS AND COLUMNS HAMIDUL AHASAN
JOINT DETAIL OF TIP END OF
FOR BEAM SLEEVE OPENING B.Sc. in Civil Engg. (AUST)
CANTILEVER BEAMS AND SECONDARY BEAMS
(Ri > 100mm) MD. MUSTAFIZUR RAHMAN
= B.Sc. in Civil Engg. (CUET)
a b B a NOTES :
COLUMN ATIQUR RAHMAN
ST□ D12 b B.Sc. in Civil Engg. (CUET)

NAYAN ROY

D
1. D ≦ 70mm , NO ADDITIONAL REINFORCEMENT
>6d b

S1
ELEVATION 2-D12 B.Sc. in Civil Engg. (BUET)
SHALL BE PROVIDED .
B

300
ZINAN URMI
2. D>70mm B.Sc. in Civil Engg. (BUET)
a

・ REINFORCEMENT (a)
DRAWN BY
S1

D
1
2

R
R

D 300
ADD. HOOP D10 ( D16 , PITCH ≦ 200mm )
IRAJ ZAHIR SHAMIM UDDIN
STIRRUP MAHADI HASSAN SHAMIM REZA
・ REINFORCEMENT (b)
PLAN < 4 R1 300 D MIZANUR RAHMAN
= R1 > R2 a B (ST T10 , PITCH SHALL BE SAME AS STIRRUPS
= a
BEAM
NOTES : OF GIRDER OR HOOP OF COLUMN .)

300 D
STIRRUP SHALL BE PROVIDED 1) OPENING SHALL BE PROVIDED AT THE
CENTER OF BEAM 0.4D< a < 0.6D b
GENERAL NOTES
2) R SHALL BE SMALLER THAN OR EQUAL TO D/4 OR 200mm ,
PLAN b ST D10
WHICHEVER LESSER .
S1
3) FOR Ri < 100mm , NO ADDITIONAL REINFORCEMENT SHALL BE PROVIDED .
S1
S-003
Scale 1 : 25
PROJECT NAME

JHILMIL
RESIDENTIAL
PARK
KERANIGANJ, DHAKA,
BANGLADESH

TYPICAL DETAILS 3 CLIENT

SLAB & MSW REINFORCEMENT CONNECTION.

SVC JHILMIL
RESIDENTIAL BD LTD.

SLAB
CONSULTANT
SLAB LD SLAB
500 LD

75

75
75

75
500
MSW FLAT- 5B, 126/3,

500
100 MSW 100
MSW MONIPURIPARA,AIRPORT
ROAD, TEJGAON,
DHAKA-1215

BUILDING INFO.
ZONE NO : 01
BLDG. TYPE : A
BLDG NO : A-01
CORNER REINFORCEMENT SLAB OPENING DETAIL.

L/5
b
b a
SLAB b a

L/5
500
75

a b
a b
a L/1
b
75

(a)

L/1
100 (b)
MSW (c) NO. DESCRIPTION DATE
L = LONGER CLEAR SPAN
a = TOP BARS ISSUE DATE
b = BOTTOM BARS
SPACING OF CORNER BARS = Y12@150C/C n1 01.20.2019

Lb
La

SLAB ENDING REINFORCEMENT DETAIL. WATERSTOPS JOINT DETAIL

1
(b) n2

L/
(a)
SLAB

1
DESIGNED BY

L/
NEW
300

CONCRETE
(a) NUMBER OF EXT. BAR (TOP & BOTTOM BAR) = n1
OLD 2
CONCRETE
(b) NUMBER OF EXT. BAR (TOP & BOTTOM BAR) = n2
* 10''/12'' WATERSTOPER FOR SLAB. 2
* 6'' WATERSTOPER FOR WALL. (c) NUMBER OF EXT. BAR (TOP & BOTTOM BAR) = 2-Y12.
DESIGN TEAM
DR. AHMADUL HASSAN
250

PhD (BUET)

DR. MONJUR HOSSAIN


PhD (BUET)
SLAB
MD. SAJAL KHAN
B.Sc. in Civil Engg. (BUET)

HAMIDUL AHASAN
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)

ATIQUR RAHMAN
B.Sc. in Civil Engg. (CUET)

NAYAN ROY
B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

GENERAL NOTES

S-003A
Scale 1 : 20
168.68m

1m Road 12.19 m Wide Road


138.0 m Wide LEGEND
12.19

TYPE-A

m
22.26m

12.19 m Wide Road

.93
Power Station

54
Play field ZONE

7m
28.8
(Z-1, 2, 3, 5, 6 & 7)

204.67m

3.67m
ide Road 18.29 m Wide Road
18.29 m W
LEVEL + 0.00
58.91
m m
. 91 GREEN AREA
108 G
R LEVEL +0.30
LEVEL +0.30 E
E 2.23m
UP UP
N
EA A
62.
AR R
N E P
EE U
27m
GR A

30.15m
A
E
R
A BLG # A-47 BLG # A-39

9m
52.92m
N
TYPE-B

.8
E
E
R
G

29
74.01m 2.09m
90.07m
57.98m 110.43m G
2.09m
R
E
E
N
A
R

41.75m
E
A

BLG # A-54 BLG # A-46


2.23m
E
A
ZONE (Z-4)

21.62m
BLG # A-38 R
S.T.P. A
N 99.72m
18.29m Wide Road GUAR D
E
3050 x 4000 E
R
G
2.23m

2.00m
LEVEL +0.30 WAITING
3050 x 5200

109.72m U
P

UP

3.08m

17.30m
School G

34.83m
R G
E BLG # A-53 R
E BLG # A-45 E BLG # A-37 School
BLG # A-60 N
A
m E
N m

EA
R A
E 07 R 07

AR
A G E
R A

N
7. E
E
7.

EE
3.88m N
A
TYPE-C

GR

16.7
.74m R
E
152 BLG # C-01 A

0m
12.19 m Wide Road

84.26m
Play field Play field

87.28m
A
BLG # A-52 BLG # A-44 E

26.
BLG # A-59 BLG # A-36 R

36.58 m Wide Road


A
N
G
R G
Z-6 Z-5 G
R
E
E
ZONE
E

84m
E R
N E
E
A N
R A
E
A R
E
A
Z-8
108.65m G
R
BLG # A-51 BLG # A-43 E BLG # A-35
BLG # A-58 E
m N
A 99.76m
(Z-8, 9 & 10)

19.81 m Wide Road


07 R
E
A
7.

BLG # C-02
A
BLG # A-50 BLG # A-42 E
BLG # A-57 BLG # A-34 R

LAKE
m A
N
Z-7 07 E
E

9.86m Wide Road 8.27m


G R
R G 7. G
E
E R
N E
E
A N 2.23m
R A
E
A R
E
A

5.62m
25.67m
G
R
2.23m E
E BLG # A-49 BLG # A-41
BLG # A-56 N
A
BLG # A-33

142.44m
R
E
A
136.36m

G
R
E
E
N
A
R 2.23m
E
2.09m A
BLG # C-03
BLG # A-55 BLG # A-48 BLG # A-40 BLG # A-32
4.52m UP UP
3.08m UP E
A LEVEL +0.30
R G UP
UP A R
N E
3.88m E E
E N
R A
LEVEL +0.30 G LEVEL +0.30
R G
LEVEL +0'-0"
E R
A E
E
N
A
R
E
A

18.29 m Wide Road 32.00 m Wide Road 18.29 m Wide Road

18.29m
18.29m

2.00m

2.00m
3.67m

6.60m
1.50m 5
8.88m

storied
Res. B-09 BLG #
B-10
BLG # C-04 BLG #
GREEN AREA GREEN AREA
BL
08 G

00
LEV

±
5 storied
EL

EL
±
00

LEV
B- #

m
#
LEV
EL

+.30
EL
+.30

LEV
m

0m
B-
G 5.3 11 Community
GREEN AREA
BL GREEN AREA

137.08m
& Health club

12.95m
10.30m
30.47m
8.

7
42

42

-0
m
BL G

8.
LE
VE
L +30
0

#B
z-4
#B
-12

BLG
BLG # C-05

32.00 m Wide Road


109.14m

4.73m
WAT E R BODY

Park
64.75m 3.02m 299.77m 98.62m
Z-9
311.02m

LAKE
BLG # B-13

BLG # B-06
WAT E R BODY

Play field

5.30m
5.30m
32.00 m Wide Road

82.50m
BLG # C-06
-14

BLG
7.00m
12.19 m Wide Road

9.86m Wide Road12.50m


#B

Health Care unit


m

8.

#B
4.52m
42

42
299.77m
8.

m
BLG

109.26m

-05
GREEN AREA GREEN AREA
5 storied

27
LE
0m

.4 VE
L
+ .3
EL

5.3

+.30
LEV

m
BL
G 0m 01
Community

LE
00

2m
VE
L

VE
LE

± 00
# B-
GREEN AREA B- # GREEN AREA
& Health club
04 G
BL
BLG # C-07

91.44m
5 23.
B LG #
B -03 B -02
13m BLG #
3.21m
storied
8.88m

Res.

6.60m
32.00 m Wide Road 18.29 m W/R
18.29 m Wide Road
4.81m

18.29m
18.23m

3.02m

LEVEL± 00m

LEVEL± 00m

G RE EN A RE A
9.24m

G RE EN A RE A

6.60m
LEVEL± 00m

G
11.75m

R A
E E
E R
N A 2.09m
2.23m 2.09m A
R E
N
E E
UP A R 2.23m
UP
G
UP UP
UP

UP
EA
AR

BLG # A-31 BLG # A-23 BLG # A-15


N
EE

BLG # C-08 BLG # A-07


GR

7.33m

BLG # A-30 m BLG # A-22 BLG # A-14 2.23m


07
BLG # A-06

137.08m
7. m
07

12.95m
10.30m
30.47m
7.
G REE N ARE A

m BLG # A-29 BLG # A-21 BLG # A-13


07 BLG # A-05
LAKE

7.
BLG # C-09

5.77m
109.68m
36.58 m Wide Road

BLG # A-28 BLG # A-20 BLG # A-12


Z-3
12.19 m Wide Road

Z-1 BLG # A-04


290.38m

Road
School
19.81 m Wide Road

12.50m

Z-10
BLG # A-27 BLG # A-19 BLG # A-11
18.

Z-2 m BLG # A-03


07

83.48m
9.86m Wide
33m

Play field 4.52m 7.


BLG # C-10 G RE EN A RE A

m
7.00m 07
7.33m BLG # A-26 7. BLG # A-18 BLG # A-10
BLG # A-02
109.77m 2.23m 2.09m
2.23m
G REE N ARE A

A
BLG # A-25 BLG # A-17 BLG # A-09 A
R
E Fire Station (2 bigha)
N
BLG # A-01 E
E
R
G
UP

P
U

2.09m 2.23m LEVEL+300

BLG # C-11 G
R
E
E
A

A N
G E A
210.49m
RE

BLG # A-24 R BLG # A-16 BLG # A-08 R R


A LEVEL± 00m
A

E E
E N A
N
N

E
106.91m

A E
UP R
EE

R
P
E G
U A
Foot path
GR

3.08m
G
LEVEL+300
R UP UP
E
E
N
A 12.19 m Wide Road
R
E
A

LEVEL± 00m

LEVEL± 00m
6.52m
6.10m

15.25 m Wide Road


4.81m

36.59m 36.58 m Wide Road

1.69m Commercial
a d
12.19 m Wide Road

MOSQUE Ro A
60

i de
.4

m
W HAK
.25
0m

15 oD
T
Wi

5m
de

5.9
22
12.19 m Wide Road
Ro

153.20m
ad

30.49 m Wide Road

Commercial
2.71m
School & Collage
4m
9.7
1m

m
.03
18.1

71
46.73m

184.80m

Kitchen
Market SUB STATION
CBD GAS RAJUK
m
148.54

230
Post Office
KV P
OW
ER L
IN E Gr
een
Belt a d
e Ro
m c
5.30
rvi
m

Se
.03

W.T.P t
39

Fron
d e
Wi 9m
9.9
m

HOSPITAL 5m 72
15.25 m Wide Road

1 5.2
46.19
m
61.41

UNIVERSITY
47.57m
69.26m

m O WA
.63
21 A
o M
T
5m
1.1
14 MASTER PLAN
42.71m

Scale 1 : 2500
NO.

Scale
IRAJ ZAHIR
BLDG NO
ZONE NO

ZINAN URMI
NAYAN ROY

MAHADI HASSAN
MIZANUR RAHMAN
DHAKA-1215

MD. SAJAL KHAN

ATIQUR RAHMAN
BLDG. TYPE : A
FLAT- 5B, 126/3,

HAMIDUL AHASAN
: 01

DESCRIPTION
CLIENT

ROAD, TEJGAON,

S-004
PARK

: A-01

ISSUE DATE
01.20.2019
SVC JHILMIL
BANGLADESH

DR. MONJUR HOSSAIN


JHILMIL

DRAWN BY
DR. AHMADUL HASSAN
DESIGNED BY

DESIGN TEAM
CONSULTANT

BUILDING INFO.
PROJECT NAME

SHAMIM REZA
KERANIGANJ, DHAKA,

SHAMIM UDDIN
RESIDENTIAL BD LTD.

MASTER PLAN
MD. MUSTAFIZUR RAHMAN
MONIPURIPARA,AIRPORT
RESIDENTIAL

DATE

PhD (BUET)

B.Sc. in Civil Engg. (CUET)


B.Sc. in Civil Engg. (CUET)
PhD (BUET)

B.Sc. in Civil Engg. (BUET)


B.Sc. in Civil Engg. (BUET)
B.Sc. in Civil Engg. (AUST)
B.Sc. in Civil Engg. (BUET)

1 : 2500
PROJECT NAME

JHILMIL
RESIDENTIAL
PARK
KERANIGANJ, DHAKA,
BANGLADESH

CLIENT

SVC JHILMIL
RESIDENTIAL BD LTD.

CONSULTANT

FLAT- 5B, 126/3,


X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39 X40 X41 X42 X43 X44 MONIPURIPARA,AIRPORT
ROAD, TEJGAON,
DHAKA-1215
22249 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 22249
BUILDING INFO.
Y8 Y8 ZONE NO : 01
BLDG. TYPE : A
BLDG NO : A-01
25093

25093
Y7 Y7
2400 2400

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

4800
Y6 Y6

Y5 Y5

N
D
P
U

UP
BLG # A-06 BLG # A-04 BLG # A-02 NO. DESCRIPTION DATE
P
U

ISSUE DATE
Level (- 1225 mm) Level (- 1225 mm) Level (- 1225 mm)
29612

29612
01.20.2019

Y4 Y4
2400 2400

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

Level (- 2925 mm)

4800
Y3 Y3

Y2 Y2 DESIGNED BY
BLG # A-07 BLG # A-05 BLG # A-03 BLG # A-01
25093

25093
Level (- 1225 mm) Level (- 1225 mm) Level (- 1225 mm)

DESIGN TEAM
Y1 Y1
DR. AHMADUL HASSAN
22249 14358 20055 14358 20055 14358 20055 14358 20055 14358 20055 14358 20055 14358 22249 PhD (BUET)

DR. MONJUR HOSSAIN


PhD (BUET)

MD. SAJAL KHAN


X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39 X40 X41 X42 X43 X44 B.Sc. in Civil Engg. (BUET)

HAMIDUL AHASAN
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)

ATIQUR RAHMAN
Semi Basement Plan (Zone-01) B.Sc. in Civil Engg. (CUET)

1 1 : 450
NAYAN ROY
B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

Semi Basement
Plan (Zone-01)

S-005
Scale 1 : 450
PROJECT NAME

JHILMIL
RESIDENTIAL
PARK
KERANIGANJ, DHAKA,
BANGLADESH

CLIENT

SVC JHILMIL
RESIDENTIAL BD LTD.

CONSULTANT

FLAT- 5B, 126/3,


MONIPURIPARA,AIRPORT
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39 X40 X41 X42 X43 X44 ROAD, TEJGAON,
DHAKA-1215

22249 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 20055 2800 2850 3058 2850 2800 22249 BUILDING INFO.
ZONE NO : 01
Y8 Y8
BLDG. TYPE : A
BLDG NO : A-01
25093

25093
Y7 Y7
2400 2400

4800
Y6 Y6

Y5 Y5 NO. DESCRIPTION DATE

ISSUE DATE
01.20.2019
29612

29612
Y4
Y4
2400 2400

4800
Y3 Y3
DESIGNED BY
Y2 Y2
25093

25093
DESIGN TEAM
Y1 Y1 DR. AHMADUL HASSAN
PhD (BUET)
22249 14358 20055 14358 20055 14358 20055 14358 20055 14358 20055 14358 20055 14358 22249 DR. MONJUR HOSSAIN
PhD (BUET)

MD. SAJAL KHAN


B.Sc. in Civil Engg. (BUET)
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39 X40 X41 X42 X43 X44
HAMIDUL AHASAN
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)

MAT OUTLINE (Zone-01) ATIQUR RAHMAN


1 1 : 450
B.Sc. in Civil Engg. (CUET)

NAYAN ROY
B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

MAT OUTLINE
(Zone-01)

S-006
Scale 1 : 450
PROJECT NAME

Y1 Y2 Y3 Y4 Y5 Y6 Y7 JHILMIL
RESIDENTIAL
PARK
KERANIGANJ, DHAKA,
BANGLADESH

CLIENT

X32 X32

X33 X33 SVC JHILMIL


RESIDENTIAL BD LTD.

X34 X34
BLG # A-02 CONSULTANT

X35 X35

X36 X36 FLAT- 5B, 126/3,


MONIPURIPARA,AIRPORT
ROAD, TEJGAON,
X37 2 X37 DHAKA-1215
S-008

BUILDING INFO.
ZONE NO : 01
BLDG. TYPE : A
BLDG NO : A-01

1
S-008

NO. DESCRIPTION DATE

X38 X38 ISSUE DATE


01.20.2019
X39 X39

X40 X40
BLG # A-01
X41 X41
DESIGNED BY
X42 X42

X43 X43

N
D
DESIGN TEAM

UP
DR. AHMADUL HASSAN
PhD (BUET)

DR. MONJUR HOSSAIN


PhD (BUET)

MD. SAJAL KHAN


B.Sc. in Civil Engg. (BUET)

HAMIDUL AHASAN
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)

ATIQUR RAHMAN
B.Sc. in Civil Engg. (CUET)

NAYAN ROY
B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
X44 X44
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

EXPENSION JOINT
Y1 Y2 Y3 Y4 Y5 Y6 Y7 PLAN

EXPANSION JOINT PLAN S-007


1 1 : 180
Scale 1 : 180
PROJECT NAME

JHILMIL
RESIDENTIAL
PARK
KERANIGANJ, DHAKA,
BANGLADESH

CLIENT

SVC JHILMIL
RESIDENTIAL BD LTD.

CONSULTANT

FLAT- 5B, 126/3,


MONIPURIPARA,AIRPORT
ROAD, TEJGAON,
DHAKA-1215

BUILDING INFO.
50mmGAP BETWEEN TWO
ADJECENT BUILDING 50mm GAP BETWEEN TWO ADJECENT ZONE NO : 01
BUILDING 1ST FLOOR
1ST FLOOR
BLDG. TYPE : A
5625 5625
PARKING BUILDING MAIN BUILDING BLDG NO : A-01
ADJECENT MAIN BUILDING MAIN BUILDING
G.F. ROOF G.F. ROOF
4875 4875

PROVITION FOR
EXPASION
PROVITION FOR JOINT
EXPASION
JOINT
NO. DESCRIPTION DATE

ISSUE DATE
01.20.2019

G.F. G.F.
1825 1825

PROVITION FOR
EXPASION DESIGNED BY
PROVITION FOR JOINT
EXPASION
JOINT
ROAD LEVEL ROAD LEVEL
0 0

DESIGN TEAM
SEMI BASE SEMI BASE
DR. AHMADUL HASSAN
-1225 -1225 PhD (BUET)

DR. MONJUR HOSSAIN


PhD (BUET)

MD. SAJAL KHAN


B.Sc. in Civil Engg. (BUET)

SECTION 1 SECTION 2 HAMIDUL AHASAN


1 1 : 35
2 1 : 35
B.Sc. in Civil Engg. (AUST)

MD. MUSTAFIZUR RAHMAN


B.Sc. in Civil Engg. (CUET)

ATIQUR RAHMAN
B.Sc. in Civil Engg. (CUET)

NAYAN ROY
B.Sc. in Civil Engg. (BUET)

ZINAN URMI
B.Sc. in Civil Engg. (BUET)

DRAWN BY
IRAJ ZAHIR SHAMIM UDDIN
MAHADI HASSAN SHAMIM REZA
MIZANUR RAHMAN

EXPENSION JOINT
SECTION

S-008
Scale 1 : 35

S-ar putea să vă placă și