1. GENERAL INFORMATION ABOUT THE COURSE
Credit point: 3
2 hours lecture / week
2 hours practical course/ each second week
Test:
90 min. on 22 of March on lecture
(90 min. on 6 of April on lecture)
Deadline of projects:
1 project: 21 April
2 project: 19 May
1. GENERAL INFORMATION ABOUT THE COURSE
Contact information:
Web: oktatas.epitp.bme.hu Earthworks (change the language)
Office: Central Building-groundfloor Room No. 20
(Kmf20)
E-mail: gvarga@mail.bme.hu
2. CONTENTS OF THE SEMESTER
Types of earthworks
Slope stability:
•Geometry of slopes
•Designing methods
•Geotechnical softwares
2. CONTENTS OF SEMESTER
Classification of earthworks materials:
•Material
•Compactibility Soil-improvement:
•Bearing capacity •Methods
•Frost sensitivity •Technologies
•Excavation •Advantages-disadvantages
2. CONTENTS OF SEMESTER
Quality control:
•Methods
•Technologies
Dewatering:
•Methods
•Steps of designing
3. TYPES OF EARTHWORKS
Cut:
•Slope
•Retaining structure
•Ditches
•Subgrade of superstructure
(road, parking place,
industrial floor)
3. TYPES OF EARTHWORKS
Fill:
•Slope
•Retaining structure
•Ditches
•Subgrade of superstructure
(road, parking place, industrial floor)
4. STEPS OF DESIGING
2. General task
(inclination 10-25%, no natural water, no special
soils, used structures and geotechnical technologies,
<6 m retaining structures, <10m cut or fill, etc.)
Soil investigation:
1. Horizontal
Level of designing
Za≥2m
4. STEPS OF DESIGING
Ground investigation:
2. Vertical
0,8*h<Za<1,2*h
Za≥6,0m
FILL
4. STEPS OF DESIGING
Ground investigation:
2. Vertical
Za≥2,0m
Za<0,4*h
CUT
4. STEPS OF DESIGING
Ground investigation:
2. Vertical
Za≥2,0m from the bottom
Za ≥ 1,5*bAH
DITCH, DRAIN
4. STEPS OF DESIGNING
Ground investigation:
2. Vertical
Group of pile
Za≥4*Df
Za≥5,0m from the toe
Za ≥ 1,5*bg
4. STEPS OF DESIGNING
Designing of earthworks:
1. Slope
(inclination-stability, surface protection, dewatering)
2. Retaining structure
(geometry-stability, construction steps-stability,
materials, dewatering)
3. Fill
(inclination of slopes-stability, material, settlement,
consolidation time, surface protection, dewatering, top
layers of fill, technology)
5. Surface of the erathworks
(material, compaction, bearing capacity)