CALCULO

1- FLETE TERRESTRE DE MATERIALES POR PESO


Descripción Und. Cantidad factor Peso (kg)
TOPOGRAFO hh 32.2036 0.00 0
OPERARIO hh 4,253.2930 0.00 0
OFICIAL hh 4,160.4200 0.00 0
PEON hh 5,609.0609 0.00 0
CLAVOS PARA MADERA C/C 1" kg 0.0420 1.00 0.042
CLAVOS PARA MADERA C/C 2 1/2" kg 0.1300 1.00 0.13
CLAVOS PARA MADERA C/C 3" kg 1,082.2831 1.00 1082.2831
CLAVOS PARA MADERA C/C 1/2"x6" kg 2.0000 1.00 2
ALAMBRE NEGRO N°16 kg 1,665.9848 1.00 1665.9848
ALAMBRE NEGRO N°8 kg 930.3726 1.00 930.3726
ACERO DE REFUERZO Fy=4200Kg-f/cm2 GRADO 60 kg 44,565.0888 1.00 44565.0888
PIEDRA MEDIANA DE 4" m3 3.3570 0.00 0
PIEDRA CHANCADA DE 1/2" A 3/4" m3 288.3702 0.00 0
AFIRMADO m3 71.9602 0.00 0
ARENA GRUESA m3 192.3270 0.00 0
PIEDRA GRANDE m3 14.9050 0.00 0
ASFALTO RC-250 gln 0.4600 6.00 2.76
LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS. und 3,655.5860 0.60 2193.3516
CUMBRERA SUPERIOR P. TEJA ANDINA MATE pza 40.6875 0.40 16.275
CEMENTO PORTLAND TIPO I (42.5KG) BOL 3,954.6106 42.50 168070.9505
YESO EN BOLSAS DE 20 KG. Y TIZA und 16.1018 20.00 322.036
PEGAMENTO PARA PVC gln 0.5000 4.00 2
FLETE TERRESTRE - ESTRUCTURAS GLB 1.0000 0.00 0
HORMIGON m3 65.3759 0.00 0
COLA SINTETICA FULLER gln 18.9513 4.00 75.8052
AGUA m3 235.8000 0.00 0
GIGANTOGRAFIA 3.50x5.00m und 1.0000 2.00 2
VIGUETA DE MADERA TORNILLO DE 3"x6" p2 2,131.0980 0.35 745.8843
TORGO DE MADERA DE 12" m 38.4825 0.20 7.6965
TRIPLAY DE 1.2x2.4 m. e=6 mm pln 8.0000 2.00 16
MADERA TORNILLO INC.CORTE P/ENCOFRADO p2 13,587.2121 0.35 4755.524235
ARANDELA PLANA DE 1/2" und 727.1600 0.30 218.148
TEJA ANDINA 1.18m x0.745m x5mm pza 363.1375 0.10 36.31375
POLICARBONATO RANURADO TRANSLUCIDO m2 362.1345 0.50 181.06725
TIRAFONES PARA TEJA ANDINA pza 2,258.9200 0.01 22.5892
TUBERIA PVC SAP DE 1/2" m 55.0000 0.20 11
CODO PVC SAP 1/2" X 90° und 1.0000 0.05 0.05
REDUCCION PVC P/AGUA 3/4" A 1/2" pza 1.0000 0.05 0.05
MIRAS Y JALONES hm 32.2017 0.00 0
MEZCLADORA DE CONCRETO TROMPO 8HP 9 P3 hm 149.0200 0.00 0
VOLQUETE DE 15 M3 hm 40.8724 0.00 0
COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 199.1695 70.00 13941.865
CARGADOR S/LLANTAS 125 HP 2.5 YD3. hm 40.8724 0.00 0
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 54.8814 0.00 0
TEODOLITO hm 32.2041 0.00 0
CAMION SEMITRAYLER 6X4, 330 HP 20 TN. VJE 4.0000 0.00 0
CAMION CAMABAJA DE 4 EJES VJE 4.0000 0.00 0
VIBRADOR DE 3/4" - 2" CONCRETO hm 163.0809 0.00 0
NIVEL TOPOGRAFICO hm 32.2036 0.00 0
PESO (KILOS) 238867.2678
TONALEDA 238.8672678
VIAJE 15.92448452
COSTO X VIAJE S/2,000.00
TOTAL S/31,848.97
CALCULO DE FLETE - ESTRUCTURAS
PROYECTO: "MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.I. N°
1143 SEMILLITAS DEL SABER, DISTRITO DE SAN LUIS, PROVINCIA DE CARLOS
FERMIN FITZCARRALD - ANCASH"

S-ar putea să vă placă și