1 Overview
Indicator Colour Status Meaning
Power supply unit (PSU) Lithium battery
DPU30D-N06A1 DBU20B-N12A1 Off No power input or module fault
Run indicator Green Blinking slowly (0.5Hz) Normal communication
Blinking fast (4Hz) Abnormal communication
Steady on Module alarm
Alarm indicator Yellow Abnormal communication (This state
Blinking slowly (0.5Hz) does not apply to lithium batteries.)
Fault indicator Red Steady on Module fault
Installation Installation Max. Capacity/Layer Max. System
Scenario Method Configuration
Small pole Side 2 PSUs + 2 lithium batteries or 3 4 PSUs + 5 lithium
mounting lithium batteries (Install the first lithium batteries
battery against the small pole, install
the second lithium battery on its left, NOTICE
and install the third lithium battery or If the system
two PSUs on its right.)
configuration exceeds
the maximum
Small pole, Flush 1 PSU + 1 lithium battery or 2 PSUs capacity/layer, install
wall, large pole, mounting
channel steel, the devices on
(Unit: mm) (Unit: mm) angle steel different layers.

2 Installing PSUs and Lithium Batteries


NOTICE
 Never install a module with power on. Ensure that the angle between a module and the line vertical to the ground is within 10 degrees.
 Do not assemble a lithium battery with an RRU.
 If multiple lithium batteries need to be side-mounted together on a single layer, the four waterproof rubber plugs between adjacent batteries
must be removed.
 There are two types of connecting kits. The BOM number of the kits for connecting a PSU with another PSU or with a lithium battery is
2121152571xxx. The BOM number of the kits for connecting a PSU with an RRU is 2121151141xxx.
 The paint on the surface of the module should be kept intact. Therefore, any damaged paint must be repaired.
2.1 Side Mounting on a Small Pole: 1 PSU + 1 Lithium Battery (Pole Diameter: 60–114 mm)
Space Planning Required Accessories Installation Procedure

Install the pole mounting Install the connecting kit


kit. to the lithium battery.
Connecting kit
x1

Pole mounting kit


Cx1
Bx1
Ax1

Install the lithium battery to Install the PSU to the lithium battery.
the pole.

(Unit: mm)

1
2.2 Side Mounting on a Small Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 60–114 mm)

Space Planning Required Accessories Installation Procedure

Connecting kit Hanging kit Install the pole mounting kit. Assemble the PSUs.
x1 x1

Pole mounting kit


Cx1
Bx1
Ax2

Install the hanging kit. Install the lithium battery to Install the PSUs to the pole.
the pole.

(Unit: mm)

2.3 Flush Mounting on a Small Pole: 1 PSU + 1 Lithium Battery (Pole Diameter: 60–114 mm)

Space Planning Required Accessories Installation Procedure

Install the pole mounting Remove the hanging kit from the
kit. rear of the lithium battery and
Connecting install the kit on its left side.
kit x 1

Pole mounting kit


C x1
Bx1
Ax1

Install the connecting Install the lithium battery to Install the PSU to the lithium
kit to the lithium the pole. battery.
battery.

(Unit: mm)

2
2.4 Flush Mounting on a Small Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 60–114 mm)
Space Planning Required Accessories Installation Procedure
Connecting kit Hanging kit Install the pole mounting kits. Assemble the PSUs and install
x1 x1 the PSU hanging kit.

Pole mounting kit


Cx2
Bx2
Ax2

Install the PSUs to the Remove the hanging kit Install the lithium
pole. from the rear of the lithium battery to the pole.
battery and install the kit
on its right side.

(Unit: mm)

2.5 Flush Mounting on a Wall: 1 PSU + 1 Lithium Battery


NOTICE
• The wall must be made of reinforced concrete and be able to bear at least 720 N.
• The wall must not be damaged if subject to a tension of 1.25 kN exerted outwards vertical to the wall.

Space Planning Required Accessories Installation Procedure


(Unit: mm)
Install explosive Install the pole mounting kits B and A.
bolts.
Connecting kit x 1

Pole mounting kit


Cx0
Bx1
Ax1

(Unit: mm)

Remove the hanging Install the connecting Install the lithium battery to Install the PSU to the
kit from the rear of kit. the wall. lithium battery.
the lithium battery
and install the kit on
its left side.

3
2.6 Flush Mounting on a Wall: 2 PSUs + 1 Lithium Battery

Space Planning Required Accessories Installation Procedure


Connecting Hanging Install explosive
(Unit: mm) kit x 1 kit x 1 Install the pole mounting kits B and A.
bolts.

Pole mounting kit


Cx0
Bx2
Ax2

(Unit: mm)

Remove the Install the lithium Assemble the PSUs and Install the PSUs to the wall.
hanging kit from battery to the wall. install the PSU hanging kit.
the rear of the
lithium battery and
install the kit on its
right side.

2.7 Flush Mounting on a Large Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 114–400 mm)

Space Planning Required Accessories Installation Procedure


Assemble the large pole Secure the pole mounting kits
(Unit: mm) mounting kits. to the large pole.
Large pole mounting
kit x 2 sets NOTICE
Ensure that the hoops are attached
closely to the pole so that they do
Connecting kit x 1 Hanging kit x 1 not slide.

Pole mounting kit Cx0


Bx2
Ax2
Front Rear

Assemble the PSUs Install the PSUs to Remove the Install the lithium
and install the PSU the large pole. hanging kit from battery to the
hanging kit. the rear of the large pole.
lithium battery
and install the
kit on its right
side.

4
2.8 Flush Mounting on a Large Pole: 1 PSU + 1 Lithium Battery (Pole Diameter: 114–400 mm)
Space Planning Required Accessories Installation Procedure

(Unit: mm) Large pole mounting Connecting Assemble the large pole Secure the pole mounting kits
kit x 1 sets kit x 1 mounting kits. to the large pole.

Pole mounting kit


Cx0
Bx1
Ax1
Front Rear

Remove the Install the Install the lithium Install the PSU to
hanging kit from connecting kit to battery to the large the lithium battery.
the rear of the the lithium battery. pole.
lithium battery and
install the kit on its
left side.

2.9 Assembling with the RRU: 1 PSU + 1 RRU


Space Required Installation
Planning Accessories Procedure

(Unit: mm) Connecting Install the connecting Remove the hook on Install the PSU to the RRU.
kit x 1 kit to the RRU. the left of the PSU.

2.10 Mounting on Channel or Angle Steel

NOTE
Channel steel size  As shown in the left figures,
and installation when the narrow edge size of
method channel steel is less than 40
mm, only installation methods
a and b are supported.
 When channel or angle steel
is used for installation, each
Angle steel size layer supports a maximum of
and installation 1 PSU + 1 lithium battery or 2
method PSUs. Refer to the procedure
for flush mounting on a small
pole.

2.11 Flush-Mounting a Single PSU


A single PSU can be flush-mounted on a small pole, wall, or large pole. For details, see the installation procedures in sections 2.3, 2.5, and 2.7.

5
3 Installing an AC SPM (SPM60A)
NOTICE

 If the SPM is not configured, you do not need to install the SPM and its cables.
 It is recommended that the SPM be installed under the PSU on the same pole or wall.

3.1 Pole-Mounting the SPM (Small Pole Diameter: 60–114 mm; Large Pole Diameter: 114–400 mm)
Space Planning Required Accessories Installation Procedure

(Unit: mm) Fastener x 1 Install the fastener onto Secure the SPM onto the pole using the
the SPM. pole mounting kit.

Pole mounting
kit x 1

3.2 Wall-Mounting the SPM


Space Planning Required Accessories Installation Procedure

Fastener x 1 Install the fastener onto Mark mounting holes.


(Unit: mm)
the SPM. (Unit: mm)

Drill holes and install Install the SPM onto


expansion anchor bolts. the wall.

(Unit: mm)

6
4 Installing Cables
4.1 Installing Ground Cables
SPM

Site ground bar Core cross-sectional


area: 10 mm2
Core cross-sectional
area: 16 mm2

PSU 1 PSU 2 Lithium battery


4.2 Installing Power Cables and Communications Cables

DC wiring terminal AC wiring terminal


Cable Type Core Cross- Max Cable Outer
Negative (blue) PE (green) Sectional Area Length Diameter
AC (3-core) 1.5–4 mm2 - 9.0–14.5 mm
Positive (red) N/L2/HVDC negative (blue) DC (2-core) 3.3–6 mm2 50 m
L/L1/HVDC positive (brown)

Preparing Cables and Connecting Waterproof Connectors


NOTE
DC load cables and AC input cables should be prepared onsite. DC load cables are used an example here. Refer to this procedure when
preparing AC input cables.

(Unit: mm)

Installing Ground Clips for DC Load Cables


Cable binding hole (4 mm2) Cable binding hole (≥ 6 mm2)

Cable tie

Waterproof tape Insulation tape Cable tie Load cable Ground cable

7
4.3 Installing Power Cables and Communications Cables
1 PSU + 1 Lithium Battery + 1 SPM
DB15 Female Connector Definition
NOTICE
 The system does not simultaneously support AC input and DC input.
 If the SPM is not configured, connect the AC input power cable to the
input port of the PSU.

SPM

Pin Signal Name Description


DC loads
1 ALM1+ AC outage alarm
Site ground bar (open: alarm; close: normal)
2 ALM1-
Ground Clips 3 ALM2+ Common dry contact (normally open)
AC input 4 ALM2- Common dry contact (normally open)
Monitoring 5 ALM3+ Common dry contact (normally open)
device
6 ALM3- Common dry contact (normally open)
7 RS485_TX+ Northbound RS485 transmission +
8 RS485_TX- Northbound RS485 transmission -
PSU 9 RS485_RX+ Northbound RS485 reception +
10 RS485_RX- Northbound RS485 reception -
11 ALM4+ Common dry contact (normally open)
12 ALM4- Common dry contact (normally open)

DC input 13 Reserved Reserved


Lithium battery 14 CANH CAN data transmission and reception H
15 CANL CAN data transmission and reception L
Multi-module Cascading

NOTICE

 If the SPM is configured when AC input is used, each PSU should be connected to the SPM.
 A maximum of four PSUs can be cascaded. If multiple PSUs are configured, they can be cascaded by connecting BAT and LOAD ports or
by interconnecting LOAD ports. It is recommended that DC loads be equally distributed on the PSUs.
 A maximum of five lithium batteries can be cascaded. If multiple lithium batteries are configured, they should be cascaded by
interconnecting BAT ports.

 Signal cable cascading:


PSUs should be interconnected using DB9–DB15 cables.
PSUs should be connected to lithium batteries using DB9–DB9 cables.
Lithium batteries should be interconnected using DB9–DB9 cables.

 Connecting remote monitoring cables (two optional methods):


PSUs should be connected to RRU using DB15–DB15 cables.
PSUs should be connected to a monitoring device using DB15–dry contact cables.

Monitoring
device
AC/DC DC DC AC/DC DC DC DC AC/DC DC DC DC AC/DC DC DC
input load load input load load load input load load load input load load

PSU 1 PSU 2 PSU 3 PSU 4

Lithium battery 1 Lithium battery 2 Lithium battery 3 Lithium battery 4 Lithium battery 5

8
5 Verifying the Installation
1. Check that the mounting kits are reliably installed and all screws are tightened.
2. Check that all cables are reliably connected with correct polarity and there is no short circuit.

6 Power-On Commissioning
1. Measure the PSU input voltage. Ensure that AC input voltage is in the range of 85–300 V AC and the HVDC input voltage is in the range
of 85–400 V DC.
2. Check the PSU and lithium battery indicators. Ensure that the green indicators are blinking slowly and that the yellow and red indicators
are off.
3. Measure the DC output voltage at each load port. Ensure that the value is in the range from -42 V DC to -58 V DC.
4. Observe the power system for about 15 minutes. If no alarm indicator is on, the system is running properly.

9
Scan here for technical support (enterprise):
Apple Store Google Play Huawei App Store

Scan here for technical support (carrier):


Apple Store Google Play Huawei App Store

Scan here for more documents:


Support-E Support WeChat

You can also log in to Huawei technical support website:


http://support.huawei.com/enterprise
http://support.huawei.com

Huawei Technologies Co., Ltd.


Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
www.huawei.com

10

S-ar putea să vă placă și