Hp feed water heaters is an important equipment in regenerative system of power plant it uses steam extraction
of the steam turbine to heat boiler feed water and reach the required feed temperature, so as to increase thermal
efficiency and ensure unit output.
HP heater system of this unit adopts single series, horizontal large bypass arrangement, includes 3 HP heaters
( HP heater #1, #2, #3). Each HP heaters consists of 3 zones, Desuperheating, condensing and drain cooling.
HPH # 1,2,3 extractions taken from HP turbine 6th stage, CRH and IP turbine 2nd stage respectively..
HP HP HP
HEATER-1 HEATER-2 HEATER-3
THE NUMBER OF EACH UNIT
1 1 1
EQIPMENT
Horizontal Horizontal
Horizontal U-
U-tube U-tube
TYPE tube Surface
Surface Surface
Heating
Heating Heating
TOTAL HEATING AREA m2 2550 2680 2070
FEED WATER AMOUNT t/hr 2060 2060 2060
INLET TEMPERATURE OF FEED
deg C 250.2
WATER 218.9 184.5
OUTLET TEMPERATURE OF FEED
deg C 282
WATER 250.2 218.9
HEATED STEAM PRESSURE Mpa 6.449 3.991 2.271
OPERATING PROCEDURE –
RESPONSIBILITY
Sr.
Description UCE DE FE E
No.
E
3. All drip line manual valve and control vales are open condition
5. Ensure that HPH 3, 2, 1 stream charged from water side i.e. HPH inlet and
outlet valves open with bypass valve closed.
6. Ensure that operation vent of HPH 3,2,1 going to deaerator is in full open
condition
7.
Open the extraction steam to HPH 3 block valve.
8.
HP heater charging sequence - FIRST-3 ,second-2 & third-1
9. Open the extraction steam to heater by opening MOV (inching MOV). Initially
open MOV by 10% .Ensure line pressure and temperature and before NRV
steam pressure & temperature .Give sufficient time for warm-up the line
completely. Also observe feed water temperature. The feed water temperature
starts increasing then opens the MOV step by step to full open.
10. Control Main heater level through both emergency drain & normal drain V/V.
While charging, close emergency drain V/V and maintain with normal drain.
11.
Put HP heater 3 drip to deaerator CV in Auto.
12. Check that the heater levels are normal and controller modulates to maintain
level.
13.
Close the Extraction steam line drain valve after NRV.
14.
Check that HPH 3 feed water outlet temperature increases.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Abinash Mishra Name: Name:
Designation: Assistant Manager Designation: Designation:
KSK Mahanadi Power Company Ltd.
15. In the same manner charge HPH 2 and 1 also. Check that drip control
valve LCV maintains the HP heater level.
16.
HPH 2 and 1 outlet feed water temperature increases.
17.
Close the Heater shell side drains and Vents
18 Ensure all drain valve fully closed and no passing. √
SHUTDOWN SEQUENCE:
1. PLANNED SHUTDOWN :
1. Close extraction to the HP Heater gradually. √
√
1
2. Closing sequence FIRST-Hp heater-1,second-2,Third-3
Heater Emergency drain valve should be opened fully. If still level is not
maintaining then all HPH will be bypassed automatically.