QVR Description: Control panel installation Inspection Doc No.

: MEP-G-005
Project No.: Inspection Date:
KKS (if applicable): Unit: System/Building:
System/Section/Room/ GNPD-03-00-1-ITP-
ITP Number and Revision:
Gridline: 03015- 0
Drawing Number and
Test Equipment Serial No: N/A
Revision:
Calibration Date: N/A Calibration Certificate No: N/A

Nr Test items Acceptance Remark/Results


1 Ensure that the location, elevation, and
orientation of the local panel is as per YES NO
approved drawing.
Ensure that the local panel is level and
2 YES NO
rigidly supported.
Ensure that the local panel is level and
3 YES NO
rigidly supported.
Ensure that the local panel is free from
4 YES NO
damage and defect.
Ensure that the electrical grounding and
5 instrument grounding connection is properly YES NO
installed as per approved drawing.
Ensure that available wall clearance is
6 YES NO
provided as per approved drawing.
Ensure that proper access is provided as
7 YES NO
per approved drawing.
Check the panel space heater, lamp, and
8 YES NO
ventilation (cooling fan/filter).
9 Check the panel IP enclosure is correct. YES NO
Check all internal wirings ferrules and
10 devices are properly labeled according to YES NO
drawings.
11 Check panel lock and keys are provided. YES NO
Ensure that the location, elevation, and
12 orientation of the local panel is as per
approved drawing.
Comments:

Acceptance Department Acceptance Advice

Construction Department Date:

SEPC Quality Date:

GNPD Quality Date: