Proyecto: CASA RACD

Metrado:
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:
PRESUPUESTO
Proyecto: CASA RACD
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019

TRABAJOS PRELIMINARES

1.0. TRABAJOS PRELIMINARES Unidad Metrado Precio Unitario Parcial


1.4 Trazo y Replanteo (Area) m2 520.00 0.00
1.6 Limpieza de terreno manual. m2 520.00 2.18 1,133.60
1.7 Movilizacion de maquinaria y equipo para la obra Glb 1.00 0.00

S/. 1,133.60

ESTRUCTURAS

2.0 MOVIMIENTO DE TIERRAS Unidad Metrado Precio Unitario Parcial


2.3 Excavación masiva con maquinaria m3 43.92 5.00 219.60
2.1 Nivelación y compactación de terreno (en relleno c/20 cm.) con material de afirmado m3 5.08 48.70 247.54
2.2 Excavación localizada manual (tanque cisterna, bases de columnas) m3 32.16 25.50 820.18
2.9 Eliminación de material excedente (25% esponjamiento) m3 95.10 57.89 5,505.59

S/. 6,792.92
4.0.- CONCRETO ARMADO Unidad Metrado Precio Unitario Parcial
4.1 LOSA DE CIMENTACION
4.1.1 Concreto f'c=175 kg/cm² m3 0.00 280.00 0.00
4.1.4 Acero de refuerzo f'y=4200 kg/cm² kg 1212.86 3.22 3,905.41
4.1.5 Encofrado y desencofrado m2 35.40 30.30 1,072.62

4.2 TANQUE CISTERNA


4.2.1 Concreto f'c=210 kg/cm² m3 #REF! 379.15 #REF!
4.2.2 Acero de refuerzo f'y=4200 kg/cm² kg #REF! 3.22 #REF!
4.2.3 Encofrado y desencofrado m2 #REF! 34.45 #REF!

4.3 ESCALERAS
4.3.1 Concreto f'c=210 kg/cm² m3 2.24 345.11 774.43
4.3.2 Acero de refuerzo f'y=4200 kg/cm² kg 155.00 3.22 499.09
4.3.3 Encofrado y desencofrado m2 #REF! 51.62 #REF!

4.4 COLUMNAS
4.4.1 Concreto f'c=210 kg/cm² m3 #REF! 336.53 #REF!
4.4.2 Acero de refuerzo f'y=4200 kg/cm² kg #REF! 3.22 #REF!
4.4.3 Encofrado y desencofrado m2 #REF! 34.98 #REF!

4.5 VIGAS, DINTELES Y SOLERAS


4.5.1 Concreto f'c=210 kg/cm² m3 #REF! 251.43 #REF!
4.5.2 Acero de refuerzo f'y=4200 kg/cm² kg #REF! 3.22 #REF!
4.5.3 Encofrado y desencofrado m2 #REF! 39.27 #REF!

4.6 LOSAS ALIGERADAS


4.6.1 Concreto f'c=210 kg/cm² m3 8.32 237.80 1,978.50
4.6.2 Acero de refuerzo f'y=4200 kg/cm² kg 3268.30 3.22 10,523.94
4.6.3 Encofrado y desencofrado m2 418.18 24.89 10,408.50
4.6.4 Poliestireno expandido de 30cm.x15cm. para aligerado de losa ml 260.00 0.00

4.5 PLACA DECORATIVA EXTERIOR


4.5.1 Concreto f'c=175 kg/cm² m3 #REF! 280.00 #REF!
4.5.2 Acero de refuerzo f'y=4200 kg/cm² kg #REF! 3.22 #REF!
4.5.3 Encofrado y desencofrado m2 #REF! 34.45 #REF!

S/. #REF!

ARQUITECTURA

6.0.- ALBAÑILERIA Unidad Metrado Precio Unitario Parcial


6.1 MURO DE LADRILLO DE ARCILLA KING KONG TIPO IV
6.1.2 Muro ladrillo K.K. Mezcla C:A 1:4, T.IV, de soga m2 #REF! 31.00 #REF!

S/. #REF!

7.0.- REVOQUES, ENLUCIDOS Y MOLDURAS Unidad Metrado Precio Unitario Parcial


7.2 TARRAJEO DE MUROS y COLUMNAS
7.2.1 Tarrajeo de muro frotachados, mezcla C:A 1:5, E=1.5 cm. m2 #REF! 12.55 #REF!
7.5 TARRAJEO DE VIGAS
7.5.1 Tarrajeo de vigas superficie, mezcla C:A 1:5, E=1.5 cm. m2 #REF! 20.07 #REF!
7.6 VESTIDURA DE DERRAMES
7.6.1 Vestidura derrames ancho=0.15 m, mezcla C:A 1:5, E=1.5 cm. ml #REF! 12.56 #REF!
7.6.2 Vestidura en fondo de escalera ancho=0.15 m, mezcla C:A 1:5, E=1.5 cm. m2 #REF! 26.69 #REF!

S/. #REF!
8.0.- CIELORASOS Unidad Metrado Precio Unitario Parcial
8.2 CIELO RASO CON MEZCLA 0.00
8.2.1 Cieloraso con mezcla C:A 1:5, E=1.5 cm. m2 #REF! 20.07 #REF!

S/. #REF!

9.0.- PISOS Y PAVIMENTOS Unidad Metrado Precio Unitario Parcial


9.1 CONTRAPISOS
9.1.1 Contrapiso, mezcla 1:4, E=20mm. m2 #REF! 11.93 #REF!
9.6 PISO DE CEMENTO PULIDO
9.6.1 Piso de cemento pulido E=1.5cm., mezcla C:A 1:4 m2 #REF! 26.79 #REF!
9.7 PISO DE PARQUET
9.7.1 Piso parquet de 30 * 6 cm. (Coricaspi veteado) m2 #REF! 22.12 #REF!
9.8 PISO DE CERAMICO 30X30
9.8.1 Piso de Ceramico Celima 30x30 m2 #REF! 52.02 #REF!

S/. #REF!

10.0.- CONTRAZOCALOS Unidad Metrado Precio Unitario Parcial


10.4 CONTRAZOCALO DE MADERA
10.4.1 Contrazócalo de 3/4"x3", rodón 3/4" de cedro. ml #REF! 9.69 #REF!

S/. #REF!

13.0.- CARPINTERIA DE MADERA Unidad Metrado Precio Unitario Parcial


13.1 PUERTAS DE MADERA
14.1.10 #REF! m2 #REF! 493.79 #REF!
14.1.11 #REF! m2 #REF! 176.54 #REF!
14.1.12 #REF! m2 #REF! 176.54 #REF!
S/. #REF!
14.0.- CARPINTERIA METALICA, HERRERIA Y CERRAJERIA Unidad Metrado Precio Unitario Parcial
14.1 PUERTAS, VENTANAS Y MAMPARAS
14.1.1 #REF! Pza. #REF! #REF!
14.1.2 #REF! Pza. #REF! #REF!
14.1.3 #REF! Pza. #REF! #REF!
14.1.4 #REF! Pza. #REF! #REF!
14.1.5 #REF! Pza. #REF! #REF!
14.1.6 #REF! Pza. #REF! #REF!
14.1.7 #REF! Pza. #REF! #REF!
14.1.8 #REF! Pza. #REF! #REF!
14.1.9 #REF! Pza. #REF! #REF!
14.1.13 #REF! Pza. #REF! #REF!
14.1.14 #REF! Pza. #REF! #REF!
14.1.15 #REF! Pza. #REF! #REF!
14.1.16 #REF! Pza. #REF! #REF!
14.2 BARANDAS Y PASAMANOS METALICO 0.00
14.4.1 Barandas de tubo galvanizado de 3" h=0.50m. ml 12.00 0.00
14.4.2 Pasamanos aislados de tubo galvanizado de 3" h=1.00m. ml 50.80 0.00
14.3 CERRAJERIA 0.00
14.4.1 #REF! Pza. #REF! 8.01 #REF!
14.4.2 #REF! Pza. #REF! 73.40 #REF!
14.4.3 #REF! Pza. #REF! 88.58 #REF!
14.4.4 #REF! Pza. #REF! 69.80 #REF!
14.4 VARIOS 0.00
14.5.1 Barra para comedor de diario pza 18.00 0.00
S/. #REF!

17.0.- PINTURA Unidad Metrado Precio Unitario Parcial


17.1 Pintura muros exteriores m2 #REF! 8.93 #REF!
17.2 Pintura muros interiores con imprimante m2 #REF! 5.13 #REF!
17.3 Pintura cielorasos lavable 2 manos m2 #REF! 6.54 #REF!
17.4 barniz DD en pisos parquet m2 #REF! 11.80 #REF!
17.5 Pintura en puertas de madera con barníz 2 manos m2 #REF! 10.57 #REF!
S/. #REF!

INSTALACIONES SANITARIAS

18.0.- SISTEMA DE DESAGUE Unidad Metrado Precio Unitario Parcial


18.1 ACCESORIOS DE REDES (INST. INCLUÍDA EN REDES DE DISTRIBUCIÓN)
18.1.1 #REF! #REF! #REF! 17.52 #REF!
18.1.2 #REF! #REF! #REF! 19.64 #REF!
18.1.3 #REF! #REF! #REF! 22.51 #REF!
18.1.4 #REF! #REF! #REF! 42.41 #REF!
18.1.5 #REF! #REF! #REF! 2.28 #REF!
18.1.6 #REF! #REF! #REF! 5.09 #REF!
18.1.7 #REF! #REF! #REF! 7.89 #REF!
18.1.9 #REF! #REF! #REF! 3.67 #REF!
18.1.11 #REF! #REF! #REF! 11.38 #REF!
18.1.13 #REF! #REF! #REF! 2.28 #REF!
18.1.17 #REF! #REF! #REF! 3.83 #REF!
18.1.18 #REF! #REF! #REF! 5.74 #REF!
18.1.19 #REF! #REF! #REF! 11.93 #REF!
18.1.20 #REF! #REF! #REF! 22.35 #REF!
18.1.21 #REF! #REF! #REF! 50.36 #REF!
18.1.22 #REF! #REF! #REF! 29.92 #REF!
18.1.23 #REF! #REF! #REF! 30.88 #REF!
18.1.24 #REF! #REF! #REF! 33.54 #REF!
18.1.25 #REF! #REF! #REF! 11.93 #REF!
18.1.26 #REF! #REF! #REF! 11.38 #REF!
18.1.27 #REF! #REF! #REF! 43.21 #REF!
18.1.28 #REF! #REF! #REF! 5.07 #REF!
18.1.29 #REF! #REF! #REF! 4.57 #REF!
18.1.30 #REF! #REF! #REF! #REF!
18.1.31 #REF! #REF! #REF! 111.76 #REF!
18.1.32 Ventilacion de desague SAL 2" #REF! 72.00 112.76 8,118.72

S/. #REF!
19.0.- SISTEMA DE AGUA FRÍA Y CALIENTE Unidad Metrado Precio Unitario Parcial
19.1 APARATOS Y ACCESORIOS DE REDES 0.00
19.1.1 #REF! #REF! #REF! 9.72 #REF!
19.1.2 #REF! #REF! #REF! 10.18 #REF!
19.1.3 #REF! #REF! #REF! 10.70 #REF!
19.1.4 #REF! #REF! #REF! 12.61 #REF!
19.1.5 #REF! #REF! #REF! 2.68 #REF!
19.1.6 #REF! #REF! #REF! 3.56 #REF!
19.1.7 #REF! #REF! #REF! 7.06 #REF!
19.1.8 #REF! #REF! #REF! 4.47 #REF!
19.1.9 #REF! #REF! #REF! 7.06 #REF!
19.1.10 #REF! #REF! #REF! 9.25 #REF!
19.1.11 #REF! #REF! #REF! #REF!
19.1.12 #REF! #REF! #REF! #REF!
19.1.13 #REF! #REF! #REF! 45.00 #REF!
19.1.14 #REF! #REF! #REF! 62.20 #REF!
19.1.15 #REF! #REF! #REF! 102.88 #REF!
19.1.16 #REF! #REF! #REF! 67.49 #REF!
19.1.17 #REF! #REF! #REF! 109.61 #REF!
19.1.18 #REF! #REF! #REF! 543.85 #REF!
19.1.19 #REF! #REF! #REF! #REF!
19.1.20 #REF! #REF! #REF! 2.39 #REF!
19.1.21 #REF! #REF! #REF! 1.85 #REF!
19.1.22 #REF! #REF! #REF! 1.08 #REF!
19.1.23 Jaboneras simple 15x15 Pza #REF! 8.53 #REF!
19.1.24 Toallera de losa barra plástica Pza #REF! 10.28 #REF!
19.1.25 #REF! #REF! #REF! 22.00 #REF!
19.1.26 #REF! #REF! #REF! #REF!
19.1.27 #REF! #REF! #REF! #REF!
19.1.28 #REF! #REF! #REF! #REF!
19.1.29 #REF! #REF! #REF! #REF!
19.1.30 #REF! #REF! #REF! 1843.67 #REF!
19.1.31 #REF! #REF! #REF! 78.31 #REF!
19.1.32 #REF! #REF! #REF! 78.31 #REF!
19.1.33 #REF! #REF! #REF! 208.89 #REF!
19.1.34 #REF! #REF! #REF! #REF!
19.1.35 #REF! #REF! #REF! #REF!
19.1.36 Colocacion de aparatos sanitarios #REF! #REF! 71.62 #REF!
19.1.37 Colocacion de Accesorios sanitarios #REF! #REF! 14.35 #REF!

S/. #REF!

INSTALACIONES ELECTRICAS

22.0.- INSTALACIONES ELECTRICAS Unidad Metrado Precio Unitario Parcial


22.1.1 #REF! #REF! #REF! #REF!
22.1.2 #REF! #REF! #REF! #REF!
22.1.3 #REF! #REF! #REF! #REF!
22.1.4 #REF! #REF! #REF! #REF!
22.1.5 #REF! #REF! #REF! 64.36 #REF!
22.1.6 #REF! #REF! #REF! 64.36 #REF!
22.1.7 #REF! #REF! #REF! 74.77 #REF!
22.1.8 #REF! #REF! #REF! 169.77 #REF!
22.1.9 #REF! #REF! #REF! #REF!
22.1.10 #REF! #REF! #REF! #REF!
22.1.11 #REF! #REF! #REF! #REF!
22.1.12 #REF! #REF! #REF! #REF!
22.1.13 #REF! #REF! #REF! #REF!
22.1.14 #REF! #REF! #REF! #REF!
22.1.15 #REF! #REF! #REF! #REF!
22.1.16 #REF! #REF! #REF! #REF!
22.1.17 #REF! #REF! #REF! #REF!
22.1.18 #REF! #REF! #REF! #REF!
22.1.19 #REF! #REF! #REF! #REF!
22.1.20 #REF! #REF! #REF! #REF!
22.1.21 #REF! #REF! #REF! 1.28 #REF!
22.1.22 #REF! #REF! #REF! 1.92 #REF!
22.1.23 #REF! #REF! #REF! 4.33 #REF!
22.1.24 #REF! #REF! #REF! #REF!
22.1.25 #REF! #REF! #REF! 1.00 #REF!
22.1.26 #REF! #REF! #REF! 8.84 #REF!
22.1.27 #REF! #REF! #REF! 8.88 #REF!
22.1.28 #REF! #REF! #REF! 8.57 #REF!
22.1.29 #REF! #REF! #REF! 1.01 #REF!
22.1.30 #REF! #REF! #REF! 1.48 #REF!
22.1.31 #REF! #REF! #REF! 3.02 #REF!
22.1.32 #REF! #REF! #REF! 56.45 #REF!
22.1.33 #REF! #REF! #REF! 32.26 #REF!
22.1.35 #REF! #REF! #REF! #REF!
22.1.36 #REF! #REF! #REF! #REF!
0.00

S/. #REF!

PRESUPUESTO TOTAL:
S/. #REF!

NOTA: Estos costos no consideran Gastos Generales, Utilidad, Impuestos ni honorario, solo Costo Directo
Proyecto: CASA RACD
Metrado: Concreto de Vigas Secundarias
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

VIGAS SECUNDARIAS

EJE VIGA N° AREA/LARGO ANCHO


ELEMENT (m2/m.) (m.)
V- 17xB 1 15.80 1.00
TODOS A-B
V- 03xB 1 5.85 1.00
PERALTE VOLUMEN
(m.) (m³)
0.17 2.69
0.13 0.76

3.45
ACERO ACERO ACERO ALAM. MALLA
AFIRMADO LADRILLO LADRILLO CEMENTO ARENA PIEDRA HORMIGO ACERO ACERO ACERO ALAM. CASETON CLAVOS
3/8 12mm 1/2 N°16 GALL.
(m3) ART. (mil) PAND. (mil) (bol) (m3) (m3) N (m3) 1/4 (var) 8mm (var) 5/8 (var) N°8 (Kg) (Und) 2" (Kg)
(var) (var) (var) (Kg) (m2)
RELLENO 7.00
ZAPATAS 47 3.6 3.6 12
VC 40 3 3 28 10 31 2 2
SC 7.5 2.5 2 2
CC 1 0.5
FALSO PISO 18 4
MUROS 8 1.5 58 9
COLUMNAS 62 4.5 4.5 0.25 81 24 20 11 42 4 23 6
VIGAS 30 2.5 2.5 83 16 18 83 34
ALIGERADO 71 5.5 5.5 74 60 2 222 110 5
ESCALERAS 19 1.5 1.5 31 3

7.00 8 1.5 354 29.6 20.6 7.25 266 24 137 29 156 16 66 10 222 110 5
25 360 570 21 40 65 35 5.7 11 14.4 23 25.5 39.5 3.7 3.7 7 4 3.8
175 2880 855 7434 1184 1339 253.75 5.7 264 1972.8 667 3978 632 244.2 37 1554 440 19

24104.65

fechas
29/07/19
30/07/19
31/07/19
01/08/19 825.00 7434.00 1516.20 264.00 1972.80 667.00 3978.00 632.00 244.20 37.00 18.50
02/08/19
03/08/19
04/08/19 175
05/08/19
06/08/19
07/08/19
08/08/19
09/08/19
10/08/19 70
11/08/19
12/08/19
13/08/19 140 260
14/08/19
15/08/19
16/08/19
17/08/19
18/08/19
19/08/19
20/08/19 80 130
21/08/19 760 80
22/08/19
23/08/19 375 120
24/08/19
25/08/19
26/08/19
27/08/19
28/08/19
29/08/19
30/08/19
31/08/19
01/09/19
02/09/19
03/09/19
04/09/19
05/09/19
06/09/19
07/09/19
08/09/19
09/09/19
10/09/19
11/09/19
12/09/19
13/09/19
14/09/19
15/09/19
16/09/19
17/09/19
18/09/19
19/09/19
20/09/19
21/09/19
22/09/19
23/09/19
24/09/19
25/09/19
26/09/19
27/09/19
28/09/19
29/09/19
30/09/19
01/10/19
02/10/19
03/10/19
04/10/19
05/10/19
06/10/19
07/10/19
08/10/19
09/10/19
10/10/19
11/10/19
12/10/19
13/10/19
14/10/19
15/10/19
16/10/19
17/10/19
18/10/19
19/10/19
20/10/19
21/10/19
22/10/19
23/10/19
24/10/19
25/10/19
26/10/19
27/10/19
28/10/19
29/10/19
30/10/19
31/10/19
01/11/19
02/11/19
03/11/19
04/11/19
05/11/19
06/11/19
07/11/19
CLAVOS CLAVOS TECN. 1"
SIKA
2.5"(Kg) 3" (Kg) (plancha)

2 2 5

2 2 5 5
3.8 3.8 20 11
7.6 7.6 100 55

TOTAL

S/. 8,000.00 CAJA ZCT.


7.40 7.40 46.50 ### S/. 2,000.00 PAGO INICIAL AL MAESTRO
S/. 0.00
S/. 0.00
S/. 175.00 AFIRMADO
S/. 0.00
S/. 0.00 S/. 2,000.00 RECIBO DE NELI (ZCT)
S/. 0.00
S/. 0.00
S/. 0.00
AFIRMADO
S/. 70.00 S/. 1,000.00 RECIBO DE RCC (ZCT) S/. 2,000.00 2° PAGO A MAESTRO
SOLADOS
S/. 0.00
S/. 0.00 PIEDRA 3/4,
S/. 400.00 ARENA
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00 S/. 2,000.00 3er. PAGO MAESTRO
S/. 0.00
S/. 0.00 PIEDRA 3/4,
S/. 210.00 ARENA
2 MIL LAD.,
S/. 840.00
AREN
S/. 0.00
44 S/. 539.00 S/. 1,500.00 3er. PAGO MAESTRO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00 S/. 2,190.00 S/. 7,500.00 S/. 9,690.00
S/. 0.00
S/. 0.00
S/. 0.00 S/. 11,000.00 S/. 1,310.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
AFIRMADO LADRILLO LADRILLO CEMENTO ARENA PIEDRA HORMIGON ACERO ACERO ACERO ACERO ACERO
(m3) ART. (mil) PAND. (mil) (bol) (m3) (m3) (m3) 1/4 (var) 8mm (var) 3/8 (var) 12mm (var) 1/2 (var)

RELLENO 7.00

ZAPATAS 47 3.6 3.6

VC 40 3 3 28 10 31

SC 7.5 2.5

CC 1 0.5

FALSO PISO 18 4

MUROS 8 1.5 58 9

COLUMNAS 62 4.5 4.5 0.25 81 24 20 11 42

VIGAS 30 2.5 2.5 83 16 18 83

ALIGERADO 71 5.5 5.5 74 60

ESCALERAS 19 1.5 1.5 31

7.00 8 1.5 354 29.6 20.6 7.25 266 24 137 29 156


RUIZ SAN MARTIN 570 21 5.7 11 14.4 23 25.5
0 0 855 7434 0 0 0 1516.2 264 1972.8 667 3978

25 360 570 21 40 65 35 5.7 11 14.4 23 25.5


175 2880 855 7434 1184 1339 253.75 5.7 264 1972.8 667 3978

S/. 24,104.65
NOTAS:
1 EL AFIRMADO ES DE CERRO, EL QUE USAN PARA REPARAR LOS PAVIMENTOS EN LAS INSTALACIONES DE GAS
2 EL LADRILLO SOLIDO TIENE QUE TENER SOLIDEZ, BIEN TRABAJADO EN SU ACABADO, EL COLOR DE QUEMADO NO ES PRIORIDAD
3 EL LADRILLO PANDERETA, SE COMPRARA CUANDO ESTE LLENANDO EL TECHO DEL PRIMER PISO
4 DEL TOTAL DE CEMENTO, 100 BOLSAS TIPO I (CEMENTO INCA), ENTREGAR EN TRES PARTES (120 BOLSAS-LUNES 05, 100 BOLSAS EN 40 DIAS Y EL RESTO EN 65 DIAS)
5 ARENA DE CERRO, DEL TOTAL 9 M3, SON DE ASENTAR LADRILLO
6 PIEDRA CHANCADA, DEL TOTAL 7M3 ES DE 3/4", EL RESTO ES DE 1/2"
7 EL HORMIGON ES DE CERRO
8 TODO EL ACERO DEBE SER ACEROS AREQUIPA (NO ACERO IMPORTADO)
9 LAS PLANCHAS DE TECNOPOR PARA TECHO COTIZAR CON EL RESTO DE MATERIALES Y TAMBIEN COTIZAR SOLO EN FERRETERIA DETRÁS DEL PARADERO DE LA MINA (ING. BLANCO, RE
ACERO ALAM. ALAM. CASETON MALLA CLAVOS CLAVOS CLAVOS TECN. 1" JUNTA
SIKA
5/8 (var) N°16 (Kg) N°8 (Kg) (Und) GALL. (m2) 2" (Kg) 2.5"(Kg) 3" (Kg) DILAT (plancha)

12

2 2

2 2

4 23 6 4

34

2 222 110 5 2 2 5

16 66 10 222 110 5 2 2 5 5
39.5 3.7 3.7 3.8 3.8 3.8 11
632 244.2 37 0 0 19 7.6 7.6 0 55 17689.4

39.5 3.7 3.7 7 4 3.8 3.8 3.8 20 11


632 244.2 37 1554 440 19 7.6 7.6 100 55

RESTO EN 65 DIAS)
ARADERO DE LA MINA (ING. BLANCO, REF UNA ESQUINA)
Proyecto: CASA RACD
Metrado: Acero corrugado para Vigas Secundarias
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

Tabla de translapes: Ø Long transl.


(Pulg. (m.)
)
1/4 0
3/8 0.4
1/2 0.51
5/8 0.64
3/4 0.77
1 1.28

Long. de varilla L= 9.00 m.


Peso Específico del Acero: g= 7850.00 Kg/m3

EJE # Tipo Elem Grafico # Diametro Longitud #


Pisos Elem (pulg) (m.) Transl
1 LOSA 1 1 1 3/8 262.10 11
LOSA
1 LOSA 2 1 1 3/8 265.00 11
1 LOSA 1 1 1 1/4 331.50 11
1 LOSA 2 1 1 1/4 331.50 11
1 V- EJE, D-E 1 2 1/2 51.05 5
1 V- EJE, D-E 1 1 1/2 11.25 1
1 V- EJE, A 1 2 1/2 45.90 5
1 V- EJE, A 1 1 3/8 20.20 2
1 V- EJE, 6 1 2 1/2 22.25 2
1 V- EJE, 6 1 2 3/8 13.90 1
1 V- EJE, 4 1 2 1/2 34.62 3
1 V- EJE, 4 1 2 3/8 2.65 0
03
1 V- EJE, 1 1 2 1/2 36.95 4
1 V- EJE, 1 1 2 3/8 9.25 1
1 V- EJE, 2 1 2 1/2 45.00 4
1 V- EJE, 3 1 2 1/2 56.80 6
1 V- EJE, C 1 2 1/2 92.00 10
1 V- EJE, B 1 2 1/2 34.64 3
1 VB- A 1 2 3/8 30.40 3
1 V- TOTAL 1 2 1/4 371.50 41
Long Transl Longitud Peso de la Peso Total Peso Total ( Kg )
Transl Total (m.) Varilla ( Kg/m ) ( Kg ) 1/ 4 3/ 8 1/ 2 5/ 8 3/ 4
0.4 4.4 266.5 0.56 149.07 149.07
0.4 4.4 269.4 0.56 150.69 150.69
0 0 331.5 0.25 82.41 82.41
0 0 331.5 0.25 82.41 82.41
0.51 2.55 107.2 0.99 106.60 106.60
0.51 0.51 11.76 0.99 11.69 11.69
0.51 2.55 96.9 0.99 96.36 96.36
0.4 0.8 21 0.56 11.75 11.75
0.51 1.02 46.54 0.99 46.28 46.28
0.4 0.4 28.6 0.56 16.00 16.00
0.51 1.53 72.3 0.99 71.90 71.90
0.4 0 5.3 0.56 2.96 2.96
0.51 2.04 77.98 0.99 77.54 77.54
0.4 0.4 19.3 0.56 10.80 10.80
0.51 2.04 94.08 0.99 93.55 93.55
0.51 3.06 119.72 0.99 119.05 119.05
0.51 5.1 194.2 0.99 193.12 193.12
0.51 1.53 72.34 0.99 71.94 71.94
0.4 1.2 63.2 0.56 35.35 35.35
0 0 743 0.25 184.71 184.71

Total 349.54 376.62 888.03 0.00 0.00


Total = 1614.18 Kg.
g)
1
29.61
29.93
36.83
36.83
11.91 81.78444444
1.31
10.77
2.33 15.27
5.17
3.18
8.03
0.59
8.66
2.14
10.45
13.30 17.44
21.58
8.04
7.02
82.56

0.00
Proyecto: CASA RACD
Metrado: Acero y Concreto Losa Aligerada
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones: Aproximado

Pisos = 1

Acero:
1m2 = 2.5 ml
x = #VALUE! ml

malla:
1m2 = 8 ml
x = #VALUE! ml
LOSA ALIGERADA

losa Ø N° AREA long / m² longitud longitud


PISOS (m²) (m.) As(+) As(-)
LOSA 01 3/8 1 108.92 2.50 272.30 136.15
LOSA 02 1/2 1 300.69 2.50 751.73 375.86
LOSA 03 5/8 1 8.57 2.50 21.43 10.71
malla 1/4 1 418.18 8.00 3345.44 0.00

418.18

Area de Encofrado y Tarrajeo = 418.18 m2

1m² = 2.5 m. Poliestireno expandido


1m² = 0.080 m³ Concreto

Area toal = 104.00


Concreto de Losa Aligerada: 8.32 m³
Poliestireno expandido 260.00 ml

216.67
longitud longitud longitud longitud longitud
Ø5/8 Ø1/2 Ø3/8 Ø1/4
408.45 408.45
1127.59 1127.59
32.14 32.14
3345.44 3345.44

Longitud = 32.14 1127.59 408.45 3345.44 m.

Peso = 49.813125 1116.311625 228.732 1873.4464 Kg

Total = 3268.30 Kg.


Proyecto: CASA RACD
Metrado: Concreto para Escalera
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

N° Pisos = 1
Ancho escalera = 1.2
Parte No. Elemento Area Ancho Volumen
Area 1 1 0.600 1.20 0.72
Area 2 1 0.250 1.20 0.30
Area 3 1 0.510 1.20 0.61
Area 3 1 0.510 1.20 0.61
1
Concreto de Escaleras = 2.24 m3
Proyecto: CASA RACD
Metrado: Acero corrugado para Escaleras
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

Long. de varilla L= 9.00 m.


Peso Específico del Acero: g= 7850.00 Kg/m3

EJE # Tipo Elem Grafico # Diametro Longitud #


Escaleras Elem (pulg) (m.) Transl
1 Escalera 1 7 3/8 24.80 0
1 1 90 3/8 1.15 0
Long Transl Longitud Peso de la Peso Total Peso Total ( Kg )
Transl Total (m.) Varilla ( Kg/m ) ( Kg ) 1/ 4 3/ 8 1/ 2 5/ 8 3/ 4 1
0.4 0 173.6 0.56 97.10 97.10
0.4 0 103.5 0.56 57.89 57.89

Total 0.00 155.00 0.00 0.00 0.00 0.00

Total = 155.00 Kg.


19.29
11.50
Proyecto: CASA RACD
Metrado: Concreto de Losa de Cimentacion
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

Parte No. Elemento Area 01 Area 02 Altura Volumen


ZAPATAS 1 11.050 0.50 5.53
COL- SOT 1 0.580 7.65 4.44
PL 20-66 1 0.133 7.15 0.95
COL SINSOT. 1 0.200 6.73 1.35
COL 15x25 1 0.038 4.15 0.16
VC 1 9.310 0.50 4.66
SC 1 2.340 0.70 1.64
SC 1 0.470 0.25 0.12
CC 1 1.340 0.30 0.40
FP 1 63.200 0.10 6.32
COL CONF 3 0.030 4.25 0.38
6.89

1.76

7.189
Proyecto: CASA RACD
Metrado: Acero corrugado para Losa de Cimentacion
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

Long. de varilla L= 9.00 m.


Peso Específico del Acero: g= 7850.00 Kg/m3

MALLA 5/8" o 1/2"@.20


1.32 m² = 12 ml.
11.05 m² = 100.455 ml. 12.00 VARILLAS

EJE # Tipo Elem Grafico # Diametro Longitud #


Elem/Tipo Elem (pulg) (m.) Transl
ZAPATA 1 ZAP 1 1 5/8 108.00 0
TODOS 1 V - C 01 1 6 1/2 45.34 0
1 V - C 02 1 2 3/8 45.34 0
1 V - C 01 1 209 1/4 1.18 0
COL 1 C-1 1 4 5/8 9.00 0
1 C-1 1 4 1/2 9.00 0
1 C-1 1 110 1/4 1.12 0
1 C-2 1 6 1/2 9.00 0
1 C-2 1 6 1/2 9.00 0
1 C-2 1 110 1/4 0.98 0
1 C-3 1 3 1/2 9.00 0
1 C-3 1 3 1/2 9.00 0
1 C-3 1 55 1/4 1.30 0
1 C-4 1 4 1/2 9.00 0
1 C-4 1 4 1/2 9.00 0
1 C-4 1 55 1/4 1.50 0
1 C-5 1 12 1/2 9.00 0
1 C-5 1 6 3/8 9.00 0
1 C-5 1 153 1/4 0.88 0
1 C-6 1 4 1/2 5.00 0
1 C-6 1 30 1/4 0.70 0
1 PL-20-70 1 4 3/8 9.00 0
1 PL-20-70 1 4 3/8 9.00 0
1 PL-20-70 1 82 1/4 1.25 0
1 PL-20-66 1 4 1/2 9.00 0
1 PL-20-66 1 4 1/2 9.00 0
1 PL-20-66 1 78 1/4 1.20 0
3 COL CONF 1 4 3/8 4.35 0
3 COL CONF 1 54 1/4 0.60 0
VARILLAS

Long Transl Longitud Peso de la Peso Total Peso Total ( Kg )


Transl Total (m.) Varilla ( Kg/m ) ( Kg ) 1/ 4 3/ 8 1/ 2 5/ 8 3/ 4

0.64 0 108 1.55 167.81 167.81


0.51 0 272.04 0.99 270.52 270.52
0.4 0 90.68 0.56 50.72 50.72
0 0 246.62 0.25 61.31 61.31
0.64 0 36 1.55 55.94 55.94
0.51 0 36 0.99 35.80 35.80
0 0 123.2 0.25 30.63 30.63
0.51 0 54 0.99 53.70 53.70
0.51 0 54 0.99 53.70 53.70
0 0 107.8 0.25 26.80 26.80
0.51 0 27 0.99 26.85 26.85
0.51 0 27 0.99 26.85 26.85
0 0 71.5 0.25 17.78 17.78
0.51 0 36 0.99 35.80 35.80
0.51 0 36 0.99 35.80 35.80
0 0 82.5 0.25 20.51 20.51
0.51 0 108 0.99 107.40 107.40
0.4 0 54 0.56 30.21 30.21
0 0 134.64 0.25 33.47 33.47
0.51 0 20 0.99 19.89 19.89
0 0 21 0.25 5.22 5.22
0.4 0 36 0.56 20.14 20.14
0.4 0 36 0.56 20.14 20.14
0 0 102.5 0.25 25.48 25.48
0.51 0 36 0.99 35.80 35.80
0.51 0 36 0.99 35.80 35.80
0 0 93.6 0.25 23.27 23.27
0.4 0 52.2 0.56 29.20 29.20
0 0 97.2 0.25 24.16 24.16

Total 268.63 150.40 737.89 55.94 0.00

Total = 1212.86 Kg.


g)
1 N° VARILLAS

12.00
30.23
10.08 102
27.41 9
4 11.33333333
4
13.69
6
6
11.98
3
3
7.95
4
4
9.17
12
6
14.96
2.23
2.34
4
4
11.39
4
4
10.4
5.8
10.8

0.00
Proyecto: CASA RACD
Metrado: Pisos
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones:

Falso piso 3" 62.32 m2

CEM 0.4 25
HORM 0.1 6
Proyecto: CASA RACD
Metrado: Muros met aprox.
Ubicación: Urb. LA ALAMEDA - Cajamarca
Fecha: Cajamarca Julio 2019
Observaciones: Aproximado considerando altura media de muro de 2.4

1° Piso

ladrillo comun long altura area (m2)


cabeza 21.97 1.42 31.20
1.10 2.1 2.31
0.65 2.85 1.85
soga 1er.P 25.16 2.73 68.69
4.10 1.2 4.92
3.63 1.2 4.36
soga 2do.P 21.55 2.405 51.84
1.20 1.9 2.28
1.25 1.2 1.50
soga 2do.P. pand 13.13 2.4 31.51
2.21 1.2 2.65

Total muro e: 0.25 35.36 m2


Total muro e: 0.15 133.58 m2
Total muro e: 0.15 pand 34.16 m2
Excavaciones
Coef Expan: 1
Parte Area Altura No. Elem Coef Expan:
Explan. Semisot. 27.750 0.870 1 1
Zapatas semisot. 7.500 1.300 1 1
Zapatas sin semisot. 3.550 1.69 1 1
1.080 0.42 1 1
viga de cimentacion 2.570 0.84 1 1
3.700 0.35 1 1
Cim. corridos, VC 1.200 0.10 1 1

Relleno
Coef de compact. = 1/ 1.150
Parte Area altura No. Elem No. Elem
Con mat. Prestamo 11.05 0.40 1.00 1.00
(-) Con mat. Prop. Semisot 35.70 0.08 1.00 1.00
(-) Con mat. Propio 3.87 0.15 1.00 1.00
3.50 0.65 1.00 1.00
26.050 0.08 1.00 1.00
26.050 0.10 1.00 1.00

Total excav.= 43.92 m3

Total relleno mat. Prest. = 5.08 m3


Total relleno mat. prop = 11.76 m4

total eliminacion 32.16 m3


Volumen
24.14 m3
9.75 m3
6.00 m3
0.45
2.16
1.30
0.12 m3

43.92 m3

Volumen
4.42 5.746
2.68
0.58 m3
2.28
2.08
2.61

10.03
2019
TOTAL IMP. PREDIAL 2383.02

CASA CALLE CASA INT. TERRENO


CODIGO DE PREDIO 20078 20079 20077 SUMA OBERVACION
VALOR AFECTADO 26227.62 269696.32 64195.78 360119.72 DATA DE HR
AREA TERRENO 950 2216
IMP. PRED. TERRENO 182.11 424.80
IMPUESTO PREDIAL 173.556 1784.661 424.803 2383.02
VARRIDO DE CALLE 48.44 0 0 48.44
PARK. JARDINES 41.13 41.13 82.26
RECOJO DE BASURA 63.27 192.32 255.59
SERENAZGO 122.75 122.75 144.89 390.39

TOTAL 449.146 2140.861 569.693 3159.7

ZCT 449.15 45.53 142.42 S/. 637.10


WECC 45.53 142.42 S/. 187.95
MACC 1024.90 142.42 ###
RACC 1024.90 142.42 ###
449.15 2140.86 569.69 3159.70

2018
TOTAL IMP. PREDIAL 2351.41

CASA CALLE CASA INT. TERRENO


CODIGO DE PREDIO 20078 20079 20077 SUMA OBERVACION
VALOR AFECTADO 26225.48550218 269674.3711459 64190.5555171 360090.412 DATA DE HR
AREA TERRENO 950 2216
IMP. PRED. TERRENO 179.70 419.17
IMPUESTO PREDIAL 171.254 1760.988 419.168 2351.41
VARRIDO DE CALLE 52.88 0 0 52.88
PARK. JARDINES 44.18 44.18 88.36
RECOJO DE BASURA 187.7 187.7
SERENAZGO 126.15 126.15 0 252.3

TOTAL 394.464 2119.018 419.168 2932.65

ZCT 394.46 44.92 104.79 S/. 544.18


WECC 44.92 104.79 S/. 149.72
MACC 1014.58 104.79 ###
RACC 1014.58 104.79 ###

394.46 2119.02 419.17 2932.65

OTROS PAGOS 30 NUEVA INSPECCION


10 PU - HR
29.81 INT. 2018
TOT OTROS 69.81
A CADA UNO S/. 17.45

TOTAL A PAGAR 2018 2019 OTROS TOTAL


ZCT 637.10 544.18 17.45 ###
WECC 187.95 149.72 17.45 S/. 355.12
MACC 1167.33 1119.38 17.45 ###
RACC 1167.33 1119.38 17.45 ###
S/. 6,162.16