Sunteți pe pagina 1din 2

PROJECT No

PROCESS DATA SHEET - WFF OPEN AREA SEPARATOR TANK 6483


PROJECT TITLE Hamad International Airport Western Airfield Development – Fuel Farm
CLIENT HIAEPSC DOC NO AC001-D6000-15-MTD-D-XXX0009
LOCATION Doha, Qatar EQUIPMENT No T231 PAGE 1 OF 2
PLANT Western Fuel Farm NUMBER REQUIRED 1 off REV -C
1 VESSEL DETAILS Rev
2 NORMAL MAXIMUM MINIMUM
3
3 Working Volume m 21.5 21.5 0
4 Operating Pressure bar a Atmospheric
o
5 Operating Temperature C Ambient 75 5
6 Filling Rate (Gas/Liquid) m3/h 60 m3/h 140 m3/h Estimated /
3
7 Discharge Rate m /h 20 m3/h 20 m3/h Estimated
8 Process Vent Rate m3/h Note 2
3 o
9 Relief Vent Rate (Gas/Liq) In / Out rate m /h Note 2 Corresponding Temperature 5 to 75 C
o
10 Provisional Design Pressure (Positive) VTA Corresponding Temperature 75 C
o
11 Relief Device Provisional Set Pressure N/A Corresponding Temperature 75 C
o
12 Provisional Design Pressure (Negative) N/A Max. Corresponding Temperature 75 C
13 Provisional Minimum Design Temperature 0oC Max. Corresponding Pressure Atmospheric bar g
14 Suggested Material of Construction High Grade GRP Corrosion Allowance INT / EXT N/A mm
15 Nominal Shell Diameter 2500 mm Overall Length / TAN to TAN length 4800 mm
16 Total Volume Tan/Tan 21.5 m3 Including % Ullage at Heads
17 Insulation NO Tracing NO Jacketing NO
18 Cooling NO Heating NO
19 Agitation NO Baffles NO
20 Demister NO Inert Blanket NO
21 Internal Access NO Double Skin NO
22 Vessel Orientation (See Sketch) BURIED HORIZONTAL HIGH GRADE GRP UNDERGROUND TANK
23 PROPERTIES OF VESSEL CONTENTS
24 Description of Vessel Contents Free Water Slops / Oily Water (Assume Water properties for Design)
25 Corrosive NO Abrasive NO
26 Toxic YES OEL ppm Flammable YES Flash Point >38 oC
3 o
27 Density (at op. temp) 1000 kg/m Vapour Pressure (at 35 C) 0.056 bar a
o
28 Viscosity (at op. Temp) 1.0 cP Boiling Point (at op. Pressure) 100 C
o o
29 Specific Heat LIQUID 4.180 kJ/kg C Freezing Point 0 C
o
30 Solids Content 0.00 % w/w Crystallisation Temp. N/A C
31 ANCILLARY EQUIPMENT
32 JACKET / EXTERNAL COILS INTERNAL COILS
33 Type and No. Off N/A N/A
34 Contents N/A N/A
35 Material of Construction N/A N/A
o
36 Operating Temperature C N/A N/A
37 Operating Pressure bar a N/A N/A
38 Provisional Design Pressure bar g N/A N/A
o
39 Provisional Design Temperature C N/A N/A
o
40 Minimum Attainable Temperature C N/A N/A
41 Corresponding Pressure bar g N/A N/A
42 Area m2 N/A N/A
43 Dimensions N/A N/A
44
45 No. of Baffles N/A
46 Baffle Length N/A Wall to Baffle Clearance N/A mm
47 Baffle Width N/A Baffle to Agitator Clearance N/A mm
48 Suggested Material of Construction of Baffles N/A
49 Vessels Internals Vendor proprietary oil coalescing & filtering from water and oil retention in vessel (VTA)
50 ADDITIONAL COMMENTS:
51 1. Reference P&ID Drawing No.: AC001-D6130-15-M6-D-XXX0045.
52 2. The Tank will be designed with a gooseneck atmospheric vent (VTA).
53 3. Design Code ASME VIII.
54
55
56
57
PREPARED BY: Javed Saleem DATE 14/02/2019 CHECKED BY K. Sagarzazu-Achurra DATE 14/02/2019

P-84-1
PROJECT No
PROCESS DATA SHEET - WFF OPEN AREA SEPARATOR TANK 6483
PROJECT TITLE Hamad International Airport Western Airfield Development – Fuel Farm
CLIENT HIAEPSC DOC NO AC001-D6000-15-MTD-D-XXX0009
LOCATION Doha, Qatar EQUIPMENT No T231 PAGE 2 OF 2
PLANT Western Fuel Farm NUMBER REQUIRED 1 off REV -C
1 Rev
2 VESSEL SKETCH:
3 GRP OILY WATER SEPARATOR
4
5
6
7
8
9
10
11
12
13 N2
14 N1 N4 N3
15 N5
16
17
18
19
20
21
22
T-231
23
24
25
26
27
28
INSTALLATION
29
30 Underground tanks are installed without saddles and are put on a sand bed.
31
The contractor should consider the need for hold down straps to avoid buoyancy problems.
32
33 Buried tanks shall be back filled with aggregate graded through 9.5mm (3/8 in) square opening sieve at 40 – 75 percent by weight passing, and
34 topped off with 100mm of clean aggregate graded through 25mm (1 in) square opening sieve at 75 – 95 percent by weight passing.
35
Please see section 7.2.1 Aggregate of AC001-D6000-15-3PS-321116.16 Aggregate Subbase Courses.
36
37
38 NOZZLES
39 SIZE DESCRIPTION SIZE DESCRIPTION
40
41
42 N1 3" Inlet
43 N2 3" Outlet (Dip Pipe)
44 N3 4" Atmospheric Vent
45 N4 2" Level Transmitter
46 N5 10" Overflow clean water to storm sewer or soakway
47
48
49
50
51
52
55 ADDITIONAL COMMENTS:
56 4. Vendor to provide third party inspection appropriate to the vessel design code. Incorporating at least certified calculation. Approved fabrication
57 details, material certification, NDT Certification witnessed test certification.
58
59
60
PREPARED BY: Javed Saleem DATE 14/02/2019 CHECKED BY K. Sagarzazu-Achurra DATE 14/02/2019

P-84-1

S-ar putea să vă placă și