HIRARC (Cable Trench Construction Work-Underneath Live Equipment)

REQUIREMENTLEGAL
HAZARD IDENTIFICATION ENVIRONMENTAL RISK ASSESSMENT
*** RISK

CONDITION

LIKELIHOOD*
CONTROL/

SEVERITY**
STEP SEQUENCE OF RISK RANKING RECOMME PERSON
CURRENT RISK CONTROL
NO BASIC JOB STEP HAZARD EFFECT ASPECT IMPACT NDED IN CHARGE

SCORE

LEVEL
ACTION
AND DATE

1. To comply with SWMS


Oil 2. Safety briefings  Project
Spillage Soil 3. Inspection on all machineries & lifting Engineer/
contamination tools Assistant
1. Unsafe working Major
4. Trained signal man Project
1 Excavation work A/L R platform injury 3 2 6 M
Dust – 5. Machineries with valid PMA & license Engineer
2. Congested area
Moving 6. Clear working area with obstructions  Site Supervisor
machiner Air pollution 7. Barricading with signage  SHO
y 8. No obstructions for the excavator  SSS
operator

1. Comply with SWMS


2. Safety briefing by PICs  Project
3. Good access and egress to and from Engineer/
3. Fall from height Major height Assistant
Erection of form
4. Unsafe working injury 4. Required safe working platform & use Project
2 work A/L R N/A N/A 2 4 8 M
platform safety harnesses above 2.0m height Engineer
5. Congested area 5. Observe strictly house-  Site Supervisor
6. Good house keeping  SHO
7. Proper PPE: safety helmet, safety harness,  SSS
safety shoes, cotton gloves
REQUIREMENTLEGAL
HAZARD IDENTIFICATION ENVIRONMENTAL RISK ASSESSMENT
RISK
***

CONDITION

LIKELIHOOD*
CONTROL/

SEVERITY**
STEP SEQUENCE OF RISK RANKING RECOMME PERSON
CURRENT RISK CONTROL
NO BASIC JOB STEP HAZARD EFFECT ASPECT IMPACT NDED IN CHARGE

SCORE

LEVEL
ACTION
AND DATE

1. Comply with SWMS


 Project
2. Materials shall arrange properly and the
Engineer/
1. Fall from height sharp edges protected.
Oil Spillage Soil Assistant
2. Trip and fall 3. Safety briefings
Major contamination Project
3 Placing rebar A R 3. Falling object 4. Loose objects and hand tools shall 2 3 6 M
injury Dust- Engineer
4. Struck by secure properly
moving Air Polluted  Site Supervisor
5. Safe access & egress of working area
machinery  SHO
6. Proper house keeping
 SSS
7. PPEs as per above stated

1. To comply with SWMS


2. Daily Safety briefings
3. Inspection on all machineries
4. Trained signal man
5. Machineries with valid PMA & license
1. Excavator failure
6. Clear working area from any physical
2. Machineries Fall
obstructions and provide proper and well
into trench and  Project
Oil Spillage maintained access road for both
excavation pit Engineer/
Soil excavator and concrete mixer truck.
Positioning of 3. Collapse of Assistant
contamination 7. Barricading working area from outsider
excavator and excavation Major Project
4 A R Dust – and provide proper safety signage around 3 2 6 M
concrete Pit/Trenches Wall injury Engineer
Moving Air polluted construction work area
mixture truck 4. Struck by falling  Site Supervisor
machiner 8. Ensure that there is no obstructions to
objects  SHO
y the excavator operator’s field of view
5. Hit & Knocked by  SSS
during handling of machinery
moving
9. Provide steel plate for excavator base at
machineries part
soft spot area of soil (if present).
10. Constantly monitoring the soil condition
surrounding the machineries during the
concreting work (especially near
excavated pit/trenches wall area)
REQUIREMENTLEGAL
HAZARD IDENTIFICATION ENVIRONMENTAL RISK ASSESSMENT
RISK
***

CONDITION

LIKELIHOOD*
CONTROL/

SEVERITY**
STEP SEQUENCE OF RISK RANKING RECOMME PERSON
CURRENT RISK CONTROL
NO BASIC JOB STEP HAZARD EFFECT ASPECT IMPACT NDED IN CHARGE

SCORE

LEVEL
ACTION
AND DATE

1. Stay alert during lowering excavator


bucket
2. Proper receiving load required
Oil &
3. Watch out for obstructing objects and  Project
Concrete
1. Hit by lowering Soil slippery ground Engineer/
Spillage
excavator bucket Major contamination 4. Use hard hat all the time. Assistant
Pouring
injury 5. Watch out for starter bars Project
5 concrete A R 2 3 6 M
2. Overfilling of 6. Use safety rubber boots while concreting Engineer
Dust –
Concrete Air polluted 7. Maximum volume of concrete to be  Site Supervisor
Moving
carried out by excavator in one trip is 70%  SHO
machiner
from total excavator bucket Volume  SSS
y
8. Inspection of excavator condition will be
conduct before start of work (Daily)
9. Competent Excavator Operator

 Project
Engineer/
Assistant
Storage of raw 1. Observe strictly house-keeping rules Project
1. Hand, foot and Minor
6 materials and A R N/A N/A 2. Provide trash buckets for waste materials 2 2 4 L
body injury injury Engineer
finish product and dispose regularly
 Site Supervisor
 SHO
 SSS

 Project
Engineer/
1. Excavator operator to minimize swing Assistant
1. Hit by swinging
Retrieving of and to adopt vertical drop. Follow Project
excavator bucket Minor
7 excavator A R N/A N/A ground crew instructions 2 1 2 L
2. Concrete mixture injury Engineer
bucket 2. Excavator & mixer to park correct
hit by bucket  Site Supervisor
operating distance
 SHO
 SSS
Legends

A – Occupational Safety and Health Act 1994


B – OSH (Classification, Labeling and Safety Data Sheet of Hazardous Chemicals) Regulations 2013
C – OSH (Prohibition of Use of Substance) Order 1999
D – OSH (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000
E – OSH (Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease)
Regulations 2004
F – Factories and Machinery Act 1967
G – FM (Steam Boiler and Unfired Pressure Vessel) Regulations 1970
H – FM (Electric Passenger and Goods Lift) Regulations 1970
I – FM (Fencing of Machinery and Safety) Regulations 1970
J – FM (Safety, Health and Welfare) Regulations 1970
K – FM (Notification, Certification of Fitness and Inspection) Regulations 1970
L – FM (Building Operations and Work of Engineering Construction) (Safety) Regulations 1986
M – FM (Noise Exposure) Regulations 1989
N – Arm Act 1960
O – Environmental Quality Act 1974
P – Electrical Supply Act 1990

Conditions
R – routine
NR – non routine

Likelihood (L) Score


Most likely The most likely result of the hazard/ event being realized 5
Possible Has a good chance of occurring and is not unusual 4
Conceivable Might be occur at sometime in future 3
Remote Has not been known to occur after many years 2
Inconceivable Is practically impossible and has never occurred 1

Severity (S) Score


Numerous fatalities, irrecoverable property damage and
Catastrophic 5
productivity
Approximately one single fatality major property damage
Fatal 4
if hazard is realized
Serious Non-fatal injury, permanent disability 3
Minor Disabling but not permanent injury 2
Negligible Minor abrasions, bruises, cuts, first aid type injury 1
RPN Score Control Measures
A risk identified as LOW may be considered as acceptable and further
Green reduction may not be necessary. However, if the risk can be resolved
(1-4) quickly and efficiently, control measures should be implemented and
recorded.
A MEDIUM risk requires a planned approach to controlling the hazard and
Orange applies temporary measure if required. Actions taken must be documented
(5-12) on the
risk assessment form including date for completion.
A HIGH risk requires immediate action to control the hazard as detailed in
Pink the hierarchy of control. Actions taken must be documented on the risk
(15-25) assessment form including date for completion.