Sunteți pe pagina 1din 18

RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA

SIGNAGE AND WAYFINDING - Exterior & Traffic Package

Wayfinding systems are vital for a user in public spaces; signs communicate, direct
and guide users to travel from one place to another. Airports, hospitals, clinics, museums, libraries,
book, stores, shopping malls have considered wayfinding as an major tools for everybody who are
navigating within a public space.

Prepared by
PT Detta Karya Mandiri
Hospital Map (Building & Facility)
01
PUBLIC PUBLIC
ENTRANCE ENTRANCE
(Vehicular) (Pedestrian)

SECURITY GUARD
BUILDING

ENTRANCE BUILDING
DRIVER WAITING
BUILDING

PUBLIC
PARKING
ADMINISTRATION BUILDING

HOSPITAL BUILDING

BUS PARKING

STAFF QUARTER BUILDING

MOTORCYCLE STAFF
PARKING BUILDING ENTRANCE
(Vehicular)

PARKING
BUILDING
WASTE TREATMENT
PUBLIC STAFF
CANTEEN PARKING
PUBLIC SERVICE
ENERGY CENTER
BUILDING
BUILDING

1.0 WAYFINDING STRATEGY


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Hospital Traffic Map - Vehicular
02
PUBLIC
ENTRANCE
(Vehicular)

OUT IN

GATE
HOSPITAL

DROP OFF
ADMINISTRATION

EMERGENCY
EMERGENCY

MATERNITY
CENTRAL
IMAGING
EMERGENCY

LOADING DOCK
PUBLIC

QUARTER
CANTEEN SERVICE

STAFF
STAFF
& LOADING

GATE
ENTRANCE
(Vehicular)

ENERGY
CENTER

1.0 WAYFINDING STRATEGY


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Hospital Traffic Map - Pedestrian
PUBLIC
03
ENTRANCE
(Pedestrian)

HOSPITAL
BUS
STATION
(RIK)

ADMINISTRATION

EMERGENCY
MATERNITY
CENTRAL
IMAGING
EMERGENCY

PUBLIC

QUARTER
CANTEEN SERVICE

STAFF
STAFF
ENTRANCE
(Student)

ENERGY
CENTER COMMUTER
LINE
(Pondok
Cina)

1.0 WAYFINDING STRATEGY


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Hospital Traffic Map - Parking Zone
04
PUBLIC
PUBLIC ENTRANCE
ENTRANCE (Pedestrian)
(Vehicular)

GATE
HOSPITAL
BUS

DROP OFF
STATION
(RIK)
A
C
ADMINISTRATION

EMERGENCY
MATERNITY
EMERGENCY

CENTRAL
IMAGING
EMERGENCY

LOADING DOCK
P PUBLIC

D E

QUARTER
CANTEEN SERVICE

STAFF
STAFF
& LOADING

GATE
ENTRANCE
(Vehicular)

ENERGY
CENTER COMMUTER
LINE
(Pondok
Cina)

1.0 WAYFINDING STRATEGY


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Hospital Traffic Hierarchy
05
Destination
Gate/ Lobby/ Parking
Building/
Ticket Drop Off Lot
Facility

VEHICULAR
Destination
Gate/ Parking
Building/
Ticket Lot
Facility

Destination
PEDESTRIAN Gate Building/
Facility

Traffic Hierarchy Signage & Wayfinding Hierarchy (Needs)

BUIDING
A
2F8

Vehicular Hierarchy

Road Parking Pedestrian Destination

BUIDING

Pedestrian Hierarchy

1.0 WAYFINDING STRATEGY


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Hospital Destination Message Hierarchy
06

PARKING
& PEDESTRIAN

Information Registration 24H Emergency Workshop Insurance Loading Loading


Mushalla Patient Ward Seminar Public Services
ATM Medical Services Exhibition
Canteen Cashier Rehabilitation
Store Pharmacy Library
Customer Service

Destinations Destinations Destinations Destinations Destinations

ENTRANCE BUILDING HOSPITAL BUILDING EMERGENCY ADMINISTRATION PUBLIC SERVICE STAFF QUARTER ENERGY CENTER
BUILDING

2.0 DESIGN ELEMENTS & STANDARDS


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Typography - UI Foundry Sterling Family
07

Foundry Sterling Bold

ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890`-=[]\;’,./
~!@#$%^&*()_+{}|:”<>?
Foundry Sterling Book Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890`-=[]\;’,./
~!@#$%^&*()_+{}|:”<>?
2.0 DESIGN ELEMENTS & STANDARDS
RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Pictograms, Signs and Arrows
08

Service Sign Registration Lounge Care Staff Unit Pharmacy Administration Medical Record Cashier Medical Library Health Education Social Service Auditorium Ambulance

Medical Sign Emergency In Patient Out Patient OB Clinic Immunization Cardiology OB Gyn Pediatrics Pediatrics Surgery Mortuary Radiology

Facility Sign Toilet Disable Baby Care Escalator Stairs Elevator ATM Center Convenience Store Photocopy Mushalla Loading Dock Taxi Information Canteen

x x x
No Parking Parking No Stop No Access No Smoking No Smoking Height Clearance No Horn

x x x
KELUAR/LOBBY KELUAR P2 PARKIR
2F8
Parking Lot
P2 KELUAR/PARKIR Dilarang Belok Kanan

Traffic (Ceiling) Traffic (Ceiling)


x
BATAS KETINGGIAN MAKSIMUM
x x
DILARANG PARKIR PARAREL
x Assembly Point Evacuation Route Warning Warning Regulatory (Ceiling)

x x x Crosswalk Disable Lot Walk Your Bicycle Accessible Ramp Staff ID Drop Off Parking

x x x

Arrows Traffic Signs Walk This Way Disable Lot Bicycle Motorcycle Car Bus Taxi Loading

2.0 DESIGN ELEMENTS & STANDARDS


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Families
09

EXISTING EXISTING
Direction Sign Identification Sign Direction & Regulatory Sign Identification Sign Identification Sign Directory Sign 1 Directory Sign 1 Directory Sign 2
(Pedestrian/ Parking Building) (Parking Building) (Vehicular/ Parking Building) (Vehicular/ Parking Area) (Vehicular/ Parking Area) (Pedestrian/ Parking Area) (Pedestrian/ Destination) (Pedestrian/ Destination)

KELUAR/LOBBY
KELUAR P2 PARKIR
A1 A2 A RSUI RSUI

2F8
Rumah Sakit Rumah Sakit
Universitas Indonesia Universitas Indonesia
RSUI
Rumah Sakit
RSUI
Rumah Sakit
Universitas Indonesia Universitas Indonesia

Gawat Darurat Gawat Darurat


Emergency Emergency

RSUI
Rumah Sakit
Universitas Indonesia

Lobby Utama
Main Lobby

Gedung
Administrasi
Administration Building

Gawat Darurat
Emergency

Central Imaging
Central Imaging

Forensik
Forensic

Gedung
Pelayanan Publik
Public Service Building

Parking Pedestrian

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details - DIRECTORY SIGN - 1
10

600

2 RSUI
Rumah Sakit
400
Universitas Indonesia

DIRECTORY

Legend

1600

P-01
DIRECTORY SIGN - 1
h 200cm x w 60cm x d 15cm
Mounting : Ground
4 900

Notes:
1. Material Base: ACP Panel (Black)
2. Logo Identity : Oracal Cutting Sticker (Yellow & White)
3. Map & Directory : Oracal & Vinyl Cutting Sticker (Multi Color)
4. Commercial Space : Vinyl Sticker Print / w 60cm x h 60cm
5. Foot Cover : Stainless Steel Mirror

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
11

RSUI
Rumah Sakit
Universitas Indonesia

DIRECTORY

DIRECTORY
0
60

Front Elevation

600
Back Elevation
Top View

Back Elevation Front Elevation

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details
700 12

P-02
DIRECTION SIGN - 2
h 300cm x w 70cm x d 70cm
Mounting : Ground

Notes:
1. Parking Zone : Acrylic Neon Box
2. Arrows : Acrylic Laser Cut Letter Sign (Yellow)
1

2
A
KELUAR
700

3. Information (Bahasa/ English) : Oracal Cutting Sticker (White) LOBBY


4. Emergency : Oracal & Vinyl Sticker (Red) ADMINISTRASI
5. Material Base: ACP Panel (Black) 3 Out
Lobby
Administration

IGD
4 Emergency

PARKIR ZONA B
Parking Zone B

2300
PARKIR ZONA C
Parking Zone C

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details
13
Pictogram Information Parking Zone
/Direction Text & Floor Level

KELUAR/LOBBY

P-05 P-04
DIRECTION SIGN - 1 (Pedestrian Sign) DIRECTION SIGN - 1 (Vehicular Sign)
h 20cm x w 90cm x d 12cm h 20cm x w 250cm x d 12cm
Mounting : Ceiling Mounting : Ceiling
Material Base : MDF Board Finishing HPL Sheet Material Base : MDF Board Finishing HPL Sheet
& 3M Scotchlite Cutting Sticker & 3M Scotchlite Cutting Sticker

P-08 P-09

P-03
950
A1 A2 550
REGULATORY SIGN -1
h 20cm x w 200cm x d 0,2cm
Mounting : Ceiling
REGULATORY SIGN -2
d 60cm
Mounting : Wall
IDENTIFICATION SIGN - 1 Material Base : Alumunium Plate Material Base : Alumunium Plate
(Parking Zone)
h 95cm x w 40cm 400
Mounting : Ground
Material Base : ACP Sheet
& 3M Scotchlite Cutting Sticker 400 300
P2 DILARANG PARKIR PARAREL

B24
25
P-06
3000
IDENTIFICATION SIGN - 2
500
(Parking Zone)
h 100cm x w Proposional 60
Mounting : Wall
Material Base : Wall Epoxy Paint

1150

1000
P-07
CORNER GUARD
h 100cm x w 6cm x d 0,5cm
Mounting : Wall
Material Base : Steel
150
3.0 SIGN FAMILIES
RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details - Road Sign & Marking
14
MARKING SIGN
Q-02 Q-03 Q-04 Q-05
R-01 R-02 R-03 R-04 Q-01
Disable Ladies Staff Loading
Lines Arrows Zebra Cross Walk Zone Drop Off
Parking Parking Parking Dock
300 300
Dilarang Reserved Ladies Staff Loading
150 Parkir Parking Parking Parking Dock
1000 Drop Off Zone
Hanya Untuk Antar Parkir Khusus Parkir Khusus Parkir Khusus Staff Area Khusus Bongkar
dan Jemput Penyandang Pengemudi Wanita dan Kendaraan Muat Barang

2000
Penumpang Disabilitas Berstiker

2000
1500

200

WALK
ZONE

5000

Kurangi Pejalan
Kecepatan Kaki

Hati-Hati Ada Hati-Hati Ada Pejalan


Penyebrang Jalan Kaki Di Bahu Jalan
Kanan

Q-06 Q-07
Cross Walk
3.0 SIGN FAMILIES
RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details - Traffic Sign Mandatory
15
Direction Sign

Regulatory Sign

S P
Evacuation Sign

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details - Vehicular Sign
15
PUBLIC
ENTRANCE
(Vehicular)

OUT IN

GATE
P02 P02

P03 P03 HOSPITAL


P03 P03 P03 P03 P03

DROP OFF
P03 P03

P03 P03 P03 P03 P03


P03 P03

P02 P02 ADMINISTRATION

P03 P03 P03 P03 P03 P03 P03

P03 P03

P02

EMERGENCY
EMERGENCY
P03 P03 P03 P03 P03

MATERNITY
CENTRAL
IMAGING
EMERGENCY

P02

LOADING DOCK
P03 P03
PUBLIC

QUARTER
CANTEEN SERVICE

STAFF
P02 P03 P03

P03 P03

STAFF
& LOADING

GATE
ENTRANCE
(Vehicular)

ENERGY
CENTER

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri
Sign Elevation & Details - Pedestrian
PUBLIC
15
ENTRANCE
(Pedestrian)

P01

P01

HOSPITAL
BUS
STATION
P01
(RIK)

P01

P01 P01 ADMINISTRATION

EMERGENCY
MATERNITY
CENTRAL
IMAGING
P01
P01 EMERGENCY

P01

PUBLIC

QUARTER
CANTEEN SERVICE

STAFF
P01 P01

P01 STAFF
ENTRANCE
(Student)

ENERGY
CENTER COMMUTER
LINE
(Pondok
Cina)

3.0 SIGN FAMILIES


RSUI - RUMAH SAKIT UNIVERSITAS INDONESIA
SIGNAGE AND WAYFINDING - Exterior & Traffic Package Prepared by
PT Detta Karya Mandiri

S-ar putea să vă placă și