Supervisors

EN NORMAN BIN HAKIM

1. SALEHA BINTI SOLIHIN 10DKM18F1191


2. SITI NURHALIZAH BINTI SHARIDAN 10DKM18F1011
3. SULAIMAN BIN SAUD 10DKM18F1091
4. MOHD FAUZI BIN SALIM 10DKM18F1156
Introduction
Problem Statement
Objective
Scope Of Research
Literature Review ( Summary )
Drawing / Conceptual Design
Gantt Chart
Flow Chart Of Project Works
Estimation Cost
- Nowadays, manufacturers biscuit factory still using manual
methods. They do not use sophisticated technology to develop
their factory production process.
- Now, factory still using the workers to do the production process
such as the arrangement process.
- In addition, when using manual ways it also will waste their
workers energy to arrange the process, out initiative is to create a
machine that can arrange the biscuit automatically. Its make the
process became faster other than old method.
USE A LOT OF WORKS
• Because they need maximum 2 workers to control the process.
• Because they use manual method

WASTE OUTPUT TIME


•Because they took to much time to control the manual arrangement proses.
•When they took to much time to arrange, other process will delay.

OUTPUT DECREASE
•When they took to much time to do the output process, it will be effect to their quantity of their
output.
Screw and nut are intended for permanent Chain is use to move the tray and the conveyors.
connection process. We also use the screw We use the chain because it is suitable and not
because screw is optional foot neater susceptible to damage.
(Kemas) than nails.
The aim of the wheel is to change the
Spoket is suitable to move venue if necessary. In our project we use
the chain wheel for accommodate the load of
mechine.
Conveyor is the important component, This generate motor use for move the
because it help the machine to arrange conveyor using the specified speed.
the biscuit on the tray according the
programming that we have done.
A programmable logic controller, PLC, or
programmable controller is a digital computer
used for automation of typically industrial
electromechanical processes, such as control of
machinery on factory assembly lines,
amusement rides, or light fixtures. PLCs are
used in many machines, in many industries.
belt Its function is to bring the For arrange the biscuit
materials transported .
Ball bearing

To rolling the wheels and to make the


conveyor roller move smoothly.
OLD METHOD NEW METHOD

• Use two or three workers to control • Use one worker to observe the
the process process
• Waste workers time to arrange the • Don’t take to much time because
biscuit on the tray one by one using the machine work quickly.
manual method • Just put the tray on the system .
• Need to arrange the tray multilevel
Minggu 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Activities
Briefing session

Do organisation chart

Find problem

Solve the problem and


preparing for slideshow
Presentation 1

Change tittle of the project

Make a revision and get the


information about
component that will used
Literature review
Methodology of project
Drawing improvement

Presentation 2
Set the timer on plc
Push start button
The tray down and go to under conveyor
Then the biscuits will moving on conveyor
The biscuits will fall on the tray

It automatically stop at the distance for the setting timer


After the biscuits full, it automatically change another tray
Type of Material Price ( RM/Per meter)
Material cost:

Mild steel 10.00 a) Mild steel = 10x5=50


Aluminium 18.00 b) Aluminium = 18x5=90
Stainless steel 25.00 c) Stainless steel = 25x4=100
Iron plate 18.00 d) Iron plate = 18x9=162
Components Price(RM) Component cost:

Screw and nut 10 a) Screw and nut = 10x1=10

Chain 7 b) Chain = 7x4 = 28

Sprocket 6 c) Sprocket = 6x4 = 24


d) Roller = 15x4 = 60
Roller 15
e) Motor = 300x1 = 300
Motor 300
f) Conveyor = 50x1 = 50
Conveyor 50
Total
Material costs + component costs
RM 402 + RM 472
=RM 874
EXPECTED RESULTS
• THE EXPECTED RESULTS SHOULD ANSWER UR OBJECTIVES
CONCLUSION
REFERENCES AND CREDITS

• http://www.theedgemarkets.com/my/article/teo-seng-malaysia%E2%80%99s-
egg-consumption-grow-3-5(Assessed 10 JAN 2019)
• http://wpsa-foodsafety.com/index.php?item=13(Assessed 10 JAN 2019)
• https://www.ukessays.com/essays/biology/eggs-industry-in-malaysia-biology-
essay.php(Assessed 10 JAN 2019)
• http://www.poultrytrends.com/2016/#/16 (Assessed 10 JAN 2019)
• http://www.moa.gov.my/documents/10157/010b6921-c643-421d-aef1-
29ae379f6f85 (Assessed 10 JAN 2019)
THE END
THANK YOU

S-ar putea să vă placă și