Documente Academic
Documente Profesional
Documente Cultură
Metric 1 Decrea
Burr sing it
removal from 5%
15 %
to 5%
Metric 2 Can
What metrics will be improved, what With
controlli
is the current performance for those zero
3. Objective metrics and how much improvement ng
progra 80%
is targeted? Provide specifics on machin
mming
how metrics are computed. es
errors
Metric 3 DIME
DIMES
SNSIO
NIONS
N
OF
SHOU 80%
CHIDL
LD BE
PARTS
PERF
ECT
DIMENSIONS OF EACH CHIDL PARTS
Which process steps will be SHOULD BE CHECK ,MAN POWER
considered in this project? What is SHOULD BE IMPROVED,MACHINES
4. Process Scope the first step and what is the last SHOULD BE CHECKED REGULARLY.
step?
PROPER MEASURING
INSTRUMENTS,KNOWLEDGABLE MAN
POWER,REGULAR CHECK OF ASSEMBLY
What resources, people, departments ,MACHINES AND FOLLOWING CHECKSHEETS
9. Support Required are required? GUIDELINES WHICH SPECIFIED
Process Description: Quality check of speedo assembly and reduction of defect piece.
Completed by :AMAAN SADANGI, PIYUSH KULKARNI,PAYOJ.