Sunteți pe pagina 1din 22
‘SPECIFICATION FOR SPRING SUPPORTS OF PURCHASE REQUISITION; 3000009799 SCOPEOF SUPPLY ‘The scope Includes supply of complete materials, Inspection, testing packing and forwarding of supports as per the. specifications, spring assemblies, standards and applicable codes ‘mentionedenclosed with this speciation ‘GENERAL REQUIREMENTS 1 Inspection shall be by anyone of the third party agencies M/s. LRIS/ BY) DNV/ TUV/ EIL (CEIL)/1Rs/ TOYO only and this inspection shall be arranged by the vend The quote fom ‘vendor shal! be incusive ora Third party tnspecuon charges 2, All requirements as per specification O0-6S-100-10 Rev02 shal be met and deviations If aay shall be clearly mentioned, ‘3. The material shal be supplied alongwith the following documents 8, Original Third party inspection certfiates. by Original Test certincates (Mechanical property, chemical compositor, heat treatment reports, supplementary tests, mandatory tests a5 per code, etc). Photocopy of these ‘certificates are applicable, ifthe third party has endorsed these copes. © Cross sectional drawings, applicable ATTACHMENTS 1. MRPL speciation 00-5-100-10 Rev0? (6 Sheets). 2 Annexure-: Spring Schedule (1 Sheed) 3, Spring Assembles drawing (9 Sheets) ANNEXURE-A: SPRING SCHEDULE so|e%ce| meses | "sho atoews| eoesemnen | oy Gost ‘SPECIFICATION FOR SPRING SUPPORTS OF PURCHASE REQUISITION: 300009799 ‘DESIGN AND DRAWINGS APPROVALS 1. The dravengsissued with this enquity are for estimation purpose only 2. The manufacture shall prepare detailed fabrication drawings and it shall by submited along, with the offer fr approval Procurement of materia, abrcation et sal tart only ater such approval (Including QAP Approval) PACKING "The vendor should properly pack the material suitable for storing and transporting the Spring supports without any damage. Item wil be rejected if any damage to the spring supports Is ‘observed duting inspection ofthe tem at MRPL st ‘GUARANTEE "The Manufacturer shall be responsible for any defects due to any inferior material or workmanship developed under operating conditions within 12 months ‘rom the date of commissioning or 18 months fom the date of recelpt of the material at ste, whichever is ati, The manufacturer shall this own cost make necessary repairs and or replacements without delay. who ‘Nay )Shetty Hariprasad Engineer (/¥) cM (sn) rea “pase Approved By vam | veerr = az wae | oerorooor [ez VIvoOETHO-s0E | Ozer Te OF 09¢_[ a ‘6589070007 WIV raer-ocry [IRL z a7 005 | sassy | ez-vro-lrH | searoro00r rviv-oee-wo-aze | OBze Ear ZL zoe ESTO BOTEEOI_[ocexvivoDE rviv-ose2-v0aze | 1209 9 =z 008 DESH ZLO-LE-e0-9 | BZECOLOOOT viv Osrewrste | FL6E 52 aL oe DISH. SLirae-£0-9 | ZZeEOLOOOT VOOReHrse | 8562 89 we S25 est SL0-8¢-60-_| SZEEOTOOOT FvIV-ODRE-SO-azL | SBE Z92 ay Sor ‘geSHD $L0-82-60-)_[SZEEOTOOOT 2508 Zi. oe Seor SESH eorae-e0-9 | HZEEOTOOOT 26SE ozs. oe Seo7 ‘ES, ZLOFaC-E0-D | eZeEOTOOOT B0TE 368 ze S97 ‘aESH Tao-He-E0-9 | zeeeoro0oT Wee 56 =e S197 SSH ‘c0-82-60-9_| TzeEoTOOOT 0085 Zor wh , ZH 90-82:E0°3_[ o28e07000E 7EL ass = Serr we Fcr-a0-eorA_[ 61EE010007 Trsev-cove-worswT | —_e0ee 50 ci 3 z ‘re-re-e0~A_| BreE0L000T Lravv-a9ve-Wra9 EL ca 3 ee BE B0z-90-80-A_| ZEEOIOOOT 502 Ter = act Fe FEC-6O-EO-A_[STEFOTOOOT 092 st s 307 xe ZEC-60-80-A_[ STEEDTOOOL 507 sor 36zr 3 TECso-e0-A | FrEEOTOOOT 39 Hr ele 2 eee-6o-e0-n_[ereeoro0or | ¥) Sie ES S05T oe GerST-E0-A_[ereeoToOor | f, OF rid 905T OF, e509 eOA_[ revotoo0r | 7 HrorezezF0WSZ | _18E. 62 90ST Of, ‘1-9 EOA[oreEoTOOO | T an >a (se) avo1 aaxatanassy | waannn ‘on ‘waawaNaNri Tas a saaoo wat wtsis40 | oj yrga | 3814 TWNIMON [a syonseaana] 18OsdNSDNIHAS | ONKKAS as Windanos ONTas ‘W-RUNXANNY ‘SPRING! “Yoo PIPING a Tone [A Br [am | PRS) i u a i : u i 4 $1 ete] i i ie] 13 [400-} eS oe Dg wares ec uss overace Sechas W Sno Sabu eu 2}. nop To Row READE. 5).4864 800 Toa a AONE, C) Geert SR Coe cea et oes Soars y ies S0as Sr Sha (E) FeSthete Haines ii) Bee OE Sahara ear 1 fe sane? To BE sum mmm "”ancaoh nob TOE Um FE] gett cos. DBuMRt iow gro ai) “RE erate ee en Fon cern germ i. 3 oF F ENGINEERS INDIA LIMITED |___ SPRING aSstuaLE® 355) -09-w-Be— 00a NEW DELHI SE Taree nore PIPING [Ae [eae TEVSIONS 0 fies aBES 1 sa STS BY [one | APPROVALS team i L (Fasuenom) L (PaBLENCTH) 4 pune rom DEmIL PP REFER shh For ocran-W aren 917.3 oF 7 BOF? ENGINEERS INDIA, LIMITED NeW DELHI [ASSEMBLIES eae ib Pyners, PPNG 2 ee eee b= PuRcnnren's Fak DerArL'P" REFER SHT 20F 7 Fe octaL =) mereR ST. 2 OF 7 SPRING ASSENOU ENGINEERS INDIA Lire {SERINE ASSEMBLES —_. iy Ryworh UC os | PIPING [RS [amie aaa i if i i ui > ui 7330 Lu oe \ i Me PuRcharen's swore Fon bemttn REFER stir 20607 SPRANG ASSEMBLY TPE ISTE ENGINEERS INDIA UMITED 3602-00-m-5«0009 | Ae 1 ENGINEERS INDIA UNITED 7 —r STANDARD Rey BD new oes Bie scm’ Mr | caameomwcaecoour |e $1 Siig Barroocwcacooaa | 3 | ‘unos PIPING [ve foare | rewauis Br [crn | aprrovaes 0 [5-059 Taito 45 we staan [wr PU ub 448 te 1 te oro RY A NOES we ABUT I NBER Sore OF sem ‘unten stata new see rete be OAL WATERAL HAL BEA Pn a Un send o ‘ow ree BAU BE PLY SEOMED 0 te CaO Wet Soke Or ems “OMEF, MESO 3602-00--t-0003 5H 1/7 sor ‘Bene: PIPING PSS is Lee aemoucy| | wea] | wa sla fa yer ib | | OT: i ‘ il : HI ‘ i Ti | venues ‘sear, i FP LLOmNE sete Pyne: ‘Stomesid, tm Gdk $ 1000104293 Bim Cod ® i Code © 1000104399 Rnow Tynwe9 Fim de 1090 10,900 te a Le Standard Specification for Spring Support Assemblies PoE : 00-ES-100-10 Tar BER | Rearmed vada Tk G ie [Weal io | Reve on sued se ta 0 [06508-2007 | standardised & 5060 ae — [sv avi Remers repaid | checked Approval sie i serine supponrs (00.65-100-10 ‘This speiteaton covers supp, best, rg sippotesursieg elon ‘Seid and dotaes sping tases, ih manufacture shot guaran he proper unctonng othe sng estensics under speed Wood and ve condos, Te deta desgn Is menuiturrs euponsay sh bs abacnee ‘sing soba sewng snowing genes erengenert dls =e or care oa ender shal isn deed reniondanings foreach sping esseniy or agro. and sing tesing inspection and nepoitinfse of ‘hled and heat Feted compression pings 96 Unies ctaris spoces. heme of cansbucton shal be a8 ows Clamp (es) 's2026.08 clamp (AS) — Nate ASTMA 367 Gr 1122 orgs 210221 lamp (55) sss1e.a21 ge (05) ~ Note 13202648 Lage 8) Note 3 ASTMA 307 Gx. 1108 gs (85) ~ Note 3 ssstecet ye ro (63 Forged Roses Ba) 15 1875 ChAMWASTM AO 15 2082 Gr AB Hanger Roa (C5) 1S 1875 Chama /aSTC A 1057182082 Gr AE ‘Tom Buca 15 1875 CHAM, ASTI A105 fr es <0 ot sues > M30 tess may be ‘Sbeted ype of Eaunlent ater ates 8, 10, 2,20, 28mm ete Is 2002 oc Sua’ Bato Cs cme asta 199 6.87 Sud Bot or AS laos AsTaeA 193 Gr816 ‘Sus Sot for 88 camps ASTMA 199 a8 As toe Game ASTMA 18¢ aH Nts for AS Compe SIMA 184 Grater? sors camps ASIA 196628 Speing Cat S970 EN <2 4545h, 47,50 Cr:V.51 CrMo v4 IS-44Seratt or sige apt smn cl on) Cosa {8.12364 (Mesum 118 2082 Gr, 5.00 men nn) ‘STANDARD SPEGFERTION aera] FOR spring suPPORTS rrovzets (O0.E8-100-10, ABI SL Ge NB ERW 800 m:n) 163589 330 ER 200 nn) Name Pate 81 Atuneium| aaa deste 8) Alennum Wire Eocrose ie tner Bote Nas Is 1287 61 4g/1s 1987 C140 Roter/Ballarangement Notes) $8 304/3187 SAE 52100, TT Incese ot Ay Stel Cun vando con stems spay SS Cans 2 Lugmateriaor both pe side & suc ie atachrors 3. Lug mater pipe sie tachment 4 Bate stl be provides at encapale type enone wh separators fr each Bat,“ The ba set be orang above We Encore otha ip spo te {See ofmovement of pie. Sng of bale n ca of ip movers is ot szatatie Desi 1951726 (tes ethos MSS.SP.53ASTI A25, Spacing otcots ‘Te sng shal be coe in such 2 marr to ensure (rat the col ae ugly spaced and he See ae Darl oe ane othe sping. Fie onc ‘ping sal nave ther ens round at an sooth an aight angles tte tea & te eons over he fal reumderonee so thet when Paced on © eteonal ‘nee ping wl and peers ‘Sonstuction: 18 stings sna be etectnaly encoead a robust casing conatcie of oo! when i 6 be ‘once we 0x30 mm opening at he lowest pint he eating an any anwar or oe etage equa wien may eter ‘Te ene ping azarby neti the atacnens and peel king deve shal be designes {ora ines te srr onc Fyctet aed weve i rst and shal vo ut ot ype ft Varable sping sesries nd pin ype fer constant spring secon, The ngs shal eo ‘ave subi eanres so hatha canbe oe any zosbon wn he range of ad cape ore harges ISsisAsme Sacton be ‘Avtltnles shal be 2m roe an nebo ‘STANDARD SPEGRCATION wea] FOR Princ SUPPORTS Prenat (0.8-100-10 & 82 53 sa so ‘Atinyeads eal be mete ypof01S4218- standard eoare pch Ara GO lie Teese [Aporsiectet sping) shal be desaned win minimum coo sft of Each sping shld factory preset the ad gen inthe stg checdeesehaet ‘A sings shal ve poise wih » means of postvaly and fly lacking te sition pate for hyaenate teing ofthe pe (Se) Esch eping sha be provide win means of suing ne instal lng by» ncn of 25mm ‘as sated. Ros ans turn bul asarby shal ba deunes or 80mm agusmert oer Me Seca tengo ene spn support sseemy Turnout sho ba made fon fae teal Hes upto MOO and for sz sbove MSO thay canbe forged of mechne om fled ar 8 fected ype [Al sprigs sha hav a fio "osd ané wae! ple on which ot ad cold poetins ate sty trattes The poston pss sta have on imo! pore ade the adn he apn tay ‘Athanges hat atow 3 minevur 4 e976 hort! moverent ofthe i many reton for ‘ents poston, Varaare may ofr acer ond var an poticen coset springs to be provided wih means of postiey and fly locking ding hyo ting of ne Pe’ ‘A ring supp waiting mare an 45 ge sal be mandatory povided wen tng luge ‘Al springs she be neoprene fpcyrettane costes for coredion resistance. Elecoplsng of fang coe nt scope ‘Alloy sae! springs tobe ent peenes ‘Spings wih tee nigh to aan camater to of mre than 4 sh nl be ud wihoteaterat ‘ung erargemens sre 1OW AUD TESTING, “Tesing chal be sper 861726 Pa 1 (Latest Eton) ‘A compression ts sheulé be mate by peting the sing od ment tes nen eucassion, ‘The aping tan shold conor fo semen aurea, 1 camp test should be mage by Heideg the suing compressed te minum woking aepasse eng for a pros of tot naan 12 hs wih il sad an sng ale how ‘ton af mae hen 33 ne es eng ‘Owners rapes shal hve re acces apace we ection at ivelars ‘STANDARD SPEGAEATION % seas suPeORTS reeaare (o.eS-100.10| step Alinpecien sha be mase ln secorsance wih the levat cose wiht requemens ot ‘he gnerl paceton 65 Marware shal conduct eto extabon the spring rie athe mescresnt hal be ‘arid out th 30% 0 70 one manimin oes te sre fee heh ma ‘roman the sou na tat nas oe concurs on he sng Spon nis al ‘Shsembied conan nana be restos by approve hed pay mapecan agen 155 Alay stool sprigs sale examined by magne prt method 71 Bere spat ost ean lace shat be thorough scrapes ana wre brute onal sutaces te rermove ust mt sess oe an be gen wo cals Zine Cnet res ode pero (8.2074 Aa teased pons shallbe gaarzed 018 1S7SAGTIMA TOMA 129 S'S67 Pa 51 Each eping cuppa be mates wih PR No, sod Sping No. pares wih he \westrproaf pnton te cssng punched on SSIAuminiom metal ngatachs fo uppOR Dpto re 9 Reuiston Ne Spring No 82. Aetems tobe shppedin wooden boxeszates ad shal be poeta fom 8 coraon ‘Sd machaneal carnage dung Vanepraon ehemant and sorepe 21 Any deviation to he eguremns of te sanders or dstashest ell be exly ated a ‘tiched cevtion ‘ermal dueng i submission ony ain sbeonce of = ely Se Seven ferme wl be unser that ete reno eats 'n abeance of any oral ached wan the enquly, Venera urish ne otowing sping schedule ‘erate spngs beng sped S| pRinber] rte) [oa | Tata) — Se = | Tea Seven — — aay Sg ese Sie 11 wezentive QuaLirY ASQURANCE PLAN 11.1 The folowing san inate txt plan wih the minenum quirements. The ander hast submit ‘ra Qual aseuranc pan or soprova om WPL win 2 weeks o psceme of erdor na STANDARD OREO we spr suPronts reesote OOES-10040 no | acer seroscomens — vendor | Sepa pcan Mewalaana 2 er Ta ans — [Fhe sonra Suen rahe 5] aa RT 7a Seeteonyhacie 7 earner RT co eee Soniteto/Pchse 7 | ac ee Tae TBE 7k SectetanPoche Spectetn chase 9 | Reson aan area Bah Ta 7 Ir soetentnyrchae TP esi Rania aa an 7 veo) cs ‘Wisands for hed aap sey (0.88-100.10 ‘usar witness rom 112025508 uth niu 0) om 2 on tvs) quam ft al 208

S-ar putea să vă placă și