(KODINAR)
Submitted By
JIGAR N. BHUVA
The plant with an installed capacity of 0.7MTPA (million tons per year)
was a huge success with some equipment changing and optimizing the existing
plant company had produced 1MTPA from the plant. Then another plant
“Gujarat Line-1” again with an installed capacity of 1MTPA was erected in the
same area and commissioned in 1992. Then a new unit “Gujarat Line-2” with an
installed capacity of 1 MTPA was erected in the same area and commissioned
in 1996. Then through continues improvement Ambuja unit and Gajambuja line
-1 have upgraded by 0.5 MTPA each. In addition to these plants Ambuja
Cement Ltd. has packing units at Surat (Gujarat) and Panvel (Maharashtra).
Loose cement is dispatched to these locations by sea-route.
The rapid growth of the Indian economy has developed the basic
industries like cement, iron and steel and fertilizers have prospered. This is also
a result of the govt.’s incentives of developing such industries. At the time of
the installation of this plant, there was not any cutthroat competition in the
cement industry.
Thus, the above mentioned are the main reason, which encouraged this
organization to enter into the cement industry. The Ambuja Cement Ltd. is a
company, which has been promoted by the Gujarat Industrial And Investment
Corporation Ltd.
3. Coal
Coal is another major input, which along with electricity forms 40% of
total cost. There is a several coal shortage for the industry. The coal is
generally imported from certain African countries, which are unloaded at
companies’ Muldwarka port that is near to the factory site.
4. Labour
5. Transportation
Rapid Hardening
cement
Sulphate
Resistance
Cement
OPC=43 Grade
OPC=33
Grade
OPC=53
Grade
Masonry
PPC
Manufacturing Process:
1. LIMESTONE
2. RED CLAY
3. GYPSUM
4. COAL
5. FLY ASH
6. SILICA s
According to the mode of preparing the raw mix three different processes
can manufacture cement:
A. Wet Process
B. Semidry Process
C. Dry Process
MANUFACTURING PROCESS
1. MINING & CRUSHING OF LIMESTONE:
The second stage of cement manufacturing is to crush the gypsum & coal
by griddling machine.
3. MAKE A CINKER:
4. STORAGE OF CLINKER:
After a making of clinker it storage in a one place. It’s called silo. As per
the requirements clinker is send at required place weighing bin.
5. DRYING OF CLINKER:
After the drying a clinker it stored in a one place. It’s called silo. As per
the requirements, clinker is send at required place through conveyor belt.
Dried clinker is again crushed in the grinding cement mill. And chemical
is added as per the grad of cement. After adding the chemicals, this all things
are mixing in the raw mill. After this process all these mixing material is
transfer in to the ruler. Rulers exclude the wastage & clean to the cement.
8. PACKING:
Packing is the final step of cement manufacturing process. Clean cement
again stored in a silo and last as per the requirement it come in weight box
through conveyor belt. After this cement bag which have capacity to include 50
kgs. Cement in it.