The photographs in this brochure feature construction PERI Formwork Malaysia Sdn. Bhd.
sites in progress. For this reason especially safety and Formwork Scaffolding Engineering
anchor details cannot always be considered as conclusive B-12-02, Level 12, Block B, PJ8,
or final. These are subject to the risk assessment carried
No. 23, Jalan Barat, 46050 Petaling Jaya,
out by the contractor.
Selangor Darul Ehsan, Malaysia
© PERI GmbH Phone +60 (0)3.7969 1088
Fax +60 (0)3.7969 1020
info@perimalaysia.com
www.perimalaysia.com
MY 1 2017
The PERI Magazine
Scope
2
All-round safety – increased efficiency
ibis Hotel, Kuala Lumpur
Contractor Mr. Jack Xiong, General Manager: The RCS climbing protection panel serves as
Goldstone Project anti-fall protection; thus work on the facade
“The good construction result is
Builders could be completed very quickly.
Field Service proof that we selected the right
PERI Malaysia formwork provider for this project.
Jalan Yap Kwan Seng, Kuala Lumpur is
Together with PERI engineers,
set to host Downtown Kuala Lumpur's
we were able to develop the right
first ibis Hotel by French hotelier Accor
solutions and problem free con-
Group: a 30 storey hotel expected to
struction work.”
complete in 2017.
Mobile climbing units lifted the rail-guilded RCS The hydraulic cylinder could be easily mounted on Together with PERI specialists, the
Climbing Protection Panel from storey to storey. the climbing shoe between the wall and climbing rail. site management team developed a
formwork concept that ideally matched
the ambitious construction schedule
and project requirements.
3
Safe working conditions without interruptions
Reliable support during all phases of the project
Equatorial Hotel, Kuala Lumpur
Hotel Equatorial Kuala Lumpur, one columns. SKYDECK Panel Slab Contractor
IJM Construction
of the city's oldest landmarks was Formwork ensured that the operations
Sdn Bhd
opened in 1973, ceased operations were carried out very efficiently. Field Service
on April 1, 2012 to make for the rede- PERI Malaysia
velopment. The construction will take At the later stage, the RCS Climbing
36 months involves the construction Protection Panel will be used, not
works of the podium block, office only to secure the construction site
and hotel towers. The board range of personel against falling, the enclosed
PERI products and optimized logistical secure against falling, the enclosed Mr. Liew Yoon Han,
operations through only one formwork working areas are also protected Project Manager:
partner simplified and accelerated the against extreme weather conditions. “Due to our positive experience
construction progress. The VARIO Wall This, together with the increased with similar projects, we decided
Formwork System and CB 240 Climb- feeling of safety, meant that work once again in favour of PERI.
ing Formwork could be used extremely could be efficiently carried out at all The customer support and the
versatile for forming the core walls and heights in 10 days cycle. fast provided on-site solutions
by their technical team have been
highly appreciated and proven
PERI engineers combined rentable construc- The columns could be safely and quickly PERI‘s commitment to the job.”
tion kit systems to create a customized shuttered in the protection of the RCS
formwork and scaffolding solution. enclosure with VARIO.
4
Well ahead of schedule with PERI
system application and support
Four Season Hotel, Kuala Lumpur
Contractor The 1.5 million sq.ft. development scaffold enclosed the individual steel
CRCC Malaysia BHD
consist of over 300,000 sq.ft. of luxury ribs on all sides and the height of the
Field Service
PERI Malaysia retail space, with more than 230 hotel scaffold increased in step with the
rooms, as well as hotel service apart- construction progress.
ments and residences. This develop-
ment is expected to be completed The shoring solutions were completed
in 4 years and will be a new landmark with the formwork systems which
located in Kuala Lumpur City Centre. facilitated an optimized transfer of
Mr. Ma Zhan Jiang, loads. Interface problems were kept
Project Manager: PERI Engineers combined PERI UP, to an absolute minimum, errors in the
“PERI complied with our requests ST 100 shoring and the RCS climbing execution were avoided and productivi-
right from our very first meeting. protection panel to create an efficient ty was maximized. The RCS climbing
The comprehensive support – formwork solution with a very high protection panel completely enclosed
planning, static, logistics through level of safety. The PERI UP shoring the building edges of the uppermost
to the on-site service also had a system was adapted to support the floors still under construction. This
very positive impact on the project.” deep concrete beams with width safeguarded personnel and passers-by
of 3.50 m the height of 26 m of the alike and also ensured a higher opera-
birdcage. The PERI UP birdcage tional performance.
5
Successful initial applications of system formwork
Aspen Residence, Penang
Located at Precinct 5,
Putrajaya, a total of 100,000
houses will be built under
1Malaysia Civil Servants‘
Housing Programme (PPA1M)
nationwide. The first phase
of the PPA1M programme
involving the construction of
10,366 houses was launched Mr. Ng Kong Huei,
in April 2015. Mitrajaya first Project Director:
time using the new inno- “DUO system rationalises
vate system DUO for this the processes on the con-
housing project. DUO was struction site and we were
chosen to enhance the able to reduce the execution
efficiency, flexibility, speed time as well as staff require-
and cost saving. With the ment. DUO can be cleaned
integration of the DUO for shuttered from the installa- of the shuttering aid. As the easily because the concrete
the walls and columns. PERI tion level. The panels are panel size determines the hardly sticks to the formlining.
TK Table and PERI UP for hooked in from below and position of the slab props, We are satisfied with the
the slabs, can be safely pushed upwards by means measuring is not necessary. concrete surface results too.”
6
DUO Formwork
Lightweight, universal and easy
DUO is the innovative system form- nents. DUO Panels can be used for site. Working with almost no tools
work featuring a very low weight and vertical and horizontal applications. additionally reduces the risk of injury
extremely simple handling. It is not Besides the investment and logistics and prevents noise.
only the material used that is innova- costs, this also minimises the expendi-
tive, but rather the entire concept. It ture for the training of staff. Simple The special highlight of DUO: easy
allows for efficient formwork of walls, operations, low weights and uniform replacement of formlining guarantees
columns and slabs using a minimum system components allow for a very quick maintenance – without requiring
number of different system compo- high productivity on the construction any special tools or skills.
7
8
Performing systems from one source
Suruhanjaya Pencegahan Rasuah Malaysia (SPRM), Precinct 7, Putrajaya
Contractor The Malaysia Government is investing The flexibility of the PERI UP system
Pembinaan Mitrajaya
in the extension of the Malaysian allows to modify the grid pattern to
Sdn Bhd
Field Service Anti Corruption Agency in Putrajaya. 100 cm of 50 cm ledgers to get around
PERI Malaysia 3 office towers are built with a distinc- the columns and keep the system
tive architecture, based on traditional stable and rigid.
local housing concepts founded on
piles. The 3 highrise with 25 to 30 The slanting mega columns can easily
levels start in a height of 20 m - 40 m be climbed thanks to the RCS rail
Mr. Leslie Lim, Project Director: above the ground, founded on top guided system, which allows safe
“The expertise of PERI‘s engineer- of a series of inclined mega columns. climbing even on the “face down”
ing staff was invaluable to our side of the columns. A bracing system
project. Their unique and innova- The building is situated on a hill in made of custom made connecting
tive formwork designs served a the centre of the Government City parts and ST 100 has been designed
variety of applications, including of Putrajaya and is expected to in close cooperation with the structural
a challenging shoring design be completed by the end of 2016. engineers from ARUP in order to
utilizing the PERI UP system. In close cooperation with the engi- stabilize the slanting columns during
PERI‘s solution allowed us to neers from the contractor MITRAJAYA, construction.
execute our project in a safe, PERI designed especially for the
productive and timely fashion.” high shoring a very flexible and safe Finally, above the 180 cm thick transfer
solution with the PERI UP volumn floor slab, the typical floors have been
shoring. A steady grid pattern of realized in a very economical way using
150 cm x 150 cm x 150 cm makes PD 8 and TK table form.
assembly easy to manage.
9
Detailed cycle planning with optimized system use
You can rely on PERI
RGT2 LNG Tank, Pengerang, Johor
It is used as a stable spacer with tube The excellent finishes resulting from ■ waterproof ■ soundproof
the use of the PERI SK Tie System suited gas impermeable suitable for strong-
for walls thicker than 60-cm-tie rod ■ ■
10
Tunnel know-how for
a cost-effective system solution
Tun Razak Exchange Station, Kuala Lumpur
TRX is an iconic 70-acre develop- WCT, one of our regular customer Contractor
WCT Construction
ment in the heart of Kuala Lumpur using components taken from the
Sdn Bhd
that is set to become a dedicated VARIOKIT Construction Kit and Field Service
international financial and economic supplied formwork and scaffolding PERI Malaysia
hub, promoting Malaysia as a new form one source.
global economic growth nucleus.
Strategically located at the southern TRX infrastructure project runs
gateway to Kuala Lumpur’s city underground with a depth of 14.00 m,
centre, TRX is flanked by main arterial the double-tube tunnel with a rec- Encik Mohamad Hafez bin Abdul Malek,
roads, with its excellent accessibility tangular cross-section was realized Project Manager:
and connectivity via an integrated using cut-and-cover construction “For such projects, the choice of
underground Mass Rapid Transit (MRT) method. the right formwork system is a
interchange station as well as direct very important decision. After very
connectivity to key roads and major With this customized project solution, careful consideration, we decided
highways such as the SMART Tunnel, the construction crew maintained in favour of PERI due to the high
MRR2, Jalan Tun Razak, Jalan Bukit a 3 week cycle. PD 8 elements were level of safety, easy handling and
Bintang, and Jalan Sultan Ismail, as connected to form large-size units fast cycle sequences. As expected,
well as connections to the planned which could be moved very quickly the PERI team has provided us
KL-Singapore HSR in Bandar Malaysia to the next place of use each time. with very professional support.”
via the MRT Line 2. This saved valuable crane time and
also allowed moving operations to
PERI engineers developed a custom- take place in the area even when no
ized formwork carriage solution for crane was available.
11
Climbing System
RCS and ACS Climbing Formwork
Climbing Phase
Presentation with external working
platforms on advancing core
12
Systematic adaptation for completely
safe working conditions
KVMRT UDG Cochrane Station, Kuala Lumpur Contractor
IDE-Totalap Joint Venture
Field Service
PERI Malaysia
13
Safely to the top with optimally
adapted climbing technology
KL Eco City Parcel B, Kuala Lumpur
KL Eco City is an integrated pedestrian access for the This enclosure provided safe
urban city development entire construction period working levels and could be
located in Bangsar right had to be guaranteed. The adapted to the constantly
across Mid Valley City. It is complex building floor plan changing layout of the slabs.
the first mixed commercial with curvatures, offsets
and residential development and different angled walls PERI designed a special
designed for Gold Certifica- presented further challenges anchor solution that could
tion under Malaysia Green during the planning and vary the inclinations of
Building Index (CGBI). execution. the protection panels and Mr. Yap Wei Tong, Asst
Due to the confined condi- allowed the hydraulic climb- General Manager – Project:
tions on the construction An efficient working envi. ing procedure to take place “This KL Eco City itself is
site, crane time for the form- ronment was guaranteed by without any modifications. a real technical challenge
working operations was to the use of the RCS climbing Laterally, sliding scaffold whilst the site surroundings
be minimized; in addition, protection panel on the elements secured the also provide severe restric-
unobstructed and safe building’s outer edges. variable balcony cantilevers. tions. The PERI climbing
formwork solution, based on
Contractor the RCS system, fully meets
Grand Dynamic Builders Sdn Bhd our requirements-both in
Field Service
terms of safety as well as use.”
PERI Malaysia
14
The VARIOKIT Engineering Construction Kit
Heavy-Duty Trusses and Heavy-Duty Shoring Towers for high loads
15