PERI – The service provider

We offer more than just products

Technical solution Logistics On-site support


Due to their in-depth understanding of PERI has the world‘s largest rental PERI Formwork instructors provide an
the needs of our customers, our equipment pool and supplies its extensive professional briefing on-site.
engineers are able to develop the best customers reliably, fast and with They support the site management
project-related solution. The services a high level of flexibility. “Just in time” with this specific product knowledge
include general arrangement drawings, deliveries and return deliveries – and train the site team on the use of
method statement, static calculations according to the particular construc- PERI products in order to achieve effi-
as well as assembly drawings. tion schedule. cient and safe construction progress.

Welcome to our
Customer Training Centre

Our Training program includes both


general product training and seminars
with customized content. We support
our customers with training on
the latest formwork and scaffolding
technologies, safe working processes
and efficient construction methods.

MY en 01 | 2017 3.5eb 794084 © PERI GmbH

The photographs in this brochure feature construction PERI Formwork Malaysia Sdn. Bhd.
sites in progress. For this reason especially safety and Formwork Scaffolding Engineering
anchor details cannot always be considered as conclusive B-12-02, Level 12, Block B, PJ8,
or final. These are subject to the risk assessment carried
No. 23, Jalan Barat, 46050 Petaling Jaya,
out by the contractor.
Selangor Darul Ehsan, Malaysia
© PERI GmbH Phone +60 (0)3.7969 1088
Fax +60 (0)3.7969 1020
info@perimalaysia.com
www.perimalaysia.com
MY 1 2017
The PERI Magazine

Scope

Site working conditions without interruptions


Equatorial Hotel, Kuala Lumpur – Page 4

Performing systems from one source


Suruhanjaya Pencegahan Rasuah Malaysia (SPRM), Precinct 7, Putrajaya – Page 8

Detailed cycle planning with optimized system use


RGT2 LNG Tank, Pengerang, Johor – Page 10
tives to conventional aluminium modern technology and specifically
formwork. The shortage of qualified safety, in order to prevent accidents.
workers is repeatedly mentioned by Increase the method engineering
our customers as the major challenge competencies of interested parties
in the market for everyone. Related in the early phase of a project, in order
to the lacking qualification of the to introduce more compliant work
workforce are issues with productivity, processes.
Dear construction partners, safety and quality!
With our new training center we are
These mentioned issues, will not contributing to the sustainable develop-
We are happy to present to you once be solved by continuously importing ment of the Malaysian construction
more our yearly PERI scope, with a millions of unqualified workers into industry.
choice of exciting projects that we are Malaysia. The only real option for
proud of having contributed during sustainable development is improving
the last year as your solution provider! education and professional training. We will be happy to welcome you
to our training center and invite you
Again, the KVMRT has given us Responding to this major market to subscribe to one of our training
challenging tasks, and has given us requirement, we have recently taken modules!
the opportunity to introduce innovative another important step ahead.
technology solutions, such as for We have opened our PERI Malaysia
example our VARIOKIT tunnel form- Training Center, which targets to Sincerely,
work, which is provided as a cost
efficient alternative to custom made Train contractor and subcontractor
formwork due to the fact of being site teams on the use of our products
entirely rentable. Also the local highrise before they are using them on site,
construction is keeping developing at and therefore ensuring high producti-
a strong pace, demanding for innova- vity from the first day of use. Increase Bernhard Steinle,
tive, and more labour efficient alterna- awareness and competencies on Managing Director

Saving time with SKYDECK Contractor


Syarikat Pembenaan Yeoh
Tiong Lay Sdn Bhd
Stripe Hotel, Kuala Lumpur Field Service
PERI Malaysia

One blow of the hammer releases Mr. Tan Chee Been,


the drophead; in the process, the
Construction Manager:
formwork is lowered by 6 cm. Main
beams and panels can then be struck. “SKYDECK effectively
addresses the issues of
Another YTL project, 20 SKYDECK for their on-going sequence and lightweight time, quality and cost.
Storey Boutique hotel is development projects. system components acceler- It is extremely versatile
been built along Jalan SKYDECK the proven ate working operations. and can be adapted to
Kamunting, Dang Wangi, alumi­nium panelized slab In addition, early striking accommodate just about
Kuala Lumpur. Being one of formwork with very fast with the drophead system any decking issue.”
our long time customer, YTL shuttering times. The reduces on site material
decided to purchase PERI systematic assembly requirements.

2
All-round safety – increased efficiency
ibis Hotel, Kuala Lumpur

Contractor Mr. Jack Xiong, General Manager: The RCS climbing protection panel serves as
Goldstone Project anti-fall protection; thus work on the facade
“The good construction result is
Builders could be completed very quickly.
Field Service proof that we selected the right
PERI Malaysia formwork provider for this project.
Jalan Yap Kwan Seng, Kuala Lumpur is
Together with PERI engineers,
set to host Downtown Kuala Lumpur's
we were able to develop the right
first ibis Hotel by French hotelier Accor
solutions and problem free con-
Group: a 30 storey hotel expected to
struction work.”
complete in 2017.

Mobile climbing units lifted the rail-guilded RCS The hydraulic cylinder could be easily mounted on Together with PERI specialists, the
Climbing Protection Panel from storey to storey. the climbing shoe between the wall and climbing rail. site management team developed a
formwork concept that ideally matched
the ambitious construction schedule
and project requirements.

The two top floors under construction


were completely enclosed with the
help of the RCS Climbing Protection
Panel. This enclosure served as
protection against falling and reliably
shielded the working area from the
effects of the wind and weather.

Thanks to the mobile RCS climbing


hydraulics, no crane was required
for the rail-guided moving procedure.
An integral part of the PERI climbing
concept was the RCS MP Landing
Platform which was used for moving
and intermediates storage of formwork
materials.

3
Safe working conditions without interruptions
Reliable support during all phases of the project
Equatorial Hotel, Kuala Lumpur

Hotel Equatorial Kuala Lumpur, one columns. SKYDECK Panel Slab Contractor
IJM Construction
of the city's oldest landmarks was Formwork ensured that the operations
Sdn Bhd
opened in 1973, ceased operations were carried out very efficiently. Field Service
on April 1, 2012 to make for the rede- PERI Malaysia
velopment. The construction will take At the later stage, the RCS Climbing
36 months involves the construction Protection Panel will be used, not
works of the podium block, office only to secure the construction site
and hotel towers. The board range of personel against falling, the enclosed
PERI products and optimized logistical secure against falling, the enclosed Mr. Liew Yoon Han,
operations through only one formwork working areas are also protected Project Manager:
partner simplified and accelerated the against extreme weather conditions. “Due to our positive experience
construction progress. The VARIO Wall This, together with the increased with similar projects, we decided
Formwork System and CB 240 Climb- feeling of safety, meant that work once again in favour of PERI.
ing Formwork could be used extremely could be efficiently carried out at all The customer support and the
versatile for forming the core walls and heights in 10 days cycle. fast provided on-site solutions
by their technical team have been
highly appreciated and proven
PERI engineers combined rentable construc- The columns could be safely and quickly PERI‘s commitment to the job.”
tion kit systems to create a customized shuttered in the protection of the RCS
formwork and scaffolding solution. enclosure with VARIO.

4
Well ahead of schedule with PERI
system application and support
Four Season Hotel, Kuala Lumpur

Contractor The 1.5 million sq.ft. development scaffold enclosed the individual steel
CRCC Malaysia BHD
consist of over 300,000 sq.ft. of luxury ribs on all sides and the height of the
Field Service
PERI Malaysia retail space, with more than 230 hotel scaffold increased in step with the
rooms, as well as hotel service apart- construction progress.
ments and residences. This develop-
ment is expected to be completed The shoring solutions were completed
in 4 years and will be a new landmark with the formwork systems which
located in Kuala Lumpur City Centre. facilitated an optimized transfer of
Mr. Ma Zhan Jiang, loads. Interface problems were kept
Project Manager: PERI Engineers combined PERI UP, to an absolute minimum, errors in the
“PERI complied with our requests ST 100 shoring and the RCS climbing execution were avoided and productivi-
right from our very first meeting. protection panel to create an efficient ty was maximized. The RCS climbing
The comprehensive support – formwork solution with a very high protection panel completely enclosed
­planning, static, logistics through level of safety. The PERI UP shoring the building edges of the uppermost
to the on-site service also had a system was adapted to support the floors still under construction. This
very positive impact on the project.” deep concrete beams with width safeguarded personnel and passers-by
of 3.50 m the height of 26 m of the alike and also ensured a higher opera-
birdcage. The PERI UP birdcage tional performance.

5
Successful initial applications of system formwork
Aspen Residence, Penang

Contractor As the panels are very light they can


Rimbaco Sdn. Bhd. be installed manually. The construc-
Field Service tion team works efficiently and
PERI Malaysia without having to wait for the crane.

Eng. William Low,


Project Manager:
“For the team it was the
first time using system
formwork. Compared to
the use of conventional
formwork we were able
to save around 50 % of
working time. Especially Always being a conventional the first 13 storeys with same time provides good
the straightforward contractor, Rimbaco relies timber and boards. Due wall surface results.
application is to be on PERI for their first system to its low weight, all work
emphasised. The whole formwork for this 26 storeys will be carried out by hand. Furthermore, the reduced
team quickly understood residential and commercial In addition, the formwork cleaning effort results in
the system and worked building in Penang. DUO system is very simple and time savings: as the con-
with little training.” was first introduced for the thus easy to handle. The crete does not stick to the
shear wall of the upper good quality of the system formlining, it can be easily
storeys as the construction components guarantees a and quickly cleaned after
team has started working on high reusability and at the every use.

Fast shuttering and striking


1Malaysia Civil Servants‘ Housing Programme (PPA1M), Putrajaya Contractor
Pembinaan Mitrajaya Sdn Bhd
Field Service
PERI Malaysia

Located at Precinct 5,
Putrajaya, a total of 100,000
houses will be built under
1Malaysia Civil Servants‘
Housing Programme (PPA1M)
nationwide. The first phase
of the PPA1M programme
involving the construction of
10,366 houses was launched Mr. Ng Kong Huei,
in April 2015. Mitrajaya first Project Director:
time using the new inno- “DUO system rationalises
vate system DUO for this the processes on the con-
housing project. DUO was struction site and we were
chosen to enhance the able to reduce the execution
efficiency, flexibility, speed time as well as staff require-
and cost saving. With the ment. DUO can be cleaned
integration of the DUO for shuttered from the installa- of the shuttering aid. As the easily because the concrete
the walls and columns. PERI tion level. The panels are panel size determines the hardly sticks to the formlining.
TK Table and PERI UP for hooked in from below and position of the slab props, We are satisfied with the
the slabs, can be safely pushed upwards by means measuring is not necessary. concrete surface results too.”

6
DUO Formwork
Lightweight, universal and easy

DUO is the innovative system form- nents. DUO Panels can be used for site. Working with almost no tools
work featuring a very low weight and vertical and horizontal applications. additionally reduces the risk of injury
extremely simple handling. It is not Besides the investment and logistics and prevents noise.
only the material used that is innova- costs, this also minimises the expendi-
tive, but rather the entire concept. It ture for the training of staff. Simple The special highlight of DUO: easy
allows for efficient formwork of walls, operations, low weights and uniform replacement of formlining guarantees
columns and slabs using a minimum system components allow for a very quick maintenance – without requiring
number of different system compo- high productivity on the construction any special tools or skills.

Universally applicable Ergonomic in all respects Easy replacement of formlining


Flexible forming of walls, columns Low weights, crane-free handling Quick maintenance with just a
and slabs using only one system and intuitive application few screws – without requiring
special skills

With DUO, the slab can be safely


shuttered from the installation level.
The panels are hooked in from below
and pushed upwards in from below
and pushed upwards by means of
the shuttering aid. As the panel size
determines the position of the slab
props, measuring is not necessary.

7
8
Performing systems from one source
Suruhanjaya Pencegahan Rasuah Malaysia (SPRM), Precinct 7, Putrajaya

Contractor The Malaysia Government is investing The flexibility of the PERI UP system
Pembinaan Mitrajaya
in the extension of the Malaysian allows to modify the grid pattern to
Sdn Bhd
Field Service Anti Corruption Agency in Putrajaya. 100 cm of 50 cm ledgers to get around
PERI Malaysia 3 office towers are built with a distinc- the columns and keep the system
tive architecture, based on traditional stable and rigid.
local housing concepts founded on
piles. The 3 highrise with 25 to 30 The slanting mega columns can easily
levels start in a height of 20 m - 40 m be climbed thanks to the RCS rail
Mr. Leslie Lim, Project Director: above the ground, founded on top guided system, which allows safe
“The expertise of PERI‘s engineer- of a series of inclined mega columns. climbing even on the “face down”
ing staff was invaluable to our side of the columns. A bracing system
project. Their unique and innova- The building is situated on a hill in made of custom made connecting
tive formwork designs served a the centre of the Government City parts and ST 100 has been designed
variety of applications, including of Putrajaya and is expected to in close cooperation with the structural
a challenging shoring design be completed by the end of 2016. engineers from ARUP in order to
utilizing the PERI UP system. In close cooperation with the engi- stabilize the slanting columns during
PERI‘s solution allowed us to neers from the contractor MITRAJAYA, construction.
execute our project in a safe, PERI designed especially for the
productive and timely fashion.” high shoring a very flexible and safe Finally, above the 180 cm thick transfer
solution with the PERI UP volumn floor slab, the typical floors have been
shoring. A steady grid pattern of realized in a very economical way using
150 cm x 150 cm x 150 cm makes PD 8 and TK table form.
assembly easy to manage.

9
Detailed cycle planning with optimized system use
You can rely on PERI
RGT2 LNG Tank, Pengerang, Johor

Contractor storage tanks. Construction is expect-


Samsung C&T
ed to be completed by April, 2018.
Corporation
Field Service The re-gasification terminal (known as
PERI Malaysia RGT-2) is part of Malaysia’s develop-
ment plan to secure stable natural gas
supply for the nearby Refinery and
Petrochemical Integrated Development
(RAPID), Pengerang Co-generation
Mr. Alex Seo, Civil Manager: Plant (PCP) and also to the Peninsular Tanks where water proof concrete is
“We are satisfied with PERI form- Gas Utilization (PGU) Grid. The main necessary. The SK sealing cones prove
work not only the material but also focus was to coordinate the wide to be an advantage for closing the
their continuous technical support range of formwork configurations, required tie positions. The cones could
at site. PERI system are versatile with a tight schedule and high material be fixed with minimum effort and are
and easy to handle during assembly, requirements in particular. In addition permanently watertight.
jumping and rectifying.” to the planning of formwork and
scaffolding solution for the complex The outer tank diameter is 89.40 m
With a package of solutions consisting geometries and high loads, strict and the overall pouring height is 4.50 m
of formwork, scaffolding, logistical and compliance of the construction when completed. To withstand the
technical services provided throughout schedule and staying within the pressure from within, the standard wall
the project, PERI engineers effectively planned budget for the imposing LNG thickness and the buttress is about
supported Samsung C&T Corporation Project were the major challenges. twice as thick. The result with a height
for the construction of the LNG tank The right choice of the tie system is of 4.50 m for each casting, the main
with capacity of 5 million tons per crucial, particularly for structures with contractor manages to finish the entire
annum and two 200,000 m³ LNG special requirements, such as LNG wall casting in only 8 sequences.

SK tie cone system


Lightweight, universal and easy

The SK sealing cones prove to be an


advantage of waterproof concrete
through to radiation protection.

It has long life span, replaceable plastic


tubes and moreover, it can be simply
unscrewed for ease of striking.

It is used as a stable spacer with tube The excellent finishes resulting from ■ waterproof ■ soundproof
the use of the PERI SK Tie System suited gas impermeable suitable for strong-
for walls thicker than 60-cm-tie rod ■ ■

the high demanding off-form requirement. ■ fire-resistant rooms and architec-


recoverable. tural concrete

10
Tunnel know-how for
a cost-effective system solution
Tun Razak Exchange Station, Kuala Lumpur

TRX is an iconic 70-acre develop- WCT, one of our regular customer Contractor
WCT Construction
ment in the heart of Kuala Lumpur using components taken from the
Sdn Bhd
that is set to become a dedicated VARIOKIT Construction Kit and Field Service
international financial and economic supplied formwork and scaffolding PERI Malaysia
hub, promoting Malaysia as a new form one source.
global economic growth nucleus.
Strategically located at the southern TRX infrastructure project runs
gateway to Kuala Lumpur’s city underground with a depth of 14.00 m,
centre, TRX is flanked by main arterial the double-tube tunnel with a rec- Encik Mohamad Hafez bin Abdul Malek,
roads, with its excellent accessibility tangular cross-section was realized Project Manager:
and connectivity via an integrated using cut-and-cover construction “For such projects, the choice of
underground Mass Rapid Transit (MRT) method. the right formwork system is a
interchange station as well as direct very important decision. After very
connectivity to key roads and major With this customized project solution, careful consideration, we decided
highways such as the SMART Tunnel, the construction crew maintained in favour of PERI due to the high
MRR2, Jalan Tun Razak, Jalan Bukit a 3 week cycle. PD 8 elements were level of safety, easy handling and
Bintang, and Jalan Sultan Ismail, as connected to form large-size units fast cycle sequences. As expected,
well as connections to the planned which could be moved very quickly the PERI team has provided us
KL-Singapore HSR in Bandar Malaysia to the next place of use each time. with very professional support.”
via the MRT Line 2. This saved valuable crane time and
also allowed moving operations to
PERI engineers developed a custom- take place in the area even when no
ized formwork carriage solution for crane was available.

11
Climbing System
RCS and ACS Climbing Formwork

PERI ACS self-climbing variants for facades, building Crane-independent


cores, shaft structures and inclined bridge pylons make Shuttering, striking and hydraulic climbing
the construction of high concrete structures extremely in a very fast work rhythm
economical, fast and safe. The efficient sequence of Weather-independent
operations from floor to floor facilitate allow a very high Comfortably-designed platforms, also protected
level of productivity and exceptionally short cycle times. against wind and weather if required
Load-independent
Working platforms can accommodate high loads,
e.g. arising from material storage or placing boom mast

Installation and climbing sequence

Climbing Phase
Presentation with external working
platforms on advancing core

1st Step 2nd Step 3rd Step 4th Step


Strike, Attach climbing shoe, Climb climbing scaffold Place internal formwork, Close formwork, Concrete
Climb rail, Remove trailing Position climbing scaffold Clean formwork, Reinforce,
climbing shoes and anchors on climbing shoe Install leading anchor Shutter

12
Systematic adaptation for completely
safe working conditions
KVMRT UDG Cochrane Station, Kuala Lumpur Contractor
IDE-Totalap Joint Venture
Field Service
PERI Malaysia

Suspended scaffolding for Mr. Raymond Tan,


installation of M&E & ceiling and
Senior Engineer:
wall cladding.
“With PERI UP system
scaffold, construction
can be optimally executed
For the M&E and architec- in a safer manner, shorter
ture finish works the time frame and lesser
contractor chose to use cost. The partnership
PERI UP scaffolding due to and the support has been
its safety, versatility and fast absolutely phenomenal,
installation. As the space the productivity and
below the working area was efficiency has all been
fully occupied by escalators, met and our targets are
the PERI UP scaffold was on track.”
suspended from the ceiling
at a height of 15 m to
provide access for installa- PERI has provided a com- anti-slip surface is providing of the hatch is closed
tion of cladding on ceiling plete solution starting with an excellent working area automatically which provides
and walls. The top platform design, calculation, method with live load capacity of up the working space across
was suspended 2 m below statement for installation, to 200 kg/m2 on each level. the whole area of the plat-
the slab structure with an logistics and an instructor For the access from one form. Horizontal ledgers UH
area of 8 m x 21 m and there on site to ensure that the level to another, PERI has plus are also used as a rail-
were 5 platform levels installation ran smoothly. supplied a hatch 75 x 100 ing and the yellow toe board
below. The metal decking with with a ladder. The opening to prevent any falling object.

Mobile working platform reduces


time and material cost
KVMRT Semantan North Portal, Kuala Lumpur

Semantan North Portal PERI UP working platform


is the interfacing point for installation of the water
between the underground proofing membrane. The
and elevated tract, located ground levels were not equal
next to Jalan Duta, Kuala and part of the scaffolding
Lumpur. This portal will have was placed on the concrete
its Portal Building to house cantilevered beam. The
M&E related equipment, whole scaffolding was
as well as a 132 kV TNB anchored using wall ties to
substation, a suction and ensure stability. To provide
pump room and a perma- an access to all levels, PERI
nent access road. has supplied a stair tower
which was connected to the
Nanyang Tunnel Engineering scaffolding itself.
has chosen 9.30 m high

13
Safely to the top with optimally
adapted climbing technology
KL Eco City Parcel B, Kuala Lumpur

KL Eco City is an integrated pedestrian access for the This enclosure provided safe
urban city development entire construction period working levels and could be
located in Bangsar right had to be guaranteed. The adapted to the constantly
across Mid Valley City. It is complex building floor plan changing layout of the slabs.
the first mixed commercial with curvatures, offsets
and residential development and different angled walls PERI designed a special
designed for Gold Certifica- presented further challenges anchor solution that could
tion under Malaysia Green during the planning and vary the inclinations of
Building Index (CGBI). execution. the protection panels and Mr. Yap Wei Tong, Asst
Due to the confined condi- allowed the hydraulic climb- General Manager – Project:
tions on the construction An efficient working envi. ing procedure to take place “This KL Eco City itself is
site, crane time for the form- ronment was guaranteed by without any modifications. a real technical challenge
working operations was to the use of the RCS climbing Laterally, sliding scaffold whilst the site surroundings
be minimized; in addition, protection panel on the elements secured the also provide severe restric-
unobstructed and safe building’s outer edges. variable balcony cantilevers. tions. The PERI climbing
formwork solution, based on
Contractor the RCS system, fully meets
Grand Dynamic Builders Sdn Bhd our requirements-both in
Field Service
terms of safety as well as use.”
PERI Malaysia

14
The VARIOKIT Engineering Construction Kit
Heavy-Duty Trusses and Heavy-Duty Shoring Towers for high loads

With VARIOKIT core and system Countless possibilities


components, heavy-duty shoring Bridge, tunnel and civil engineering solutions with core and
towers and wide-span lattice girders functional system components
can be systematically assembled.
Also for other construction tasks Fast assembly
where high loads are to be transferred, with bolted connections and pre-assembled tower segments
VARIOKIT is the optimal system. up to 10 m
Providing the overall solution from
one source ensures optimized Cost-effective solution
processes during the course of the as all system components are available in the PERI rental parks
project. Through the connection
possibilities for the PERI UP Modular High degree of safety
Scaffold, secure access to all work- Integrable solutions for working platforms and access means
ing areas as well as the required with the PERI UP modular scaffold
working surfaces is easily integrated.