ORGANOGRAM FOR POWER PLANT

DGM

Sr. Manager Sr. Manager


(Operation) (Maintenance)

Manager Manager Manager


Manager (Mech.) (Electrical) (I/C)
(BTG/Elect Manager
system) (CHP/AHP/DM/Off
Site/Fire Figth.) Sr. Engg/Engg Sr. Engg/Engg Sr. Engg/Engg
(Mech.)(02) (Electrical) (I/C)

Ass. Engg Ass. Engg ASS. Engg


Sr. Engineer (02) (Mech.)(04) (Mech.)(04) (Mech.)(04)
Sr. Engineer (CHP/AHP/DM/Off
Sr. Engineer
(220KV/33KV/6.6kV Site/Fire Figth.)
(Boiler/STG) Technician (7) Technician (7)
/DG set/Generator) Technician (4)
(2 per shift) (2 per shift)
(1 per shift)
(Mech.) (Electrical)
(I/C)
BLOCK-A C/R.
Engineer(12) BLOCK-F
(1+2=3per shift)
[4 must be BOE]
1st class B.A.
(4/7)
(1/2 per shift) Foremen(4/7) Chargeman Chemist (4) Foremen(4) Foremen (7)
(1/2 per shift) (4) (1 per shift) (1 per shift) (2 per shift)
(STG/ ) (1 per shift) (QCD)(BSC.) (offsite/Utility (CHP/AHP/LI
(DM)(BSC) /FF) ME )
2st class B.A. (7)
(2 per shift)
BLOCK-B
BLOCK-C BLOCK-E BLOCK-D