Legacy NCRs

Sr. NCR/OBS Number ISSUED BY

1 10/8017/KAFD/SBG/A2237 Meinhardt

2 10/8017/KAFD/SBG/A2288 Meinhardt

3 10/8017/KAFD/SBG/A2376 Meinhardt

4 10/8017/KAFD/SBG/A2406 Meinhardt

5 10/8017/KAFD/SBG/A2504 Meinhardt

6 10/8017/KAFD/SBG/A1717 Meinhardt

7 10/8017/KAFD/SBG/A1718 Meinhardt

8 10/8017/KAFD/SBG/A1876 Meinhardt

9 10/8017/KAFD/SBG/A1878 Meinhardt

10 10/8017/KAFD/SBG/A1995 Meinhardt
11 10/8017/KAFD/SBG/A1998 Meinhardt

12 10/8017/KAFD/SBG/A1999 Meinhardt

13 10/8017/KAFD/SBG/A2020 Meinhardt

14 10/8017/KAFD/SBG/A2023 Meinhardt

15 10/8017/KAFD/SBG/A2024 Meinhardt

16 10/8017/KAFD/SBG/A2208 Meinhardt

17 10/8017/KAFD/SBG/A2266 Meinhardt

18 10/8017/KAFD/SBG/A2269 Meinhardt

19 10/8017/KAFD/SBG/A2289 Meinhardt

20 10/8017/KAFD/SBG/A2290 Meinhardt

21 10/8017/KAFD/SBG/A2297 Meinhardt

22 10/8017/KAFD/SBG/A2366 Meinhardt
23 10/8017/KAFD/SBG/A2402 Meinhardt

24 10/8017/KAFD/SBG/A2405 Meinhardt

25 10/8017/KAFD/SBG/A2430 Meinhardt

26 10/8017/KAFD/SBG/A2431 Meinhardt

27 10/8017/KAFD/SBG/A2435 Meinhardt

28 10/8017/KAFD/SBG/A2436 Meinhardt

29 10/8017/KAFD/SBG/A2437 Meinhardt

30 10/8017/KAFD/SBG/A2500 Meinhardt

31 10/8017/KAFD/SBG/A2501 Meinhardt

32 10/8017/KAFD/SBG/A2502 Meinhardt

33 10/8017/KAFD/SBG/A2503 Meinhardt

34 10/8017/KAFD/SBG/A2506 Meinhardt
35 10/8017/KAFD/SBG/A2508 Meinhardt

36 10/8017/KAFD/SBG/A2509 Meinhardt

37 10/8017/KAFD/SBG/A2510 Meinhardt

38 10/8017/KAFD/SBG/A2511 Meinhardt

39 10/8017/KAFD/SBG/A2512 Meinhardt

40 10/8017/KAFD/SBG/A2513 Meinhardt

41 10/8017/KAFD/SBG/A2514 Meinhardt

42 10/8017/KAFD/SBG/A2515 Meinhardt

43 10/8017/KAFD/SBG/A2516 Meinhardt

44 10/8017/KAFD/SBG/A2517 Meinhardt

45 10/8017/KAFD/SBG/A2518 Meinhardt
46 10/8017/KAFD/SBG/A2519 Meinhardt

47 10/8017/KAFD/SBG/A2520 Meinhardt

48 10/8017/KAFD/SBG/A2521 Meinhardt

49 10/8017/KAFD/SBG/A2522 Meinhardt

50 10/8017/KAFD/SBG/A2523 Meinhardt

51 10/8017/KAFD/Z3/SBG/A254 Meinhardt

52 10/8017/KAFD/SBG/A2525 Meinhardt

53 10/8017/KAFD/SBG/A2526 Meinhardt

54 10/8017/KAFD/SBG/A2527 Meinhardt

55 10/8017/KAFD/SBG/A2528 Meinhardt

56 10/8017/KAFD/SBG/A2529 Meinhardt

57 10/8017/KAFD/SBG/A2530 Meinhardt
58 10/8017/KAFD/SBG/A2531 Meinhardt

59 10/8017/KAFD/SBG/A2532 Meinhardt

60 10/8017/KAFD/SBG/A2533 Meinhardt

61 10/8017/KAFD/SBG/A2534 Meinhardt

62 10/8017/KAFD/SBG/A2535 Meinhardt

63 10/8017/KAFD/SBG/A2536 Meinhardt

64 10/8017/KAFD/SBG/A2537 Meinhardt

65 10/8017/KAFD/SBG/A2538 Meinhardt

66 10/8017/KAFD/SBG/A2539 Meinhardt

67 10/8017/KAFD/SBG/A2540 Meinhardt

68 10/8017/KAFD/SBG/A2541 Meinhardt
69 10/8017/KAFD/Z3/SBG/M520 Meinhardt

70 10/8017/KAFD/Z3/SBG/M593 Meinhardt

71 10/8017/KAFD/Z3/SBG/M601 Meinhardt

72 10/8017/KAFD/Z3/SBG/M613 Meinhardt

73 10/8017/KAFD/Z3/SBG/M621 Meinhardt

74 10/8017/KAFD/Z3/SBG/M645 Meinhardt

75 10/8017/KAFD/Z3/SBG/M653 Meinhardt

76 10/8017/KAFD/Z3/SBG/P506 Meinhardt

77 10/8017/KAFD/Z3/SBG/M306 Meinhardt

78 10/8017/KAFD/Z3/SBG/M310 Meinhardt

79 10/8017/KAFD/Z3/SBG/M405 Meinhardt

80 10/8017/KAFD/Z3/SBG/M406 Meinhardt
81 10/8017/KAFD/Z3/SBG/M436 Meinhardt

82 10/8017/KAFD/Z3/SBG/P433 Meinhardt

83 10/8017/KAFD/Z3/SBG/E1107 Meinhardt

84 10/8017/KAFD/Z3/SBG/E1110 Meinhardt

85 10/8017/KAFD/Z3/SBG/E1111 Meinhardt

86 10/8017/KAFD/Z3/SBG/E1112 Meinhardt

87 10/8017/KAFD/Z3/SBG/E1225 Meinhardt

88 10/8017/KAFD/Z3/SBG/E1283 Meinhardt

89 10/8017/KAFD/Z3/SBG/E1360 Meinhardt

90 10/8017/KAFD/Z3/SBG/E1387 Meinhardt

91 1482 DAR

92 1162 DAR
93 1631 DAR

94 1628 DAR
Legacy NCRs Log 5.06

Description

Survey and documents required for correction of all missing fire rating labels on doors and frames. Several
openings are missing either a fire rating label on the door or frame.

Exhaust shaft .Substandard CMU construction supposed to be a 2 hour fire rated wall around an exhaust shaft.
The emergency generator is not built with a 2 hour fire rated perimeter as required by SBC 201 2.15.10.1. The
steel frame supporting the flue cannot be embedded into the CMU wall. IR required after removal. .

Confirmation is required all fire rated doors and frames have certification labels after required labels were found
missing.

CNU walls are built between hotel rooms and likely have vertical cells without solid grout and can only achieve a
48STC which is not adequate for a hotel. Demonstrate compliance to achieve STC rating from the acoustic report
and walls are fully grouted.

Documentation is required that white polystyrene backing rod is approved for use in a 2 hour fire rated
systems for joints in an exit staircase. Provide the material submittal.

A low door is built into stair 3 lower ground floor under a concrete beam and measures
1930mm high without allowance for floor finish. According to NFPA 101 7.1.5 minimum headroom is 2030mm in
a doorway

Lower ground floor. Headroom in the corridor to stair 3 is 1930mm and less than 2285mm
required by NFPA 7.1.5

Basement 1. Life safety drawings do not show fire rating on the walls in this room and
incorrect-walls must be 2 or 3 hours fire rating. Plan required with wall fire rating s and means of fire protecting
intake and exhaust louvers. Door ratings and wall penetrations must also correspond to the wall rating. Life
safety drawings to be revised. Confirmation required fuel containment and fire suppression systems comply with
the NFPA requirements

All basement levels. Life safety drawings do not show occupant load calculation neither do
plans show the exits have capacity for the occupant load. Plans and calculations to be provided showing
occupant load in the basements and the required exit width is provided and path to exit at ground level.

Lower ground floor-ballroom 1 and banquet kitchen. The exit route for ballroom 1 to be
revised as its second exit through the banquet kitchen must be within 76m in accordance with NFPA 101
12.2.5.2
Ground level. Penetrations permitted in exit enclosures are only those directly for the exit
enclosure for stair 2.

Ground level-ICT and electrical room.. Penetrations permitted in exit enclosures are only
those directly for the exit enclosure for stair 1.

Most room levels for electrical and ICT rooms swing into the required corridor exit width

Lower ground floor all day dining. Lie safety strategy all day dining area has one exit to stair1
and second to stair 23. The size of the kitchen expanded adjacent to stair 1 so exit is through the kitchen and I
not permitted by NFPA 101 12.2.5.2

Lower ground level near the banquet Kitchen .Updated drawings required and confirmation
work done in the corridor adjacent to the banquet kitchen is coordinated with the beam and mechanical
systems.
Complete information of the construction details for the lower level rod including:
• Detailed exterior elevations.
• Detailed roof plan
• Metal framings (if any Section though this area.
• All roof details.
• Al louver details.
• Details of skylights and or glazing.
Basement 1. Emergency Generator Room. Because of the fuel stored in the room and the
adjacent exhaust shaft, a 2 hour fire barrier must surround the emergency generator room (presently missing)
according to NFPA 110 7.2.1.1.All of the generator must be within the room and cannot project into the exhaust
shaft as the radiator does now.

Specifications required that govern construction of the escalators and elevators including the
cab finishes

basement 1. Drawings are required for approval of extending the emergency generator into
the exhaust shaft

Provide plan and route of the exhaust flue and the exhaust shaft that connects to the
stainless steel louvers.

Ground level. Air intake for the parking levels is adjacent to the carbon monoxide source and
does not comply with enclosure requirements of NFPA 8.6.4.1.

Secondary roof drain system. Saudi Building Code SBC 701 requires a secondary roof drainage system. Raise IR
demonstrating compliance with 6.7.1 and 6.7.2.
Provide pressurization test results confirming the two stair portions of stair 1 are completely
separated and comply with NFPA 101 7.1.3.2 and 7.1.3.2.1 (7).

Provide all wall sections throughout the hotel that show the acoustic requirements and STC
rating that the wall will achieve. Provide plans where wall sections with acoustic requirements are located.

Most floors throughout parcel have 2 hour fire rating therefore expansion joints must have
similar rating. And comply with either UL 2079 or ASTM E 1966 according to NFPA 110 (2006) 8.3.6. In addition
show joint width and accommodates the dimensional size and movement determined by the structural
engineer.

Plans do not show a CMU wall passing across an expansion joint in all hotel rooms and at the
corridor. Wall detail of the expansion joint and location of the fire barriers to be shown if the wall expansion
joint is not fire rated. Provide a detail for the expansion joint in the ceiling

Throughout 5.06. Details are required for 2 hour shafts with corridor access doors.

Throughout 5.06. Details are required of the two hour shaft wall adjacent to the bathroom.
STC rating for the wall to be demonstrated. Detail waterproofing location in wall details.

Level 7. And wherever condition occurs. Provide Omrania architectural approval of the door swing into the bathr

NFPA 101 28. 2. 5. 6 limits maximum length of dead end corridor to 15m but exceeded at
level 3.Revised corridor plan is required.to eliminate dead ends longer than 15m.

Stair 2. Access doors are permitted in stair 2 under NFPA 101 7. 1. 3 .2.Access doors as
shown on the plan are prohibited in exit enclosures and block exits.

Duct penetrations at stairs 1 and 2 are not permitted to route into the exit stair enclosure.
NFPA 101 7.1.3.2.1 limits penetrations for the purpose of existing. Ducts installed on site are crossing the stair
enclosure and is not permitted on any stair exit enclosure

Metal stud framing in a 2 hour wall must be part of an approved UL fire rated system. Sound
transmission must be considered. 2 hour fire rated detail with UL design number for shaft wall construction is
required and show STC rating. IR required that all framing installed is for approved 2 hour wall systems build
from one side.

The typical room plan shows vague information between the room door and CMU wall for this
fire rated wall. The corridor walls have 1 hour rating and door to corridor has a 45 minute rating. Detailed
drawing is required showing wall with 1 hour construction between the door frame and CMU
the IFC banquet kitchen that took over an exit and made it part of the kitchen and where the travel distance to
stair 2 exceeded 76m.

Another example of non- compliance are the large assembly ballrooms for the hotel which sat nearly 500 people
and was the capacity in 2012. The size of room was later increased in the IFC. Assembly occupancies have higher
densities of people and NFPA places stricter control code requirements. For all portions of the building, confirm
the IFC drawings comply with the following requirements:

• 12.2.6 travel distance not longer than 76 m


•Lower 12.2.5.1.2
ground Maximum
level andcommon
basementpath
2. of travel (generally 6.1 m)
•A 12.2.3.6 Main entrance/exit.
smoke curtain is required at the escalator opening. Fire and safety strategy calls for protection of escalator
•floor
12,2,5, 2. Exit
opening through
and hazard occupancies.
requirements should be shown in for compliance with Fire and Life Safety strategy or submit
•documentation
12.2.3.8 Minimum corridor widths.
why this no longer applies. Protection requirements to be determined for the escalator opening
•in12.2.5.1.3.
the ceiling Dead end maximum
at basement 2. length.
• 12.2.6. (1) Maximum travel distance.
Protection of the floor openings at the function facilities support lobby in basement 2 in accordance with the
Fire and Life Safety Strategy (2012) to allow sufficient protection prevent smoke movement between floors in
the form of full height enclosure or down-stand with closely spaced sprinkler heads.. The openings have to
comply with NFPA 101 8.6.8 that only allows for openings through a single floor. Demonstrate compliance with
the Fire and Life Strategy or submit documentation approvals why is no longer applies.
Room level corridors. Documentation is required showing actual products approved for installation on the 4
sides of the corridor
Finish complies with the flame spread and smoke developed requirements in the Fire and Life Safety Strategy
Report. Close with IR

Emergency Generator (B1) and Fuel Storage (B4). Fire and Life Strategy Report requires a 3 hour fire rated
perimeter whlist typical construction only requires a 2 hour fire rating. Demonstrate construction compliance
with the requirements of the Fire and Life Safety Strategy for 3 hours or submit documentation approvals why it
no longer applies. Close with IR

lower ground floor and basement 2.The Fire and life Safety Strategy report shows a 1 hour rating symbol on the
glass wall of the Function Facilities Support lobby room to prevent fire spreading vertically through the floor
opening but protection is only on one side as the right side wall is not fire rated. Protection requirements from
Buro-Happold to be provided around this opening on both levels. Provide IR. Category: Coordination
Lower ground level and absement2. The occupancy of the function facilities Support Lobby and Function
Facilities Support Foyer rooms are more than 50 and both rooms have a dead end that is longer than code
(12.2.5.1.3) allows and does not comply with limitation of common path of travel because the common path is
longer than 6.1m (12.2.5.1.2) Common path of travel means there must be 2 exit choices within 6.1metres and
on plan there is only one choice within that distance and requires an exit. Provide IR
Ballroom 2, Basement 2.Lower ground level and Basement 2. The function and facilities support lobby room is
more than 50. The IFC drawing for the size of ballroom 2 is increased compared to the Fire and life Safety
Strategy Report and may exceed the exit capacity. The occupancy for ballrooms 2 are required to be divided into
ballrooms 2A and 2B and exit capacity determined for the required number of people. A seating plan is required
like the ones in the IFC to match seating capacities. Provide IR.

Lower ground level ballroom 1. The size of ballroom was increased under the IFC and additional chairs allowing
for 135 increase beyond maximum in the Life Safety and Fire Strategy report. Occupancy for Ballroom 1 to be
revised and determine the exit capacity and revised seating plan. IR required.

Basement 2. For assembly occupancy, the minimum corridor width is 1120mm according to NFPA 12.2.3.8.At
least one corridor is found less than the required width and IR is required that the finished width of all corridors
for assembly occupancy is at least 1120mm clearance. Confirmation is required out-swinging doors are installed
in the vestibule.
Lower ground floor, banquet kitchen. The IFC plan is changed from the Fire and Life Strategy Report and
expanded the kitchen out of the 1 hour rated walls into the exit corridor. An exit through a kitchen is prohibited
by NFPA 101.7.5.2.1 so the kitchen plan has to be revised and removed from the exit. Also is noted that fire
rated doors cannot swing in both directions. To close the kitchen Must be contained in 1 hour walls and maintain
required widths in the exit corridors and ballroom 1 exit cannot be through a kitchen. IR required
Basement 2. A single door is provided to the exit stair for 300 people and is not enough capacity for that
occupancy load and at least 2 or 3 doors are required. The door from the vestibule to the stair is also a single
door and there is not enough dimension between the first stair riser and the elevator wall in the exit stair to
make the double door entry into stair 4. IR is required.

Ground Floor level, Stair 3. The landing at stair 3 is not complaint with the code requirements for minimum
dimension. NFPA 101.7.2.2.3.2.3 requires a stair landing to be at least a wide as the stair and for stair 3 that
means that a minimum dimension between the step and the door is 1120mm. IR is required that the required
landing dimension is built after construction changes.

Ground level. Minimum corridor width is 1120mm according to NFPA 12.2.3.8.Provide IR that the finished width
of all corridors for assembly occupancy provide at least 1120m clearance is serving more than 50 persons
otherwise the corridor is not an exit. Corridor width calculations are required using the actual occupancy loads.
Either construction changes are required to make the clearance of the path is not an exit as now constructed.
Ground level. The exit passageways connect stair 1 to the exterior referenced under Meinhardt report no. A1999
and items are not addressed. Systems that cross the exit passageway have to be removed from the passageway
with a 2 hour fire rated ceiling. No fire rated ceiling plan has been provided to Meinhardt at one year. Provide IRs
that the extent of the ceiling plan ois built and used the correct 2 hour ceiling detail and the passageway is
pressurized in accordance with the Fire and Life Safety Strategy.
Ground level. Previous Meinhardt report A1998 stated requirements for an exit passageway between stair 2 and
the exit discharge. Systems that cross the exit passageway have to be removed or separated from the
passageway with a 2 hour fire rated ceiling and latter is the more likely solution. Detail is required showing UL
design listing for the 2 hour system, An approved ceiling plan is required for a 2 hour fire rating in the exit
passageway including construction details for the penetrations.IR is required that the extent of the ceiling plan
is built and correct
Throughout ceiling detail require
5.06. Specifications is used.breakaway panels for exiting through sliding glass doors use as exit
doors in an emergency. IR to be issued demonstrating how sliding doors comply with specification 08311
Aluminum Sliding Glass Doors, 2.02 E and others that require breakaway panels for exiting and in compliance
with NFPA requirements. The breakaway is used if the door is out of operation or during power failures.
Specification also requires use of a thumb turn release on the interior side of the sliding door to positively latch
doors in the closed positions. IR is required to demonstrate the requirements.
Minimum distance of 915mm to be confirmed as provided between the reception counter and the open door in
accordance with NFPA 101.7.3.4.1.and applies the access to this door adjacent to the reception counter and
clearance between the counter and the opened door or wall. Provide IR.

Roof to level 14 stair 1. Architecture plans are required from level 14 to roof and outstanding after 1 years.
Details are required for 2 hour enclosure to the stair 1 opening and the UL number. The required clear width to
stairs and landings to be determined. This observation superseded A2000 due to inaction for more than one
year. IR is required
Ground level, stair 1, exit passageway. An exit passageway is necessary to connect stair 1 with exterior doors at
the exit discharge as stated under Meinhardt Observation Report A1999. The plan has the following code
problems:

• Access panels are not allowed in an exit passageway according to NFPA 110(2006) 7.1.3.2.1.(6)
• Elevators are not allowed in an exit or in exit passage-ways according to 9.4.7
Submit changes to completely separate the 2 portions of scissor stair 1.Prior to testing an additional wall
construction is required not shown on the plan to achieve required physical separation of the two portions of
staircase 1.Previous Meinhardt report was not responded for over 5 months. Provide IR.

Lower ground floor. At least 182 occupants will try to reach stair 4 which is the main exit in an emergency for
one half of the ballroom1 and only a single door is provided to the exit stair. Two doors are required. Analysis
Confirmation is the
and solution to required that exit
occupancy door requirements
capacity problem fromare provided
ballroom near
1 and the
the all-day
lobby dining room.
is required. Confirmation is
IR required.
required by IR:

• The main entry/.exit for all day dinning is in accordance with NFPA 101 12.2.3.6 and door is changed to swing
out of the room.
• The sliding door cannot be locked and must be accessible at all times as it is an exit and include a breakaway
panel in case of power outage.
• Door as indicated under report cannot be locked as door is an exit and must have exit signage.
The occupancy of the wedding suit exceeds 50 so doors must comply with NFPA 101 7.2.1.4.2. Doors must swing
out from the room and not block the corridor. It is required that four doors swing out from the meeting room.
Provide IR.

Basement 2 Meeting Room The occupancy of the Meeting Room exceeds 50 so the doors must comply with
NFPA 101 7.2.1.4.2. Doors must swing out from the meeting room. Provide IR

Basement 2, Ballroom 2A. If exit 1 reached capacity than occupants are forced to use exit 2 which means
distance will be greater than 76m and non-compliance with NFPA 101 12.2.6. Provide analysis and solution to
the travel distance problem from ballroom2. Provide IR.
Lower ground floor, stair 3. Exit access to stair 3 is an exit requirement. SBG ruined the exit access to stair 3 by
not coordinating with the overhead structural beam height. The clearance under the beam was built less than
2030mm required by NFPA 101 7.1.5. A repair solution is required to increase headroom or portion under the
beam must be walled off. Meinhardt observation report no. A1717 raised issue and remains open over 18
months for repair of the beam. Coordination of exit requirements for the prayer rooms is also outstanding.
Provide IR.
Level 14, executive Lounge. The executive lounge includes more than 50 occupants. The Fire and Life Safety
Strategy showed 25 occupants whilst the associated plan shows 63 seats. As the number of occupants in the
executive lounge will exceed 50, both required exit doors have to swing in the direction of the exit according to
Level
NFPA 14. Two exit
7.2.1.4.2. doors are
Previous providedobservation
Meinhardt at level 14 no.
andA20001
path to was
bothclosed
exits must remain open and
on understanding doornot locked.
swing will be
Confirmation is required that:
changed nad requires confirmation by IR. Presently one exit door swings inward. Provide IR
• Door shown on report is locked on the swing side but cannot lock from the other side because it is an exit.
• Door locking requirements are provided as referenced under the report.
• The ICT door has to be moved as it blocks the exit door to the stair.
• Confirm out swinging doors marked with a star at elec. & ICT do not block more than half the required exit
width nor project
Basement morebeams
3. Concrete than 180mm
are builtinto
thatthe
dorequired
not allowwidth when
vehicles or fully opened.
humans to walk under them. Clearance is
• If required
2050 widthunder
mm vertical is 120overhead
and doorsbeams.
only open 90 degreesvehicle
The minimum these will not comply
clearance with NFPA
is 2100mm 101 7.2.1.4.4…
in accordance with SBC
Provide
201 IR NFPA allows a lower clearance for humans to 2030mm min as per NFPA 7.1.5 but does not provide
2.18.2.2.
enough for vehicles to drive under without occasional damage to the structure. Physical barriers are required to
prevent walking where the clearance is less than 2030mm vertical. Provide IR demonstrating 2100mm for
vehicles and 2030mm for people in all areas of basement 3. This observation supersedes A2008 because of
inaction after more than one year.

Top of atrium. Drawings are required that show the exhaust and intake openings and equipment locations for
the Atrium Smoke Control System. Provide IR.

Lower ground level and ground level. The Fire and Life Strategy report requires a 60 minute fire resistive
construction between the all -day restaurant and the lobby not shown on the architectural plan. The life safety
requirements for the barriers require confirmation. The required barriers which are fire rated require
construction. The sliding door at lower ground floor cannot be fire rated and requirements should be identified.
Provide Ir to demonstrate requirements.
Upper ground level restaurant. The Fire and Life Safety Strategy report shows a 60 minute smoke curtain
between the Special Dining and Lobby Lounge rooms but the architectural floor plan does not show a curtain.
This opening is a required exit so the smoke curtain must also allow for exit. Confirm the life safety requirements
for a smoke curtain. Construct the required barrier and exit. Confirm by IR that the required barrier is built
correctly
Upper ground level restaurant. Several exit problems remain in the Speciality Dining:
• Dead end corridors are longer than 6.1m allowed by NFPA 122.2.5.1.3
• Minimum exit door width is 810mm according to NFPA 7.2.1.2.4. A door to the corridor is too narrow.
• Door must swing in the direction of the exit. A door to the corridor swings in the wrong direction and must
swing towards the stair.
• Report references two doors are not exist and exit signs must not point to these doors.
• The main entry/exits must not be blocked and have an exit sign.
Generator Installation-Not Accepted, Generator Room must be arranged and follow all requirements
regarding fire protection and access to plant and equipment.

Car Park Ventilation System- Submit Approved Design, method of statement for T & C.

Building Occupancy-Documentations to be submitted prior to handover.

Acoustic Specialist Qualifications-Approved documentation for Acoustic Specialist required.

Building External wall U-valves- Approved documentation to be submitted.

Test and completion. As per conditions of contractor shall follow the sequence clause and sub
clause 9.1.

Trial operation – During trial operation, when the works are operating under stable conditions the contractor
shall give notice to the Engineer that the works are ready for any other tests on completion.

Areas protected with Fire suppression Systems- Provide Sealed Enclosures

AHU coil fins damaged-Approved IR for the correct work should be provided.

(LB4). Fuel Oil tank Installation-Not Installed correctly.

(B1 B4) Fuel Oil tank Installation-Not installed correctly.

(B1) Generator exhaust installation is incomplete- Approved IR for the correct work should be
provided.
Registration date with the USGBC.
LEED Version used for conformance.
LEED certification level and rating category.
Current LEED Score Card for the parcel.
What stage of the LEED registration process is the parcel on.

(B4) Installation of water tanks not standard

Improper use of flexible conduit.

Mechanical Services installed above distribution boards.

(L14) Suitability of lighting protection clamp-The clamp used to connect the three lighting protection cables are n

(L14) Lightning protection Installation-Connection clamp exposed and the conduit damaged.

Improper use of flexible conduits

(L8). Accessibility to junction box-Mechanical services installed directly in front of junction box.

B1 ICT Room).3-Compartment trucking design.

Area of refuge communication system-is not equipped with two way communication system as required.

Pre action system in Elevator machine Room-Not as per Design.

(B1 ETS Room). Mishandling of Electrical Equipment-Big noise.


Flow Switch in FHC and Sprinkler line.

Electrical equipments not protected.


Discipline Category

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
MECH D

MECH D

MECH D

MECH D

MECH D

MECH D

MECH D

MECH D

MECH C2

MECH D

MECH D

MECH D
MECH D

MECH D

ELE C2/C1

ELE D

ELE C2

ELE D

ELE C2

ELE D

ELE D

ELE D

MECH D

ELE D
ELE D

ELE C1/C2
Legacy NCRs Log 5.05
Sr. NCR/OBS Number ISSUED BY

1 10/8017/KAFD/SBG/A 1774 Meinhardt

2 10/8017/KAFD/SBG/A 1777 Meinhardt

3 10/8017/KAFD/SBG/A 1816 Meinhardt

4 10/8017/KAFD/SBG/A 1966 Meinhardt

5 10/8017/KAFD/SBG/A 2202 Meinhardt

6 1510 DAR

7 10/8017/KAFD/SBG/F0623 Meinhardt

8 10/8017/KAFD/SBG/F1070 Meinhardt

9 10/8017/KAFD/SBG/A 1060 Meinhardt

10 10/8017/KAFD/SBG/A 1646 Meinhardt

11 10/8017/KAFD/SBG/A 1650 Meinhardt


12 10/8017/KAFD/SBG/A 1684 Meinhardt

13 10/8017/KAFD/SBG/A 2163 Meinhardt

14 10/8017/KAFD/SBG/A 2186 Meinhardt

15 10/8017/KAFD/SBG/A 2187 Meinhardt

16 10/8017/KAFD/SBG/A 2203 Meinhardt

17 10/8017/KAFD/SBG/A 2205 Meinhardt

18 10/8017/KAFD/SBG/A 2206 Meinhardt

19 10/8017/KAFD/SBG/A 2365 Meinhardt

20 10/8017/KAFD/SBG/A 2439 Meinhardt

21 10/8017/KAFD/SBG/A 2461 Meinhardt

22 10/8017/KAFD/SBG/A 2462 Meinhardt

23 10/8017/KAFD/SBG/A 2463 Meinhardt


24 10/8017/KAFD/SBG/A 2464 Meinhardt

25 10/8017/KAFD/SBG/A 2465 Meinhardt

26 10/8017/KAFD/SBG/A 2466 Meinhardt

27 10/8017/KAFD/SBG/A 2467 Meinhardt

28 10/8017/KAFD/Z3/SBG/M499 Meinhardt

29 10/8017/KAFD/Z3/SCE/M501 Meinhardt

30 10/8017/KAFD/Z3/SBG/M555 Meinhardt

31 10/8017/KAFD/Z3/SBG/M577 Meinhardt

32 10/8017/KAFD/Z3/SBG/M578 Meinhardt

33 10/8017/KAFD/Z3/SCE/M579 Meinhardt

34 10/8017/KAFD/Z3/SBG/M592 Meinhardt

35 10/8017/KAFD/Z3/SBG/M620 Meinhardt

36 10/8017/KAFD/Z3/SBG/M624 Meinhardt

37 10/8017/KAFD/Z3/SBG/M476 Meinhardt

38 10/8017/KAFD/Z3/SBG/M493 Meinhardt

39 10/8017/KAFD/Z3/SBG/P505 Meinhardt

40 10/8017/KAFD/Z3/SBG/M349 Meinhardt

41 10/8017/KAFD/Z3/SBG/M282 Meinhardt

42 10/8017/KAFD/Z3/SBG/E1100 Meinhardt

43 10/8017/KAFD/Z3/SBG/E1182 Meinhardt
44 10/8017/KAFD/Z3/SBG/E1183 Meinhardt

45 10/8017/KAFD/Z3/SBG/E1184 Meinhardt

46 10/8017/KAFD/Z3/SBG/E1279 Meinhardt

47 10/8017/KAFD/Z3/SBG/E1358 Meinhardt

48 10/8017/KAFD/Z3/SBG/E1086 Meinhardt

49 10/8017/KAFD/Z3/SBG/E1088 Meinhardt

50 10/8017/KAFD/Z3/SBG/E1089 Meinhardt

51 10/8017/KAFD/Z3/SBG/E559 Meinhardt

52 1510 Meinhardt
Legacy NCRs Log 5.05
Description
Resident tower at various levels. Suspended ceilings are progressing and farming is using channels in
both directions. This is not standard as hat shaped channels are typically used against the gypsum
board. Approval is required for the ceiling framing and confirmation that the ceiling system provides
heavy duty classification required by spec 09260 2.04.SSc requested to provide IR and corrective and
preventative plans. Track is bent and requires replacement.

Resident tower level 6. Unsupported gypsum board has been installed beyond the wall furring.
Suspended framing detail for gypsum boards installed below the slab is required.

Office tower level 13 and others. Framing is installed and uses non-standard hat channels that should
be installed against gypsum board. Approval requirements to be demonstrated in accordance with the
heavy duty classification required by spec 09260.2.04. The cross channels are too long and touch the
wall surface. The spacing of the channels is not equal or straight.
Level 3. Framing walls in the Chauffers room do not have acoustical insulation. Wall details to be
demonstrated including omission of insulation. Category Coordination subject to compliance with
approved shop drawings. Close out action. Check construction is in accordance with an approved shop
instructed by the Engineer
Residential tower level1.and others. Portions of CMU wall have 1 and 2 hour fire rating. IR covering
both sides of the wall for all levels under the skylight and adjacent shaft required for CMU walls, fire-
stopping
Escalator and protection
installed of steel
in a semi tubesenvironment.
outdoor in fire rated walls. Detail
Following are requiredoutlined
requirements for the CMU wall escalator
in KONEs for 1 nad
2
and auto-walls planning guide to be complied: Bi-component epoxy zinc dust anti corrosion paintcells
hour CMU walls that show spacing of vertical and horizontal reinforcement, clean outs and and
grouted.
syntheticDetails are required of
resin finishingcoat; the finishing
Water drain andandoil farming applied
collection to the
channels in CMU wallsStainless
the truss; and steelsteel
tubes.
skirts
with anti-friction coating.; · Automatic step chain lubrication not required with lubrication free
chains.Weatherproof electrical system; NEMA 4X motor.;Step chain covers.; Stainless steel handrail
guide.; Step and step chain rollers with sealed bearings.; NEMA 4x exposed electrical components.;
In hot climate above 40 deg. C or below 4 deg. C appropriate cooling or heating option to be selected.;
SBG were required to confirm escalators met the above specification requirements otherwise
components will need
LEED information to beto provided
be up graded. Category: Design Coordination/Major
including:Registration date with USGBC; LEED NCR. version
Close outused
action:
for
Coordinate submission requirements and request Engineer instruction for omissions
conformance; LEED certification level and rating category.; Current LEED score for the parcel.; What
stage of the LEED registration process is on; Category

Residential tower, north elevation. The approved shop drawings show the external stairs with glazing
railing whilst cement board (mock up) is used. Final approved shop drawing is not in place.

There is concern that the fire life safety drawing approvals may require alterations to completed work.
Fire Life safety drawings approved and stamped by Riyadh Civil Defense are required.

Office tower 2nd floor. Confirmation is required that building code exiting requirements are approved
for the Contract documents. Confirm exiting through an intervening space, not exiting through a
kitchen, maximum dead end length, no locked doors on exit path and maximum travel distance to an
exit. Observation A1060 remains open seeking the approved shop drawings by Riyadh Civil defense.
SSC were required to follow up to assure construction is building requirements of the approved
Contract drawings by Riyadh Civil Defense. Category: NCR/Coordination.
Resident tower basement 1. SSC Sec 8.9.2 requires a minimum of 2.1 meters vertical
clearance for head room at exit stairs. Stairs do not appear to have correct headroom
Exit passageway requirements of SBC 8.20 are missing a room BOH 0015 are missing. SSC requested to
provide approved Life Saving drawings by Riyadh Civil Defense demonstrating:8.20 exit passageway
shall not be used for any other purpose than means of egress.8.20.3 Fire construction rating is the
same at the exit enclosure.8.20.4 Elevators shall not open into an exit passageway.8.20.5 Penetrations
are prohibited except for required exit doors, pressurization equipment, sprinkler piping, standpipes
and electrical raceways fior passageway or fire department communications. No penetrations or
communicating openings between exit passageways are allowed. Lobby occupants exiting through this
Contractor
area have required to provide evidence
three intervening rooms toperimeter walls haveAllows
exit. 8.19.1.8.1. 2 hour openings
fire rating in
around
the the Emergency
passageway if
generator Room
pressurization including the louvers. Requiring fire dampers at most locations2 hour fire rating is
is provided.
determined by quantity of fuel stored I the room. Details to be demonstrated for supply air, exhaust air
and exhaust flue. Coors to be confirmed for 1.5 fire rating (if wall has 2 hours rating) Section required
to be demonstrated through highest portion of the generator or shaft.
NFPA 7.1.5 requires minimum headroom of 2010 m. Valve handle on a pipe on the stair landing does
not provide the required clearance. Either remove the pipe or provide a barrier so that the handle is
not in the walking
Basement zone ofThe
1 and others. thecar
landing.
park exhaust room and car park exhaust shaft share the same room.
The room volume is on several levels of the building and requires a 32 hour fire rating on all the
perimeter walls. The following submittals are required:Provide plan sections of all levels showing 2
hour fire rating perimeter wall including highest and lowest points in the shaft.Show fire dampers,
floors and louvers with hour rating including at the exterior. Provide exterior elevation for the vertical
louvers. Louvers in fire rated walls require dampersIR required for all walls .CMU must have full mortar
CAD measurements
and fire stopping.Romonmust
the have
curving stairdoor
a man doesfornot
exitcomply with
as there theapparent
is no minimum exittread
fromrequirements
the room andofa
NFPA
roll up7.2.2.2.4.or
door is not landing requirements
an exit.Railings for fullunder 7.2.2.3.2.3.Exit signage is required to point to this stair.
protections.
Note new winders shall have at tread depth not less than 150mm and a tread depth of 280mm at a
point 305mm from the narrowest edge. In new buildings every landing shall have a dimension in
direction of travel not less than the width of the stair. In accordance with life safety drawings 2 no exits
are required from this level.
Level 1. Exits are required for both elevator lobbies that are enclosed with turnstiles. Omission of
turnstiles on ground level tio be justified.

Office tower ground level. Three exits discharge at ground level and two stairs use the
lobby to reach the exterior as designed without complying with NFPA 7.7.2

Saudi Building Code 701 section 607 requires a secondary roof drainage system. IR to be raised
demonstrating compliance with SBC 6.7.1 and 6.7.2 requirements.
Floors throughout parcel have 2 hour fire rating therefore expansion joints must also have this rating.
In addition expansion joints to comply with requirements of either UL 2079 or ASTM E 1966 testing
according to NFPA (2006) 8.3.6.6. The standard specification does not mention these building code
requirements. To close from the approved material submittal for the expansion joint demonstrate the
installation complies with UL 2079 or ASTM E 1966 tests using movement cycles. Also show joint width
and material submittal to accommodate the dimensional size and movement determined by the
The fire strategy
structural submission drawings 1110-5.05-FF-2304 show 3 hour walls for 3 rooms therefore
engineer.
requiring 3 hour fire rated doors in those rooms (4 no doors total). Dors for rooms that have fire
suppression gas or foam must have door bottoms and seals for containment Door to B1067 at one
time had a 60 minute label. If floor slabs have 2 hour fire rating they do not comply with the 3 hour
Level 4 near amenity room. A large occupancy load not calculated on the life safety plans must access
requirement.
the exit stair D through the amenity room. This exit must be available at all times. Following
requirements to be coordinated and demonstrated:The pair of doors must swing inward because the
occupancy load will be greater than 49 on the deck.The clear dimension at the tightest exit point must
be at least 915mm.The single interior door must be unlockable from the amenity side because this
forms part of the exit for both the deck and amenity room. Exit signage must be located along this
path including exterior emergency exit signs
Level 4 Amenity room. Room has occupancy of 77 people but only a single exit and does not comply
with NFPA 101 7.4.1.1 that requires two exits are required for occupancies of 50 and more people. The
amenity room has an occupancy that is higher than 50 and requires two exits.
Level 4 near breakout Room. The occupancy load not calculated on the Life Safety plans from the
exterior deck must access the exit stair A through the breakout room. The access must be available at
all times. The two exterior doors must be unlockable from the deck-side because the door is part of
the exit. Exit signage must be located along these paths including the exterior emergency exit signs.
Amenity Roof level 34. The amenity room at this level has an area larger than for 50 occupants but the
designer only provided a single exit. This violates code NFPA 7.4.1.1 that requires two exits for 50
occupants. For a single exit the maximum area for assembly occupancy is 68m2. Design does not
include a toilet which is two floors lower. Category major NCR.

Level 4 exterior deck. No toilets are provided on a very large floor area. Design confirmation is required
that approval of public toilets as adequate.

Level 4. Door to stair B has an occupant load exceeding 100. Therefore NFPA 101 12 2 2 2 3 is a
requirement for panic hardware or exceptions. All doors from the meeting room must swing outwards
because number of occupants exceed 49 and direction of travel is out of the meeting room for exit-see
NFPA 101 7 2 1 4 2.

(L4) Clash of equipment- Coordination needed

(L4) No access to equipment for maintenance.

(B4) Clash of equipment- Coordination needed.

(B2) Jet Fan’s flow obstructed by Building structure.

(B2) Jet Fan’s flow obstructed by Building structure.

(B2) No access to equipment for maintenance.

Car park Ventilation System-Submit Approved Design.

Building external wall U-Valves- To be submitted.

(B1 Generator room).Generator exhaust pipe- clearance required with cable tray.

(B5) Clash of equipment-Coordinate needed.

(B3) Sprinkler heads close to other equipment.

Areas protected with fire suppression systems- Provide sealed enclosures.

(B1). Fuel oil tank installation-Improper installation.

(B5). Fire & Smoke Dampers- No Duct Access Door.

(RT L18 & General) Installation of Raceways-cable tray is installed close to a cable trunking,
not allowed.

Mechanical services installed above light fitting-Not allowed.


Missing Color coding of conduits.

Conduit installation-Conduits are installed in lengths of more than 12m without a Draw in box.

(OT/ L21). Improper use of flexible conduits.

(B1 Generator room). Generator control panel design not comply with Standard.

(B1). Generator exhaust installed above cable tray-Not allowed.


(B1). Lux Levels-Mechanical services pipe is directly installed below a light fitting which will cast a
shadow of the basement floor.
(B1). Mechanical Services installed above light fitting-Not allowed.

(OT/ L7 to L1). Lightning protection cable-has been run surface in several locations.

GF. KONE’s escalator installed in external location.


Discipline Category

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

MECH C2

MECH D

MECH D

MECH D

MECH D

MECH D

MECH D

MECH D

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

ELE C2

ELE D
ELE C2

ELE C2

ELE C2

ELE D

ELE D

ELE D

ELE D

ELE D

ELE D
Legacy NCRs Log 5.04
Sr. NCR/OBS Number ISSUED BY
1 NCR 1147 DAR

2 KAFD 504 170 item 5 MKA

3 KAFD 504 171 item 3 MKA

4 KAFD 504 138 item 2 MKA

5 KAFD 504 164 item 2 MKA

6 KAFD 504 165 item 4 MKA


7 KAFD 504 165 item 5 MKA
8 KAFD 504 165 item 5 MKA
9 KAFD 504 166 item 2 MKA
10 KAFD 504 167 item 5 MKA

11 KAFD 504 168 item 4 MKA

12 KAFD 504 170 item 1 MKA

13 KAFD 504 170 item 3 MKA

14 KAFD 504 170 item 4 MKA

15 KAFD 504 172 item 6 MKA

16 KAFD 504 173 item 5 MKA

17 KAFD 504 174 item 4 MKA

18 10/8017/KAFD/Z3 SBG F0907 Meinhardt

19 10/8017/KAFD/Z3 SBG F0942 Meinhardt

20 10/8017/KAFD/SBG/A2028 Meinhardt

21 10/8017/KAFD/SBG/A2030 Meinhardt

22 10/8017/KAFD/SBG/A2036 Meinhardt
23 10/8017/KAFD/SBG/A2358 Meinhardt

24 10/8017/KAFD/SBG/A2429 Meinhardt

25 10/8017/KAFD/SBG/A0457 Meinhardt

26 10/8017/KAFD/SBG/A1184 Meinhardt

27 10/8017/KAFD/SBG/A1185 Meinhardt

28 10/8017/KAFD/SBG/A1824 Meinhardt

29 10/8017/KAFD/SBG/A1827 Meinhardt

30 10/8017/KAFD/SBG/A1871 Meinhardt

31 10/8017/KAFD/SBG/A2027 Meinhardt

32 10/8017/KAFD/SBG/A2029 Meinhardt

33 10/8017/KAFD/SBG/A2212 Meinhardt

34 10/8017/KAFD/SBG/A2072 Meinhardt

35 10/8017/KAFD/SBG/A2125 Meinhardt

36 10/8017/KAFD/SBG/A2152 Meinhardt

37 10/8017/KAFD/SBG/A2153 Meinhardt

38 10/8017/KAFD/SBG/A2212 Meinhardt
39 10/8017/KAFD/SBG/A2216 Meinhardt

40 10/8017/KAFD/SBG/A2248 Meinhardt

41 10/8017/KAFD/SBG/A2331 Meinhardt

42 10/8017/KAFD/SBG/A2332 Meinhardt

43 10/8017/KAFD/SBG/A2333 Meinhardt

44 10/8017/KAFD/SBG/A2338 Meinhardt

45 10/8017/KAFD/SBG/A2351 Meinhardt

46 10/8017/KAFD/SBG/A2354 Meinhardt

47 10/8017/KAFD/SBG/A2355 Meinhardt

48 10/8017/KAFD/SBG/A2356 Meinhardt

49 10/8017/KAFD/SBG/A235 Meinhardt

50 10/8017/KAFD/SBG/A2359 Meinhardt
51 10/8017/KAFD/SBG/A2409 Meinhardt

52 10/8017/KAFD/SBG/A2410 Meinhardt

53 10/8017/KAFD/SBG/A2411 Meinhardt

54 10/8017/KAFD/SBG/A2412 Meinhardt

55 10/8017/KAFD/SBG/A2413 Meinhardt

56 10/8017/KAFD/SBG/A2414 Meinhardt

57 10/8017/KAFD/Z3/SBG/M572 Meinhardt

58 10/8017/KAFD/Z3/SBG/M591 Meinhardt
59 10/8017/KAFD/Z3/SBG/M611 Meinhardt
60 10/8017/KAFD/Z3/SBG/M619 Meinhardt

61 10/8017/KAFD/Z3/SBG/M643 Meinhardt

62 10/8017/KAFD/Z3/SBG/M434 Meinhardt
63 10/8017/KAFD/Z3/SBG/E1180 Meinhardt
64 10/8017/KAFD/Z3/SBG/E1291 Meinhardt
65 10/8017/KAFD/Z3/SBG/E1356 Meinhardt
66 10/8017/KAFD/Z3/SBG/E1357 Meinhardt

67 10/8017/KAFD/Z3/SBG/E1399 Meinhardt
68 10/8017/KAFD/Z3/SBG/E891 Meinhardt
69 10/8017/KAFD/Z3/SBG/E945 Meinhardt
70 10/8017/KAFD/Z3/SBG/E1081 Meinhardt
71 10/8017/KAFD/Z3/SBG/E1082 Meinhardt
Legacy NCRs Log 5.04
Description
Core drilling/cut rebar at 1st and 2 floors for opening size 359*950 mm without structural approval.
Category: NCR/Design

Core drilling/cut rebar in walls to openings at levels 14-15 near grids B.5 and 11 and multiple locations
at TB106 beam that supports the structural steel bridge. Category Major: NCR/Design Review.

Core drilling/cut rebar in walls to openings at levels 11 to 12 near grids B.2 and 10.3. Category Major
NCR/Design Review
Cut shear wall vertical, horizontal and tie- rebar at multiple locations at level 14. Category: Major
NCR/Design.
Level 8 150mm dia. core holes/cut rebar have been cut through rebar at multiple locations now
covered up. Category: workmanship NCR now covered.
Post drilled opening/cut rebar from level 0-06 GL B.8 and 6.8 Category NCR/Design Review
Post drilled opening from level 05-06 GL B.2 and 17.3. Category: NCR/Design Review
Level 05-06 core drilling/cut rebar through a link beam. Category: NCR/Design Review
No 200mm dia. core holes/cut rebar through the slab. Category: Minor NCR/Design Review
Core penetration cut rebar at level B1. Category NCR/Design Review
Core drilling/cut rebar near core wall at L13 near grids B.2 and 6.8. Category: NCR/Design Review

Core drilling/cut rebar in walls to opening GL to level 01, Area A near grids B.8 and 6.5 Category
NCR/Design Review
Core drilling/cut rebar in walls to opening at levels 13-14 near grids B.2 and 615.4 Category :
NCR/Design Review
Core drilling/cut rebar in walls to opening at levels 09-10 near grids D and 6.5 Category: NCR/Design
Review
Core drilling/cut rebar in slab level 13 Area A grids B.2 and 7. Meinhardt Report No 10/8017/KAFD/Z3
SBG F0700
Core drilling/ cutting rebar at Ground-1st Floor core wall at grids B.9 and 15.2 .Category NCR/Design
Review
Level 15 slab near GL A.5 and 7.5. Category: NCR/Design Review.
Electrical box and pipe atedge of the slab. Area now covered. No approved shop drawing. Category
NCR,
Level 8 west elevation missing insulation around the pipework creating a thermal bridge. Detail
drawing is required. Category: NCR
Provide location of 2 hour walls enclosing the intake air shaft and all fire dampers for mechanical ducts
or openings. Category: Design coordination.
Provide location of fire rated dampers in 2 hour fire rated walls for the intake and exhaust air at the
Emergency Generator Room. Category: Coordination.
Provide details for 2 hour wall construction around shaft and gypsum board in the corridor. Provide
detail for location and detail for wall access into the shaft. Category: Coordination.
Applies throughout parcel including level 14 for stud runners overhanging the slab edge for the ‘as
built’ hanger conditions including runners overhanging supported brackets with bracket spacing and
runner overhanging without support. Provide maximum approved space the runner can overhang the
edge unsupported. Provide fastener to attach the runners to the slab, its minimum spacing to slab
edge and on center spacing. Attachment is expected to be a powder actuated fastener. Approval is
required Category: Major NCR

At basement 1 the mechanical duct was built without coordination of the wall location. Duct to be
relocated and repair the wall: Category: NCR

Minimum headroom height of 2100mm in fire scape stair not in compliance with Saudi Building code
201-ref Section 8.9.2. Measurements taken indicate a height of 1740mm. Category: Major NCR

Level 7 sector ‘A’ down-stand beam conflicts with minimum headroom required in a fire escape stair.
Height is 1950 and minimum requirement is 2010 in accordance with the NFPA Life safety Code 01 IS
20130. Category: Major NCR/design
Level 7/8, sector ‘A’ down-stand beam conflicts with minimum headroom required in a fire escape
stair. Height is 1950 and minimum requirement is 2010 in accordance with the NFPA Life safety Code
01 IS 20130. Category: Major NCR/Design
Level 8 .In the residence units,electrical panels and boxes are oversized and clearances under stair-
flights are aproblem. Category: Major NCR/Design.
Level 8 Ducts penetrating party walland requires confirmation as per code fire dampers and acoustic
requirements wereinstalled. Category: Major NCR/Design.
Level 11 area B and requiredheadroom of 2.0 m by SBC 8.3.2 at concrete beam is not provided.
Category: MajorNCR/Design.
Basement 1. NFPA 101.7.1.3.2.1 limitspenetrations to the exit. Systems crossing the exit are
prohibited. Category: Designcoordination.
Confirm rough opening is ready for door frame with jambs that are parallel in the 45 degree wall. Wall
has 2 hour fire rating. Category :Coordination
Level 8 Event Room is larger than 70m2 (appears larger) and remains assembly occupancy and exceeds
49 occupants (as per IBC 1015.1) There has to be two exits and panic hardware should be provided. If
occupancy less than 50 provide calculation and room area. Confirm which doors have panic hardware.
Category: Major NCR/Design.
Width of mock up stair is less than 800mm and does not comply with SBC 20 8.9 requirements for a
staircase not less Category: NCR and coordination.
Level 8 residential door. Wooden residential door is installed in corridor fire rated wall adjacent wood
construction that may not be rated. Construction to be protected from fire with the fire rating of the
corridor wall. Category: Coordination

Following requirements to be determined: Bituminous waterproofing is continuous on vertical and


horizontal surfaces and overlaps lower portions of the membrane and does not collect water. Top of
curb required at waterproof level. Show detail how water will get out at level 16 so not trapped. Check
material approved for these locations. Category Coordination/NCR.
Exterior has recesses and projections and use of a sling or a boatswain chair for support. Check
supports for tie downs. Category Coordination.
Event room exceeds 70m2 and remains an assembly occupancy, capacity of room exceeds 49
occupants (IBC 1015.1) and therefore requires two exits and doors swing in direction of travel. Also to
IBC 1008.1.9 the exit has to have panic hardware regardless as the adjacent area is also an assembly
occupancy. Category: Major NCR
Approved plans by Civil Defense require fire rated walls in the Chauffeurs area level 2 however many
walls were built without fire rated gypsum board and other walls appear to be only 1 hour rated.
Category major NCR.

SBG no intention to build 2 hour rated fire rated shafts at vertical ducts and did not believe fire rated.
The approved Fire and Life Safety report by RCD shows the duct shaft enclosures as 2 hour walls. Plans
are required showing walls enclosing vertical ducts that will be built without fire rated enclosures
along with documents that permits such construction. Documents should include plans from the Fire
and Life Safety report otherwise all duct enclosures will be assumed to have 2 hour fire rated
enclosures as shown in the Fire and Life Safety report. Category: Major NCR

IBC 2009 1008.1.2 requires areas with occupant loads 50 or higher to have sing doors in the direction
of egress. Provide IR for close out. Category: Major NCR
No. exits from basements reach ground using stairs at exits B and D. Both exits do not discharge
occupants outside but have to pass a security barrier to reach outside and does not comply with SBC
201 8.23.1. Category: Major NCR
No curb under basement 1 exterior door. Provide ID that waterproofing on floor and walls is properly
installed with the floor drain and rain water will not enter the building under the door. Category:
Coordination.

At both trash rooms on B1 provide structural approval for penetrations made for ENVAC systems and
suspended point loads to support ENVAC equipment Provide detail to fill holes around ENVAC pipes.
NFPA requires 1 hour fire rating. Provide an approval building plan that is fully coordinated with the
ENVAC construction and revised design. Visual differences on site conflicting with ENVAC plan are walls
not complete, door conflict, hose reel conflicts and ENVAC penetrations do not match ENVAC plan
Category: Major NCR

Ground level GL 2.5 door required to open 90 degrees and may not be correctly located. Category:
NCR.
Level 1 Retail has two exits but one stair exits retail space 00A01 through an adjacent tenant and not
permitted by IBC 2009 1014.2.1. Category Design coordination.

Level 1 Retail 01c17 .Occupant load for retail a rea is 133 for retail usage and second exit is required if
number of persons exceeds 49. In accordance with IBC 2009 Table 1021.2 for Mercantile occupancy
for a single exit. The 2 pair doors do not qualify because they swing inward. Exit doors require signage
on egress side or adjacent door and state ‘This door to remain unlocked when building is
occupied’.Sign to comply with IBC 2009 1008.1.9.3 Category Major NCR

Ground level retail 00c13. There is a single exit but the occupancy load is about 155 for a retail
occupancy. Therefore the number of people exceeds 49 which is the limit according to IBC 2009 Table
1021.2for Mercantile occupancy for a single exit. Two exits are required and door must swing out of
the space. Exit doors with locks or latches to state: ’this door to remain unlocked when the building is
occupied. Signage to comply with IBC 2009 1008.1.9.3.Category: Major NCR

Confirmation is required from the Life safety Consultant that 30 minute doors and separation walls are
correct for all residential units. Corrective and preventative plans are requested. Category: Design
Coordination.
Saudi Building Code SBC 701 section 6.7 requires a secondary roof drainage system. Provide IR
approving compliance with 6.7.1 and 6.7.2 requirements. Secondary drains are not found on the roof
plan. Category: Major NCR
Egress corridor at ground level is part of the exit enclosure. Occupants must be able to walk to the
public right of way at grade according to IBC 2009 1027.1. Currently exterior doors are more than 2
meters above grade. Approved plans are required for the stair. Category: Major NCR.

At level 7 and lower floors the approved Fire and Life Safety plans for a bridge between office sectors
shows fire shutters on both sides of the bridge to protect the bridge from openings on the east and
west. Same problem is repeated on the chauffer bridges. The construction plans do not show or
mention these fire shutters. Either provide a revised fire and Life Safety plan that matches the
construction plans without fire shutters or provide IR after installation of fire shutters coordinated and
matching the Fire and Life Safety drawings for all office and chauffer bridges. Approval is required from
Rolf Jensen Associates for revisions to the Fire and Life safety plans. Category: Major NCR.

At level 8 and above the approved Fire and Life Safety plans for a bridge between residential sectors
shows fire shutters on both sides of the bridge. The final construction plans do not show or mention
these fire shutters. Either provide a revised fire and Life Safety plan that matches the construction
plans without fire shutters or provide IR after installation of fire shutters coordinated and matching the
Fire and Life Safety drawings for all residential bridges Approval is required from Rolf Jensen Associates
for revisions to the Fire and Life safety plans. Category: Major NCR.

At Atrium ground to level 5 building design has created an atrium around bridges on several floors. The
atrium must comply with all requirements under IBC 2009 Section 404 including but not limited to
smoke control, sprinkler spacing, interior finishes and stand by power. Issue inspection request and
demonstrate compliance with Section 404 at all levels of the atrium in part B. Category: Major NCR.

At Atrium level 2 to 6 building design has created an atrium around bridges on several floors. This
atrium must comply with all requirements under IBC 2009 Section 404 including but not limited to
smoke control, sprinkler spacing, interior finishes and stand by power. Issue inspection request and
demonstrate compliance with Section 404 at all levels of the atrium in part B. Category: Major NCR.

At bridge level 1 near gridline C7 the approved Fire and Life safety plans show 2 hour fire rating of
walls at the bridge connect to the 2 hour exterior walls of the building. The final construction drawings
do not show the fire rated walls connected and do not conform to requirements shown in those
drawings. Provide IR near grid C7 as an example that all 2 hour walls connect as shown in the approved
Fire and Life safety drawings. Category: NCR

Testing and Commissioning-Mechanical and Public Health systems, SSC to confirm that contractors
have not started testing, commissioning, adjusting, and balancing of mechanical systems and
equipment without an approved T & C schedule / Plan.
Car Ventilation System-Submit Approved Design.
Acoustic Specialist Qualifications-Approved documentation required.
Building external wall U-Valves-To be submitted.
Test and Completion-Contractor shall carry out tests on completion in accordance with clause and sub
clause 7.4.
LEED process-Documentation needed.
Mechanical services installed above light fitting-not allowed.
(B2). Mechanical services installed above electrical services-not allowed.
(B1 Generator Room). Generator not comply with Specification.
(B1 Heat Exchanger Room). Chilled water Pump Motor connection not comply with Specification.
Trial Operation-Documentation required.
LEED Process-Documentation required.
(B1). Removal of Transformers-difficult to remove for maintenance.
(L14). Mechanical Services installed above Cable trays-not according to the Specs.
(L14). Missing of coordination of the Electrical services.
Discipline Category
CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2
CIV/ARCH C2
CIV/ARCH C2
CIV/ARCH C2
CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2
CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

MECH C2

MECH C2
MECH D
MECH C2
MECH C2
MECH C2
ELE C2
ELE C2
ELE D
ELE D
ELE C2
ELE C2
ELE C2
ELE C2
ELE C2
Legacy NCR

Sr. NCR/OBS Number ISSUED BY

1 1328 DAR

2 1412 DAR

3 KAFD-503-143 item 3 MKA

4 KAFD-503-184 item 1 MKA

5 10/8017| KAFD | Z3 | SBG | A2050 Meinhardt

6 10/8017| KAFD | Z3 | SBG | A2051 Meinhardt

7 10/8017| KAFD | Z3 | SBG | A2057 Meinhardt

8 10/8017| KAFD | Z3 | SBG | A2136 Meinhardt

9 10/8017| KAFD | Z3 | SBG | A2147 Meinhardt

10 10/8017| KAFD | Z3 | SBG | A2176 Meinhardt

11 10/8017| KAFD | Z3 | SBG | A2233 Meinhardt


12 10/8017| KAFD | Z3 | SBG | A2234 Meinhardt

13 10/8017| KAFD | Z3 | SBG | A2284 Meinhardt

14 10/8017| KAFD | Z3 | SBG | A2296 Meinhardt

15 10/8017| KAFD | Z3 | SBG | A2313 Meinhardt

16 10/8017| KAFD | Z3 | SBG | A2337 Meinhardt

17 10/8017| KAFD | Z3 | SBG | A2392 Meinhardt

18 10/8017| KAFD | Z3 | SBG | A1674 Meinhardt

19 10/8017| KAFD | Z3 | SBG | A1691 Meinhardt

20 10/8017| KAFD | Z3 | SBG | A1695 Meinhardt


21 10/8017| KAFD | Z3 | SBG | A1747 Meinhardt

22 10/8017| KAFD | Z3 | SBG | A1928 Meinhardt

23 10/8017| KAFD | Z3 | SBG | A1929 Meinhardt

24 10/8017| KAFD | Z3 | SBG | A1942 Meinhardt

25 10/8017| KAFD | Z3 | SBG | A1943 Meinhardt

26 10/8017| KAFD | Z3 | SBG | A1947 Meinhardt

27 10/8017| KAFD | Z3 | SBG | A1952 Meinhardt

28 10/8017| KAFD | Z3 | SBG | A1954 Meinhardt

29 10/8017| KAFD | Z3 | SBG | A1955 Meinhardt

30 10/8017| KAFD | Z3 | SBG | A1987 Meinhardt

31 10/8017| KAFD | Z3 | SBG | A2025 Meinhardt

32 10/8017| KAFD | Z3 | SBG | A2026 Meinhardt


33 10/8017| KAFD | Z3 | SBG | A2041 Meinhardt

34 10/8017| KAFD | Z3 | SBG | A2042 Meinhardt

35 10/8017| KAFD | Z3 | SBG | A2045 Meinhardt

36 10/8017| KAFD | Z3 | SBG | A2047 Meinhardt

37 10/8017| KAFD | Z3 | SBG | A2048 Meinhardt

38 10/8017| KAFD | Z3 | SBG | A2049 Meinhardt

39 10/8017| KAFD | Z3 | SBG | A2052 Meinhardt

40 10/8017| KAFD | Z3 | SBG | A2070 Meinhardt

41 10/8017| KAFD | Z3 | SBG | A2083 Meinhardt

42 10/8017| KAFD | Z3 | SBG | A2135 Meinhardt

43 10/8017| KAFD | Z3 | SBG | A2146 Meinhardt

44 10/8017| KAFD | Z3 | SBG | A2175 Meinhardt


45 10/8017| KAFD | Z3 | SBG | A2191 Meinhardt

46 10/8017| KAFD | Z3 | SBG | A2292 Meinhardt

47 10/8017| KAFD | Z3 | SBG | A2243 Meinhardt

48 10/8017| KAFD | Z3 | SBG | A2244 Meinhardt

49 10/8017| KAFD | Z3 | SBG | A2283 Meinhardt

50 10/8017| KAFD | Z3 | SBG | A2291 Meinhardt

51 10/8017| KAFD | Z3 | SBG | A2292 Meinhardt

52 10/8017| KAFD | Z3 | SBG | A2364 Meinhardt

53 10/8017| KAFD | Z3 | SBG | A2373 Meinhardt

54 10/8017| KAFD | Z3 | SBG | A2377 Meinhardt

55 10/8017| KAFD | Z3 | SBG | A2391 Meinhardt

56 10/8017| KAFD | Z3 | SBG | A2438 Meinhardt


57 10/8017| KAFD | Z3 | SBG | A2440 Meinhardt

58 10/8017| KAFD | Z3 | SBG | A2441 Meinhardt

59 10/8017| KAFD | Z3 | SBG | A2442 Meinhardt

60 1625 DAR

61 1611 DAR

62 1612 DAR

63 1648 DAR

64 1081 DAR

65 10/8017/KAFD/Z3/SBG/M571 Meinhardt

66 10/8017/KAFD/Z3/SBG/M590 Meinhardt

67 10/8017/KAFD/Z3/SBG/M610 Meinhardt

68 10/8017/KAFD/Z3/SBG/M618 Meinhardt

69 10/8017/KAFD/Z3/SBG/M642 Meinhardt

70 10/8017/KAFD/Z3/SBG/M650 Meinhardt

71 10/8017/KAFD/Z3/SBG/M433 Meinhardt

72 10/8017/KAFD/Z3/SBG/E1261 Meinhardt
73 10/8017/KAFD/Z3/SBG/E1352 Meinhardt

74 10/8017/KAFD/Z3/SBG/E1353 Meinhardt

75 10/8017/KAFD/Z3/SBG/E1354 Meinhardt

76 10/8017/KAFD/Z3/SBG/E808 Meinhardt

77 10/8017/KAFD/Z3/SBG/E890 Meinhardt

78 10/8017/KAFD/Z3/SBG/E891 Meinhardt

79 10/8017/KAFD/Z3/SBG/E941 Meinhardt

80 10/8017/KAFD/Z3/SBG/E942 Meinhardt

81 10/8017/KAFD/Z3/SBG/E1064 Meinhardt

82 10/8017/KAFD/Z3/SBG/E696 Meinhardt
Legacy NCRs Log 5.03

Description

Un-approved Coring for slab of residential tower level27

Using Galvanized Steel Grating instead of stainless steel approved one.

item 3 Parapet Roof Level, beam at Grids B.3 and 11. The shear connection plate to the HSS girder has
a missing weld and there is a gap that is too large. Per Design Drawing Detail 6/S5071 Sheet 1 of 1
there needs to be a 6 mm fillet weld each side of the shear plate to the HSS girder

item 1 Level 3, steel framing Grid 7 to 11 and Grid B to C.5. The steel framing and the concrete curb
supporting the steel framing are not shown on Design Drawing S1124.
The welds at the connections for the tube steel beams show multiple visual defects that do not
conform to the requirements of AWS D1.1, Table 6.1.
Structural approval for the framing is required.

Residential Tower, Level 16. Throughout building provide wall details for the fire rated
shaft enclosure for the gypsum board and metal framing. Show the location of the access into this
shaft. Confirm the shaft is 2 hour rated construction.

Residential Tower, Provide confirmation that non rated plumbing chases have fire sealants at each
floor slab. Provide plans that show plumbing chases in non-rated wall enclosures for all levels.

Residential Tower, Level 6, Wood doors to units are installed without factory applied fire rated labels
for the door and frame. Remove the doors and frames and replace with doors and frames with the
correct fire rating labels. Provide the IR when the replacement is done

Office all levels with office corridors Provide the detail for these corridor walls that shows whether the
wall is rated or non-rated.

Residential Tower, Ground Level the plan shows the duct in a chase and was not built the way the plan
shows it.

Office Building, Ground Level requires compliance to be demonstrated with dead end requirements of
NFPA 101 38.2.5.2.1 that are presently not complied.

Basement 1 Previous Observation1948 in the Chauffeur’s Lounge, noted at least one door frame
(and one door leaf) were missing fire rating labels. Now all four door frames in this room have fire
rating labels. According to SBG, the new label (s) was installed by the manufacturer, Al Sultana, at the
site and is not permitted. The manufacturer does not have authority to do fire labelling at the site. and
is a serious breach of construction quality control. See Observation 2234 for the two methods to
correct this Life Safety problem at this room.
Several openings are missing either a fire rating label on the door and or frame and is a serious life
safety problem. Survey and prepare a list of all doors and frames (wood, metal or operating) missing
their required fire rating labels throughout the parcel. The Survey will be based upon the Door
Schedule.

Basement 1, Emergency
Generator The mechanical plan was not coordinated with the Life Safety plan that shows 2 hour fire
rating walls for adjacent occupancies, therefore ducts penetrating the two hour walls have to have fire
dampers including the supply and exhaust air. Revise the mechanical plan.

Residential Tower, Air Intake Shaft The inside of the Air Intake shaft near grids F x 4.5 and the
surrounding walls are 2 hour fire rated, however there are workmanship problems including open
mortar joints and the fire sealant at the wall head and jamb has to be on both sides of the wall. The
fire rated wall on the third side of this shaft is missing.

Ground Floor, Waterproofing was installed on the front vertical and sloping surfaces along the
property line of marble planters, however the side walls and back vertical surface does not have visible
waterproofing. Confirm the lack of waterproofing is permitted by the contract documents.

Basement 1, the generator is installed in the Emergency Generator room in a pond of water and the
plan
does not match the site wall construction. Provide wall rating for this room and the wall locations
including louvers and fire dampers.

Residential tower, Many openings were cast into the floor slab for vertical pipes and pipes are not
permitted at all the openings. Install required fire rated sealants at all the openings to create a
complete fire barrier at each slab including the vertical duct and at the wall (mostly CMU) joints install
a complete perimeter fire barrier at each level providing a 2 hour shaft enclosure with fire stopping.
State the 2 hour fire rated detail that the perimeter wall complies with. Any access points also require
a fire rated penetration.

At North Tower Level 1 Stair. The recessed Fire Hose Cabinet penetrates a 2 hour fire rated wall that
encloses the exit stair and is not permitted by code.

At Office Tower, 3rd Floor The wall is a 2 hour fire rated wall at an exit enclosure and penetrations
permitted in stair enclosures are only those directly for the stair enclosure in accordance with SBC
8.19.1.2 requirements. The duct, pipe and conduits are not allowed to penetrate into the exit
enclosure wall

At Resident Tower, 3rd Floor the Access is limited to the side of the transformer. Access is required for
maintenance.
Through-out the Resident Tower Mechanical fan coil units have busted through walls in order to be
installed and the unit sizes may not be appropriate for the plan. Walls have holes in them for the units
making acoustic isolation of the room impossible

Office Tower, Ground Level Three stairs serve the Ground Level of the Office Tower. Confirm Stair 5 is
not an Exit and Exit signage does not lead to this stair at all levels. If it is an Exit, then either Stair 3 or 5
has to discharge to the exterior via an exit passageway in a two hour fire rated enclosure instead of the
Lobby according to NFPA 101 7.7.2. Also see A1930 for further observations on Stair 5.

Office Tower, Ground Level the corridor connected to Stair 4 is not fully protected with limited
penetrations (7.1.3.2.1). This space has to be a 2 hour fire rated exit passageway to the exterior,
confirm when it is provided and exit signage directs occupants to the correct exit. Four doors from
unoccupied spaces open into the passageway that are not permitted (7.1.3.2.1 (5) and elevators
cannot open into an exit (9.4.7). Any door that is permitted has to have 90 minute fire label.

Basement 2, Cable trays penetrate the vertical portion of the floor slab. Confirm the floor fire rating is
provided and the appropriate matching fire protection material will be installed on all the cable tray
penetrations.

Basement 1, this duct is routed through the Stair 5 and is not permitted by NFPA 7.1.3.2.

Basement 1, Two or three hour fire rated walls surround the Emergency Generator room. Provide the
required wall rating and verify cable trays stacked 3 levels high penetrating this wall. Provide the
approved Method Statement for construction that will fire protect these penetrations.

Ground Level Routing ducts through the exit stair is not permitted by NFPA 101 7.1.3.2.1. These
penetration are not permitted.

Level 3, Framing is installed at the skylight. Provide the relative interface details that show water
tightness.

Level 3, Skylight framing is installed and has a slight cross slope away from the tower. Confirm the
required slope in both directions is provided in the framing.

Residential Tower, Level 1 ST-01 and 02 are the exits for this building. Portions of the building travel
through the Service Corridor to reach ST-01. As the potential occupancy travelling through the Service
Corridor likely exceeds 50, both doors have to swing in the direction toward ST-.01 according to NFPA
101 7.2.1.4.2. Confirm an exit sign will be posted outside Service Corridor.

Office Tower, Ground Level.


Fire Command Center, SBC 800 5C.9 requires 1 hour rated walls at Fire Command Centers and the 5.03
Fire and Life Safety plans show this is a 2 hour wall. This reinstalled door frame is without a fire rating
label. Provide the IR for a new door frame with a factory label with the correct fire rating.
Office Tower, Ground Level.
Fire and Life Safety drawings show the AHU/Mechanical room has 2 hour wall to the curtain wall and
no closure to the curtain wall has been installed. Provide the correct closure in the correct location.
Ground & First Levels, Design Development drawings included Fire and Life Safety and show a
“Smoke Baffle” according to the sheet legend. Approved requirements to be installed on site around
the openings on both levels.

Level 2 Design Development drawings were included a Fire and Life Safety set. The drawing shows a
“Facade Perimeter Sprinkler system” according to the sheet legend and to be complied on site.

Residential Tower, Level 25 Conflicts between mechanical systems and walls show the construction
documents were not coordinated on this level including (a) Walls are not built full height which is an
acoustic compromise. (b) Mechanical units (FCU= fan coil units) bust through walls which also increase
noise and are hard to maintain. (c) The contractor has made changes to the ceiling heights from the
contract documents.
Residential Tower, Level 24 Conflicts with mechanical systems and walls show the construction
documents were not coordinated on this level. Walls are not built full height which is an acoustic
compromise. Mechanical units bust through walls which also increase noise and are hard to maintain.
The contractor has made changes to the ceiling heights from the contract documents
Residential Tower, Level 18 Conflicts with mechanical systems and walls show the construction
documents were not coordinated on this level including (a). Walls are not built full height which is an
acoustic compromise. (b) Mechanical units bust through walls which also increase noise and are hard
to maintain. (c) The contractor made changes to the ceiling heights from the contract documents.

Residential Tower, Level 16 Conflicts with mechanical systems and walls show the construction
documents were not coordinated on this level including; (a). Walls are not built full height which is an
acoustic compromise. (b) Mechanical units bust through walls which also increase noise and are hard
to maintain. (c) The contractor made changes to the ceiling heights from the contract documents.

Residential Tower, Level 15, Conflicts with mechanical systems and walls show the construction
documents were not coordinated on this level including : (a) Walls are not built full height which is an
acoustic compromise. (b) Mechanical units bust through walls which also increase noise and are hard
to maintain.
Office Tower,(c) The contractor
Ground Level andmade changes
Basement to Plan
levels the ceiling
showsheights from the
an Air Intake contract
shaft documents
that provides air to the
Emergency Generator and basement parking levels. The shaft has a 2 hour fire rating-confirm walls
around the shaft have this rating and door openings must have the required ratings of 1.5 hours if they
occur in a 2 hour wall. Confirm all openings C, D &E are still required and if they are, confirm their fire
rating with swinging doors. Describe how door seals keep pressure differences from sucking air out of
the lobby on 4 sides of the frame. Provide the detail of the rated wall to the curtain wall showing it
provides fire rated protection
Residential Tower, Level 6 but applies to all levels Ceiling in front of the service elevator
is lower than the elevator door. Confirm the ceiling height is built at the correct height in Serv. Vest

Office Tower, Level 11 the balcony appears to be larger than 70 m2 of area and using 1.4 m2/occupant
results in more than 50 occupants. A Balcony with more than 50 occupants requires two exits
according to NFPA 101 7.4.1.1. and this balcony only has a single exit. Either provide a second exit from
the balcony or reduce the area of the balcony to less than 50 occupants.

Office Tower, Level 2 Ducts are installed in a future restaurant but are too low, the ceiling height under
the duct will be about 2300 mm.

Office Tower, Ground Level and Basement levels. Plan shows an air Intake shaft that provides air to the
Emergency Generator and basement parking levels and has a 2 hour fire rating. The current plan shows
a curtain wall on the north side, this is an exterior wall but it is also adjacent to other portions of the
building which must also have a 2 hour fire rating.
Office Tower Ground Level the Emergency Generator on Basement 1 has fuel storage tank in the room,
therefore the building code requires a 2 hour minimum rating for this room for walls and ceilings. A
Sky bridge connects to Parcel 5.03 above the grating for the Emergency Generator and as designed
there is no protection between the Sky Bridge and the fire potential in the Emergency Generator
room. The grating is an unprotected opening located at the face of the building exterior walls and the
FCC room resulting in a fire risk for the vertical walls adjacent to the grating.
Skylight is nearly installed but it does not have the required slope of 6 mm in 300 mm
called for in detail 3A/ 1110-5.03-CSA-5002-1of1-R03-Rev00. Provide approval for changes to this
requirement. Sealant should have been tested for compatibility according to the Sealant Adhesion
Test. Provide the approved sealant product data.

Level 3, Skylight framing is flat as Meinhardt has measured no slope on any of the members. Rain
and dirt will fall on the top surface and a slope would help move them off the skylight. Drawing 1110-
5.03-CS-A-5002 calls for a 2 % slope and is not built

Level 3. Detail on 1110-5.03-CS-A-5002 is for the lower edge of the sloping skylight and will allow
water leakage into the building as no overlapping water protection was detailed. No board supporting
the waterproofing is referenced

Residential Tower Level 1 Exit stair has less than the minimum headroom of 2030 mm required by
NFPA 101 7.1.5. Clearance is measured from the sloping surface connecting the stair nosing’s

Basement 1, Chauffeurs’ toilet NFPA 101 7.1.5 requires the minimum headroom to be 2030 mm. That
height is not provided in the toilet for the Chauffeurs

Skylight is nearly installed but it does not have the required slope of 6 mm in 300 mm called for in
detail 3A/ 1110-5.03-CSA-5002-1of1-R03-Rev00. Provide approval for changes to this requirement.
Sealant should have been tested for compatibility according to the Sealant Adhesion Test. Provide the
approved sealant product data.

Saudi Building Code (SBC) 701 Section 6.7 requires a secondary roof drainage system.

Every fire rated door and door frame must have a label and according to SBC 801 4B.15.3.5, fire rating
labels are required on all fire door assemblies. Several Meinhardt Observations document the required
labels are missing in construction

According to Intertekwho is the certification company for many fire rated Sultanah hollow metal doors
and frames, Sultanah is only permitted to affix the Intertek label to single doors and not door pairs.
Therefore all pairs of Sultanah doors and frames with the Intertek label are not compliant with SBC 801
4B.15.3.5 door labelling requirements.
Residential tower, this is a 2 hour fire rated shaft however installed gypsum board as built does not
provide the rating. The contract drawing detail does not result in 2 hour shaft construction. Based on a
2 hour UL shaft detail for gypsum board, provide IR approving all gypsum board shaft wall construction
on all floors. In the IR state the UL design number detail to which all work complies

Floors in this parcel have a 2 hour fire rating and expansion joints, therefore the floor expansion joints
must also have this rating and comply with the requirements of either UL 2079 or ASTM E1966 testing
according to NFPA 101 (2006) 8.3.6.6. The standard Specification Section 05805 does not state these
building code requirements
Meinhardt closed
Level 1, Riyadh Observation
Civil A1930awith
Defense require Smoke theBarrier”
understanding
near thethat construction
residential towerchanges would1 be
on the Level built
plan.
for code compliance so ST-05 is not an exit. Using an IR, confirm the following construction changes
are actually built:

(a) Corridor built at Level 2 that connects the Restaurant Lobby to Stair ST03 so this is the second exit
for this level.
(b) Vestibule wall and door is removed at ST-05
© Gate Barrier on the landing of ST-05 is removed
Stair ST-05,
Provide the core
drawing of thethat
revisions office building
show thesehas 3 stairs ST-03, ST-04 and ST-05. Three stairs cause code
changes.
problems at Ground Level and to solve that problem SBG agreed to not make ST-05 an exit- this is still
a stair but is not used as an exit at all levels and requires no exit signage

(B1 MDB Room). Water leakage in MDB Room damaged electrical equipments.

(L3 Mechanical Room).Fans Installation-not as per Specs.

(RT/ L2 Kitchen). Mechanical installation without shop drawings.

(B5). Leakage inside Air intake Duct area from B4 Retaining wall.

Wrong installation of disconnect switch. (UL Requested).

Testing and Commissioning-Mechanical and Public health Systems-contractor have not started testing,

Car park ventilation System-Submit approved Design.

Acoustic Specialist Qualifications-documentation required.

Building external wall U-valves- To be submitted.

Test on Completion-Contractor shall carry out Tests on completion in accordance with clause and sub cla

Trial Operation-Documentation is required.

LEED Process Documentation required.

(OT General). Spacing of LV Panel-Not as per Specs.


(Generator not Comply with Specification).

(B1 Generator Room). Single core cables terminated on steel plate-not comply with
Specification.

(B1 Emergency Switchroom Room). Single core cables terminated on steel plate-not comply with Specifi

(B1). Working distance at MV equipment-the work space distance does not conform to NEC table.

LEED Process

LEED Process-Documentation needed.

(RT/ L8). Spacing between LV Equipment-the work space distance does not conform to NEC table.

(RT/ L8). Mechanical services installed above distribution board-not allowed.

(RT/ L16). Spacing for LV Equipment the work space distance does not conform to NEC table

(OT/ L3). Working distance at MV Equipment-the work space distance does not conform to NEC table.
Discipline Category

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2
CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

MECH D

MECH D

MECH D

MECH D

ELE C2

MECH C2

MECH C2

MECH D

MECH C2

MECH C2

MECH C2

MECH C2

ELE C2
ELE D

ELE C2

ELE C2

ELE D

ELE C2

ELE C2

ELE D

ELE C2

ELE D

ELE D
Legacy NCRs

Sr. NCR/OBS Number ISSUED BY

1 1610 DAR

2 KAFD 405 162 item 6 MKA

3 KAFD 405 172 item 1 MKA

4 KAFD 405 172 item 2 MKA

5 KAFD 405 172 item 4 MKA

6 KAFD 405 163 item 4 MKA

7 KAFD 405 163 item 6 MKA

8 KAFD 405 163 item 10 MKA

9 KAFD 405 171 item 1 MKA

10 KAFD 405 170 item 4 MKA

11 KAFD 405 170 item 6 MKA


12 KAFD 405 173 item 1 MKA

13 10/8017/KAFD/Z4/SBG/A1118 Meinhardt

14 10/8017/KAFD/Z4/SBG/A1187 Meinhardt

15 10/8017/KAFD/Z4/SBG/A0316 Meinhardt

16 10/8017/KAFD/Z4/SBG/A0533 Meinhardt

17 10/8017/KAFD/Z4./SBG/A0642 Meinhardt

18 10/8017/KAFD/Z4./SBG/A0822 Meinhardt

19 10/8017/KAFD/Z4./SBG/A0989 Meinhardt

20 10/8017/KAFD/Z4./SBG/A01059 Meinhardt

21 10/8017/KAFD/Z4./SBG/A01060 Meinhardt

22 KAFD 405 172 item 8 Meinhardt

23 KAFD 405 170 item 1 Meinhardt


24 10/8017/KAFD/SBG/A1094 Meinhardt

25 10/8017/KAFD/Z4/SBG/A1095 Meinhardt

26 10/8017/KAFD/Z4/SBG/A1096 Meinhardt

27 10/8017/KAFD/Z4/SBG/A1101 Meinhardt

28 10/8017/KAFD/Z4/SBG/A1119 Meinhardt

29 10/8017/KAFD/SBG/A1170 Meinhardt

30 10/8017/KAFD/Z4/SBG/A1183 Meinhardt

31 10/8017/KAFD/Z4/SBG/A1188 Meinhardt

32 10/8017/KAFD/Z4/SBG/A1200 Meinhardt

33 10/8017/KAFD/Z4/SBG/A1234 Meinhardt

34 10/8017/KAFD/Z4./SBG/A01062 Meinhardt

35 10/8017/KAFD/Z3/SBG/E784 Meinhardt
36 10/8017/KAFD/Z3/SBG/E831 Meinhardt

37 10/8017/KAFD/Z3/SBG/E1324 Meinhardt

38 10/8017/KAFD/Z3/SBG/M612 Meinhardt

39 10/8017/KAFD/Z3/SBG/M602 Meinhardt

40 10/8017/KAFD/Z3/SBG/M591 Meinhardt

41 10/8017/KAFD/Z3/SBG/M583 Meinhardt

42 10/8017/KAFD/Z3/SBG/M539 Meinhardt

43 10/8017/KAFD/Z3/SBG/M538 Meinhardt

44 10/8017/KAFD/Z3/SBG/M537 Meinhardt

45 10/8017/KAFD/Z3/SBG/M466 Meinhardt

46 10/8017/KAFD/Z3/SBG/P676 Meinhardt

47 10/8017/KAFD/Z3/SBG/M268 Meinhardt
Legacy NCRs Log 4.05

Description

shows hollow blocks with dimensions 400*200*100mm in corridors at GL 6/a-e and 8/A-E from levels
2-15 inclusive and do not conform with the approved Civil Defense Fire and Safety Plan. Walls and
doors are required to be 120 minute resistant.

A steel Stud partition wall at level 04 slab soffit GL E-D is installed with its studs screwed to the top
channel track without allowing slab to deflect independently of the partition wall

Roof level framing. The structural steel connections as per design drawing are Contractor designed.
Approved shop drawings for the structural steel framing and connections are required.

Roof levels at grids A-E/5-9. Core holes /cut rebar found without approval.

Level 1 at grid A.5 to c and 6.2-78 structural steel framing installation is in progress with anchors
installed in cored holes and edge distances that are less than typical minimums. Coring requires
approval as per design drawing G030002, Section v, note 19.

At level 9.Light gauge steel stud wall with two of the top studs not secured within the top channels so
they resist lateral movement and not connected tight against the slab soffit above

At level 9 light gauge stud wall, the studs are fixed to the top track with screw and should be attached
to the soffit so it provides lateral support to the studs and at the same time allows for deflection of the
slab independent of the studs.

At level 8 light gauge steel stud wall, the track is away from one of the studs and provides no lateral
support for the stud.

Level 14 structural steel grid E to F /6.2 to 7.8 multiple locations at the upper truss/veil. There is a gap
between the plates and the connection does not have full contact at the faying surfaces that is
required. In addition at multiple locations the tube steel to end plate welded joints appear to be field
modified and field welded. There appears to be a large gap concealed at the tube steel field weld to
the end plate. Structural approvals for the field welds are required
Level 12 and 13 steel framing at grid E and 8.4. At the stair 1 level 13 intermediate landing there is
chipping into the 400mm type W6 wall.25 mm cover is required for the reinforcing steel as per design
drawing S03-7300 schedule 1.

At level 14 gridlines E.1 and 6.2, the steel framing connection to the 400mm type W6 wall includes
chipping and exposed reinforcing steel at the upper frame Y truss type 4 connection. 25mm concrete
cover is required for the reinforcing steel as per design Drawing S03-7300 Schedule 1.
. Roof level wall at gridlines. C and 7. Core drilling is completed at the core wall in 4 bolt patterns with
non-approved cut rebar at approximately 1 meter centers each way on what appears to be the facade
brackets. Structural approval is required for the cut reinforcing and coordinated with the bracket
layout.
Throughout 4.05. All gypsum board edges for vertical installation must be supported by framing unless
it is above a ceiling for non-fire rated walls. Framing that does not support every gypsum board edge is
not in compliance with GA 216. Fastener spacing frequently exceeds the maximum allowed by GA. 216
5.7 and where screws are used shall be spaced no more than 305mm o.c for ceilings or 406mm for
walls where the framing members are 406mm o.c. Screws shall be spaced not more than 305mm for
both ceilings and walls where framing members are 610mm o.c. Revised frame layouts are required
showing correct framing and fastener spacing. Provide IR approving revised ground floor level framing.

Metal lintels are used in fire rated CMU walls and approving documentation to be demonstrated

At B1 level big holes were observed for small electrical boxes. Remedial plan is required to
demonstrate how correct size openings are achieved to comply with the contract specifications

Ground level. RC surfaces are noted in improper condition and lines for the beading are not straight.
Provide a remedial plan showing RC repair and implementing the architectural details to achieve the
required quality as per contract documents

At 7th floor flammable white polystyrene strip fixed to close the gap of the separation wall between
the different compartments. Demonstrate how the fire rating is to be achieved and comply with the
contract specifications.

Level 12. The RC up-stand supporting the skirting of the tanking system is discontinued. Compliance
to be demonstrated in accordance with PPA 30 Technical Specification, Volume1 of 4th August2009,
division on 7-07105 bituminous membrane waterproofing to ensure there is no water infiltration into
the building envelope. Corrective action and approved IR is required.

Level varies. Separation wall between the corridor and hotel rooms is 100mm hollow CMU.
Corrective action to be taken and closed under an approved IR

At ground floor level there is no fire smoke exhaust provided in the lobby ceiling. Corrective action to
be taken and closed under an IR inspection on completion. SSC to provide the fire smoke
management report.

Level varies. Joint left between CMU wall and R wall is too large and irregular and the impact on
structural rigidity and fire rating requirements. Corrective action to be taken and closed under an
approved IR inspection on completion.

Level 2 steel framing at grid 3.2 to 5 from the perimeter wall to grid A.4 There is a gap
between the faying surfaces at the bolted connection near GL 3.2.

Level 13 steel framing at grid D to E and 6.2 to 7.8. The steel framing is not shown on
design drawing S031123. The structural steel bolted connections do not have full contact of the faying
surfaces at multiple locations. Approved shop drawings and details for the steel framing are required.
At ground level S-4 OO-09 and the secure Lobby the exit stair does not provide a continuous 2 hour
exit enclosure to the exterior as required by IBC 2009 1022.2, 1022.3 AND 1022.4. Penetrations are
prohibited in the enclosure except as noted in those sections. Provide IR.

Ground level S-300-05 and the Secure Lobby. The exit stair does not provide a 2 hour exit enclosure as
required by IBC 2009 1022.2, 1022.3 and 1022.4 Penetrations are prohibited in the enclosure except
as noted in those sections. The closet unlikely complies with the requirements. Provide IR confirming
construction complies with code requirements

Ground level and all levels stair S-4 00 0-9. The vertical clearance of 2032mmm is not provided as
required by IBC 2009 1009.2 and Saudi Building Code 201 8.9.2 requires a minimum of 2100mmm.
Provide IR that stair provides required vertical clearance at all levels.

The Saudi building code SBC 701 Section 6.7 requires a secondary roof drainage system. Provide IR
approving compliance with 6.7.1 and 6.7.2 requirements.

Throughout 4.05. Maximum span for stud size, spacing and thickness can span with typical loading.
Confirm the spans at ground level are less than the maximum span

Provide wall sections throughout the hotel showing acoustic requirements and STC rating that
the wall will achieve.
Throughout all levels. Access panels/doors are not permitted in exit stair enclosures according to NFPA
101 (2006) 7.1.3.2.
At least two stair plans show access panels. IR to be provided after construction changes have been
completed to eliminate access panels in the stair exit enclosures and demonstrate compliance with
CMU
NFPA walls areWall
7.1.3.2. usedplans
in many
to bewalls –confirmation
provided that showiswalls
required
havemetal
2 hourlintels comply
fire rating onwith the following
the perimeter of the
requirements or if not correct
stair and the associated provide
fire rated correctused
wall detail approvals for both fire
for construction. ratedadjacent
Shafts and non-fire rated
to the doors:be
stir must
separated by 2 hour construction and their systems cannot cross the stair. Furnish non fire rated wall
•details
Lintelsused
in CMU
at thewalls
stairare only used in non- fire rated walls according to DB16CZ2-DC-A-0225 as
perimeter.
approved in zone 2.fire rated walls.
• Maximum span is 1.8m subject to Engineer approval.
• Minimum bearing at each side of the opening is 200mm.
• Contractors engineer selects lintel model number based upon span, wall thickness, height and
load .Unitechparcel
Throughout is an approved
4.05 ceiling manufacturer.
channels found spaced at 600mm centers and is more than the
specification allows. Under section 09260 specification for gypsum board, the spacing is not to exceed
400mm on center. Provide IR for closure.

Contactor is building shaft walls that do not provide 2 hour fire rating. Provide two hour wall details
using metal stud construction used in this parcel including UL number for each detail. Show details
that are actually used or will be used for wall construction.

At level 3 the plexi-glass elements of the closet in the mock up room are deflecting too much under
slight pressure presenting low quality standards. Corrective action to be taken and closed under an
approved IR inspection on completion.

(B1). Installation of Transformer-not conform to thence NEC and contract Specs.


(General). Installation of MV Switch Gear- Space distance does not confirm to standard.

(General). Electrical Load Capacity-documentation required.

Trial Operation-Shall demonstrate that the works or section perform reliably and in accordance with the

Test on Completion-Contractor shall carry out Tests on completion in accordance with clause and sub cla

BMS Manufacturer & Control Specialist Firm-Submit Approved Documents Qualifications.

Chilled water piping System-Submit Chemical treatment results.

Building Occupancy-Documentations to be submitted prior to handover.

Independent T&C Firm-Submit documentation of Specialist with Approved Schedule and Plan.

Car Park ventilation System-Submit Approved Design.

Acoustic Specialist-shall be engaged to execute the scope of works as per Specs.

(B5). Potable water tanks-Directly under Waste pipes/not allowed.

LEED Process-Documentation needed.


Discipline Category

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2
CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH C2

CIV/ARCH D

CIV/ARCH D
CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

CIV/ARCH D

ELE D
ELE C2

ELE D

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

MECH C2

MECH D

MECH D