Sunteți pe pagina 1din 23

PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

ELT Location : KONDARA_KLU


Area :SULSEL
Site ID : 25KLU018

RECTIFIER SYSTEM
= Yes
Rectifier Series :HUAWEI
= No
System Propose:: Indoor Outdoor
PS 2.3kW PS 3.3kW PS5.3KW
Rectifier Type : Rectifier ELTEK FP2 3000W
Rectifier Capacity : 3x 63A/ 230 V VoltageInput
: 220V(Linetoneutral)

I. VISUAL CHECK
INDOOR CABINET

NO. DESCRIPTION STATUS CAPACITY RESULT

1. Dimension H xWxD
2. Outdoor cabinet 600 mmW x 600mmD x
2000mmH (+/- 3%) 600 x 550 x 2000

3. Traybatteryadjustable OK NOK 


Adjustablebatterybeltor
4.
stopper battery OK NOK 
5. Indoor cabinetshall have IP 20 OK NOK 
Indoor cabinetusingmaterial
6.
steel oraluminium OK NOK 
7. Cabinetshall bepowder coating OK NOK 
Cableentryindoor viathetop
8.
behind OK NOK 
9. GroundingbarCabinet OK NOK 
GroundingCableuseNYAF
10.
35mm(Green-Yellow) OK NOK 

OUTDOOR CABINET

NO. DESCRIPTION STATUS CAPACITY RESULT

1. Dimension H xWxD H xWxD


2. Outdoor cabinet (H xWxD) 2060x800x770mm 2060x800x770mm
3. Innerdepth outdoor Min 580mm Min 580mm
4. Traybatteryadjustable OK NOK 
Adjustablebatterybeltor NOK
5.
stopper battery
OK 
Outdoor cabinethavefreespace NOK
6.
17U,19”forBTS transmission
OK 
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

7. outdoor cabinetshall have IP 55 OK NOK 


outdoor cabinet usingmaterial NOK
8.
aluminium
OK 
9. Cabinetshall bepowder coating OK NOK 
Cableentryoutdoor viathe
10.
bottom of baseplinth OK NOK 
11. Gasketoutdoor cabinet OK NOK 
12. FanAxial 48VDC OK NOK 
13. Grounding Bar Cabinet OK NOK 
14. GroundingCable GSW3x25 OK NOK 
INSTALLATION QUALITY CHEKLIST

NO. DESCRIPTION STATUS SEVERITY REMARK


ACPDBCableEntriessealedwith IP
1. MAJOR
cablegland OK NOK NA
ACcablefrom AC PDBtoservice
2. cabinet protectedinapproved
OK NOK NA MAJOR
conduit
ACcableburied>=minimum
3.
required depth(60cm)
OK NOK NA MAJOR
Verifythat allACpower Cables/
4.
wiringuses correct phasecolours
OK NOK NA MAJOR
Verifyusescrimpedferrules/cable
5.
shoesonwire terminations
OK NOK NA MAJOR
ACPower Cablemusthave an
6. appropriatesizeofconduit andfitted to
OK NOK NA MAJOR
theglandcorrectly
Anchorhardwaremustbe12mm
diameter,andHD galvanisedor
OK NOK NA
7. MAJOR
stainless steelandinstalledinall4
corner ofthecabinet base
Confirmthatnumber ofFaninstalled
as per specificationandrunning
OK NOK NA
8. MAJOR
properly(2fansforWestindoand3
fansfor Hariff)faultymotor bearings
9. Groundingwireconnectedtodoor OK NOK NA MAJOR
Groundingbar inCabinetis installed
10.
properly
OK NOK NA MAJOR
Groundingbar inplinthbaseis
11.
installedcorrectly
OK NOK NA MAJOR
Rear Groundingis usecorrect
12.
material 3xGSW25mm
OK NOK NA MAJOR
Groundingcable oftheservice
cabinetroutedwithgoingdown
OK NOK NA
13. MAJOR
directiontotheBusbar.(noupward
direction)
Rear Groundinglugis properly
14. Integrated tosite's Main Earth
OK NOK NA MAJOR
Terminal
Cables areprotectedfromsharp
15.
objects
OK NOK NA MINOR

16. Noloose,unconnectedcables OK NOK NA MAJOR


PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

All Power supplymodules&


17. replaceableunitshave Indosatbar-
OK NOK NA MINOR
codes

18. All Baterrieshave Indosatbar-codes OK NOK NA MINOR


ACcableinsulationjacketmustcome
19.
allthewayup totheAC board
OK NOK NA MINOR
Rectifier canbeeasily withdrawn on
20.
rails
OK NOK NA MAJOR

21. fullsetofDC MCBsinstalled OK NOK NA MAJOR


2x4xBatteries(Standard External
22.
Cabinet).
OK NOK NA MAJOR
Brand of batteries(Narada,Shoto,
23.
Enersys,Northstar)
OK NOK NA MINOR

24. Rectifier moduleis asAs plan OK NOK NA MAJOR


All Rectifier moduleisworking
25.
properly
OK NOK NA MAJOR
All baterrycableconnectionis done
26.
properly
OK NOK NA MAJOR
Timeanddatesettingaccordingto
27.
specification(real time)
OK NOK NA MAJOR
All batteryconnectionsare tightand
28. covers are notdamaged and
OK NOK NA MAJOR
replaced correctly
Bothbatterybankshave thebatteries
29.
labelled1to4
OK NOK NA MAJOR
Cabinet Ambienttemperaturesensor
30.
locatedinplinth.
OK NOK NA MAJOR
Batterytemperaturesensor #1fixed
31.
betweenbattery2 and 3
OK NOK NA MAJOR
Batterytemperaturesensor #2fixed
32. betweenlower battery2 and3(or in
OK NOK NA MAJOR
theslavecainet)
Cabinetsensor isfixedsecurelyto
33. thecabinetonthelefthandsideat OK NOK NA MAJOR
thetop.

II. VOLTAGE INPUT

SPECIFICATION/
NO. DESCRIPTION RESULT
CONDITION
1. ACInput:
- ACInputR –S 350Volt ~ 410Volt 382Vac
- ACInputS–T 350Volt ~ 410Volt 380Vac
- ACInput T –R 350Volt ~ 410Volt 385Vac
- ACInputR –N 90Volt ~ 242Volt 221Vac
- ACInputS–N 90Volt ~ 242Volt 220Vac
- ACInput T –N 90Volt ~ 242Volt 220Vac
2. VoltageN–G 0 Volt ~ 2Volt 5,28Vac
3. Frequency 50Hz~ 60Hz 52Hz
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

III. RECTIFIER MODULE

NO. DESCRIPTION RESULT


1.
Part number of rectifier modules P/N : WPSU50A05

2. Serial number of rectifier modules : S/N 1: 2102310FFAHVK5007326


Rectifier 1st S/N 2: 2102310FFAHVK5007354
Rectifier 2nd S/N 3: 2102310FFAHVK5007281
Rectifier 3rd S/N4:_____________________
Rectifier 4th S/N 5:_____________________
Rectifier 5th S/N 6:_____________________
Rectifier 6th S/N 7:_____________________
Rectifier 7th S/N 8:_____________________
Rectifier 8th

IV. SYSTEMVOLTAGELEVELTEST

SPECIFICATION/
NO. DESCRIPTION RESULT
CONDITION
1. Rectifier Setting:
- NominalFloat 54,48 Vdc 51.52Vdc
- BoostVolt 56,40 Vdc 52.13Vdc
- RectifierStandbyVoltage 45,0 Vdc 45.17Vdc
- BatteryDisconnect 43,2 Vdc 43.12Vdc
- BatteryReconnect 47,0 Vdc 49.39Vdc
- Load Disconnect 46,0 Vdc 45.52Vdc
- LoadReconnect 47,0 Vdc 52.39Vdc
- BatteryChargeCurrentLimit 10%x 190Ah 19Ah

2. LoadCurrent 0Amp~200 Amp 27 Amp


3. Back UpBattery OK/NOTOK 

V. ALARM CONTROL

RELAYALARM ACTIVE RELAY


NO DESCRIPTION RELAYTEST RESULT
MAPPING LEVEL STATE
st st
1. Relay1 Mainsfail Energize NC ActiveRelay1 
nd nd
2. Relay2 Rectifier Fail Energize NC ActiveRelay 2 
rd rd
3. Relay3 High Temp Energize NC ActiveRelay3 
th th
4. Relay4 PLVDFail Energize NC ActiveRelay4 
th th
5. Relay5 Arrester Fail Energize NC ActiveRelay5 
th th
6. Relay6 DoorOpen Energize NC ActiveRelay6 
th th
7. Relay7 FuseFail Energize NC ActiveRelay7 
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

VI. BATTERY

SPECIFICATION/
NO. DESCRIPTION RESULT
CONDITION
1. Total batteryper bank 4/8/12/16/20
2. Total batterybank 1/2/3/4/5
3. Voltagenominal per battery 2 Vdc/12Vdc Vdc
4. Capacitynominalper battery 100/170/ 180Ah Ah
5. Voltagenominal per bank 48Vdc Vdc
6. Total batterycapacity Bank xAh Ah

NO. DESCRIPTION RESULT DE RESULT


S
7. BatteryPartNumber P/N :6-FMX-170
8. BatterySerial Number: S/N :EE1314200890
BatteryCell1 Battery Vot 13,2  OK  NOK
BatteryCell2 S/N :EE1823434865
BatteryCell3 Battery Vot 13,2  OK  NOK
BatteryCell4 S/N :EE1307844098
BatteryCell5 Battery Vot 13,2  OK  NOK
BatteryCell6 S/N : EE1961983144
BatteryCell7 Battery Vot 13,2  OK  NOK
BatteryCell8 S/N :EE1497105037
BatteryCell9 Battery Vot 13,2  OK  NOK
BatteryCell10 S/N :EE1781171169
BatteryCell 11 Battery Vot 13,2  OK  NOK
BatteryCell12 S/N :EE1918336492
Battery Vot 13,2  OK  NOK
S/N :EE1607260137
Battery Vot 13,2  OK  NOK
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

VII. REMAKS

TestDate :………………………………….

Approvedby, Testedby,

PT. INDOSAT PT. Huawei Tech. Investment

( ) ( )
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

1.Foto Team Di Site 2.Site Name Plate/Site ID

Comment Comment

3.Tampak Tower 4.Site Tampak Dari Depan (Over View)

Comment Comment

5.Cabinet Rectifier Tertutup 6.Cabinet Rectifer Terbuka

Comment Comment

7.Foto Kabel Grounding di Pintu ke Cabinet Rectifier 8.Foto Gland Cable Bagian Belakang

13.Foto
11.Foto
15.Busbar
GlandModule
KabelRectifier
Grounding
bagian (belakang
All )
Cabinet 16.Busbargrounding
12.FotoinBattery
Base Plate
14.Fan cabinet
Bank 1 & 2

Comment Comment

Comment
Comment Comment
Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

9.Foto Module Rectifier (All) 10.Foto Battery Bank 1 & 2 (All)

Comment Comment

11.Fan Cabinet 12.Busbar Grounding Cabinet

Comment Comment

13.Busbar Grounding in Base Plate 14.Pengukuran Vtotal Bank Battery (All) #Bank 1

Comment Comment

15.Pengukuran Vtotal Bank Battery (All) #Bank 2 16.Pengukuran Vtotal Bank Battery (All) #Bank 3

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

17.Pengukuran Vtotal Bank Battery (All) #Bank 4 18.DDF alarm yang diberi label

Comment Comment

19.Sensor Temperature di atas kiri Rectifier 20..Sensor Temperature pada Bank1 (Diantara Block
2&3)

Comment Comment

21..Sensor Temperature yang diletakan di base plit 22.Koneksi G Wire ke Cabinet Rectifier

Comment Comment

23.Akses Kabel Power di Gland Rectifier sebelah kanan 24..Label Kapasitas Battery
depan yang sudah di flash band

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

25.Barcode Module 1 26.Barcode Module 2

Comment Comment

27.Barcode Module 3 28.Barcode Module 4

Comment Comment

29.Smartpack/Display Monitoring (tampak depan) 30.Barcode Battery Bank 1 Block 1

Comment Comment

31.Barcode Battery Bank 1 Block 2 32.Barcode Battery Bank 1 Block 3

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

33.Barcode Battery Bank 1 Block 4 34.Barcode Battery Bank 2 Block 1

Comment Comment

35.Barcode Battery Bank 2 Block 2 36.Barcode Battery Bank 2 Block 3

Comment Comment

37.Barcode Battery Bank 2 Block 4 38.Barcode Battery Bank 3 Block 1

Comment Comment

39.Barcode Battery Bank 3 Block 2 40.Barcode Battery Bank 3 Block 3

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

41.Barcode Battery Bank 3 Block 4 42.Barcode Battery Bank 4 Block 1

Comment Comment

43 Barcode Battery Bank 4 Block 2 44 Barcode Battery Bank 4 Block 3

Comment Comment

46. Barcode Battery Bank 4 Block 4 47.Input Kabel Power Ke ACPDB (melalui kabel gland)

Comment Comment

48.Pengukuran Tegangan Fasa R-N di MCB Input 49.Pengukuran Tegangan Fasa S-N di MCB Input

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

50.Pengukuran Tegangan Fasa T-N di MCB Input 51.Pengukuran Tegangan Fasa R-S di MCB Input

Comment Comment

52.Pengukuran Tegangan Fasa R-T di MCB Input 53.Pengukuran Tegangan Fasa S-T di MCB Input

Comment Comment

54.Pengukuran N-G di Rectifier 55.Foto Jalur Kabel Input

Comment Comment

56.Koneksi G-Wire ke Busbar Grounding 57.Posisi Penempatan Rectifier

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

58.Foto Bak Kontrol Dalam Keadaan Terbuka 59.Foto Dynabolt Depan Kanan

Comment Comment

60Foto Dynabolt Depan Kiri 61.Foto Dynabolt Belakang Kanan

Comment Comment

62.Foto Dynabolt Belakang Kiri 63.Barcode Smartpack/Monitoring Control

Comment Comment

64.Barcode Smartnode 65.Barcode Subrack Rectifier

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

66Barcode Cabinet Rectifier 67.Koneksi Kabel Alarm Arrester (dibawah Arrester)

Comment Comment

68.Koneksi Kabel Alarm Arrester di MCB Output 69.Pengukuran Tegangan Battery Bank 1 Block 1

Comment Comment

70.Pengukuran Tegangan Battery Bank 1 Block 2 71.Pengukuran Tegangan Battery Bank 1 Block 3

Comment Comment

72.Pengukuran Tegangan Battery Bank 1 Block 4 73.Pengukuran Tegangan Battery Bank 2 Block.1

15.Busbar Grounding Cabinet 16.Busbargrounding in Base Plate

Comment Comment

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

74.Pengukuran Tegangan Battery Bank 2 Block 2 75.Pengukuran Tegangan Battery Bank 2 Block 3

Comment Comment

76.Pengukuran Tegangan Battery Bank 2 Block 4 77.Pengukuran Tegangan Battery Bank 3 Block 1

Comment Comment

78.Pengukuran Tegangan Battery Bank 3 Block 2 79.Pengukuran Tegangan Battery Bank 3 Block 3

Comment Comment

80.Pengukuran Tegangan Battery Bank 3 Block 4 81.Pengukuran Tegangan Battery Bank 4 Block 1

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

82 Pengukuran Tegangan Battery Bank 4 Block 2 83 Pengukuran Tegangan Battery Bank 4 Block 3

Comment Comment

84 Pengukuran Tegangan Battery Bank 4 Block 4 85 .Pengukuran Pondasi Rectifier (Depan)

Comment Comment

86. Pengukuran Pondasi Rectifier (kiri) 87.Pengukuran Pondasi Rectifier (Kanan)

Comment Comment

88..Simulasi Pemanasan Temperature Shelter 89.Foto Capture Alarm Temperature

Comment Comment
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

Capture Active Module (Home)

Capture Active Module (Monitoring – Rectifier 3 /Module Rectifier 1)


PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

Capture Active Module (Monitoring – Rectifier 4 /Module Rectifier 2)

Capture Active Module (Monitoring – Rectifier 5/Module Rectifier 3)


PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

Capture Active Module (Monitoring – Rectifier 6 / Module Rectifier 4)


PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

ATP TRANSMITTAL

Site ID : KONDARA_KLU

Site Name : 25KLU018

ATP Date :

ATP Scope Vendor


Applicable

Mini CME Ericsson / Huawei / NSN / Other:....................

CME Hariff/ Westindo / Other: ..............................

Transmission Ericsson / NSN / ALU / NEC / Other: ................

RAN Ericsson / Huawei / NSN / Other:....................

\ PUNCHLIST

Responsible
NO Punchlist Item Company Remarks

1 Accept

6
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

PHOTO REVISI ITEM PUNCHIST


BEFORE AFTER

Comment 20..Sensor Temperature pada Bank1 (Diantara Comment 23.Akses Kabel Power di Gland Rectifier sebelah
Block 2&3) kanan depan yang sudah di flash band
BEFORE AFTER

Comment 24. Comment


Label Kapasitas Batterai 30.Barcode Battery Bank 1 Block 1

BEFORE AFTER

Comment 31.Barcode Battery Bank 1 Block 2 Comment 32.Barcode Battery Bank 1 Block 3

BEFORE AFTER

Comment 33.Barcode Battery Bank 1 Block 4 Comment 34.Barcode Battery Bank 2 Block 1
PT.HUAWEI TECH INVESTMENT Doc. No.

ACCEPTANCE TEST PROTOCOL (ATP) Revision 0.1


POWERSUPPLY INDOSAT Page dari 7
Date

BEFORE AFTER

Comment 35.Barcode Battery Bank 2 Block 2 Comment 36.Barcode Battery Bank 2 Block 3