Subject: Prefabricated Building size 81’x27’ Thallian Camp FWO.

S.No Description Qty. Unit Rate Total


1 Prefabricated buildings:
Total (81’x27’)= 2187 Sft.
Structure specification
 Wall Panels: 50 mm thick sandwich
panels with polystyrene (thermapore)
insulation and galvanized oven-baked
painted steel sheet both sides 0.40 -0.45
mm (profile inner and outer skin as per
the machine accuracy)
 Partition Panels: Same as wall panels.
 Roof Panels: 50 mm thick corrugated
sandwich panel with polystyrene
(thermapore) insulation and 0.40 – 0.45
mm thick steel sheet both sides. Blue 2187/- 1055/- 2,307,285/-
color outside.
 Windows and Doors: Aluminum windows
and doors. All windows will be
aluminum,sliding, single glazed with net
and clear glass 5 mm thick.
 Structural Components:
o C Channel Columns :78 x 40 x 1.5
mm thick
o Column base plate 120 x 120 x 5
mm thick
o Column base C – Channel : 78 x
40 x 1.5 mm thick
o Cleats for trust rest : 90 x 90 x 80
x 6 mm thick
o Trusses and purlins using 1.5mm
thick C Channel/M.S Pipe
o Final thickness may vary as per
the design specifications during
drawing submission phases.
o All nuts, bolts, anchor bolts, self
tapping screws etc for installation
o Clear Height after false ceiling
will be 8’ approximately.
2 Civil works
 Provision and installation of ceramics
tiles 16” x 16” (Stile/Master/Shabbir/
equivalent brand) for all floors.
 Any additional task not included in this
scope will be charged separately as per 2187/- 250/- 546,750/-
agreed upon rates.
3 False Ceiling
 Provision and installation of Gypsum false
ceiling 7 mm thick complete with 2187/- 63/- 137,700/-
aluminium frame and DFB / Elephant
brand tiles.excluding verandah
4 Electrification
 Provision and Installation as Includes
internal connection up to main power 2187/- 125/- 273,375/-
distribution panels of Pre Fabricated
building. Sufficient SMD lighting, sockets,
power plugs for A.C. Fast or Dawn Brand
for cables and SMD fittings brand OSAKA
or equivalent. (No bracket fans included)
5 Plumbing
 Plumbing will include a community toilet
room with sonesco fittings and and
master accessories whereas Porta 2187 150/- 328,050/-
(Economy )fittings and sonex accessories
will be used for director office Toilet
6 A.C’s
A.Cs, haier/Kenwood/Orient 1.5 tonnes
reversible x 6nos. 2187 206/- 450,522/-
7 PVC Panelling for commander room
 20x20 Sft =400 SFT 2187 80/- 175,000/-
8 Transportation, Installation and Misc Costs
 Transportation of structure.
 Installation and handling of Structure.
 Mobilization / demobilization costs. 2187/- 122.16/- 267,164/-
Grand Total 2187/- 2051.16/- 44,85,893/-
Income Tax@7.5% = 2187/- 153.84/- 336,442/-
44,85,893*7.5%=RS336,442/-
Grand Total including 7.5% tax 2187/- 2205/- 4,822,335/-
Terms and conditions:

 60% advance, 30% at the time of delivery of material at site, and the remaining 10% after
completion.
 Prices are exclusive of all government taxes.
 Delivery time will be 45 days after confirm purchase order.
 Continuous Electricity, water and clearance for labor to be provided by client on site.
 Prices are ex-thallian FWO.
 Any extra works other than the ones mentioned in the description will be charged accordingly.

We are sincerely looking forward to establish a mutually beneficial business relationship if the