Sunteți pe pagina 1din 7

Progress Report of PSDG Works 2017

Physical
Title of Activity Cont. Amount Expenditure Bills in hand Prog.

Trincomalee
1 Metaling & Tarring to Kanthalai- wan ela 7,559,195.35 4,303,679.89 3,917.00 100%
Road (6.4Km) 0.8-2.00Km
2 Metaling & Tarring to D6 Channel Road 4,412,467.00 3,987,644.96 100%
(3.6Km) 2.5-3.6Km
3 Metaling & Tarring to Salli-Sampaltheevu 7,953,536.16 6,238,377.75 100%
Road (2.0Km) 0.7-2.0Km
4 Metaling & Tarring to Kappalthurai Road 5,928,690.00 4,755,424.40 1,577.00 100%
(3.5Km) 0.7-1.7Km
5 Metaling & Tarring to Sripura Track 11 Road 8,778,278.81 2,000,000.00 5,997.00 100%
(5.6Km) 2.0-3.0Km
6 Metaling & Tarring toIllupaichcholai Road 5,894,350.00 1,171,545.68 5,449.00 100%
(1.8Km) 0.00-1.00Km
7 Asphalt Paving to Power House Road 6,672,280.00 4,622,378.60 1,710.00 100%
(0.4Km) 0.00-0.40Km
8 Metaling & Tarring to Jeyasiri Mawatha road 2,608,451.00 2,012,430.69 100%
(0.45Km)
9 Improvements to Paddimedu Kovil 4,424,556.00 850,665.69 2,570.00 100%
Kudiyiruppu road (1.8Km)
54,231,804.32 21,220.00
Total
Batticaloa

1 Reconstruction of 1no Bridge and 01no 1,016,543.05


.Culvert to Eravur Punnakudah Road 2nd km. 5,245,175.00 3,982,577.75 100%

2 Asphalt Paving to Mylankarachi road from 4,013,978.50


Ch 0+00 to 0+500 4,160,645.00 100%

3 Asphalt Paving to Kaluwanchikudy Link 2,300,000.00 (30,000.00)


Road from Ch. 0+000 to 0+180 2,455,580.00 100%

4 Asphalt Paving to South Boundary road 5,700,000.00


Kattankudy from Ch.0+000 to 0+730 6,695,190.00 100%

5 Asphalt Paving to Ferry Road ,Palugamam 4,865,146.50 4,926,450.81


from Ch.0+000 to 0+800 10,304,747.50 100%

6 Asphalt Paving to Kaluwanchikudy Beach - Cont.2018


Road from Ch. 0+000 to 0+300 3,542,270.00 25%

7 Asphalt paving to Kannakipuram Colony - Cont.2018


road from Ch. 0+000 to 0+500 6,483,645.00 75%

8 Concrete Surfacing to Vantharumoolai 2,030,000.00 1,467,493.60


Approach road from Ch. 1+135 to 1+735 3,930,735.00 100%

Concrete Surface to Kuruchamunai


9 Kannankudah Mandapathady Kayakanthivu 7,808,297.25 3,035,115.27
750.0 m 2+000 to2+750 11,120,997.00 100%
Concrete Surfacing to Kokkadicholai
10 Ampilanthurai road 450m Ch 0+ 000 to 1,500.00 3,799,373.77
0+450 km 6,373,400.00 100%
Urgent repairsto Drainage of Associated
11 Renovation work of Governor's Secretariat, 1,000,000.00 1,323,503.24 100%
Chapple street Battticaloa 2,579,388.99
62,891,773.49 15,538,479.74

Ampara
Asphalt surfacing to Rajagalathanna nugelantha
1 4,333,125.00 4.98 100%
road from ch 3+600 to 3+950
Asphalt surfacing to Alivanniyar road from ch
2 4,328,176.20 4.97 100%
0+350 to 0+700
Asphalt surfacing to Alayadivembu road from ch
3 6,897,520.00 7,927,589.40 100%
0+000 to 0+700
Concrete surfacing and drainage to beach road
4 4,310,221.80 2,000,000.00 2.95 100%
akkaraipattu from ch 1+100 to 1+350
Concrete surfacing and retaining wall to
5 4,663,392.50 2,000,000.00 3.36 100%
Veeracholai road from 3+100 to 3+400

Asphalt surfacing to Lihiniyagama-Sadamadulla


6 7,488,000.00 4,750,000.00 3.86 100%
(Webadagama) road ch 0+000 to 0+700

Construction of side drainage and culvets to


7 2,515,976.00 1,086,000.00 1.80 100%
Vakkirasa road from ch 0+000 to 0+500
Concrete surfacing to Lahugala village road,
8 43,111,130.00 2,750,000.00 2.20 100%
lahugala from ch 3+200 to 3+500
Asphalt surfacing and drainage to Dispensary
9 5,069,613.50 500,000.00 5.30 50%
road from ch 0+000 to 0+475
Improvement to Thoddama ambalanoya aligama
10 2,701,071.05 1,000,000.00 1,98 100%
road from ch 0+000 to 4+800
Asphalt surfacing and drainage to Arafa road from
11 4,857,510.00 1,152,673.74 4,50 35%
ch 0+000 to 0+500
Improvement to Kolamanthalawa dorakumbura
12 2,656,336.50 1,200,000.00 1.45 100%
komana road from c h 0+000 to 5+520

Asphalt surfacing and drainage to Moongiladi


13 4,605,262.50 1,000,000.00 3,00 100%
road from ch 0+600 to 0+800
Improvement to Himuthurawa paragahagala road
14 3,212,624.00 647,300.00 2.89 100%
from c h 0+000 to ch 5+000
100749959.05

Con. Amount-Excluding VAT

Progress report of city planning works


Batticaloa
Concrete Surfacing to Lagoon Drive, Eravur,
1 BatticaloaDistrict 44,803,498.31 10,113,026.85
54,916,525.16
Asphalt Paving to Valaichenai Oddamavady
2 Road @ Valaichenai (0+000 to 1+660Km.) 8,665,530.00 26,284,470.00

34,950,000.00
Ampara

Asphalt Concrete Surfacing to


Irakkamam Varapothanchenai Road @
59,402,200.00 13,070,020.00 75%
Irakkamam (Ch 0+000 to 3+300) 3.3Km.

1
Asphalt Surfacing to Sareef Hajiyar Road
& Kappalady Road, Addalachenai. 19,748,185.50 60%

2
Asphalt Concrete Surfacing& Drainage at
Old Beach Road Kalmunaikudy – 800m.
16,486,400.00 70%
(Stage – I).
3
Details Amount (Mn.)
Total Allocation for the new works 224.20

Imprest Received up to 31st October 25.00

Imprest Requested up to November 90.00

Imprest Received in December 34.20

Imprest Requested in December 180.00


Total Imprest Received 59.20
Imprest
Allocation (Mn.) Remprest Requested Received up to Requirement for
District up to now Balance
now

Trincomalee 66.25

Batticaloa 83.50

Ampara 78.25
Total