Title of Activity Cont. Amount Expenditure Bills in hand Prog.
Trincomalee
1 Metaling & Tarring to Kanthalai- wan ela 7,559,195.35 4,303,679.89 3,917.00 100%
Road (6.4Km) 0.8-2.00Km
2 Metaling & Tarring to D6 Channel Road 4,412,467.00 3,987,644.96 100%
(3.6Km) 2.5-3.6Km
3 Metaling & Tarring to Salli-Sampaltheevu 7,953,536.16 6,238,377.75 100%
Road (2.0Km) 0.7-2.0Km
4 Metaling & Tarring to Kappalthurai Road 5,928,690.00 4,755,424.40 1,577.00 100%
(3.5Km) 0.7-1.7Km
5 Metaling & Tarring to Sripura Track 11 Road 8,778,278.81 2,000,000.00 5,997.00 100%
(5.6Km) 2.0-3.0Km
6 Metaling & Tarring toIllupaichcholai Road 5,894,350.00 1,171,545.68 5,449.00 100%
(1.8Km) 0.00-1.00Km
7 Asphalt Paving to Power House Road 6,672,280.00 4,622,378.60 1,710.00 100%
(0.4Km) 0.00-0.40Km
8 Metaling & Tarring to Jeyasiri Mawatha road 2,608,451.00 2,012,430.69 100%
(0.45Km)
9 Improvements to Paddimedu Kovil 4,424,556.00 850,665.69 2,570.00 100%
Kudiyiruppu road (1.8Km)
54,231,804.32 21,220.00
Total
Batticaloa
Ampara
Asphalt surfacing to Rajagalathanna nugelantha
1 4,333,125.00 4.98 100%
road from ch 3+600 to 3+950
Asphalt surfacing to Alivanniyar road from ch
2 4,328,176.20 4.97 100%
0+350 to 0+700
Asphalt surfacing to Alayadivembu road from ch
3 6,897,520.00 7,927,589.40 100%
0+000 to 0+700
Concrete surfacing and drainage to beach road
4 4,310,221.80 2,000,000.00 2.95 100%
akkaraipattu from ch 1+100 to 1+350
Concrete surfacing and retaining wall to
5 4,663,392.50 2,000,000.00 3.36 100%
Veeracholai road from 3+100 to 3+400
34,950,000.00
Ampara
1
Asphalt Surfacing to Sareef Hajiyar Road
& Kappalady Road, Addalachenai. 19,748,185.50 60%
2
Asphalt Concrete Surfacing& Drainage at
Old Beach Road Kalmunaikudy – 800m.
16,486,400.00 70%
(Stage – I).
3
Details Amount (Mn.)
Total Allocation for the new works 224.20
Trincomalee 66.25
Batticaloa 83.50
Ampara 78.25
Total