SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
(a) The vendor is to provide an intelligent and real time based Controller which
can monitor the following sources and consumptions:
Electrical grid supply
Diesel generators (1500 KVA x 3Nos & 1250 KV x 1 No)
Solar Photovoltaic power system as specified above
Electrical power consumption
(b) The controller should be able to take current inputs from the various sources
such as PSPCL grid supply, DG sets and also the Electrical loads. Further it should be
able to communicate with the solar inverters and be able to control the power of the
solar inverters in real time based on the predefined conditions.
(c) Any required communication cabling from the various solar inverters will be
in scope of vendor. Further any communication cabling from CTs and other
sensors will be in scope of vendor.
(d) It will be responsibility for solar vendor to integrate the controller with the
solar system as well as Grid/ DG.
(e) The controller shall able to feed the available solar power to the load (Main
LT Panel) when the either Grid or DG supply is available.
This specification covers the technical requirements of design, manufacturer, supply and
testing at manufacturer’s works of electrical panel indoor type cubicle panels and
delivery to site including testing and commissioning. Specific requirements are indicated
in this specification along with bill of materials.
(b) The Panels shall be dust and vermin proof construction as per IP 52. The
sheet steel used in the fabrication of the switchgear housing shall be CRCA and
2 mm thick and levelled and finished smooth in such a manner that the complete
structure shall be rigid, self-supporting, free from magnetic vibration.
(c) All the steel panels enclosing a MCC/Panel, hinged doors, partitions and
removable panels shall be provided with stiffeners to minimize flexing and
vibration. All panel edges and door edges shall be reinforced against distortion by
rolling, bending or by the addition of welded reinforcement members. Cut outs
shall be turn in shape and devoid of sharp edges.
(d) Instruments shall be mounted on hinged type front doors. All doors shall
have neoprene gaskets. Panels shall be supported by strong hinges of concealed
type and braced in such a manner as to ensure freedom from sagging, bending
Page 21 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
and general distortion of panel or hinged parts. Cable compartment shall also
have hinged doors.
(e) All inter panel / compartments opening for wiring buses or for any other
purposes shall be used with PVC bushes so as to make each section vermin
proof.
(f) The different materials used in the making of panels such as bus
insulation, bus supports etc. shall not support combustion.
(g) All cable entries shall be from the top/bottom through gland plates
assembled at the top/bottom.
(h) Wiring should be with proper ferruling at both ends from terminal to
terminal. All terminals should be provided with identification mark.
(i) MCB of suitable rating should be provided for control wiring wherever
required.
Frequency : 50Hz
Fault level : 50 kA
(k) Interlocks – Mechanical The cubicle door shall not be open when the
MCCBs are in ‘ON’ position. Provision to defeat the interlock shall be provided.
Page 22 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
(l) Bus-Bars All the bus-bars should be electrolyte copper of suitable size
and shall be supported by epoxy/SMC supports. The supports are provided with
built-in-tracking barriers. The entire bus-bar system should be designed for
thermal and magnetic stresses corresponding to the specified short circuit
current. The neutral bus should be 100% of phase bus-bar. All Bus-bar should be
copper & PVC insulated (heat shrinkable).
(m) Surface Treatment and Painting All internal and external surfaces shall
confirm to the painting process. Painting process shall essentially consist of
surface treatment (Phosphatizing for M.S. plates and achromatizing for
aluminium plates) followed by painting, Phosphatizing for M.S. plates shall be as
per IS 3618 1966 comprising of degreasing, rinsing, pickling, rinsing, de-rusting,
rinsing, zinc phosphatizing, rinsing, passivation and hot drying subsequently.
Epoxy paint shade 631 of IS:5 shall be applied with powder coating system.
(n) Current Transformers The current transformer shall be of cast resin and
shall be capable of withstanding the thermal and mechanical stresses resulting
from the maximum short circuit and momentary current ratings of the switchgear.
CTs shall have polarity legibly marked on each transformer and at the load
terminations at the associated terminal blocks. All Metering CTs shall be
grounded through spare terminal on the terminal block to facilitate checking of
the insulation resistance without disturbing the CT circuit wiring.
Page 23 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
Testing at site
v. IR Test
vi. Continuity Test
vii. Functional Test
(r) Drawing: Following drawings should be furnished for approval with all
dimensions after award of the work.
i. GA drawing of panels
ii. Single line & control drawing indicating types, rating and other
details of components.
iii. Section details of typical compartment with components.
iv. Sectional details of bus-bar and cable chambers.
(u) After the installation of strips the wall, slab or floor etc. should be finished
to the satisfaction of the Engineer-in-Charge.
(v) Supply and installation of 25x3 mm copper earthing strip from earth
station to ACDBs panel as directed by EIC. Copper strip shall be connected to
earthing electrode and the ring main earthing by brass bolt and nuts and washers
as well as either brazing or welding surface alongside of the strip so as to be
approved by the Engineer-in-Charge. The portion of the strip outside the panel
room should be laid 600mm below the finished ground level. The surface of the
strip should be painted with two coats of the bitumen paint from the electrode up
to connecting point of the ring main earth.
Page 24 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
The Solar PV Power plant should be provided with Lightning and over voltage
protection. The “Lightning Protection System” must be completed prior to start-up of
commissioning activities of the project. The bidder shall ensure adequate lightning
protection to provide an acceptable degree of protection as per IS for the array yard.
Supply, installation testing and commissioning of Lightning discharge receivers
complete to be installed on the car port structures for lighting protection of solar system.
The material of spike and sphere shall be copper and sphere diameter not less than
60mm and minimum thickness of 4mm. The sphere shall be fixed in a 19 mm dia
(approx.) copper tube length not less than 500mm (approx.) and further fixed on a GI
pipe dia 50 mm and length not less than 1400mm. The fixing arrangement base shall be
suitable for fixing the unit on car port structure.
11. Water Cleaning System
The pipeline shall be connected in the car port structure area with adequate size booster
water pump set & must be equipped with adequate size of flexible pipe & lengths for
cleaning the solar panels with water. Department will indicate the tapping point on main
line for connecting the 25mm GI pipe to tap water for cleaning. Any additional material
which is not included the part of schedule items for commissioning the water tap shall be
in the scope of the contractor.
(b) Pipe Support: Piping shall be properly supported at 1.50 meter interval.
All M.S. supports shall be fabricated out of MS angles / channels. Cost of the
piping support shall be included in the piping rate. Supports shall be painted with
two coats of red oxide primer after manual cleaning of surfaces followed by two
coats of black bituminized paint. Paint being used for piping and supports shall
be make of Asian/Berger.
Page 25 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre
(e) Supply, installation, testing & commissioning of SSB all valve with GI
nipple (2nos.foreach valve threaded end as per the site requirements) with bolts,
nuts, washer, gasket etc. as per the following specification.
i. Body :SS
ii. Ball :SS
iii. Hand lever of valve : Shall be with PVC sleeve
iv. Type :Threaded
v. End connection : Threaded end
vi. GI nipple : Heavy class (Class ‘C’) as perIS:1239
(f) Water Taps Supply, installation of 15mm dia Copper plated standard
water tap or ball valve with BSP threaded ends along with GI hose connector.
(Sample shall be approved before supply).
(g) MS Box Supply and installation of M.S. boxes for cable and termination
and other purposes, fabricated out of CRCA sheet and MS angle frame of
suitable sizes/thickness as directed by engineer-in- charge including all
accessories for installation. After fabrication the boxes shall be treated in seven-
tank treatment and then powder coated with suitable colour as approved by the
dept.
(i) M.S. nut bolts, washers etc. and painting of supports with 2 coats of zinc
phosphate primer and two coats of suitable colour enamel paint.
Weather Monitoring Station should be able to measure solar radiation, wind speed, wind
direction, PV temperature, ambient temperature, humidity and rainfall along with inverter and
energy meter data. Weather monitoring station should communicates with SCADA systems
on RS485 MODBUS, Ethernet and to cloud on GSM/GPRS. The Weather Monitoring
Station shall has following sensors: -
(a) Solar radiation/Pyranometer
(b) Wind speed sensor
(c) Wind direction sensor
(d) PV Temperature sensor
(e) Ambient Temperature & Humidity sensor
(f) Rain bucket (RM Young, Davis)
(g) Irradiance Sensor
Page 26 of 40