Sunteți pe pagina 1din 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE CITY/ MUNICIPAL


ENGINEER/ BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE AND ZONING

LINE AND GRADE

P E R S P E C T I VE

TABLE OF CONTENTS
ARCHITECTURAL

ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL ELECTRONICS MECHANICAL

A-1 PERSPECTIVE, TABLE OF CONTENTS A-13R TYPICAL DETAIL OF CORRIDOR RAILING S-1 GENERAL CONSTRUCTION NOTES, OPTION - 1 (WITH REGULAR CLASSROOM LAYOUT) E-1 GROUND FLOOR LIGHTING LAYOUT (OPTION - 1) EC-1a GROUND FLOOR (OPTION 1) AND SECOND OPTION - 1 (WITH REGULAR CLASSROOM LAYOUT) OPTION - 4 (WITH SCIENCE LABORATORY ROOM)
(FRONT RAILING). DESIGN CRITERIA SECOND FLOOR LIGHTING LAYOUT FLOOR FIREDETECTION AND ALARM SYSTEM
A-2 GROUND FLOOR PLAN (OPTION - 1) , SECOND P-1 GROUND FLOOR PLAN AND SECOND FLOOR
TYPICAL DETAIL OF CORRIDOR RAILING E-2 THIRD FLOOR LIGHTING LAYOUT M-1 SCHEDULE OF EQUIPMENTS, GROUND FLOOR M-7 SCHEDULE OF EQUIPMENTS
FLOOR PLAN, SCHEDULE OF FLOOR FINISHES, S-2 GENERAL CONSTRUCTION NOTES PLAN (SEWER AND DRAINAGE LINE LAYOUT) EC-1b GROUND FLOOR (OPTION 2) AND SECOND
( SIDE RAILING). FOURTH FLOOR LIGHTING LAYOUT FLOOR FIRE DETECTION AND ALARM SYSTEM VENTILATION AND CEILING FAN LAYOUT, GROUND FLOOR AIR CONDITIONING AND
SCHEDULE OF WALL FINISHES TYPICAL DETAIL SECTION OF STAIR. S-3 FOUNDATION PLAN P-2 THIRD FLOOR PLAN AND DECK ROOF FLOOR TYPICAL SECOND AND THIRD FLOOR VENTILATION LAYOUT
TYPICAL DETAIL SECTION OF STAIR STEPS. SECOND FLOOR FRAMING PLAN PLAN (SEWER AND DRAINAGE LINE LAYOUT) E-3 ROOF DECK POWER LAYOUT EC-1c GROUND FLOOR (OPTION 3) AND SECOND VENTILATION AND CEILING FAN LAYOUT TYPICAL SECOND AND THIRD FLOOR
A-2a GROUND FLOOR PLAN (OPTION - 2), GROUND FLOOR POWER LAYOUT (OPTION - 1)
DETAIL SECTION OF CONCRETE BENCH P-3 GROUND FLOOR PLAN (WATER AND FIRE LINE FLOOR FIRE DETECTION AND ALARM SYSTEM VENTILATION AND CEILING FANLAYOUT
GROUND FLOOR PLAN (OPTION - 3), S-4 THIRD FLOOR FRAMING PLAN M-2 GENERAL NOTES, LEGENDS, FOURTH FLOOR
SCHEDULE OF FLOOR FINISHES, SCHEDULE OF FOURTH FLOOR FRAMING PLAN LAYOUT), ROOF PLAN (DRAINAGE LAYOUT) E-4 SECOND FLOOR POWER LAYOUT EC-1c GROUND FLOOR (OPTION 4) AND SECOND VENTILATION AND CEILING FAN LAYOUT,
A-14 SCHEDULE OF DOORS AND WINDOWS M-8 GENERAL NOTES, LEGENDS,
WALL FINISHES THIRD FLOOR POWER LAYOUT FLOOR FIRE DETECTION AND ALARM SYSTEM MISCELLANEOUS DETAILS
S-5 DETAIL PLAN AND ELEVATION OF CF-1, F-1 P-4 SECOND FLOOR PLAN , THIRD FLOOR PLAN FOURTH FLOOR VENTILATION AND CEILING FAN
A-2b GROUND FLOOR PLAN (OPTION - 4),
A-15 DETAIL ELEVATION AND SECTION OF CORRIDOR
(EXPOSURE - B) AND ROOF DECK FLOOR PLAN (WATER AND E-5 FOURTH FLOOR POWER LAYOUT EC-2 THIRD FLOOR AND FOURTH FLOOR FIRE WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC LAYOUT, MISCELLANEOUS DETAILS STRUCTURAL
RAILING (TYP. @ SECOND AND THIRD FLOOR) FIRE LINE LAYOUT) ROOF DECK POWER LAYOUT
THIRD FLOOR PLAN, SCHEDULE OF FLOOR DETAIL PLAN AND ELEVATION OF CF-1, F-1 DETECTION AND ALARM SYSTEM DIAGRAM OF WATER PUMPING SYSTEM,
FP-7 FOURTH FLOOR FE AND FHC LAYOUT
FINISHES, SCHEDULE OF WALL FINISHES (EXPOSURE - D) P-5 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) MISCELLANEOUS DETAILS
A-16 DETAIL OF TOILETS E-6 GENERAL NOTES EC-3a FIRE DETECTION AND ALARM SYSTEM RISER SCHEDULE OF EQUIPMENT
SCHEDULE OF FOOTING TIE BEAM (EXPOSURE - B) PLUMBING NOTES
ELECTRICAL SYMBOLS DIAGRAM (OPTION 1, 3 & 4) FP-1 GENERAL NOTES, LEGEND, GROUND FLOOR MISCELLANEOUS DETAILS
A-3 FOURTH FLOOR PLAN, DECK ROOF FLOOR PLAN, A-17 DETAIL OF TOILETS SCHEDULE OF FOOTING TIE BEAM (EXPOSURE - D)
P-6 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT) SCHEDULE OF LOADS FE AND FHC LAYOUT, TYPICAL SECOND AND
SCHEDULE OF FLOOR FINISHES, SCHEDULE OF EC-3b FIRE DETECTION AND ALARM SYSTEM RISER FP-8 FOURTH FLOOR FE AND FHC LAYOUT
S-6 WALL TO TIE-BEAM CONNECTION DETAILS PLUMBING NOTES SCHEDULE OF LIGHTING FIXTURES AND LAMPS THIRD FLOOR FE AND FHC LAYOUT
WALL FINISHES A-18 DETAIL OF BLACKBOARD DIAGRAM (OPTION 2) SCHEDULE OF EQUIPMENT
DETAIL OF WALL FOOTING -1 ELECTRICAL RISER DIAGRAM
DETAIL OF CHALK DUST BOX P-7 ISOMETRIC DIAGRAM (WATER LINE LAYOUT), FP-2 FOURTH FLOOR FE AND FHC LAYOUT, SCHEDULE MISCELLANEOUS DETAILS
A-4 ROOF PLAN, FRONT ELEVATION, DETAIL SECTION (CHALK DUST BOX) DETAIL SECTION OF HAN WASHING COUNTER E-7 GROUND FLOOR POWER LAYOUT EC-04 VOICE AND DATA RISER DIAGRAM
PLUMBING LEGEND OF EQUIPMENT, MISCELLANEOUS DETAILS
SCHEDULE OF WALL FINISHES DETAIL LAVATORY (HAND WASH) (WITH HOME ECONOMICS ROOM - OPTION - 2)
DETAIL SECTION OF CONCRETE SEATING EC-05 CLOSED CIRCUIT TELEVISION RISER DIAGRAM
P-8 DETAIL OF CATCH BASIN GROUND FLOOR LIGHTING LAYOUT
A-5 REAR ELEVATION, LEFT SIDE ELEVATION, DETAIL SECTION OF CONCRETE CANOPY (WITH HOME ECONOMICS ROOM - OPTION - 2) OPTION - 2 (WITH HOME ECONOMICS ROOM)
DETAIL OF SEPTIC VAULT EC-06 MISCELLANOUES DETAILS 1
RIGHT SIDE ELEVATION, SCHEDULE OF WALL
S-7 REF. DETAIL ELEVATION OF COLUMNS SCHEDULE OF SLAB REINFORCEMENT E-8 GENERAL NOTES
FINISHES M-3 SCHEDULE OF EQUIPMENTS, GROUND FLOOR
SCHEDULE OF COLUMN (EXPOSURE -D & V=340) P-9 DETAIL OF CISTERN TANK ELECTRICAL SYMBOLS AIR-CONDITIONING AND VENTILATION LAYOUT,
A-6 CROSS SECTION, LONGITUDINAL SECTION, SCHEDULE OF COLUMN (EXPOSURE -B & V=270) SCHEDULE OF LOADS SANITARY/ PLUMBING
TYPICAL SECOND & THIRD FLOOR VENTILATION
SCHEDULE OF WALL FINISHES DETAIL SECTION OF STAIR ON FILL SCHEDULE OF LIGHTING FIXTURES AND LAMPS
OPTION - 2 (WITH HOME ECONOMICS ROOM) AND CEILING FAN LAYOUT
ELECTRICAL RISER DIAGRAM
A-7 GROUND FLOOR REFLECTED CEILING PLAN S-8 SCHEDULE OF BEAMS AND GIRDERS M-4 GENERAL NOTES, LEGENDS, FOURTH FLOOR
(OPTION 2, 3 & 4) SCHEDULE OF SLABS P-1a GROUND FLOOR PLAN (SEWER AND DRAINAGE E-9 GROUND FLOOR LIGHTING LAYOUT
VENTILATION AND CEILING FAN LAYOUT,
SCHEDULE OF CEILING FINISHES, NOTES, LEGEND TYPICAL GIRDER/ BEAM DETAILS LINE LAYOUT) (WITH COMPUTER LABORATORY ROOM - OPTION - 3)
MISCELLANEOUS DETAILS
GROUND FLOOR PLAN (WATER LINE LAYOUT) GROUND FLOOR POWER LAYOUT
S-9 SCHEDULE OF BEAMS AND GIRDERS (WITH COMPUTER LABORATORY ROOM - OPTION - 3) WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC
A-8 TYPICAN 2ND AND 3RD FLR. REFLECTED CEIL. PLAN, P-1b ISOMETRIC DIAGRAM (WATER LINE LAYOUT)
FOURTH FLOOR REFLECTED CEILING PLAN (EXPOSURE - B) E-10 GENERAL NOTES DIAGRAM OF WATER PUMPING SYSTEM,
DETAIL SECTION OF R.C. RAMP P-1c ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) MISCELLANEOUS DETAILS
SCHEDULE OF CEILING FINISHES, ELECTRICAL SYMBOLS
DETAIL OF CEILING AIR-VENT SCHEDULE OF LOADS FP-3 FOURTH FLOOR FE AND FHC LAYOUT
S-10 END WALL DETAIL OPTION - 3 (WITH COMPUTER LABORATORY ROOM) SCHEDULE OF LIGHTING FIXTURES AND LAMPS
ROOF FRAMING PLAN DETAIL ADAPTABLE TO OPTION - 1 SCHEDULE OF EQUIPMENT
A-9 DETAIL BAY SECTIONS ELECTRICAL RISER DIAGRAM MISCELLANEOUS DETAILS
DETAIL SECTION (R.C. GUTTER) DETAIL OF R.C. GUTTER
DETAIL SECTION OF CORRIDOR RAILING DETAIL OF PLANTED COLUMN (PC-1) OPTION - 4 (WITH SCIENCE LABORATORY ROOM) E-11 GROUND FLOOR LIGHTING LAYOUT FP-4 FOURTH FLOOR FE AND FHC LAYOUT, SCHEDULE
(WITH COMPUTER LABORATORY ROOM - OPTION - 4)
(TYP. @ SECOND TO FOURTH FLOOR) OF EQUIPMENT, MISCELLANEOUS DETAILS
S-11 DETAIL ELEVATION OF TRUSS 1 P-1d GROUND FLOOR PLAN (SEWER AND DRAINAGE SECOND FLOOR POWER LAYOUT ELECTRICAL
A-10 DETAIL OF MAIN ENTRANCE REFERENCE WELD DETAIL LINE LAYOUT) (WITH SCIENCE LABORATORY ROOM - OPTION - 4) OPTION - 3 (WITH COMPUTER LABORATORY ROOM)
TYPICAL DETAIL OF SERVICE ENTRANCE SCHEDULE OF TRUSS MEMBERS AND WELDS GROUND FLOOR PLAN (WATER LINE LAYOUT)
SPOT DETAIL SECTION OF CORRIDOR RAILING (EXPOSURE - B) E-12 GENERAL NOTES M-5 SCHEDULE OF EQUIPMENT
P-1e ISOMETRIC DIAGRAM (WATER LINE LAYOUT) ELECTRICAL SYMBOLS GROUND FLOOR AIR-CONDITIONING AND
(AT GROUND FLOOR) SCHEDULE OF TRUSS MEMBERS AND WELDS
SPOT DETAIL SECTION OF STAIR STEP (EXPOSURE - D) P-1f ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SCHEDULE OF LOADS VENTILATION LAYOUT
(MAIN/ SERVICE ENTRANCE) SCHEDULE OF LIGHTING FIXTURES AND LAMPS TYPICAL SECOND AND THIRD FLOOR
S-12 DETAIL SECTIONS, CONNECTIONS & ANCHORAGES ELECTRICAL RISER DIAGRAM VENTILATION AND CEILING FAN LAYOUT
A-11 DETAIL OF RAMP OF TRUSS MEMBERS M-6 GENERAL NOTES, LEGEND, FOURTH FLOOR
DETAIL SECTIONS OF RAMP VENTILATION AND CEILING FAN LAYOUT
DETAIL SECTION OF RAMP RAILING S-13 DETAIL ELEVATION OF TRUSS - 2
MISCELANEOUS DETAILS
TYPICAL DETAIL PLAN OF HAND WASHING COUNTER DETAIL CONNECTION AND SPACING OF J-BOLT
TYP. DETAIL SECTION OF HAND WASHING ISOMETRIC VIEW OF CONNECTION OF ROOFING TO WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC
COUNTER PURLINS DIAGRAM OF WATER PUMPING SYSTEM,
MISCELLANEOUS DETAILS
A-12 TYPICAL DETAIL OF STAIR, S-14 DETAIL ELEVATION OF STAIR MECHANICAL
TYPICAL DETAIL OF STAIR FROM FOURTH FLOOR DETAIL SECTION OF STAIR FP-5 GROUND FLOOR FE AND FHC LAYOUT
TO DECK ROOF FLOOR LEVEL DETAIL PLAN OF LINTEL BEAM TYPICAL SECOND AND THIRD FLOOR FE AND ]
DETAIL PLAN OF STAIRWAY COLUMN FHC LAYOUT
A-13 TYPICAL DETAIL SECTION OF STAIR
FP-6 FOURTH FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR (TO DECK ROOF) S-15 FRAMING PLAN OF SATIR @ FOURTH FLOOR LEVEL
DETAIL SECTION OF STAIR LANDING SCHEDULE OF EQUIPMENT
FRAMING PLAN OF STAIR @ ROOF DECK LEVEL
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF) MISCELLANEOUS DETAILS
STAIR DETAIL FROM 4TH FLOOR TO ROOF DECK
TYPICAL DETAIL SECTION OF STAIR STEPS DETAIL PLAN OF LINTEL BEAM (LB-1)
TYPICAL DETAIL SECTION OF STAIR STEPS DETAIL PLAN OF MEDIA AGUA
(TO DECK ROOF)
SPOT DETAIL (NON-SKID NOSING STRIP)
SPOT DETAIL (TYPICAL HANDRAIL)

ARCHITECTURAL CONCEPT:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TABLE OF CONTENTS
MODIFIED STANDARD DPWH - DEPED PERSPECTIVE CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
RICARDO S. CANDIDO
DRAFTSMAN 1
APPROVED WITH SIGNATURE BOD
A-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH

S-ar putea să vă placă și