1) Light Hazard Risk – Bakery II, shop, residencies & event zone
2) Moderate Hazard Risk – Bakery I (cold storage) & panel room
HEAT DETECTORS
Detecting Radius: 40 – 80 m
- UV/IR: Bakeries and Kitchen and Cafe
A combination of both UV and infrared technology is quite popular for detection of
heat as the detector is able to collect information from both an UV perspective
and an infrared perspective. This helps to minimize false alarms.
Detecting Radius: 15 m
MANUAL CALL POINT: placed in easily accessible areas such as corridoors and next to fire
exists.
FIRE HYDRANTS
SPRINKLERS
1) Ceiling or flush and concealed type – in event zone, shop and bakery I
(as these are to be installed only in light or moderate hazard risks and not for the high
hazard class, as the spray sprinkler system cannot be used where there is exposed steel
structure.
Calculations: 1 sprinkler head per 150 sq.ft (shown in the attached excel sheet)
FIRE EXTINGUISHERS
Halogenated or Clean Agent extinguishers include the halon agents as well as the newer and less
ozone depleting halocarbon agents. They extinguish the fire by interrupting the chemical
reaction and/or removing heat from the fire triangle. Clean agent extinguishers are effective on Class
A, B and C fires. Smaller sized handheld extinguishers are not large enough to obtain a 1A rating and
may carry only a Class B and C rating.
PUMP ROOM:
Placed underground due to lack of space on the ground floor and a staircase is provided to
access the area.
Calculations: Pump capacity: 135 cubic metre, which is the minimum requirement.
Placed in rooms which have a high probability to catch or start a fire. The doors, after letting the
people inside the room out (with the help of sensors) closes, protecting the rest of the buildings
from the fire and also cutting the oxygen supply of the room.
1. The minimum requirement for the tank in the pump room is 135m3 which is suitable for the
building.
2. The sprinkler system in the event zone, bakeries, shop and kitchen are mounted on the
already existing false ceiling that was installed to accommodate the HVAC ducting for the
cassette unit. The false ceiling height is enough for the piping of the sprinklers as well as the
HVAC.
3. Due to shortage of area, the pump room is added underground and a staircase with railing
4. Since there is no space for a fire truck to come, a hose reel is added that can be utilized in
case of a fire which gets its water from the pump room.