Sunteți pe pagina 1din 65

Processing Flow/Operations

Processing Flow/Operations

C02 Processingg
Gas Processing‐dehydration, 
compression
OPERATIONAL FEATURES PECULIAR TO CO2

OPERATION PROCESSES

WE WILL LOOK AT PRODUCTION OPERATIONS FROM DIFFERENT


OPERATORS

BASED ON THE OPERATIONAL FLOW

2
3

Typical CO
yp 2/
2 / Waterflood Operation
p
NATURAL RECYCLE MAKE-UP
CO2 REMOVAL
GAS SALES CO2 CO2
FACILITIES,
COMPRESSION &
DEHYDRATION

HEATER
TREATER
TEST GAS
SEPARATOR PRODUCTION SCRUBBER
SEPARATOR
OIL OIL
TANKS SALES
LACT

FWKO
FREE
GAS KO

METER WATER
SKID TANKS

PRODUCTION INJECTION
WELL WELL
4
Production
P d ti
Header – 40+
wells

5
6
7
8
9
10
11
12
OXY PERMIAN
Denver Unit

13
Field Flow Diagram
Producing Well
CO2 Recovery Plant

Gas Sales
Test Station

Injector NGL Sales


S l
Sulfur Sales
Oil Reservoir Oil Sales

Tank Battery

Water Injection
CO2 Purchase Line
CO2 Recycle 14
Field Flow Diagram
G Sale
Gas S l

Gas/CO2
NGL Sale
Gas Compr. CO2 Rec. Plant

Oil, Wtr, Gas/CO2 Gas/CO2 Sulfur Sale

Oil Sale

T
Test S
Sat. Tank Battery
Prod. Well
Water
CO2 Recycle

Water
CO2 Purch
CO2 Purchase Inj. Well Water Inj. Stat.

15
AMERADA HESS SEMINOLE SAN ANDRESS UNIT C02
FLOOD
NEXT SLIDES ARE:

PRODUCTION WELL
WELL-FLOWING
FLOWING
PRODUCTION WELL-ROD PUMP
PRODUCTION SATELLITE
FREE WATER KNOCK OUTS
MAIN BATTERY
GAS
G S PLANT
17
18
19
20
21
22
PHOTOS FROM ENERGEN’S PENWELL(SAN
ANDRES) CO2 FLOOD

23
TWO ZONES IN THE SAN ANDRES
3300’ & 3800’
4.5 MMCFPD CO2 FROM KINDER MORGAN
CO2 INJECTION-1100-1200PSI-12 WELLS
121 PRODUCERS-65-70CO2-1000BOPD
PRODUCERS 65 70CO2 1000BOPD
20ACRE SPACING GENERALLY-SOME 10
RECYCLING 6MMCFPD-GUTS AND FEATHERS
TOTAL LEASE PRODUCTION-36000BWPD-1530 BOPD

24
USE DEHYRATION AND 4 STAGE COMPRESSION

LINES ARE CARBON STEEL-SOME FIBERGLASS


IN STAGE 3

25
26
27
28
29
30
PHOTOS FROM WHITING’S NORT WARD-ESTES CO2 FLOOD
WICKET TEXAS

31
32
33
34
35
H.T. Boyd CO2 Flood

Pre Project Production Facilities


Test Satellites Central Battery
Produced Gas to Sales Gas to Sales
(300 MSCFD) (15 MSCFD)
Production
Separator

Production Produced Gun Oil to Sales


Liquids (330 BOPD)
Produced Liquids to CB
Barrel
(10,330 LPD)

Test
Separator Water to Water Injection Facility
(10,000 BWPD)
Inlet Header

Measurement 36
H.T. Boyd CO2 Flood

Central Facilities Modification


Gas to Recycle
C
Compressors (12 MMSCFD)
Inlet
Headers
Production
P d i VRU
Production Separator
Oil Sales
(1,600 BOPD)

FWKO Gun
B
Barrel
l
Test
Separators

10,000
10 000 BWPD
Produced Water
Measurement
To New Disposal System
37
H.T. Boyd CO2 Flood

C t l Tank
Central T k Battery
B tt
Oil Storage Water Storage

VRU

Water Disposal System

Gun Barrel

Overflow Tank
Produced Gas to
Recycle Compressors

North Production Header


FWKO
North and South
Test Separators

South Production Header


Production Separator
38
H.T. Boyd CO2 Flood

C t l Tank
Central T k Battery
B tt
Test
Separator
Production
Separator

Gun
Barrel
FWKO

39
H.T. Boyd CO2 Flood

C t l and
Control dMMeasurementt

Purchase Metering Injection Metering

40
Recycle Metering
H.T. Boyd CO2 Flood

New Recycle Facilities


Four Stage
g Compression
p
Ariel Model JGK-4
Toshiba 1500 HP Variable Speed Drive
Two Stages SS - Two Stages CS
6 MMSCFD
{Provision for Second Compressor}
Gas From
Central Tank Battery Recycled CO2 to
50 PSIG Injection
jec o Sys
System
e
@ 2250 PSIG

Inlet KO

Flare
550 PSIG
Design Pressure Glycol
Dehydration Flash Gas and
Electric Heat
Still Overhead Gas 41
H.T. Boyd CO2 Flood

Recycled CO2
CO2 Injection System
@ 2250 PSIG

IInjectors
j
Gas Detection
Measurement Skid

Gas Detection
Purchased CO2 Injectors
@ 2100 PSIG
Girls Town
Measurement Skid
Injectors
Gas Detection 42
Surface Facilities Options
GAS HANDLING/PROCESSING
DEHYDRATION COMPRESSION
DEHYDRATION‐COMPRESSION

• Reinjection of associated gas produced (Often Referred 
to as Blood, Guts, and Feathers {BGF})
to as Blood, Guts, and Feathers {BGF})
– Compression and usually dehydration

• Reinjection
Reinjection of associated gas stream coupled with C
of associated gas stream coupled with C4+ 
+
extraction for sales
– Compression, dehydration, rough hydrocarbon cut, CO
p , y , g y , 2 removal

• Processing of the associated gas stream into C2+ for 
sales and CO2 for reinjection
j
– Compression, dehydration, hydrocarbon recovery (distillation, CO2
membranes, etc.)

43
Gas Handling Dehydration
Gas Handling ‐

• Purpose of dehydration 
is to eliminate potential 
corrosion caused by the 
i d b th
presence of free water 
and CO2
and CO
• Use TEG to decrease 
water content in gas 
stream to 25 lb/MMscf 
or less

44
Gas Handling ‐
g Dehydration
y
• Design Considerations
Design Considerations
– Is dehydration necessary?
– Wet CO2 flow rates
– Operating pressure
Operating pressure
– Operating temperature
• Materials
– Contactor: Stainless steel
l l
– Regeneration Skid: Carbon 
steel and stainless steel

45
Gas Handling ‐ Compression
Gas Handling 

• CO2 compression differs 
significantly from 
natural gas compression
t l i
– Materials
– Compressor Speed
Compressor Speed
– Drivers
– Cooler Design

46
Gas Plant Operations at North 
Ward Estes 
North Ward Estes - Simplified
Gas Process Flow Diagram Nitrogen
Vent

Gas from NGL Dry


Field Gas Gas
NGL’s, NRU,
NGL’ NRU Dry
D
Separation Sales Sales
Gas Processing
Gathering
System

Inlet Slug Inlet Dehydration Stage 1 Stage 1 Stage 2 Stage 2


Catchers Comp Pretreat Membranes Pretreat Membranes

Reinjection
Comp

Gas to
Field Injection
Distribution
System
Gas Inlet
-Slug Catchers-
Inlet
Compression
Train 1
Dehydration
Train 1 – Stage 1
-Pretreat-
Train 1 – Stage 1
-Membranes-
Tube Membrane Movie
Membrane Removal Movie
Train 1 – Stage 2
-Pretreat-
Train 1 – Stage 2
-Membranes-
Reinjection
Compression

S-ar putea să vă placă și