2.1 General Approach  
 
The consultant has divided the consultancy services into the following tasks but not 
limited to the following: 
 
 Review of all available reports and published information. 
 Detailed  reconnaissance  survey  of  project  roads  &  Inventory  and  condition 
survey of the existing road pavement and shoulder and Identification of possible 
improvements in the existing alignment  
 Detailed topographical survey using LiDAR Technology. 
 Traffic surveys. 
 Pavement  investigations  including  Sub  grade  characteristics  and  evaluation  of 
strength. 
 Inventory and condition survey for bridges and culverts. 
 Evolving  required design standards & specifications 
 Design of roads & other structures including flyover/grade separator 
 Project costing  
 
2.2 Reconnaissance 
 
Reconnaissance  surveys  have  been  conducted  by  our  project  team  of  engineers  to 
finalize  the  procedure  for  the  detailed  inventories  and  engineering  investigations  to 
follow, and have identified the following: 
 
 Topographic  and  physical  features  of  the  project  and  surrounding  region, 
including environmental features. 
 Need for grade separators and Flyovers. 
 Traffic flow pattern 
 Locations for conducting traffic surveys. 
 Preliminary  inventory  of  pavement,  carriageway  type,  bridges  and  structures, 
intersections, Urban/congested areas. 
 Requirements for conducting supplementary investigations. 
 Extent of land available and additional requirements for widening if any. 
 
2.3 Review of Current Data 
 
The following secondary data has been collected and reviewed.  
 
 Climatic and demographic features 
 Inventory and condition reports of road, bridges and structures. 

Chapter – 2 : Page ‐ 1 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
 Traffic data‐ classified volume count, Turning Movement Count(RITES Report) 
 Accident Data 
 Location of utility services‐(Meinhardt Report,  electric cables, telephone cable) 
 Details of sanctioned/ongoing work(road side drains, electrical poles, etc) 
 
2.4 Topography  
 
Ranchi  is  located  between  latitude  22030’N  –  23036’N  and  longitude  84054’E  – 
85054’E.The  tropic  of  Cancer  at  231/20North  passes  through  Ranchi  District  (at 
Ormanjhi).  The  average  altitude  of  Ranchi  is  600  meters  above  the  sea  level  with 
undulating land features.  
 
The physiographic characteristics of the district are rich. It has waterfalls, hills, and land 
with avalanches. Ranchi is surrounded by green forest. 
 
2.5 Surveys and Investigations 
 
Topographic Survey 
 
The  topographical  survey  has  been  carried  out  using  the  latest  LiDAR  technology  and 
augmented  with  total  station  survey  inputs  as  required.  The  data  has  been  acquired 
from the centre line of the road up to 30m on either side. All the topographic features 
along the road have been extracted and after the initial pre‐processing, Digital Elevation 
Model (DEM) for the road stretches has been generated. 
 
Traffic Surveys 
 
The  traffic  surveys  and  analysis  is  a  very  critical  aspect  in  the  preparation  of  detailed 
project report as the need and type of improvements is always dependent on the traffic 
flow characteristics. Underlying aim of  the entire assignment is to provide an  accurate 
assessment of the existing traffic flow characteristics and the future traffic levels based 
on the anticipated traffic growth and quantum of diverted traffic, if any. 
 
The details of traffic surveys have been described in Chapter – 5.  
 
2.5.1 Classified Volume Count 
 
The traffic volume surveys have been conducted based on IRC: 102‐1988 supplemented 
by  various  accepted  practices  and  project  specific  requirements.  The  objective  of  the 
surveys  will  be  to  establish  accurate  baseline  traffic  flows,  which  can  be  used  for 
forecasting the future traffic  levels.  These surveys have been undertaken  on identified 
stations based on initial reconnaissance.  
 
   

Chapter – 2 : Page ‐ 2 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
Based on the survey locations and the requirements, a series of traffic counts has been 
organized. IRC: 106‐1990 suggests undertaking traffic counts for 16 hour day (6 A.M. to 
10 P.M.) in order to capture all the peaks. In order to take care of the hourly variation to 
a great extent, data collection was extended to 24 hours x 3 days (72 hours) instead of 
16 hours. 
 
The  data  was  collected  at  15‐minute  intervals  and  aggregated  to  hourly  volumes, 
direction  wise.    This  is  required  because  of  the  requirements  for  modeling  traffic 
congestion effects which requires an hourly distribution of traffic volume. 
 
2.5.1.1 Turning Volume count Survey 
 
The  turning  volume  count  survey  for  estimation  of  peak  hour  traffic  for  the  design  of 
major  intersections  was  carried  out  for  the  study.  The  methodologies  for  the  surveys 
were as per IRC: SP: 41‐1994. The data derived from the survey was used to analyze and 
to  identify  requirements  of  suitable  remedial  measures,  such  as  construction  of 
underpasses and interchanges, along the project road alignment. Intersections with high 
traffic volume requiring special treatments either presently or in future were identified.  
 
2.5.1.2 Axle Load Surveys: 
 
The  intensity  of  traffic  load  repetitions  is  an  important  parameter  in  the  design  of 
highway  pavements.  The  intensity  of  traffic  loading  is  defined  in  terms  of  cumulative 
number of standard axles (6600 kg in case of single tire single axles, 8160 kg in case of 
dual  tire  single  axles  and  15,100  kg  in  case  of  tandem  axles)  load  repetitions  to  be 
carried  during  the  design  life  of  the  road.  The  equivalent  standard  axle  concept  is  the 
best method available, for design purposes, to handle the large spectrum of axle loads 
actually applied on to a pavement surface. IRC 37‐2012 provides a scientific method for 
the design of flexible pavements based on the concept of equivalent standard axle and 
vehicle damage factor. Since there is minimal commercial traffic on road nos. 1,2&5, axle 
load survey has not been conducted in these roads. However axle road survey has been 
conducted on Road no 3 &4, near Kantatoli and Booti More. 
 
2.5.1.3 Accident Spot Studies 
 
All secondary data on accidents occurring along the project corridor has been collected 
for year 2013 from SP, Traffic. 
 
2.5.2 Road and Pavement Investigations 
 
Field  studies  have  been  carried  out  in  respect  of  road  and  pavement  as  per  the 
requirements. Methodology for various field studies is given below. 
 
   

Chapter – 2 : Page ‐ 3 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
2.5.2.1 Road Inventory Surveys 
 
Detailed  road  inventory  surveys  have  been  carried  out  to  collect  details  of  all  existing 
road  and  pavement  features  along  the  existing  road  sections.  The  inventory  data 
includes the following: 
 
•   Terrain (flat, rolling, mountainous) 
•   Land‐use (commercial, Defense land, residential etc) 
•   Carriageway width, surfacing type 
•   Shoulder surfacing type and width 
•   Sub‐grade / local soil type (textural classification) 
•   Road intersection type and details 
•   Retaining structures, if any 
•   Location of water bodies (Lakes and Ponds), if any 
•   Land width i.e. ROW 
•   Culverts, bridges and other structures (type, size, span arrangement and location) 
•   Roadside arboriculture 
•   Existing utility services on either side within ROW 
•   General drainage conditions 
•   Riding Quality 
 
The  data  has  been  compiled  and  presented  in  tabular  form  in  relevant  section  of  this 
DPR. 
 
2.5.2.2 Pavement Investigations 
 
(I) Pavement Composition 
 
a)   Test pits were made to ascertain the pavement composition. The test pits 
were  dug  as  per  standards  and  the  test  pits  immediately  filled  up  after 
the necessary collection of samples.  
b)   For each test pit, the following information has been recorded: 
 Test pit reference (Identification number, Location) 
 Pavement composition (material type and thickness) 
 Sub grade type (textural classification) and condition (dry, wet) 
 Sub grade moisture content and strength 
 
(II) Pavement condition study 
 
It has been observed that there is no major distress in Road Nos. 1& 2. It has also 
been observed that overlay has been laid recently. In Road No. 3, the condition 
of  the  pavement  is  fair  all  along  the  road  but  some  part  of  the  pavement  has 
deteriorated  near  Kantatoli  Chowk  and  Katcheri  Chowk.  In  Road  No.  5  the 
condition of the pavement is generally good. In Road No.4 pavement condition is 
good from Rajbhawan upto Karamtoli Junction. However from Karamtoli junction 

Chapter – 2 : Page ‐ 4 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
up to Booti More the pavement condition has deteriorated due to poor surface 
drainage and other factors. 
 
(III) Shoulder condition study 
 
It has been observed that the shoulder condition varies from good to fair in Road 
Nos. 1,2,3& 5 and is in poor condition in Road No. 4. 
 
(IV) Pavement Drainage  
 
It has been observed that there is in general an absence of planned camber on 
these  roads,  yet  the  pavement  surface  does  not  suffer  drainage  related  issues 
due to rolling topography. 
 
(V) Pavement Structural Strength 
 
The structural strength surveys for existing pavement has been carried out using 
Benkelman  Beam Deflection technique  in accordance with the CGRA procedure 
given in IRC: 81‐1997 (“Guidelines for Strengthening of Flexible Road Pavements 
Using  Benkelman  Beam  Deflection  Technique”).  Benkelman  Beam  deflection 
surveys have been carried out on all roads except for severely distressed sections 
of the road warranting reconstruction. 
 
2.5.2.3 Sub‐grade Characteristics and Strength 
 
The data on soil classification and mechanical characteristics for soils along the existing 
alignments have been collected as given under: 
 
(a) The characteristics of the existing soil from every 1.0 km of the project road or 
closer where the change in soil type is encountered. 
(b) The determination of Sub grade CBR (4 days soaked) at 97% of heavy compaction 
results at 1.0 km intervals of the project road or closer where change in type is 
encountered. Laboratory CBR (4‐days soaked compacted at 97% MDD and OMC) 
and swell has also be conducted.  
(c) Benkelman Beam Deflection measurements on the project road.  
(d) Investigations  of  the  subsoil  strata  (one  trial  bore  and  /  or  test  pit  at  locations 
where new bridges or other structures are proposed. The depth of the trial bore/ 
test pit is as per IRC standards). 
 
   

Chapter – 2 : Page ‐ 5 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
2.5.3 Investigations for Bridges and Structures 
 
2.5.3.1 Inventory of Bridges, Culverts and Structures 
 
An inventory of the entire structures (bridges, via ducts, ROBs, culverts, etc.) along the 
road under the project has been prepared. The inventory for the bridges, via ducts and 
ROBs  include  the  parameters  required  as  per  the  guidelines  of  IRC‐SP:  35‐1990.  The 
inventory of culverts and cross drainage structures are presented in relevant sections. 
 
2.5.3.2 Hydraulic and Hydrological Investigations 
 
Hydrological  studies  have  been  conducted  based  on  the  available  cross  section  of  the 
stream and the linear waterway available. As only widening of the existing CD structures 
are  envisaged,  the  available  linear  waterway  is  sufficient  to  cater  to  the  existing 
discharges.  
 
2.5.3.3 Condition Surveys for Bridges, Culverts and Structures 
 
1 The  existing  structures  excluding  ROBs  have  been  thoroughly  investigated  and 
have been tabulated under relevant sections. 
2 No visual distress has been observed in the structures. 
 
2.5.3.4 Geo‐technical Investigations and Sub‐Soil Exploration 
 
Geo‐technical investigations and sub‐surface explorations for the existing minor bridges, 
proposed flyover has been conducted and will be used for design of foundations. 
 
2.6 Design of Road and Pavements 
 
Designs have been carried out and drawings have been prepared for the following: 
 
a) Improvement  to  Road  Nos.1,2,3,4&  5  and  beautification  with  provision  of  
dedicated underground utility corridor 
b) Design of pavement along with  pavement cross section 
c) GAD for bridges 
d) Alignment plans, longitudinal sections; 
e) Designs for road furniture and road safety/ traffic control features; 
f) Horizontal and vertical alignment of existing carriageway   
 
   

Chapter – 2 : Page ‐ 6 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
2.6.1 Design Standards 
 
 The design standards and material specifications for the road has been primarily 
based  on  IRC  publications,  MoRT&H  –  Revision  V‐  Specifications  for  Road  and 
Bridge  Works,  specifications  and  circulars.  Relevant  recommendations  of  the 
international standards (American, Australian, British) will be referred in case on 
non‐availability in Indian Standards. 
 The  design  standards  for  the  project  has  covered  all  aspects  of  detailed  design 
including  the  design  of  geometric  elements,  pavement  design,  bridges  and 
structures, traffic safety and materials. 
 Preliminary  design  standards  for  the  project  sections  are  given  in  relevant 
chapter. 
 
2.6.2 Geometric Design 
 
Horizontal  Alignment:  The  raw  data  collected  through  topographic  survey  has  been 
processed  and  a  base  plan  prepared  showing  all  the  manmade  features,  existing  road 
and any other features falling within the RoW. Thereafter, keeping the base plan in the 
background,  the  centre  line  has  been  finalised  using  sophisticated  computer  software, 
MX ROAD. Efforts have  been  made  to improve all the curves having poor geometry to 
the acceptable design standards and also to accommodate the widening proposal within 
the available RoW. 
 
Vertical Profile: The existing longitudinal section of the project road has been obtained 
from DTM data. The finished level along the centre line will depend on the thickness of 
the  pavement  layer  determined  from  pavement  design.  In  order  to  bring  the  existing 
road to the desired camber, a layer of profile correction course (PCC) hasbe provided.  
 
The  following  tentative  guideline  has  been  considered  while  designing  the  vertical 
profile. 
 
 To avoid cutting/scraping of existing pavement 
 Compatibility of design speed to horizontal geometry of the section 
 To  provide  adequate  vertical  curve  at  the  grade  change  from  stopping  sight 
distance criterion. 
 Cross  Section:  The  proposed  cross  sections  broadly  comprise  of  carriageway, 
medians, raised footpath and underground utility corridor. 
 The design for geometric elements covering 
a)   Horizontal alignment 
b)   Longitudinal profile 
c)   Cross‐sectional elements 
d)   Junctions /intersections 
e)   Flyover 
 
 

Chapter – 2 : Page ‐ 7 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
 The  alignment  design  has  been  verified  for  available  sight  distances  as  per  the 
standard norms. The provision of appropriate markings and signs has been made 
wherever  the  existing  site  conditions  do  not  permit  the  adherence  to  the  sight 
distance requirements as per the standard norms.  
 Details of at‐grade junctions 
 
2.6.3 Pavement Design 
 
The design of pavement will involve strengthening of existing road pavement and design 
of the new pavement for widening, wherever required. 
 
The design of flexible pavement will primarily be based on IRC: 37‐2012 and the design 
of rigid pavement will be based on IRC: 58‐ 2011. 
 
The  overlay  thickness  requirements  will  be  worked  out  for  each  road  with  respect  to 
condition, strength and sub‐grade characteristics based on IRC: 81 – 1997. 
 
2.6.4 Design of Bridges and Structures 
 
1. The  General  Arrangement  Drawing  (GAD)  showing  the  salient  features  of  the 
bridges  and  structures  proposed  to  be  constructed  along  the  road  sections 
covered  under  the  study  has  been  prepared.  These  salient  features  such  as 
alignment, overall length, span arrangement, cross section, deck level, founding 
level,  type  of  bridge  components  (superstructure,  substructure,  foundations, 
bearings,  expansion  joint,  return  walls  etc.)  has  been  finalized  based  upon 
hydraulic and geo‐technical studies, cost effectiveness and ease of construction. 
 
2. ROBs  have  not  been  considered  as  part  of  this  report  as  the  ROB  design  and 
construction has been taken up by other agencies. 
 
3. Dismantling/ reconstruction of existing structures has been avoided. The existing 
structures  having  inadequate  carriageway  width  have  been  widened  as  per  the 
latest MORT&H guidelines.  
 
2.6.5 Traffic Safety Features, Road Furniture and Road Markings 
 
The  suitable  traffic  safety  features  and  road  furniture  including  traffic  signals,  signs, 
markings, overhead sign boards, crash barriers, delineators etc has been designed as per 
the IRC guide lines. The locations of these features has been shown in the drawings. 
 
   

Chapter – 2 : Page ‐ 8 of 9 
© 2016 MECON Limited. All  rights  reserved 
   
 
DPR & PMC Services for Five Urban Roads of Ranchi  

 
2.6.6 Arboriculture and Landscaping 
 
Appropriate  plan  for  planting  of  trees  (specifying  type  of  plantation),  horticulture, 
floriculture on the surplus land of the right‐of‐way with a view to beautify the road and 
making the environment along the road pleasing has been considered. The existing trees 
/ plants has been retained to the extent possible. 
 
2.6.7 Miscellaneous Works 
 
Suitable  designs  and  layout  for  miscellaneous  works  including  bus  bays  with  shelter, 
vehicle parking areas, etc has been considered. 
2.7 Estimation of Quantities and Project Costs 
 
The  approximate  quantities  for  the  elements  for  the  project  road  and  the  structures 
have been calculated and the cost has been assigned to it based on the current schedule 
of rates of Road Construction Department, Government of Jharkhand.  

Chapter – 2 : Page ‐ 9 of 9 