1 Document Checklist
2 Acceptance Test Report
3 Inspection & Acceptance Test for OTB
4 Inspection & Acceptance Test for FO Distribution Pole (Aerial Cable)
5 OTDR Splice Loss Measurement
6 As Plan Drawing
7 As Built Drawing
8 Pending Item / Punch List
9 Daily Progress Report (Photo)
Purwanto
CCEPTANCE TEST REPORT
LOGO
VENDOR
Note:
Purwanto
tion & Acceptance for OTB
(Visual Checking)
Note:
ate attached
LOGO
VENDO
R
Site ID : Date :
Site Name : # Pole :
8
PT.Mitra Karsa Utama PT. Bali Towerindo Sentra, Tbk.
Purwanto
ble)
ssories (Photo)
LOGO
VENDO
R
: Date :
Site Name : # Pole : Unit
1 8 Core
2 16 Core
3 8 Core
4 8 Core
5 8 Core
PT.Mitra Karsa Utama PT. Bali Towerindo Sentra, Tbk.
Purwanto
g)
Total Joint
8 Core
16 Core
8 Core
8 Core
8 Core
LOGO
VENDOR
1
2
3
4
5
6
7
8
Note:
Site ID : 0 Date :
Site Name : 0
Note:
- OTDR printout report attached
Purwanto
lice Loss Measurement
(OTDR Results)
meter
Loss-db Ave
LOGO
VENDOR
As Plan Drawing
(Map / Drawing)
Site ID : 0 Date :
Site Name : 0 Length : meter
As Plan Drawing
Note:
- As Built Drawing attached
As Plan Drawing
LOGO
VENDOR
As Built Drawing
(Map / Drawing)
Site ID : 0 Date :
Site Name : 0 Length : meter
As Built Drawing
As Built Drawing
LOGO
VENDOR
Site ID : 0 Date :
Site Name : 0
Note:
Site ID : Date :
Site Name :
Photo Documentation
Site ID : 0 Date :
Site Name : 0
Photo Documentation
Purwanto
LOGO
VENDOR
Photo OTB
Site ID : Date :
Site Name :
Photo Documentation
PT.Mitra Karsa Utama PT. Bali Towerindo Sentra, Tbk.
Purwanto
LOGO
VENDOR
Photo Jointing
Site ID : Date :
Site Name :
Photo Documentation
PT.Mitra Karsa Utama PT. Bali Towerindo Sentra, Tbk.