Documente Academic
Documente Profesional
Documente Cultură
A. TANAH
N I H I L
-
KARTU INVENTARIS BARANG
B. PERALATAN DAN MESIN
2,395,786,400
86,786,525
KARTU INVENTARIS BARANG
C. GEDUNG DAN BANGUNAN
NOMOR DOKUMEN
NO NAMA BARANG KONSTRUKSI PANJANG LEBAR LUAS LETAK STATUS KODE TANAH ASAL USUL
KODE BARANG REGISTER TANGGAL NOMOR
1 2 3 4 5 6 7 8 9 10 11 12 13 14
KARTU INVENTARIS BARANG
E. ASET TETAP LAINNYA
( DI ATAS Rp 300.000 )
123 AC 02.06.02.04.04 001-004 Toshiba 2014 Besi & Mika APBD 4 7,000,000 28,000,000 Sekretariat, LL
124 Handy Talky ( HT ) 02.07.02.01.14 001-005 Kenwood TH-K20A 2014 APBD 5 2,500,000 12,500,000 Luar Ruangan
125 Kursi tunggu 02.06.02.01.04 001-002 Duma DML 04 2014 Stainles APBD 2 4,050,000 8,100,000 Angk & R.Tamu
126 Kursi Pimpinan 02.06.04.03.04 001 Chairman EC800A 2014 Besi & Spon APBD 1 3,400,000 3,400,000 R.Kadis
127 Sepeda Motor 02.03.01.05.05 001 150cc Kawasaki 2014 Besi MH4LX150CEJP02977 LX150CEPF0453 AB 6659 UB APBD 1 30,254,333 30,254,333 Luar Ruangan
128 Sepeda Motor 02.03.01.05.05 001 150cc Kawasaki 2014 Besi MH4LX150CEJP03001 LX150CEPF0618 AB 6660 UB APBD 1 30,254,333 30,254,333 Luar Ruangan
129 Sepeda Motor 02.03.01.05.05 001 150cc Kawasaki 2014 Besi MH4LX150CEJP02987 LX150CEPF0585 AB 6658 UB APBD 1 30,254,333 30,254,333 Luar Ruangan
130 Meja Kursi Tamu 02.06.02.01.49 001 2014 Kayu & Spon APBD 1 6,480,000 6,480,000 R.Kadis
131 Kursi Kerja Staf 02.06.02.01.06 001-005 2014 APBD 5 629,000 3,145,000 Sekrt,Angk,Pos Paris
Terminal Paris 1,Lobi 2,
132 Meja 1/2 Biro 02.06.02.01.04 001-005 2014 Kayu APBD 5 961,200 4,806,000 Angk 2
133 Komputer 02.06.03.02.01 001-002 HP 2014 APBD 2 6,900,000 13,800,000 Sekrt, PKB
134 Printer 02.06.03.05.03 001-003 Canon 2014 APBD 3 1,975,000 5,925,000 Angk, KTSP, PKB
135 L300 Pick Up 02.03.01.02.02 001 2477 CC Mitsubishi 2014 Besi L300DP225460 4D56C474693 AB 8032 UB APBD 1 35,000,000 35,000,000 Luar Ruangan
136 Strada Triton 02.03.01.01.01 001 Mitsubishi 2014 APBD 1 341,414,450 341,414,450 Luar Ruangan
137 AC 02.06.02.04.04 001-004 2014 Besi & Mika APBD 4 6,921,000 27,684,000 Angk 2, PKB 1, R.Rapat 1
138 Meja Kerja 02.06.02.01.04 001-002 2014 Kayu APBD 2 1,991,000 3,982,000 R Rapat, Angktn
139 Almari 02.06.02.01.01 001-004 2014 Kayu APBD 4 9,900,000 39,600,000 PKB, Angk, LL, KTSP
140 Rak Arsip 02.06.04.07.05 001-008 2014 Besi APBD 8 3,850,000 30,800,000 LL 2,Sekrt 1,PKB 4,KTSP 1
141 Kijang Kapsul 02.03.01.01.01 001 1781 CC Toyota 2015 Besi MHF11KF7000014621 7K165854 AB 62 UB APBD 1 25,000,000 25,000,000 Luar Ruangan
142 Handy Talky ( HT ) 02.07.02.01.14 001 Clarigo 328 2015 Mika APBD 1 1,955,000 1,955,000 R.Kadis
143 Lemari es ( KULKAS ) 02.06.02.04.01 001 Polytron 2 Pintu 2015 Besi APBD 1 3,150,000 3,150,000 R.Kadis
144 Sepeda 02.03.02.02.01 001-004 Polygon 2015 Aluminium APBD 4 3,950,000.00 15,800,000 R. Komputer,PKB
145 Laptop 02.06.03.02.02 001 ACER 2015 Besi APBD 1 7,500,000 7,500,000 Sekretariat (Umum)
146 Reviter 02.07.03.03.01 001 2015 Besi APBD 1 30,000,000 30,000,000 Luar Ruangan
147 Almari 02.06.02.01.01 001-002 2015 Kayu APBD 2 4,105,800 8,211,600 PKB
Sekrtariat Keu 1,Kadis
148 Filling kabinet 02.06.01.04.04 001-006 Brother 2015 Besi APBD 6 2,149,933 12,899,600 2,Angkt 1,ktsp 1,LL 1
149 Tenda 02.06.02.01.47 001-005 2015 Besi&Plastik APBD 5 2,967,360.00 14,836,800 Gudang
150 Sepeda Motor 02.03.01.05.05 001-004 Supra 125 2015 Besi APBD 4 16,231,000 64,924,000 Luar Ruangan
151 Komputer 02.06.03.02.01 001 Lenovo 2015 Besi APBD 1 7,500,000 7,500,000 Sekretariat Prog
152 Laptop 02.06.03.02.02 001-003 Lenovo 2015 Besi APBD 3 7,593,750 22,781,250 Ktsp..Angkutn..Keu.
153 Printer 02.06.03.05.03 001 Canon Pixma MP 287 2015 Mika APBD 1 1,500,000 1,500,000 Sekretariat Prog
154 Handi Talky ( HT ) 02.07.02.01.14 001-009 Alinco DJ-W100 2016 Mika APBD 9 1,260,000 11,340,000 Luar Ruangan
155 Camera SLR 02.07.01.02.03 001 Nikon D7000 18-105 VR KIT 2016 Mika APBD 1 13,407,000 13,407,000 R.Kadis
156 Camera SLR 02.07.01.02.03 001 Canon EOS 700 D+18-55IS 2016 Mika APBD 1 9,408,000 9,408,000 Sekretariat
157 Camera Pocket 02.07.01.02.03 001-004 Canon IXUS 160 Black 2016 Mika APBD 4 1,560,000 6,240,000 Sekrt,,Angkt,,Ktsp,,LL
158 Compresor 02.02.03.03.02 001 SHARK 2 HP 2016 Besi APBD 1 9,000,000 9,000,000 Gudang
159 Vacum Cleaner 02.06.02.03.01 001 Bosch GAS 11-21 2016 Mika APBD 1 3,000,000 3,000,000 R.Komputer
160 Speaker Aktif 02.06.02.06.07 001 Sharp CBOX-1200 UBL 2016 Harbet APBD 1 2,000,000 2,000,000 Sekretariat
161 Mega Phone 02.07.02.01.07 001 Toa ZR-2015S 2016 Mika APBD 1 511,000 511,000 R.Komputer
162 Mega Phone 02.07.02.01.07 001 Toa ZR-1015S 2016 Mika APBD 1 458,000 458,000 R.Komputer
163 Komputer PC 02.06.03.02.01 001-004 ASUS K31AD HASWEL 2016 Mika APBD 4 7,465,000 29,860,000 Sekrt,,Angkt,,Ktsp,,LL
Sekrt 1 , Sek 1 - Angktn 1 ,
164 Printer 02.06.03.05.03 001-005 HP Laserjet P 1102 2016 Mika APBD 5 1,980,000 9,900,000 Ktsp 1 , LL 1
Kadis 1 .. Umum 1 .. LL 1 ..
165 Laptop 02.06.03.02.02 001-004 Lenovo ID 500 S ( 8GB-GF2G-W10 ) 2016 Mika APBD 4 12,970,000 51,880,000 Sek 1
166 External disk 02.06.03.05.07 001-002 1TBWD Pasport USB 3.0 2016 Mika APBD 2 1,065,000 2,130,000 Prog 2
167 Printer multifungsi 02.06.03.05.03 001-002 HP Laser OJ 7612 2016 Mika APBD 2 4,915,000 9,830,000 Sekretariat 1 .. KTSP 1
168 Laser Distance Meter 02.04.03.01.71 001 2016 Mika APBD 1 59,400,000 59,400,000 KTSP
( Alat pengukur
Ketinggian Menara )
169 Minibus 02.03.01.02.03 001 Toyota Avansa 1.5 Veloz 5-Jun-14 Besi MHKM1CA4JEK074509DEL2239 AB 1316 UB APBD 1 183,837,500 183,837,500 DIKMENOF
JUMLAH 3,436,136,385
KARTU INVENTARIS BARANG ( KIB )
B. PERALATAN DAN MESIN
( DI BAWAH Rp 300.000 )
NO. KODE LOKASI : 12.12.01.06.01.00.00
SATUAN KERJA : DINAS PERHUBUNGAN KABUPATEN BANTUL
28
16,000,000
28,000,000
12,500,000 1,133,333.33
8,100,000
3,400,000
283,333
Kijang Kapsul
Handy Talky ( HT )
Lemari es ( KULKAS )
Sepeda
Laptop
Reviter
Almari
Filling kabinet
3,950,000 23,700,000
3,252,298,885 DISHUB
183,837,500.00 DIKMENOF
### #REF!
###
KARTU INVENTARIS BARANG ( KIB )
C. GEDUNG DAN BANGUNAN
3/SPK/P
28 Maret PKRAM
47 Rambu 03.12.07.02.01 001-217 Baik APBD 217 926,894 201,136,000
2013 BU/III/20
13
06/PJ/P
Simpang IKIP PGRI
48 APILL 03.12.07.01.01 001 Baik 17 JULI 2013 PKAPILL APBD 1 529,928,000 529,928,000
Sonosewu
/VII/2013
3/SPK/P
PKFLAS
49 Flashing Lamp 03.12.07.01.02 001-006 Baik 5 JUNI 2013 APBD 6 33,356,500 200,139,000
H/V/201
3
028/032
21 Januari
50 Landscape Dishub 03.11.01.01.04 Baik Barat Kantor DISHUB 6/DPPK APBD 1 52,531,500 52,531,500
2013
AD
Kantor Dinas
52 Sekat Ruang Kantor 03.11.01.01.04 Baik 2014 APBD 1 35,000,000 35,000,000
Perhubungan Kab.Bantul
3/SPK/P
PK-
55 Flasing Lamp 03.12.07.01.02 001 Baik Perum Metes Sedayu 12-Feb-14 APBD 1 34,034,000 34,034,000
PENGA-
FLASH/II
/2014
3/SPK/P
PK-
56 Flasing Lamp 03.12.07.01.02 001 Baik SMAN 1 Btl 12-Feb-14 APBD 1 34,034,000 34,034,000
PENGA-
FLASH/II
/2014
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3/SPK/P
Kranggan Mrtgdng PK-
57 Flasing Lamp 03.12.07.01.02 001 Baik 12-Feb-14 APBD 1 34,034,000 34,034,000
Sanden PENGA-
FLASH/II
/2014
3/SPK/P
PK-
58 Flasing Lamp 03.12.07.01.02 001 Baik SMP 3 Imgri 12-Feb-14 APBD 1 34,034,000 34,034,000
PENGA-
FLASH/II
/2014
3/SPK/P
Dpn Puskesmas Pleret(Jl. PK-
59 Flasing Lamp 03.12.07.01.02 001 Baik 12-Feb-14 APBD 1 34,034,000 34,034,000
Imogiri Timur) PENGA-
FLASH/II
/2014
3/SPK/P
60 RPPJ 03.12.07.02.02 001-003 Baik s4 bejen 12-Feb-14 PK- APBD 3 9,128,182 27,384,545
RPPJ/II/
2014
3/SPK/P
61 RPPJ 03.12.07.02.02 001-002 Baik S3 pijenan 12-Feb-14 PK- APBD 2 9,128,182 18,256,364
RPPJ/II/
2014
3/SPK/P
62 RPPJ 03.12.07.02.02 001-002 Baik S3 jejeran 12-Feb-14 PK- APBD 2 9,128,182 18,256,364
RPPJ/II/
2014
3/SPK/P
63 RPPJ 03.12.07.02.02 001-002 Baik S4 jetis 12-Feb-14 PK- APBD 2 9,128,182 18,256,364
RPPJ/II/
2014
3/SPK/P
64 RPPJ 03.12.07.02.02 001 Baik S3 pleret 12-Feb-14 PK- APBD 1 9,128,182 9,128,182
RPPJ/II/
2014
3/SPK/P
65 RPPJ 03.12.07.02.02 001 Baik S3 tembi 12-Feb-14 PK- APBD 1 9,128,182 9,128,182
RPPJ/II/
2014
3/SPK/P
12 Februari
66 Rambu 03.12.07.02.01 001-126 Baik PK- APBD 126 881,397 111,056,000
2014
RAMB/II/
2014
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3 OKTOBER 06/PJ/P
67 APILL 03.12.07.01.01 001 Baik S4 Jonggrangan Bantul APBD 1 376,980,000 376,980,000 Study
2014 PKAPILL
/X/2014
3/SPK/P
Utara TK Nogosari, 29 Januari
68 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Wukirsari, Kec. Imogiri 2014
Cermin/i/
2014
3/SPK/P
Dusun Pasutan, Utara 29 Januari
69 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Lapangan 2014
Cermin/i/
2014
3/SPK/P
Jln arah dari Wonolelo ke 29 Januari
70 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 3 4,037,737 12,113,211
Terong, Dlingo 2014
Cermin/i/
2014
3/SPK/P
S4 Maguwoharjo, 29 Januari
71 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Banguntapan 2014
Cermin/i/
2014
3/SPK/P
S4 Gedriyan (Timur PKU 29 Januari
72 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Bantul) 2014
Cermin/i/
2014
3/SPK/P
29 Januari
73 Cermin Tikungan 03.12.07.02.03 001 Baik Perum Metes , Sedayu PK- APBD 1 4,037,737 4,037,737
2014
Cermin/i/
2014
3/SPK/P
SD Kadipiro (Jl. Tino 29 Januari
74 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Sidin), Jl. Wates 2014
Cermin/i/
2014
3/SPK/P
Ds. Pokoh Utara SMA I 29 Januari
75 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Jetis 2014
Cermin/i/
2014
3/SPK/P
S3 Ngablak arah ke TPA 29 Januari
76 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Piyungan 2014
Cermin/i/
2014
3/SPK/P
S3 Babadan, Sokowaten, 21 Oktober
77 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737 Diameter 1 mter
Banguntapan 2014
Cermin/
X/2014
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3/SPK/P
Tikungan Ds Guyangan, 21 Oktober
79 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Wonolelo, Pleret 2014
Cermin/
X/2014
3/SPK/P
21 Oktober
80 Cermin Tikungan 03.12.07.02.03 001 Baik S4 Mandingan, Bantul PK- APBD 1 4,037,737 4,037,737
2014
Cermin/
X/2014
3/SPK/P
S4 Gang Ds Jedigan 21 Oktober
81 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
(barat Lap. Pasutan) 2014
Cermin/
X/2014
3/SPK/P
Tikungan Jipangan (Des 21 Oktober
82 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 4,037,737 4,037,737
Jipangan) 2014
Cermin/
X/2014
3/SPK/P
Jl. Tinosidin, Soragan (S3 21 Oktober
83 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 3,034,237 3,034,237 Diameter (-) 1 m
Marcopolo) 2014
Cermin/
X/2014
3/SPK/P
S4 TK Ds Geneng, 21 Oktober
84 Cermin Tikungan 03.12.07.02.03 001 Baik PK- APBD 1 3,034,237 3,034,237 Diameter (-) 1 m
Panggungharjo, Sewon 2014
Cermin/
X/2014
3/SPK/P
02 Maret PK-
85 Rambu LL 03.12.07.02.01 001-111 Baik APBD 111 909,514 100,956,000
2015 Rambu/II
I/2015
3/SPK/P
PK-
86 Cermin Tikungan 03.12.07.02.03 001-010 Baik 29-Apr-15 APBD 10 3,998,636 39,986,364 Diameter 1 mter
Cermin/I
V/2015
3/SPK/P
PK-
87 Cermin Tikungan 03.12.07.02.03 001-012 Baik 29 Arril 2015 APBD 12 2,964,636 35,575,636 Diameter 80 cm
Cermin/I
V/2015
88 Teralis 03.11.01.01.04 001-065 Baik 2012 APBD 65 348,123.08 22,628,000 Pindahan dari KIB B
3/SPK/P
89 Flashing Lamp 03.12.07.01.02 001-002 Baik -Pasar Mangiran 11 Mei 2015 PK- APBD 2 27,963,500 55,927,000
Flashing/
V/2015
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3/SPK/P
90 Flashing Lamp 03.12.07.01.02 001-002 Baik -Pasar Ngoto,Jl Imogiri B 11 Mei 2015 PK- APBD 2 27,963,500 55,927,000
Flashing/
V/2015
3/SPK/P
91 Flashing Lamp 03.12.07.01.02 001-002 Baik -SD Jambidan,Bangunta 11 Mei 2015 PK- APBD 2 27,963,500 55,927,000
Flashing/
V/2015
06/PJ/P
92 RPPJ 03.12.07.02.02 001 Baik -S4 Sampakan 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
93 RPPJ 03.12.07.02.02 001-002 Baik -S3 Ponegaran 19 Juni 2015 PK- APBD 2 8,582,333 17,164,667
RPPJ/VI/
2015
06/PJ/P
94 RPPJ 03.12.07.02.02 001 Baik -S3 Pos Pleret 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
95 RPPJ 03.12.07.02.02 001 Baik -S4 Jejeran 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
96 RPPJ 03.12.07.02.02 001 Baik -S4 Bakulan 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
97 RPPJ 03.12.07.02.02 001-003 Baik -S4 Sumber Agung 19 Juni 2015 PK- APBD 3 8,582,333 25,747,000
RPPJ/VI/
2015
06/PJ/P
98 RPPJ 03.12.07.02.02 001 Baik -S3 Ring Road Bakulan 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
99 RPPJ 03.12.07.02.02 001-003 Baik -S3 Sapuangin 19 Juni 2015 PK- APBD 3 8,582,333 25,747,000
RPPJ/VI/
2015
06/PJ/P
100 RPPJ 03.12.07.02.02 001-002 Baik -S4 Beji 19 Juni 2015 PK- APBD 2 8,582,333 17,164,667
RPPJ/VI/
2015
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
06/PJ/P
101 RPPJ 03.12.07.02.02 001 Baik -S4 Manding 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
102 RPPJ 03.12.07.02.02 001 Baik -S4 Sudimoro 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
103 RPPJ 03.12.07.02.02 001 Baik -S4 Jetis 19 Juni 2015 PK- APBD 1 8,582,333 8,582,333
RPPJ/VI/
2015
06/PJ/P
104 RPPJ 03.12.07.02.02 001-002 Baik -S3 Colo 19 Juni 2015 PK- APBD 2 8,582,333 17,164,667
RPPJ/VI/
2015
06/PJ/P
105 RPPJ 03.12.07.02.02 001-003 Baik -S3 Soka Seloharjo 19 Juni 2015 PK- APBD 3 8,582,333 25,747,000
RPPJ/VI/
2015
06/PJ/P
106 RPPJ 03.12.07.02.02 001-004 Baik -S4 BPN Manding 19 Juni 2015 PK- APBD 4 8,582,333 34,329,333
RPPJ/VI/
2015
06/PJ/P
107 APILL 03.12.07.01.01 001 Baik S4 Bangunjiwo 23 Juli 2015 PK- APBD 1 381,921,700 381,921,700
APILL/VI
I/2015
3/SPK/P
108 Guardrail 03.12.07.02.03 001 Baik 13 Mei 2015 PK- APBD 172 1,101,291 189,422,000
Perbatsan Dsn Cegokan Guardrail
Pleret-Dsn Terong /v/2015
4/SPK/P
PK-
109 Rambu Portable 03.12.07.02.01 001-022 Baik Kantor Dishub 01 juni 2015
R.Portab
APBD 22 1,401,395 30,830,680
el/VI/201
5
4/SPK/P
PK-
110 Rambu Portable 03.12.07.02.01 001-017 Baik Kantor Dishub 01 juni 2015
R.Portab
APBD 17 1,131,960 19,243,320
el/VI/201
5
050 /
111 Cermin Tikungan 03.12.07.02.03 001 Baik -Jl.Jogja-Imogiri Barat 12 Mei 2016
1489
APBD 1 3,435,400 3,435,400 Hibah Dari Dishub DIY
( S4 Polsek Jetis )
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
-Bakulan-Kretek 050 /
03.12.07.02.03 001 Baik ( Selatan Jembatan 12 Mei 2016
1489
APBD 1 3,435,400 3,435,400 Hibah Dari Dishub DIY
Kretek )
-Bakulan-Palbapang 050 /
03.12.07.02.03 001 Baik ( S3 R.R Bakulan Arah 12 Mei 2016
1489
APBD 1 3,435,400 3,435,400 Hibah Dari Dishub DIY
Pemda 2 )
112 RPPJ Kasihan
Bantul -
05/SPK/
03.12.07.02.02 001 Baik -S4 Pengairan 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
Pleret -
05/SPK/
03.12.07.02.02 001 Baik -S3 Pos Pleret 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
Sewon -
05/SPK/
03.12.07.02.02 001 Baik -S3 Tembi 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
Pajangan -
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
05/SPK/
03.12.07.02.02 001 Baik -S4 Kaliasem 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Kaliasem 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Kaliasem 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S3 Peleman 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S3 Peleman 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S3 Peleman 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Krebet 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Krebet 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Krebet 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Krebet 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Beji 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
05/SPK/
03.12.07.02.02 001 Baik -S4 Beji 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Beji 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
03.12.07.02.02 001 Baik -S4 Beji 1-Apr-16 PPK_RP APBD 1 8,017,800 8,017,800
PJ/IV/20
18
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Pagergunung , Cermin/II
Sitimulyo /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Pagergunung , Cermin/II
Sitimulyo /2016
Bantul -
05/SPK/
03.12.07.02.03 001 Baik -Karanggede ( Barat 15 Februari
PPK- APBD 1 4,018,750 4,018,750
2016
Mess Persiba ) Cermin/II
/2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Komplek Parasamya /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Komplek Parasamya /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-SD IT Ar-Raihan /2016
05/SPK/
03.12.07.02.03 001 Baik -Nogosari Trirenggo 15 Februari
PPK- APBD 1 4,018,750 4,018,750
2016
( Timur Rumdin Cermin/II
Bupati ) /2016
05/SPK/
03.12.07.02.03 001 Baik -Nogosari Trirenggo 15 Februari
PPK- APBD 1 4,018,750 4,018,750
2016
( Timur Rumdin Cermin/II
Bupati ) /2016
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Priyan , Trirenggo /2016
Imogiri -
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Sriharjo /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Karang Tengah /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
Cermin/II
-Karang Tengah /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Singosaren , Cermin/II
Wukirsari /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Singosaren , Cermin/II
Wukirsari /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Singosaren , Cermin/II
Wukirsari /2016
Sewon -
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Jl. Parangtritis , Ngijo Cermin/II
( Timur ISI ) /2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Randu Belang , Cermin/II
Bangunharjo /2016
Banguntapan -
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Glondong , Cermin/II
Wirokerten /2016
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Glondong , Cermin/II
Wirokerten /2016
Kasihan -
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 1 4,018,750 4,018,750
-Perumahan Gunung Cermin/II
Sempu /2016
05/SPK/
03.12.07.01.02 001 Baik -SD Wojo , Jl. 10 Februari
PPK- APBD 1 34,189,600 34,189,600
2016
Imogiri Barat , Flashing/
Bangunharjo II/2016
05/SPK/
03.12.07.01.02 001 Baik -SD Wojo , Jl. 10 Februari
PPK- APBD 1 34,189,600 34,189,600
2016
Imogiri Barat , Flashing/
Bangunharjo II/2016
05/SPK/
03.12.07.01.02 001 Baik -SD Gandok , Jl. 10 Februari
PPK- APBD 1 34,189,600 34,189,600
2016
Imogiri Barat , Flashing/
Bangunharjo II/2016
05/SPK/
03.12.07.01.02 001 Baik -SD Gandok , Jl. 10 Februari
PPK- APBD 1 34,189,600 34,189,600
2016
Imogiri Barat , Flashing/
Bangunharjo II/2016
Kretek -
05/SPK/
10 Februari
03.12.07.01.02 001 Baik
2016
PPK- APBD 1 34,189,600 34,189,600
Flashing/
-Terminal Parangtritis II/2016
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 52 979,706 50,944,735 Meter
Cermin/II
-Bendung Mojo /2016
Jetis -
05/SPK/
15 Februari
03.12.07.02.03 001 Baik
2016
PPK- APBD 150 979,706 146,955,965 Meter
-Jl. Trimulyo - Perum Cermin/II
Sindet /2016
05/SPK/
03.12.07.02.01 001-020 Baik -S4 Buk Duwur 25 Februari
PPK- APBD 20 858,883 17,177,650
2016
Potorono - S3 Gandu Rambu/II
Sekarsuli /2016
Bantul -
05/SPK/
03.12.07.02.01 001-016 Baik -S3 Gempolan - S4 25 Februari
PPK- APBD 16 858,883 13,742,120
2016
Priyan RT 05 , Rambu/II
Trirenggo /2016
Piyungan -
05/SPK/
03.12.07.02.01 001-022 Baik -S3 Jolosutro - S4 25 Februari
PPK- APBD 22 858,883 18,895,415
2016
SMP Piyungan ( Jl. Rambu/II
Wonosari ) /2016
Jetis -
05/SPK/
03.12.07.02.01 001-092 Baik -S4 Trimulyo , Jetis 25 Februari
PPK- APBD 92 858,883 79,017,191
2016
- S4 Segoroyoso , Rambu/II
Pleret /2016
Kasihan -
05/SPK/
03.12.07.02.01 001-033 Baik -S4 Maducandya 25 Februari
PPK- APBD 33 858,883 28,343,123
2016
( Madukismo ) - S3 Rambu/II
Tamantirto /2016
Bantul -
17 Februari 02/PPK/
03.11.01.21.04 001 Baik Sabdodadi 2016 Halte/Dis
APBD 1 24,874,750 24,874,750
hub/II/16
Pundong -
17 Februari 02/PPK/
03.11.01.21.04 001 Baik Sempalan Pundong 2016 Halte/Dis
APBD 1 24,874,750 24,874,750
hub/II/16
Sanden -
17 Februari 02/PPK/
03.11.01.21.04 001 Baik Lapangan Gading Sari 2016 Halte/Dis
APBD 1 24,874,750 24,874,750
hub/II/16
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
118 Rambu Portable
1/SPK/P
PK-
-RPPJ 03.12.07.02.01 001-016 Baik Kantor Dishub 10 Mei 2016
Rambu
APBD 16 1,345,000 21,520,000 ( Agustus ) TWL 3
Portable
V/2016
1/SPK/P
PK-
-Rambu Portable 03.12.07.02.01 001-003 Baik Kantor Dishub 10 Mei 2016
Rambu
APBD 3 1,067,800 3,203,400 ( Agustus ) TWL 3
Portable
V/2016
05/PPK-
119 APILL 03.12.07.01.01 001 Baik S4 Pasar Barongan 9 Juni 2016 APILL/VI APBD 1 484,524,300 484,524,300 ( Agustus ) TWL 3
/2016
120 RAMBU LL Kec. Bantul
05/SPK/
a . S.4 Sumuran – 25 Februari PPK.Ra
877,200 8,772,000
03.12.07.02.01 001-010 Baik
2016 mbu
APBD 10
S.3 Karanggayam
ABT/X1/
2016
05/SPK/
c . Jl. Dr. Wahidin 25 Februari PPK.Ra
877,200 1,754,400
03.12.07.02.01 001-002 Baik
2016 mbu
APBD 2
(Kec. Bantul)
ABT/X1/
2016
Kec. Kretek -
Kec. Pandak -
05/SPK/
a . Pasar Jodog (Kec. 25 Februari PPK.Ra
877,200 2,631,600
03.12.07.02.01 001-003 Baik
2016 mbu
APBD 3
Pandak)
ABT/X1/
2016
Kec. Jetis -
NOMOR KONDISI KONSTRUKSI LUAS DOKUMEN GEDUNG KODE
ASAL
NO NAMA BARANG TINGKAT/ BETON/ LETAK LUAS STATUS JML HARGA SATUAN HARGA KET
KODE BARANG REG. BANGUNAN LANTAI TANGGAL NOMOR TANAH USUL
TDK TIDAK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
a . S3 SMK 05/SPK/
25 Februari PPK.Ra
03.12.07.02.01 001-002 Baik Sabdodadi (Kec. 2016 mbu
APBD 2 877,200 1,754,400
Jetis) ABT/X1/
2016
Kec. Imogiri -
05/SPK/
a . S3 Barepan 25 Februari PPK.Ra
877,200 877,200
03.12.07.02.01 001 Baik
2016 mbu
APBD 1
Imogiri (Kec. Imogiri)
ABT/X1/
2016
Kec. Banguntapan -
05/SPK/
a. S4 Grojogan – S4 25 Februari PPK.Ra
877,200 12,280,800
03.12.07.02.01 001-014 Baik
2016 mbu
APBD 14
Rs. Rajawali Citra
ABT/X1/
2016
Kec. Pleret -
05/SPK/
a . S.3 Pos Pleret – 25 Februari PPK.Ra
877,200 14,035,200
03.12.07.02.01 001-016 Baik
2016 mbu
APBD 16
S4 Amanda/Groso
ABT/X1/
2016
-
JUMLAH 9,376,582,370
6
-
2,052,644
7,666,667
2014
68,750,000
-
100,956,000
348,123.08
25,747,000.00 8,582,333.33
17,164,666.67 8,582,333.33
8,582,333.33 8,582,333.33
8,582,333.33 8,582,333.33
8,582,333.33 8,582,333.33
17,164,666.67 8,582,333.33
25,747,000.00 8,582,333.33
6,716,540,370
(2,660,042,000)
Rekon
6,712,930,370
2,663,652,000
9,376,582,370
KARTU INVENTARIS BARANG ( KIB )
D. JALAN IRIGASI DAN JARINGAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 Tiang LPJU 04.13.01.03.08 001-057 Besi & Beton Jln. Yogya - Wates 8 Agst 024 / 5238 2011 APBD 57 13,679,500 779,731,500 B DPU
2 Tiang LPJU 04.13.01.03.08 001-006 Besi & Beton Jln. Bugisan 8 Agst 024 / 5238 2011 APBD 6 13,679,500 82,077,000 B DPU
3 Tiang LPJU 04.13.01.03.08 001-031 Besi & Beton Jln.Pedes-Nulis 8 Agst 024 / 5238 2011 APBD 31 13,679,500 424,064,500 B DPU
4 Tiang LPJU 04.13.01.03.08 001-287 Besi & Beton Jln. Ring Road Selatan 8 Agst 024 / 5238 2011 APBD 287 13,679,500 3,926,016,500 B DPU
5 Tiang LPJU 04.13.01.03.08 001-009 Besi & Beton Jln.Sonosewu 8 Agst 024 / 5238 2011 APBD 9 13,679,500 123,115,500 B DPU
6 Tiang LPJU 04.13.01.03.08 001-080 Besi & Beton Jln.Yogya-Wonosari 8 Agst 024 / 5238 2011 APBD 80 13,679,500 1,094,360,000 B DPU
7 Tiang LPJU 04.13.01.03.08 001-016 Besi & Beton Jln.Basen-Rejowinangun 8 Agst 024 / 5238 2011 APBD 16 13,679,500 218,872,000 B DPU
8 Tiang LPJU 04.13.01.03.08 001-038 Besi & Beton Jln Gedong Kuning-Blok O 8 Agst 024 / 5238 2011 APBD 38 13,679,500 519,821,000 B DPU
9 Tiang LPJU 04.13.01.03.08 001-161 Besi & Beton Jln.Jogja-Bantul 8 Agst 024 / 5238 2011 APBD 161 13,679,500 2,202,399,500 B DPU
10 Tiang LPJU 04.13.01.03.08 001-167 Besi & Beton Jln.Jendr. Sudirman 8 Agst 024 / 5238 2011 APBD 167 13,679,500 2,284,476,500 B DPU
11 Tiang LPJU 04.13.01.03.08 001-083 Besi & Beton Jln Gjh Mada,Paseban,Lap.Parkir 8 Agst 024 / 5238 2011 APBD 83 13,679,500 1,135,398,500 B DPU
12 Tiang LPJU 04.13.01.03.08 001-058 Besi & Beton Jln.Gose-Manding 8 Agst 024 / 5238 2011 APBD 58 13,679,500 793,411,000 B DPU
13 Tiang LPJU 04.13.01.03.08 001-055 Besi & Beton Jln.Bejen-Kweden 8 Agst 024 / 5238 2011 APBD 55 13,679,500 752,372,500 B DPU
14 Tiang LPJU 04.13.01.03.08 001-030 Besi & Beton Jln.Bejen-Stasiun 8 Agst 024 / 5238 2011 APBD 30 13,679,500 410,385,000 B DPU
15 Tiang LPJU 04.13.01.03.08 001-025 Besi & Beton Kodim-Gedriyan 8 Agst 024 / 5238 2011 APBD 25 13,679,500 341,987,500 B DPU
16 Tiang LPJU 04.13.01.03.08 001-011 Besi & Beton Masjid Agung-Bejen 8 Agst 024 / 5238 2011 APBD 11 13,679,500 150,474,500 B DPU
17 Tiang LPJU 04.13.01.03.08 001-003 Besi & Beton Jln.Klodran-Jodog 8 Agst 024 / 5238 2011 APBD 3 13,679,500 41,038,500 B DPU
18 Tiang LPJU 04.13.01.03.08 001-109 Besi & Beton Jln.Niten-Kasongan 8 Agst 024 / 5238 2011 APBD 109 13,679,500 1,491,065,500 B DPU
19 Tiang LPJU 04.13.01.03.08 001-018 Besi & Beton Jln.Godean 8 Agst 024 / 5238 2011 APBD 18 13,679,500 246,231,000 B DPU
20 Tiang LPJU 04.13.01.03.08 001-047 Besi & Beton Jln.Jogja-Imgri ( Timur) 8 Agst 024 / 5238 2011 APBD 47 13,679,500 642,936,500 B DPU
21 Tiang LPJU 04.13.01.03.08 001-002 Besi & Beton Jln.Jogja-Imgri ( Barat ) 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
22 Tiang LPJU 04.13.01.03.08 001-424 Besi & Beton Jln.Yogya-Parangtritis 8 Agst 024 / 5238 2011 APBD 424 13,679,500 5,800,108,000 B DPU
23 Tiang LPJU 04.13.01.03.08 001-032 Besi & Beton Jln.Gose-Palbapang 8 Agst 024 / 5238 2011 APBD 32 13,679,500 437,744,000 B DPU
24 Tiang LPJU 04.13.01.03.08 001-159 Besi & Beton Jln.Palbapang-Samas 8 Agst 024 / 5238 2011 APBD 159 13,679,500 2,175,040,500 B DPU
25 Tiang LPJU 04.13.01.03.08 001-100 Besi & Beton Jln.Palbapang-Barongan 8 Agst 024 / 5238 2011 APBD 100 13,679,500 1,367,950,000 B DPU
26 Tiang LPJU 04.13.01.03.08 001-066 Besi & Beton Jln.Palbapang-Srandakan 8 Agst 024 / 5238 2011 APBD 66 13,679,500 902,847,000 B DPU
27 Tiang LPJU 04.13.01.03.08 001-003 Besi & Beton Jln.Munggur-Petir 8 Agst 024 / 5238 2011 APBD 3 13,679,500 41,038,500 B DPU
28 Tiang LPJU Kecamatan Dlingo
04.13.01.03.08 001 Besi & Beton Dlingo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dlingo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn.Muntuk 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn.Muntuk 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
29 Tiang LPJU Kecamatan Pleret
04.13.01.03.08 001 Besi & Beton Kauman 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Kedaton 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn.Kloron 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jembatan Segoroyoso 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-010 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 10 13,679,500 136,795,000 B DPU
04.13.01.03.08 001-011 Besi & Beton Jl.Sudimoro-Pleret 8 Agst 024 / 5238 2011 APBD 11 13,679,500 150,474,500 B DPU
30 Tiang LPJU Kecamatan Bambanglipuro
04.13.01.03.08 001 Besi & Beton Paker 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Paker 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Ganjuran 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Ganjuran 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Ganjuran 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
31 Tiang LPJU Kecamatan Kretek
04.13.01.03.08 001 Besi & Beton Lapangan Mojo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-003 Besi & Beton Taman Oby Paris 8 Agst 024 / 5238 2011 APBD 3 13,679,500 41,038,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn. Sono 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn. Sono 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Dn. Sono 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-002 Besi & Beton TPI Depok 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
32 Tiang LPJU Kecamatan Sanden
04.13.01.03.08 001-002 Besi & Beton Kec. Sanden 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
33 Tiang LPJU Kecamatan Pundong
04.13.01.03.08 001 Besi & Beton Pasar Pundong 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Selatan Pasar Pundong 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
34 Tiang LPJU Kecamatan Bantul
04.13.01.03.08 001 Besi & Beton Badegan 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-017 Besi & Beton Mandingan 8 Agst 024 / 5238 2011 APBD 17 13,679,500 232,551,500 B DPU
04.13.01.03.08 001 Besi & Beton Nogosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Nogosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Nogosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Bantul Warung 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Bantul Warung 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
35 Tiang LPJU Kecamatan Sewon
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-004 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 4 13,679,500 54,718,000 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Pelem Sewu 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Druwo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Druwo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Druwo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Druwo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Tembi 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Krapyak 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Krapyak 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Krapyak 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Krapyak 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Krapyak 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Janganan 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Pr. Grahayasa 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jotawang 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jotawang 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jotawang 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jotawang 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-002 Besi & Beton Salakan 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
36 Tiang LPJU Kecamatan Jetis
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm. Sindet 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl. Sindet - Segoroyoso 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-002 Besi & Beton Jl. Sindet - Segoroyoso 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
04.13.01.03.08 001 Besi & Beton Jl. Sindet - Segoroyoso 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl. Sindet - Segoroyoso 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jl. Sindet - Segoroyoso 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
37 Tiang LPJU Kecamatan Pajangan
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Perum Guwosari 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Sindon 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-002 Besi & Beton Gua Selarong 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Sindon - Pajangan 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Sindon - Pajangan 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001-003 Besi & Beton AMP Pajangan 8 Agst 024 / 5238 2011 APBD 3 13,679,500 41,038,500 B DPU
38 Tiang LPJU Kecamatan Kasihan
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Prm Puspa Indah 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
39 Tiang LPJU Kecamatan Imogiri
04.13.01.03.08 001-012 Besi & Beton Jembatan Siluk Imogiri 8 Agst 024 / 5238 2011 APBD 12 13,679,500 164,154,000 B DPU
40 Tiang LPJU Kecamatan Srandakan
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Srandakan - Pandansimo 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
41 Tiang LPJU Kecamatan Banguntapan
04.13.01.03.08 001 Besi & Beton Jln. Jogoragan - Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Jogoragan - Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Jogoragan - Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Jogoragan - Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
04.13.01.03.08 001 Besi & Beton Jln. Jogoragan - Pleret 8 Agst 024 / 5238 2011 APBD 1 13,679,500 13,679,500 B DPU
42 Tiang LPJU KECAMATAN KASIHAN
Ruas Kadipiro ( Pom bensin kadipiro
04.13.01.03.08 001-019 Besi & Beton 8 Agst 024 / 5238 2011 APBD 19 13,679,500 259,910,500 B DPU
ke utara )
43 Tiang LPJU KECAMATAN SEDAYU
04.13.01.03.08 001-002 Besi & Beton Jembatan Pedes 8 Agst 024 / 5238 2011 APBD 2 13,679,500 27,359,000 B DPU
44 Tiang LPJU KECAMATAN SEWON
04.13.01.03.08 001-020 Besi & Beton LPJU bantuan Prov.Krapyak 8 Agst 024 / 5238 2011 APBD 20 13,679,500 273,590,000 B DPU
04.13.01.03.08 001-010 Besi & Beton Jln Karang Kajen-Wojo S 5-53 8 Agst 024 / 5238 2011 APBD 10 13,679,500 136,795,000 B DPU
04.13.01.03.08 001-010 Besi & Beton Jln Karang Kajen-Wojo S 5-62 8 Agst 024 / 5238 2011 APBD 10 13,679,500 136,795,000 B DPU
04.13.01.03.08 001-014 Besi & Beton Jln Wojo Barongan S 5-72 8 Agst 024 / 5238 2011 APBD 14 13,679,500 191,513,000 B DPU
04.13.01.03.08 001-014 Besi & Beton Jln.Tembi-Sudimoro 8 Agst 024 / 5238 2011 APBD 14 13,679,500 191,513,000 B DPU
45 Tiang LPJU KECAMATAN BANTUL
04.13.01.03.08 001-013 Besi & Beton Jln.Bejen-Manding 8 Agst 024 / 5238 2011 APBD 13 13,679,500 177,833,500 B DPU
04.13.01.03.08 001-011 Besi & Beton Jln.Klodran-Bejen 8 Agst 024 / 5238 2011 APBD 11 13,679,500 150,474,500 B DPU
04.13.01.03.08 001-014 Besi & Beton Jln.Klodran-Jodog S 1-72 / 14 8 Agst 024 / 5238 2011 APBD 14 13,679,500 191,513,000 B DPU
04.13.01.03.08 001-012 Besi & Beton Jln.Klodran-Jodog S 1-23 B/92U 8 Agst 024 / 5238 2011 APBD 12 13,679,500 164,154,000 B DPU
04.13.01.03.08 001-012 Besi & Beton Jln.Klodran-Jodog S 1- 128 C / 23 S 8 Agst 024 / 5238 2011 APBD 12 13,679,500 164,154,000 B DPU
04.13.01.03.08 001-010 Besi & Beton Kab.Bantul 8 Agst 024 / 5238 2011 APBD 10 8,765,800 87,658,000 B DPU
46 Tiang LPJU KECAMATAN BANTUL
04.13.01.03.08 001-008 Besi & Beton S-3 Kantor baru 2012 APBD 8 12,465,750 99,726,000 B
04.13.01.03.08 001-006 Besi & Beton Cepit - Tembi 2012 APBD 6 16,133,267 96,799,600 B
04.13.01.03.08 001-008 Besi & Beton Gapura -Klodran 2012 APBD 8 10,357,000 82,856,000 B
04.13.01.03.08 001-006 Besi & Beton Klodran -Psr Btl 2012 APBD 6 13,803,833 82,823,000 B
04.13.01.03.08 001-008 Besi & Beton Ps. Btl-gose 2012 APBD 8 10,346,750 82,774,000 B
45 Tiang LPJU
KECAMATAN BAMBANGLIPURO
04.13.01.03.08 001-007 Besi & Beton Paker - Dawetan 2012 APBD 7 10,268,214 71,877,500 B
46 Tiang LPJU KECAMATAN BANTUL
04.13.01.03.08 001-006 Besi & Beton RD-Ringroad 2012 APBD 6 10,427,833 62,567,000 B
04.13.01.03.08 001-002 Besi & Beton Masjid Agung& Dp. WS 2012 APBD 2 9,050,000 18,100,000 B
04.13.01.03.08 001 Besi & Beton Dp. Dion 2012 APBD 1 9,100,000 9,100,000 B
47 LPJU KECAMATAN JETIS
06/PJ/PPKLP
- Akses Jl. Menuju Balai Desa
04.13.01.03.08 001-003 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 3 10,763,066 32,289,199 B
Canden Jetis
2013
06/PJ/PPKLP
- S4 Jl. penghubung berbagai akses
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
trimulyo Jetis
2013
06/PJ/PPKLP
04.13.01.03.08 001-005 Besi & Beton - Jl. S4 sumber Agung ke utara Jetis 17 Juli JUKONV/VII/ 2013 APBD 5 10,763,066 53,815,332 B
2013
48 LPJU KECAMATAN PUNDONG
06/PJ/PPKLP
- S4 Balai Desa Panjangrejo
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Pundong
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S4 Kantongan Pundong 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
49 LPJU KECAMATAN BANGUNTAPAN
06/PJ/PPKLP
- S3 Ke utara Indomaret (Jl. Masuk
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
ke dusun Pelem) Banguntapan
2013
06/PJ/PPKLP
- Jl. Pedukuhan Kretek Jambidan
04.13.01.03.08 001-004 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 4 10,763,066 43,052,265 B
Banguntapan
2013
06/PJ/PPKLP
- Jl. Pedukuhan Glagah Kidul
04.13.01.03.08 001-003 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 3 10,763,066 32,289,199 B
Banguntapan
2013
50 LPJU KECAMATAN DLINGO
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Pancuran Rt. 02 Dlingo 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Saragan (Sendang) Dlingo 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Terong II Rt. 05 Dlingo 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Pasar Dangwesi Dlingo 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
- Kawasan Gunung Mungker (Jl.
04.13.01.03.08 001-007 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 7 10,763,066 75,341,464 B
Patuk - Dlingo) Dlingo
2013
51 LPJU KECAMATAN PAJANGAN
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Jl. Beji wetan Pada S3 Pajangan 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
52 LPJU KECAMATAN SANDEN
06/PJ/PPKLP
- Jl. Raya Sanden - Murtigading
04.13.01.03.08 001-002 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 2 10,763,066 21,526,133 B
(depan Mangestoni) Sanden
2013
53 LPJU KECAMATAN BANTUL
06/PJ/PPKLP
- Jl. Bantul arah SMA N 3 Bantul
04.13.01.03.08 001-004 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 4 10,763,066 43,052,265 B
Sewon
2013
54 LPJU KECAMATAN SEWON
06/PJ/PPKLP
- Jl. Tarudan Kulon Bangunharjo
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Sewon
2013
06/PJ/PPKLP
- Jl. Tarudan Wetan Bangunharjo
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Sewon
2013
06/PJ/PPKLP
- Jl glugo ke Ringroad
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Panggungharjo Sewon
2013
06/PJ/PPKLP
- Jl. S3 ke Pedukuhan Sewon -
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Tembi Timbulharjo Sewon
2013
55 LPJU KECAMATAN IMOGIRI
06/PJ/PPKLP
- Jl. Imogiri Km 15 (lap. Demi
04.13.01.03.08 001-005 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 5 10,763,066 53,815,332 B
Wukirsari) Imogiri
2013
56 LPJU KECAMATAN PLERET
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S4 Genengan Jl. Plered Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S4 BUK Duwur Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S4 Mertosanan kulon Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S4 Condowangsan Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Depan Balai Desa Potorono Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S3 Utara Dusun Salakan Plered 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
2013
57 LPJU KECAMATAN BANTUL
06/PJ/PPKLP
- Pedukuhan Nyangkringan -
04.13.01.03.08 001-003 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 3 10,763,066 32,289,199 B
Badegan Bantul
2013
06/PJ/PPKLP
- Jl. Ringroad Bantul (Gempolan)
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Bantul
2013
06/PJ/PPKLP
- Jl. Ringroad Bantul (Klembon)
04.13.01.03.08 001 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 1 10,763,066 10,763,066 B
Bantul
2013
58 LPJU KECAMATAN PIYUNGAN
06/PJ/PPKLP
- Banyakan III Rt. 05 (RT Setupak)
04.13.01.03.08 001-003 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 3 10,763,066 32,289,199 B
Piyungan
2013
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Banyakan II Rt. 03 Piyungan 17 Juli JUKONV/VII/ 2013 APBD 2 10,763,066 21,526,133 B
2013
06/PJ/PPKLP
- Jl. Ketandan Ringroad - Jogoragan
04.13.01.03.08 001-002 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 2 10,763,066 21,526,133 B
Rt. 18 (ke Selatan) Piyungan
2013
06/PJ/PPKLP
- Sepanjang Jl. Watuamben -
04.13.01.03.08 001-007 Besi & Beton 17 Juli JUKONV/VII/ 2013 APBD 7 10,763,066 75,341,464 B
Perkampungan Pandean Piyungan
2013
59 LPJU KECAMATAN JETIS
06/PJ/PPKLP
- Jl. S4 sumber Agung ke utara
04.13.01.03.08 001-004 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 4 18,971,373 75,885,493 B
melewati Balai Desa - Medelan Jetis
14
06/PJ/PPKLP
- Jl. Penghubung Dusun Cembing
04.13.01.03.08 001 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 1 18,971,373 18,971,373 B
Jetis
14
60 LPJU KECAMATAN DLINGO
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Depan Balai Desa Terong Dlingo 13-Nov JULED/IV/20 2013 APBD 2 18,971,373 37,942,747 B
14
06/PJ/PPKLP
- Dusun Dodogan (Depan Balai
04.13.01.03.08 001 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 1 18,971,373 18,971,373 B
Desa Jatimulyo) Dlingo
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - S3 Ringin Terong Dlingo 13-Nov JULED/IV/20 2013 APBD 2 18,971,373 37,942,747 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - S3 SD Terong Dlingo 13-Nov JULED/IV/20 2013 APBD 1 18,971,373 18,971,373 B
14
61 LPJU KECAMATAN SEWON
06/PJ/PPKLP
- Jl. Bantul arah ke SMA N 3 Bantul
04.13.01.03.08 001-002 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 2 18,971,373 37,942,747 B
Sewon
14
06/PJ/PPKLP
- Jl. Lingkar Depan masjid Almustofa
04.13.01.03.08 001 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 1 18,971,373 18,971,373 B
Sorowajan Sewon
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Kepek Rt. 03 Depan Pasar Sewon 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
14
62 LPJU KECAMATAN BANTUL
06/PJ/PPKLP
- Pedukuhan Nyangkringan -
04.13.01.03.08 001-004 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 4 18,971,373 75,885,493 B
Badegan Bantul
14
63 LPJU KECAMATAN SEDAYU
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Pedukuhan Metes Sedayu 13-Nov JULED/IV/20 2013 APBD 2 18,971,373 37,942,747 B
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Paker ke Timur (Bambanglipuro) 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
14
06/PJ/PPKLP
- Dawetan (S3 ke barat)
04.13.01.03.08 001-003 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
Bambanglipuro
14
65 LPJU KECAMATAN IMOGIRI
06/PJ/PPKLP
- Dusun Jatirejo Rt. 07 Wukirsari
04.13.01.03.08 001-003 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
Imogiri
14
66 LPJU KECAMATAN BANGUNTAPAN
06/PJ/PPKLP
- Rt. 11 Tegalsari Jomblangan
04.13.01.03.08 001-002 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 2 18,971,373 37,942,747 B
Banguntapan
14
06/PJ/PPKLP
- Dusun Salakan Potorono
04.13.01.03.08 001-003 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
Banguntapan
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Dusun Somenggalan Banguntapan 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Dusun Kepuh Wetan Banguntapan 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
14
67 LPJU KECAMATAN PLERET
06/PJ/PPKLP
- Gunung Kelir Plered Rt. 07, Rt. 08,
04.13.01.03.08 001-003 Besi & Beton 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
Rt. 09 Plered
14
68 LPJU KECAMATAN SEWON
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Dusun Geneng Sewon 13-Nov JULED/IV/20 2013 APBD 3 18,971,373 56,914,120 B
14
69 LPJU LED Imogiri
06/PJ/PPKLP
- Kradinan Girirejo Imogiri ( Komplek
04.13.01.03.08 001-003 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
Bale Desa Gilirejo )
14
06/PJ/PPKLP
- Jati Sriharjo Imogiri (Jati Rt 06
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Sriharjo Imogiri)
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Jalan Imogiri Kidul Lapangan 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
70 LPJU LED Jetis
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Beran Canden Jetis 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Bulu Trimulyo Jetis 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Srayu Canden Jetis 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Denokan Trimulyo Jetis Bantul 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
71 LPJU LED Pleret
06/PJ/PPKLP
- Mojosari,Wonolelo, Pleret
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
(Pertigaan mojosari Rt 06)
14
06/PJ/PPKLP
- Cegokan, Wonolelo Pleret (Jalan
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Cegokan Rt 04)
14
06/PJ/PPKLP
- Keputren Pleret (Jalan Kaputren Rt
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
01)
14
06/PJ/PPKLP
- nggotan Pleret (Jalan Perempatan
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Kanggotan 4 Rt 06)
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Wonokromo, Pleret 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
72 LPJU LED Srandakan
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Paten, Lopati, Trimurti, Srandakan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Bendo, Trimurti, Srandakan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Kukap, Poncosari, Srandakan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Ngentak, Poncosari,Srandakan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Gunturgeni, Poncosari, Srandakan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
73 LPJU LED Bantul
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Jl.Supomo (Gose Kebarat) 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Mushola Alhidayah 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
- Simpang Tiga Rt 02 Dengan
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Perbatasan Dukuh Jipangan
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Tanubayan Trirenggo Bantul 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Kuwiran RT 04 Bantul (1) 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Kuwiran RT 04 Bantul (2) 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
74 LPJU LED Kasihan
06/PJ/PPKLP
- Ngentak Bangunjiwo Kasihan
04.13.01.03.08 001-002 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
Bantul
14
75 LPJU LED Sewon
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Perempatan Manding Ke Timur 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
- Pendowo RT 87, Pendowoharjo,
04.13.01.03.08 001-003 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
Sewon
14
06/PJ/PPKLP
- Masjid Safinatulloh (Krapyak
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Wetan, Panggungharjo, Sewon)
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Terong 2 (Timur Balai Desa) 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Dodogan Jatimulyo Dlingo 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
06/PJ/PPKLP
- Bale Dusun PAUD (Cempluk
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Mangunan Dlingo)
14
06/PJ/PPKLP
- Jalan Raya RT 02 (Cempluk
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Mangunan Dlingo)
14
06/PJ/PPKLP
- Mushola RT 01 (Cempluk
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Mangunan Dlingo)
14
06/PJ/PPKLP
- Masjid Rt 06 (Cempluk Mangunan
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Dlingo)
14
06/PJ/PPKLP
- Jalan Raya Rt 035 (Cempluk
04.13.01.03.08 001 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
Mangunan Dlingo)
14
78 LPJU LED Piyungan
06/PJ/PPKLP
- Pandeyan Desa Srimulyo Kec
04.13.01.03.08 001-003 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
Piyungan
14
79 LPJU LED Banguntapan
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Glagah Lor Tamanan Banguntapan 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton - Grojogan Tamanan Banguntapan 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
14
- Balong Kidul, Potorono 06/PJ/PPKLP
04.13.01.03.08 001-005 Besi & Beton Banguntapan (Perempatan Balong 23 Aprl JULED/IV/20 2014 APBD 5 18,247,568 91,237,841 B
Ke Barat) 14
06/PJ/PPKLP
- RT.03 Karang Jambe,
04.13.01.03.08 001-002 Besi & Beton 23 Aprl JULED/IV/20 2014 APBD 2 18,247,568 36,495,136 B
Banguntapan
14
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Wonocatur RW 26 Banguntapan 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton - Pelemwulung Banguntapan 23 Aprl JULED/IV/20 2014 APBD 1 18,247,568 18,247,568 B
14
80 LPJU LED Pundong
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton - Dukuh Seloharjo Pundong 23 Aprl JULED/IV/20 2014 APBD 3 18,247,568 54,742,705 B
14
81 LPJU LED Kretek
04.13.01.03.08 001-002 Besi & Beton - Bracan Tirtomulyo Kretek 23 Aprl 06/PJ/PPKLPJ 2014 APBD 2 18,247,568 36,495,136 B
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton c. Pelem Wulung II 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton d. Jamprang Lor Jambidan 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
06/PJ/PPKLP
e. S.3 Botokenceng sampai
04.13.01.03.08 001-007 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 7 11,658,513 81,609,593 B
Lembahdesa
014
06/PJ/PPKLP
f. Jalan Pelem Wulung (simpang
04.13.01.03.08 001 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
yang sudah terpasang ke selatan)
014
06/PJ/PPKLP
g. Perempatan Dusun Balong Kidul
04.13.01.03.08 001 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
Banguntapan
014
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton h. RT. 18 Tegaltandan 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
85 LPJU LED Dlingo
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton a. Depan Balai Desa Mangunan 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
014
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton b. Akses ke kebun Mangunan 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
014
86 LPJU LED Sewon
a. Sudimoro – Plered (timur 06/PJ/PPKLP
04.13.01.03.08 001-005 Besi & Beton stadion Sultan Agung) mulai dari 23-Apr JUKONV/IV/2 2014 APBD 5 11,658,513 58,292,567 B
jembatan 014
06/PJ/PPKLP
b. Depan Balai Desa Timbulharjo
04.13.01.03.08 001-005 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 5 11,658,513 58,292,567 B
Sewon
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton c. S.3 Pedukuhan Diro ke barat 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
d. Kring Malang Timbulharjo 06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton Sewon (S.3 Aspal ke dusun 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
Sanggrahan) 014
06/PJ/PPKLP
e. Rumah Budaya Tembi ke
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
Selatan
014
06/PJ/PPKLP
f. Jalan Imogiri Barat (S.3
04.13.01.03.08 001-004 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
Pemancingan – Pasar )
014
06/PJ/PPKLP
g. Jalan Imogiri Barat (depan
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
Gereja)
014
87 LPJU LED Pajangan
06/PJ/PPKLP
a. Utara Kecamatan Pajangan 2,
04.13.01.03.08 001-003 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
Depan Kecamatan1,
014
06/PJ/PPKLP
b. Depan Koramil , Polsek
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
Pajangan
014
88 LPJU LED Pleret
06/PJ/PPKLP
a. Simpang 3 Pleret ke selatan
04.13.01.03.08 001-004 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
(Arah segoroyoso)
014
06/PJ/PPKLP
b. RT. 03 ke barat sampai dengan
04.13.01.03.08 001-007 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 7 11,658,513 81,609,593 B
dahromo 1 dan karang gayam
014
06/PJ/PPKLP
c. Pleret, Wonokromo (melanjutkan
04.13.01.03.08 001 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
tahun kemarin)
014
89 LPJU LED Imogiri
06/PJ/PPKLP
a. Tanjakan 1, Girirejo Jln. Imogiri
04.13.01.03.08 001-004 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
Mangunan
014
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton b. SPN Nogosari Selopamioro 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
014
06/PJ/PPKLP
c. SPN Nogosari Selopamioro pintu
04.13.01.03.08 001 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
masuk jalan Panggang.
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton d. Selatan Lapangan ndemi 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
90 LPJU LED Sanden
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton a. Simpang 4 Jembatan Merah 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
06/PJ/PPKLP
b. Simpang Kranggan Ponpes Al-
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
Furqon
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton c. Seputaran Pasar Surobayan 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
91 LPJU LED Bantul
06/PJ/PPKLP
a. Bejen ke utara (melanjutkan
04.13.01.03.08 001-005 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 5 11,658,513 58,292,567 B
pemasangan terakhir)
014
06/PJ/PPKLP
b. Depan Balai desa Trirenggo
04.13.01.03.08 001 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
(pertigaan)
014
06/PJ/PPKLP
04.13.01.03.08 001-004 Besi & Beton c. Gose ke utara 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
014
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton d. S.4 Klodran sisi utara 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
06/PJ/PPKLP
04.13.01.03.08 001-004 Besi & Beton f. Lapangan paseban (tiap pojok) 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
014
06/PJ/PPKLP
g. Lapangan Dwi Windu (sebelah
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
barat)
014
06/PJ/PPKLP
04.13.01.03.08 001-004 Besi & Beton h. Manding ke Timur 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
014
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton i. Manding ke Utara 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
06/PJ/PPKLP
j. Ring road bantul (depan kolam
04.13.01.03.08 001-003 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
renang)
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton k. Simpang selatan KODIM 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
92 LPJU LED Bambanglipuro -
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton a. Pertigaan Sribit barat 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton b. Pertigaan Sribit Selatan 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton c. Depan Balai Desa Sidomulyo 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
014
93 LPJU LED Kasihan -
06/PJ/PPKLP
a. Jalan Kembang Putihan
04.13.01.03.08 001-003 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
Bangunjiwo (simpang 3)
014
06/PJ/PPKLP
04.13.01.03.08 001 Besi & Beton b. Pertigaan Depan Polsek 23-Apr JUKONV/IV/2 2014 APBD 1 11,658,513 11,658,513 B
014
06/PJ/PPKLP
04.13.01.03.08 001-003 Besi & Beton c. Jembatan Cemplung 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
014
06/PJ/PPKLP
d. Perempatan MIROTA GODEAN
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
ke utara
014
94 LPJU LED Pandak
06/PJ/PPKLP
04.13.01.03.08 001-004 Besi & Beton a. Jodog - Sapuangin 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
014
95 LPJU LED Kretek B
06/PJ/PPKLP
a. Pertigaan Depan Balai desa
04.13.01.03.08 001-003 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 3 11,658,513 34,975,540 B
Donotirto Greges
014
96 LPJU LED Sedayu
06/PJ/PPKLP
a. Tikungan Timur museum
04.13.01.03.08 001-002 Besi & Beton 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
Soeharto
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton b. Simpang 4 Kemusuk 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton c. Turunan Metes (patung Gajah) 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
06/PJ/PPKLP
04.13.01.03.08 001-002 Besi & Beton d. Depan Gereja Gubug Sedayu 23-Apr JUKONV/IV/2 2014 APBD 2 11,658,513 23,317,027 B
014
97 LPJU LED Srandakan
06/PJ/PPKLP
04.13.01.03.08 001-004 Besi & Beton a. Kuwaru 23-Apr JUKONV/IV/2 2014 APBD 4 11,658,513 46,634,053 B
014
98 LPJU Konvensional Kasihan
3/SPK/PPK.A
04.13.01.03.08 001-013 Besi & Beton a. Mrisi Tirtonirmolo 27 Okt 2014 APBD 13 11,080,696 144,049,050 B
PILL/10/2014
6/PJ/PPKLpju
04.13.01.03.08 001-007 Besi & Beton a. Pedes - Kemusuk 18 Mei
Konv/V/2015
2015 APBD 7 12,507,441 87,552,089 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton b. Metes 18 Mei
Konv/V/2015
2015 APBD 2 12,507,441 25,014,883 B
6/PJ/PPKLpju
04.13.01.03.08 001-006 Besi & Beton c. Kemusuk - Puluhan 18 Mei
Konv/V/2015
2015 APBD 6 12,507,441 75,044,648 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton d. Gubug 18 Mei
Konv/V/2015
2015 APBD 3 12,507,441 37,522,324 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton e. Selogedong dan Senowo 18 Mei
Konv/V/2015
2015 APBD 2 12,507,441 25,014,883 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton f. Surobayan Argomulyo 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton a. S.4 Daleman Gadingharjo 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton b. Sekitar lapangan Gadingharjo 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. Dpn Kantor Kec.Pundong ke Selatan 18 Mei
Konv/V/2015
2015 APBD 3 12,507,441 37,522,324 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton b. S.4 Pasar Pundong ke Selatan 18 Mei
Konv/V/2015
2015 APBD 2 12,507,441 25,014,883 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton c. S.3 Makam Ngembu - Tarungan 18 Mei
Konv/V/2015
2015 APBD 1 12,507,441 12,507,441 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton d. S.3 Utara Gunung Puyuh 18 Mei
Konv/V/2015
2015 APBD 1 12,507,441 12,507,441 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton a. Terminal Imogiri 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Dodogan - Terong 18 Mei
Konv/V/2015
2015 APBD 1 12,507,441 12,507,441 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. Lapangan Jodog - S.3 Jodog 18 Mei
Konv/V/2015
2015 APBD 3 12,507,441 37,522,324 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton b. Komplek Lapangan Bola Wijirejo 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton c. Depan Kecamatan Pandak 18 Mei
Konv/V/2015
2015 APBD 1 12,507,441 12,507,441 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton b. S.4 Wiyoro - Ngipik 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton c. Ngipik - Karangturi (Dpn Kecamatan) 18 Mei
Konv/V/2015
2015 APBD 4 12,507,441 50,029,765 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. S.3 Jembatan Sindon 18 Mei
Konv/V/2015
2015 APBD 3 12,507,441 37,522,324 B
6/PJ/PPKLpju
04.13.01.03.08 001-010 Besi & Beton b. Sukun - Sulang Kidul 18 Mei
Konv/V/2015
2015 APBD 10 12,507,441 125,074,413 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton c. Sumber Agung (Pertigaan Tower) 18 Mei
Konv/V/2015
2015 APBD 3 12,507,441 37,522,324 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. Melikan Lor Bantul 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton b. Kaligawe RT. 02 Bantul 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton c. Kaligawe RT. 03 Geblak 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton f. Pertigaan MAN Sabdodadi 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton a. Timur Balai Desa Seloharjo 18 Mei
LED/V/2015
2015 APBD 4 15,504,003 62,016,013 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton c. Depan Balai Desa Srihardono 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton d. Piring Srihardono 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton a. Srunggo II 18 Mei
LED/V/2015
2015 APBD 4 15,504,003 62,016,013 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton b. Kalidadap I 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Bekas Pasar Dlingo 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton d. Gerbang Masuk Desa Jatimulyo 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton e. S.3 Mangunan 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton f. Cino mati (Wonolelo) 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton g. Dusun Gunung Cilik Muntuk Dlingo 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-006 Besi & Beton a. Dusun Kauman Wijirejo Pandak 18 Mei
LED/V/2015
2015 APBD 6 15,504,003 93,024,020 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton b. Bergan RT. 08, 09, 10 Wijirejo Pandak 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. S.3 Jembangan RT. 03 Segoroyoso 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton c. Timur Jembatan Klanggotan 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton d. Tambalan Pleret 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton b. Pasar Niten - Jalan Parangtritis 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton c. Cepit - Tembi 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton d. Ngoto RT. 03, 05, 06 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton e. Jotawang 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-003 Besi & Beton a. Kretek Lor Jambidan 18 Mei
LED/V/2015
2015 APBD 3 15,504,003 46,512,010 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton b. Dusun Grojokan 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton c. Lembah Desa ke Timur 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-007 Besi & Beton e. Wirokerten - Mutihan Kotagede 18 Mei
LED/V/2015
2015 APBD 7 15,504,003 108,528,023 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Tikungan dekat ternak pak nugroho 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton b. S.3 Pos Ronda RT 07 Kamijoro 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton c. S.3 Dekat Mushola Al- Maun 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton d. Kembang gede Guwosari Pajangan 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Patalan , Patalan jetis 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton b. Banjardowo Patalan Jetis 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton c. Jogonalan Trimulyo Jetis 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton d. Makam sebrang Watu tetes 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton a. Ganjuran - Sorok 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-005 Besi & Beton b. Dawetan - Paker 18 Mei
LED/V/2015
2015 APBD 5 15,504,003 77,520,017 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton c. Turi RT. 02, 03 Sidomulyo 18 Mei
LED/V/2015
2015 APBD 4 15,504,003 62,016,013 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Godekan Poncosari 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton a. Airud Depok (Pol Airud) 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001-004 Besi & Beton b. Metuk Donotirto kretek 18 Mei
LED/V/2015
2015 APBD 4 15,504,003 62,016,013 B
6/PJ/PPKLpju
04.13.01.03.08 001-008 Besi & Beton a. Desa Gadingsari Sanden 18 Mei
LED/V/2015
2015 APBD 8 15,504,003 124,032,026 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton b. Simpang 4 Daleman 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton a. Pedes - Kemusuk 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001 Besi & Beton b. Gubug 18 Mei
LED/V/2015
2015 APBD 1 15,504,003 15,504,003 B
6/PJ/PPKLpju
04.13.01.03.08 001-002 Besi & Beton c. Selogedong - Senowo 18 Mei
LED/V/2015
2015 APBD 2 15,504,003 31,008,007 B
06/PJ/PPK-
b. Depan Masjid Darussalam LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop 2015 APBD 1 35,997,180 35,997,180 B
Murtigading Surya/IX/201
5
06/PJ/PPK-
c. Perempatan Karangmalang LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop 2015 APBD 1 35,997,180 35,997,180 B
Gadingsari Surya/IX/201
5
06/PJ/PPK-
d. Perempatan Patihan LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop 2015 APBD 1 35,997,180 35,997,180 B
Gadingsari Surya/IX/201
5
06/PJ/PPK-
a. Pertigaan Kentolan RT 03 LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
Guwosari
5
06/PJ/PPK-
b. Pertigaan Rt.01/03 Kalakijo LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
Guwosari
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton c. S4 77 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
d. Kembang Gede, Guwosari, LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
Pajangan
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-002 Besi & Beton a. Jejeran Wonokromo (2 titik) 18 Nop
Surya/IX/201
2015 APBD 2 35,997,180 71,994,360 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton b. Brajan Wonokromo (2 Titik) 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton c. Wonolelo (2 titik) 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton d. Ketonggo Wonokromo (2titik) 18 Nop Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-002 Besi & Beton e. Pandes Wonokromo (2 titik) 18 Nop
Surya/IX/201
2015 APBD 2 35,997,180 71,994,360 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton f. Jembangan Rt.01 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton g. Jembangan Segoroyoso 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton h. Depan Bale Desa Segoroyoso 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton i. jembangan 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton a. RT.01 Kaligawe Geblag Bantul 18 Nop Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton b. Rt.02 Kaligawe Geblag Bantul 18 Nop Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton c. Rt. 05 Geblag Bantul bantul 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton d. Rt.10 Grujugtan Bantul Bantul 18 Nop Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton g. Jalan WR Supratman Bantul 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
06/PJ/PPK-
h. Jalan Sugiyo Pranoto Depan LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
TK Pelangi
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-002 Besi & Beton a. Jl. Tino Sidin 18 Nop
Surya/IX/201
2015 APBD 2 35,997,180 71,994,360 B
5
06/PJ/PPK-
b. Masjid Aceh Keutara Pertigaan LPJU Tenaga
04.13.01.03.08 001-006 Besi & Beton 18 Nop
Surya/IX/201
2015 APBD 6 35,997,180 215,983,080 B
Belok Ke Kanan Jalur Ke Bugisan
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-004 Besi & Beton c. Nitiprayan 18 Nop
Surya/IX/201
2015 APBD 4 35,997,180 143,988,720 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-002 Besi & Beton d. Kembang Putihan 18 Nop
Surya/IX/201
2015 APBD 2 35,997,180 71,994,360 B
5
LPJU TENAGA SURYA
129
(Sonar Cell)
Banguntapan -
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-003 Besi & Beton a. Jambidan dan Kretek Lor 18 Nop
Surya/IX/201
2015 APBD 3 35,997,180 107,991,540 B
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001-002 Besi & Beton a. Tangkilan 18 Nop
Surya/IX/201
2015 APBD 2 35,997,180 71,994,360 B
5
06/PJ/PPK-
a. Simpang 3 Plempungan LPJU Tenaga
04.13.01.03.08 001 Besi & Beton 18 Nop 2015 APBD 1 35,997,180 35,997,180 B
Segoroyoso Pleret Surya/IX/201
5
06/PJ/PPK-
LPJU Tenaga
04.13.01.03.08 001 Besi & Beton b. Guyangan Wonolelo Pleret 18 Nop
Surya/IX/201
2015 APBD 1 35,997,180 35,997,180 B
5
HIBAH
133 LPJU Konvensional 04.13.01.03.08 001-005 Besi & Beton - Jl. Imogiri ( Siluk )- Kretek , 12 Mei 2016 050 / 1489 2016 APBD 5 10,236,950 51,184,750 B DISHUB
Depan SMP Muhammadiyah DIY
Pundong
HIBAH
134 LPJU Konvensional 04.13.01.03.08 001-005 Besi & Beton - Jl. Ngangkruk - Celeb , 12 Mei 2016 050 / 1489 2016 APBD 5 10,236,950 51,184,750 B DISHUB
DIY
Sekitar Bale Desa Tirtomulyo
135 LPJU Konvensional Kec.Jetis
05/SPK/PPK-
b. S4 Bulu - Jonggalan 20 April
04.13.01.03.08 001 Besi & Beton BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
Trimulyo 2016
ONV/IV/2016
c. Jl. Barongan - Jetis, SMK 05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
Merah Putih ONV/IV/2016
Kec.Banguntapan -
05/SPK/PPK-
a. Jl. Rajawali (Selatan POM 20 April
04.13.01.03.08 001-006 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 6 12,301,986 73,811,913 B
Bencin Ketandan) ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-010 Besi & Beton b. Kretek Jambidan 2016
BKP.LPJU.K 2016 APBD 10 12,301,986 123,019,855 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton c. Komitrando Potorono 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton d. Somenggalan 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton f. Mutihan, Kota Gede 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton g. S4 Karang Turi 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-004 Besi & Beton h. Wonocatur RT08 dan 10 2016
BKP.LPJU.K 2016 APBD 4 12,301,986 49,207,942 B
ONV/IV/2016
05/SPK/PPK-
i. Kalangan, Baturetno 20 April
04.13.01.03.08 001-004 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 4 12,301,986 49,207,942 B
(Perum Banguntapan) ONV/IV/2016
Kec.Bantul -
05/SPK/PPK-
a. Jl. S. Parman/A. Yani 20 April
04.13.01.03.08 001-003 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
Bantul Warung ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton e. Badegan, Bantul 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton f. Bakulan 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
Kec.Kretek -
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton a. Baros, Tirtohargo 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
Kec.Pundong -
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton a. Dsn Ngentak RT01 dan 02 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
b. Sempalan Pundong Ds 20 April
04.13.01.03.08 001-007 Besi & Beton BKP.LPJU.K 2016 APBD 7 12,301,986 86,113,899 B
Gerselo 2016
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton c. Dsn Piring 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
Kec.Pleret -
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton a. Ketonggo Wonokromo 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton b. Jembatan Karanganom 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton c. Segoroyoso 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
Kec.Pandak -
05/SPK/PPK-
a. SMP 1 Pandak (Lapangan 20 April
04.13.01.03.08 001-003 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
Jodog) ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton c. Pasar Jodog 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
d. Masjid Utara Gereja 20 April
04.13.01.03.08 001-002 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
Wijirejo ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton e. Pasar Hewan Pandak 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-004 Besi & Beton f. Balai Desa Gilangharjo 2016
BKP.LPJU.K 2016 APBD 4 12,301,986 49,207,942 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton g. Gedongsari, Wijirejo 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton h. Gesikan 4 Wijirejo 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
Kec.Pajangan -
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton a. Kembang Gede 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton b. Kembang Putihan 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
Kec.Kasihan -
05/SPK/PPK-
a. Jl. Tinosidin Ds. Kwaron, 20 April
04.13.01.03.08 001-003 Besi & Beton BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
Ngestiharjo 2016
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton b. Kembaran, Gunungsempu 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton c. Mrisi 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
Kec.Bambanglipuro -
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton a. Tegal Belan, Sidomulyo 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
Kec.Srandakan -
05/SPK/PPK-
20 April
04.13.01.03.08 001-004 Besi & Beton a. Poncosari, Kwaru 2016
BKP.LPJU.K 2016 APBD 4 12,301,986 49,207,942 B
ONV/IV/2016
Kec.Sedayu -
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton a. Metes 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton b. Sungapan 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton c. Surobayan 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton d. Karanglo, Pedes 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton e. Puluhan 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton f. Sorontakan Pedes 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton g. Sedayu 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
Kec.Dlingo -
05/SPK/PPK-
20 April
04.13.01.03.08 001-005 Besi & Beton a. Temuwuh 2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-004 Besi & Beton b. Dodogan Jatimulyo 2016
BKP.LPJU.K 2016 APBD 4 12,301,986 49,207,942 B
ONV/IV/2016
Kec.Sanden -
Kec.Sewon -
Kec.Imogiri -
05/SPK/PPK-
a. Pasar Imogiri Lama 20 April
04.13.01.03.08 001-005 Besi & Beton
2016
BKP.LPJU.K 2016 APBD 5 12,301,986 61,509,928 B
Karangtengah ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-003 Besi & Beton b. Pucung 2016
BKP.LPJU.K 2016 APBD 3 12,301,986 36,905,957 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001 Besi & Beton c. Dukuh RT 5 RW 02 Imogiri 2016
BKP.LPJU.K 2016 APBD 1 12,301,986 12,301,986 B
ONV/IV/2016
05/SPK/PPK-
20 April
04.13.01.03.08 001-002 Besi & Beton d. Kalidadap I 2016
BKP.LPJU.K 2016 APBD 2 12,301,986 24,603,971 B
ONV/IV/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Jl. Garuda Dusun Modalan 2016 6
04.13.01.03.08 001-004 Besi & Beton
-29 Juni
2016 APBD 4 17,046,152 68,184,607 B
Banguntapan Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Mutihan - Kotagede 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Wirokerten Banguntapan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Bantul -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Jedigan RT03 Pasutan 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Trirenggo
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Sebelah timur Jedigan 2016 6
04.13.01.03.08 001 Besi & Beton 2016 APBD 1 17,046,152 17,046,152 B
RT03 Pasutan Trirenggo -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton c. Jedigan RT03 Pasutan -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton d. Bogoran RT01 Trirenggo -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. Jedigan RT06 Pasutan 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Trirenggo
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton f. Pasutan RT02 Trirenggo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton g. Pasutan RT02 Trirenggo -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
h. SD Muhammadiyah Pepe, 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
RT01 Trirenggo
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton i. Pasutan RT04 Trirenggo -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton j. Pepe RT 01 Trirenggo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton k. Bogoran RT02 Trirenggo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton l. Pepe RT 01 Trirenggo -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton m. Bogoran RT01 Trirenggo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton n. Bogoran RT01 Trirenggo -29 Juni
2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton o. Bogoran RT02 Trirenggo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
p. Sebelah timur Depan -20 April lpjuled/IV/201
kantor Pimpinan Daerah 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Muhamadiyah Kab. Bantul
2016 -15/ppk/Aden
Pedak Bantul Warung dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
q. Sebelah Selatan Depan -20 April lpjuled/IV/201
kantor Pimpinan Daerah 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni
2016 APBD 1 17,046,152 17,046,152 B
Muhamadiyah Kab. Bantul
2016 -15/ppk/Aden
Pedak Bantul Warung dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
r. Jl. Jend. A. Yani Bantul 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Warung (Depan Kodim)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-010 Besi & Beton s. Kaligawe Bantul -29 Juni
2016 APBD 10 17,046,152 170,461,518 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-004 Besi & Beton t. Geblag Bantul -29 Juni 2016 APBD 4 17,046,152 68,184,607 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton u. Grujutan -29 Juni 2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton v. Kresen Bantul (Tegaldowo) -29 Juni
2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton w. Geblag - Al Azar Bantul -29 Juni 2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton x. Ngentak Pendowoharjo -29 Juni
2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton y. Bantul Karang -29 Juni 2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Kretek -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Metuk Donotirto Kretek 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni 2016 APBD 3 17,046,152 51,138,455 B
Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Greges Donotirto Kretek 2016 6
04.13.01.03.08 001-003 Besi & Beton 2016 APBD 3 17,046,152 51,138,455 B
Bantul -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Pleret -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton a. Dusun Kerto Kidul Pleret -29 Juni 2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-004 Besi & Beton b. Dusun Karet Pleret -29 Juni 2016 APBD 4 17,046,152 68,184,607 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-005 Besi & Beton c. Dusun Kanggotan Pleret -29 Juni 2016 APBD 5 17,046,152 85,230,759 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton d. Dusun Wonokromo Pleret -29 Juni 2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton e. Dusun Tambalan, Pleret -29 Juni
2016 APBD 2 17,046,152 34,092,304 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001 Besi & Beton f. Cegokan RT04 Wonolelo -29 Juni 2016 APBD 1 17,046,152 17,046,152 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton g. Ploso RT04 Wonolelo -29 Juni
2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
h. Jati Wonokromo (masjid 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Daaril Abbor)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Pandak -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Depan SMP 4 Pandak 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni 2016 APBD 3 17,046,152 51,138,455 B
(Ngaran Gilangharjo Pandak)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Simpang Banjang 2016 6
04.13.01.03.08 001-004 Besi & Beton 2016 APBD 4 17,046,152 68,184,607 B
Glondong -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton c. S3 Bajang ke Bebekan -29 Juni
2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
d. S3 Jetis Daleman 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni
2016 APBD 3 17,046,152 51,138,455 B
Gilangharjo
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. S3 Sabunan Jomboran 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Gilangharjo
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Pajangan -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Dusun Kembang Gede 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Gowosari
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Plambongan Triwidadi 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
Pajangan (Masjid Al-Hidayah) -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Kalakijo Guwosari Pajangan 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
(Masjid Al-Barokah) -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
d. Kentolan Kidul Guwosari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
Pajangan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Kasihan -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton a. Sidorejo -29 Juni 2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-006 Besi & Beton b. Sidorejo (Jembatan) -29 Juni 2016 APBD 6 17,046,152 102,276,911 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Sutopadan, Ngestiharjo, 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni
2016 APBD 1 17,046,152 17,046,152 B
Kasihan, Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
d. Kasihan, Kasihan Bantul -20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-002 Besi & Beton (Depan Masjid Khusnul -29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Qotimah) 2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. Jogonalan Lor Kasihan 2016 6
04.13.01.03.08 001-006 Besi & Beton
-29 Juni
2016 APBD 6 17,046,152 102,276,911 B
Bantul (Selatan Ringroad)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
f. Jalan Bugisan - Madukismo 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Kasihan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Bambanglipuro -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Turi Sidomulyo 2016 6
04.13.01.03.08 001-008 Besi & Beton
-29 Juni 2016 APBD 8 17,046,152 136,369,215 B
Bambanglipuro Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Glondongan Sidomulyo 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
Bambanglipuro Bantul -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Srandakan -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Dusun Kukap Poncosari 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Srandakan Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Dusun Nengahan Trimurti 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Srandakan Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Dusun Paten Trimurti 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Srandakan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
d. Joho Trimurti Srandakan 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
(Masjid Miftahul Janah)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. Bayuran Poncosari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
Srandakan (Masjid Mutaqin)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
f. Koripan Poncosari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Srandakan (Masjid Murtafaqo)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
g. Sawahan Trimurti 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni
2016 APBD 3 17,046,152 51,138,455 B
Srandakan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton h. Puron Trimurti Srandakan -29 Juni 2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
i. Krapakan - Puluhan Lor 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni 2016 APBD 3 17,046,152 51,138,455 B
Trimurti Srandakan
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Sedayu -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
Pedes Argomulyo Sedayu 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
Bantul -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
Surobayan Argomulyo Sedayu 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
bantul -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Sanden -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Wonorejo II Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Al Amin)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Bongos II Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Al Fatah)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Ketalo, Gadingsari Sanden 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
(Masjid Al Mutaqin)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
d. Kurahan Murtigading 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Koba Melati)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. Bonggalan Srigading 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Al Firdaus)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
f. Dusun 12 Kemiri Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
(Masjid Al-Arif)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
g. Demakan Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Nurul Yakin)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
h. Ngujung Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid As- Salam)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
i. Klangguran Gadingsari 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
Sanden (Masjid Ar-Rohman)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Sewon -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Bakung RT01 Bangunharjo 2016 6
04.13.01.03.08 001-002 Besi & Beton 2016 APBD 2 17,046,152 34,092,304 B
Sewon -29 Juni
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Bakung RT04 Bangunharjo 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni
2016 APBD 2 17,046,152 34,092,304 B
Sewon
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Bakung RT05 Bangunharjo 2016 6
04.13.01.03.08 001-002 Besi & Beton
-29 Juni 2016 APBD 2 17,046,152 34,092,304 B
Sewon
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
d. Daden Pendowoharjo 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni 2016 APBD 3 17,046,152 51,138,455 B
Sewon Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton e. Ngoto -29 Juni
2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
f. Jalan Bantul Km 12 (Sekitar 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni 2016 APBD 3 17,046,152 51,138,455 B
Kampus ISI)
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Imogiri -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Pucung Imogiri/Jalan 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni
2016 APBD 3 17,046,152 51,138,455 B
Bawuran Segoroyoso
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Numpukan RT02 2016 6
04.13.01.03.08 001-004 Besi & Beton
-29 Juni 2016 APBD 4 17,046,152 68,184,607 B
Karangtengah Imogiri
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Karang Rejek RT03 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Karangtengah Imogiri
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
2016 6
04.13.01.03.08 001-003 Besi & Beton d. Dusun Pucung Wukirsari -29 Juni
2016 APBD 3 17,046,152 51,138,455 B
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
e. Singosaren Wukirsari 2016 6
04.13.01.03.08 001-008 Besi & Beton
-29 Juni 2016 APBD 8 17,046,152 136,369,215 B
Imogiri
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
Kec.Piyungan -
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
a. Pagergunung Sitimulyo 2016 6
04.13.01.03.08 001-003 Besi & Beton
-29 Juni
2016 APBD 3 17,046,152 51,138,455 B
Piyungan Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
b. Kraden Srimulyo Piyungan 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
-
05/PPK/kontr
ak
-20 April lpjuled/IV/201
c. Munggur Srimartani 2016 6
04.13.01.03.08 001 Besi & Beton
-29 Juni 2016 APBD 1 17,046,152 17,046,152 B
Piyungan Bantul
2016 -15/ppk/Aden
dum
kontrak.lpjule
d/VI/2016
JUMLAH 50,211,622,880
KARTU INVENTARIS BARANG ( KIB )
E. ASET TETAP LAINNYA
1 Buku Studi Kelayakan 05.17.01.01.10 001-005 MSTT UGM 2001 APBD 5 4,700,000 23,500,000
Pembangunan Prasarana
Ketertiban Lalu Lintas
2 Buku Studi Kelayakan 05.17.01.01.10 001-005 MSTT UGM 2002 APBD 5 15,750,000 78,750,000
Pembangunan Terminal,
Tempat Parkir dan Bongkar
Muat Barang
3 Buku Studi Penyusunan 05.17.01.01.10 001-005 MSTT UGM 2003 APBD 5 42,173,200 210,866,000
Jaringan Transportasi Jalan
4 Lembaran Daerah Kab. Bantul Th. 2010 05.17.01.01.10 001 Bag. Hukum 2013 APBD 1 145,944 145,944 R.Sekretariat
5 Lembaran Daerah Kab. Bantul Th. 2011 05.17.01.01.10 001 Bag. Hukum 2013 APBD 1 145,944 145,944 R.Sekretariat
6 Lembaran Daerah Kab. Bantul Th. 2012 05.17.01.01.10 001 Bag. Hukum 2013 APBD 1 145,944 145,944 R.Sekretariat
7 Lembaran Daerah Kab. Bantul Th. 2014 05.17.01.01.10 001 Bag. Hukum 2015 APBD 1 147,500 147,500 R.Sekretariat
JUMLAH 313,701,333
KARTU INVENTARIS BARANG ( KIB )
F. KONSTRUKSI DALAM PENGERJAAN
NO. KODE LOKASI : 12.12.01.20.01.00.00
SATUAN KERJA : DINAS PERHUBUNGAN KABUPATEN BANTUL
N I H I L
-
ASET LAINNYA
NIHIL