Sunteți pe pagina 1din 1

Tower Crane Daily Checklist

Crane Location Model Number Serial Number Date


/ / 20
Operator / Inspector Contractor / Project

Check all Items indicated. Inspect as indicated and note condition.


S = Satisfactory U = Unsatisfactory NA = Not Applicable
Preliminary S U NA Upper / Machinery S U NA
Foundation/Anchors (Visual Only) Unusual Noises
Tower Bolts (Random Check) Reaving
Ladders Hoist
Landings Trollet
Lacings Luffing
Tie-Ins Brakes
Gearbox Leaks Hoist
Reaving Trollet
Hook Luffing
Hook Block Lubrication
Ropes
Operational S U NA Sheaves
Horn Slewing Gear
E-Stop Drive attachments
Wind Speed Indicator Lights
Radius Indicator Fire Extinguisher
Load Indicator
Hoisting
Up Slowdown Limit
Up Final Limit
Down Final Limit
Trolley
In Final Limit
In Slowdown Limit
Out Slowdown Limit
Out Final Limit
Luffing Comments:
Up Final Limit
Up Slowdown Limit
Down Slowdown Limit
Down Final Limit
Slewing
Left Limit
Right Limit
Operator's Signature Supervisor's Signature

Any "Unsatisfactory" Condition should be reported to the supervisor and the servicing authority immediately. Crane operations should cease until all
"Unsatisfactory" conditions have been resolved. Once any repairs have been made, all systems should be checked for proper functionality.

S-ar putea să vă placă și