Serial Topics Page No:
No:
1 Introduction to Dawlance 3
3 Production - I 7-8
4 Production - II 9-10
7 Productio IV/VI 14
8 Production -V 15
2
9 Production - VII 16
12 Conclusion 20
Contents
DAWLANCE
PRODUCTS:
Food Care
Refrigerators
LVS
Monogram
Mono+
H-Zone
MDS
Double French Door
3
Top Mount
Bedroom Series
Energy Saver Series
Freezers
Single Door Freezer
Double Door Freezer
Vertical Freezer
Microwave Ovens
Classic Series
Cooking Series
Baking Series
Fabric Care
Washing Machines
Washers - Single Tub
Semi Automatic - Twin Tub
Fully Automatic
Home Care
Air Conditioners
Energy Saver
Floor Standing
Inspire Plus
Inverter Series
LVS
Monogram SL
Signature Series
4
HSE & COMPILIANCE
And compliance means that the health, safety, and environment of the
industry should be monitored and policies should be made.
Management
safety economics
maintenance management
Acute discharges.
5
Areas where considerable uncertainty about consequences may exist
include
The companies must not only comply with the regulations but also reduce
risk as far as possible. If insufficient knowledge is available about the
effect of preventive action, the HSE regulations specify that additional
measures must be adopted to avoid possible harmful impacts.
Maintenance management
Installations, facilities and equipment wear out, get used up, and become
damaged or destroyed. Insufficient maintenance may increase the risk of
major accidents, damage and mishaps.
6
PLASTIC MOULDING
DEPARTMENT
(Production-I)
7
Different machines and molding dies are used depending upon size, type
and model of the required product.
3- Screen printing:
After molding process screen printing process occurs. In this
process the numbers, labels or monograms of the company is printed.
8
shown in figure.
5- Cable manufacture:
In cable manufacture following operations are carried out:
- Wire stripping-core stripping- pin molding by vertical mold
machine –pin punching by punching machine-plug molding vertical
mold machine.
For mould purpose PVC compound is used. Different machines and dies
are used for different moulds.
SHEET METAL
(Production-II)
9
This cabinet is
formed by sheets,
as shown in figures.
10
ROLLED SHEETS MILD STEEL.
11
THE PAINTING SHOP
(PRODUTION – III)
In painting shop various parts are painted so that they could be transfer
into the final assembly shop.
It includes:
-Cabinet Painting
-Condenser Painting
Cabinet painting:
In this section cabinet is painted by passing through following
processes:
-Phosphating
-Drying
-Powder coating
-Baking
Phosphating:
The Phosphating process is actually through the following
tanks there are basically 4 different tankers, out of them 2 of the chemical
tanks and 2 of them water tanks.
The Phosphating process in which the chemical used is metaphors 247.
12
Dry oven:
At this stage the phosphate cabinet is done into dry oven
which has the temperature of 160 degree centigrade.
Powder Coating:
At this stage powder coating is done by moveable guns
in a powder room so that the layer of powder is to be coated over the
cabinet. The powder is bought from outside.
There are 2 powder rooms used in paint shop. A RECYCLER is used
with which each room which extracts wasted powder from the room;
recycle useful powder and garbage the remaining.
Backing oven:
This is the end process of painting shop here the powder
cabinet are to be backed into the oven so that the powder is to be melted
and from the paint over the cabinet. It has temperature about
220centigrade.
13
Paint Coating 1 Paint Coating 2
Back oven
Powder
coating Dry oven
Baking oven
14
CONDENSER PAINTING
Like all other painting shops, condenser painting also follows the same
process as the other painting process.
-Washing:
After that it is dipped into the fresh water for wash up to 1 to 5 minutes.
-Phosphating:
After that is to be dipped into the tank of metaphors 247 chemical tank.
And after that through pressure vessel it is to be dried.
At the end of Phosphating the condensers supposed to shift into the dry
oven and where the all moisture is dried from the phosphate condenser.
The temperature is also same as in cabinet. Dry oven has 160 centigrade,
back oven has 180 centigrade. In condenser painting coating is to be done
manually.
15
PRODUCTION- IV/VI
(Pre-foaming, foaming of cabinet or doors)
The production four or six is the place where the various operations are
carried out like pre foaming and foaming of cabinet or doors.
PRE-FOAMING SECTION:
At the pre-foaming stage, the necessary items such as the
liner, freezer and anti moisture tube, and evaporator are to be inserted into
the actual body of the cabinet. The actual process of pre-foaming starts
when the painted cabinets from the cabinet paint shop come to the pre-
foaming zone.
PRE-FOAMING PROCESS:
It consists of following steps:
Step1: first of all the compressor support is unscrewed from the painted
cabinet.
Step2: The gum type material named as slants is inserted into the corner
into the corner edge of the painted cabinet in order to make proper
isolation.
Step3: Washer type material is tape within the four whole if the back panel
so that condenser is to be screwed easily in it.
Step4: Bottom profile is inserted within the embossing area in the bottom.
Step5: Spaces in fixed in the back panel so that the pipe which is fitted in
it.
Step6: Groomer also fitted with the wholes.
Step7: Anti moisture strip and a black pipe is to be inserted within the
profile cabinet.
16
FOAMING SECTION:
The foaming section is a place when the pre-foamed
cabinet is to be foamed by the automated machines.
The foam which is to be inserted within the pre-foamed body, it is
solidified within a few minutes.
The foam is basically made of different type of chemicals like iso –
cyanate, polyol and R141B (a gas which is used as catalyst)
PROCESS OF FOAMING:
The process of foaming section begins by fixing the jigs
and fixture within the ref section so that while foaming the inside the
refrigerator is not bend etc.
After that the highly automated the mixture of foam is to be inserted
within the cabinet. The URIL has 9molding foaming hangers which are
fully automated and used to operate according to sensors and actuators
and various other equipments. Basically the mixing of chemicals as form
the foam is to be as,
12 60% of iso-cyanides.
16% R141B.
PRODUCTION -V
(ASSEMBLY LINE)
After the foaming the foamed cabined are passed over the assembly line
where different jobs are assigned to different workers at different at
different shops are as under:
COPRESSOR FITTING:
17
At shop1 two persons are assigned the job to fit compressors of required
size inside the body of cabinet of refrigerator.
BULB FITTING:
At shop 2 one person is assigned the job of the fitting bulb inside the door
of the refrigerator.
THERMOSTAT FITTING:
AT shop 5 one person is assigned the job of fitting thermostat inside the
cabinet of refrigerator.
GAS FILLING:
At shop6 two persons are assigned jobs to fill gases in grams quality
inside the compressors through the inlet according to different size of
refrigerator.
GAS WELDING:
At shop 7 two persons are assigned jobs to close the inlet valve through
gas welding.
SCREW TIGHNING:
18
AT shop10 two persons are assigned the job of screw tightening at
different parts of refrigerator.
QUALITY CONTROL:
At shop 11 three persons are assigned to check the quality of the product
made , if it fits to the requirement it will be sent to the next shop otherwise
will be sent the start of the production house i-e Coiling of sheet metal.
SENT TO STORE HOUSE: After final packing the products are sent to
store house through lifters.
Production –VII
(Forming of Deep freezer)
19
MAINTANCE
The main aim of maintance is to remove the faults if any occur as well as
maintain the machineries like oil level, lubrication e.t.c.
There are two main types of maintance
UTILITIES:
The main function of this department is to provide the basic things which
are essential for production like air for some machines, electricity e.t.c.
The main supplies are:
20
COMPRESSOR ROOM: It provide the compress air to whole industry.
The pressure produce by the compressor is 7 bar which is 1 bar more than
machine requirement in order to avoid line loses.
NITROGEN ROOM: In this section nitrogen is filtered from air and
store in the nitrogen tank later supply to the whole factory where its
needs.
GENERATORS: To overcome the load shading 6 heavy duty generators
are install
QUALITY CONTROL
The main purpose of this department is that customer can get the product
which is free from all defect no matter it is very minimum. The quality of
product is checked at different section before packing. Some quality
checked we discuss here.
CHARGING STATION:
VACCUM: Sucking pump use to sucks moisture, dust particles from the
whole body.
Time for vacuuming 22 min.
Male couples insert in the compressor or (charging line) female couples is
on the pump.
21
INJECTION: R 134 –A gas is injected. Model 70 LVS -150 gm of R 134
a charge then punch off the compressor openings.
22
Also checked back side of product and ensure not any part is missing from
back side.
It can take 45 sec to 1 min
Evaporate gap
Dent, scratch, linear out, foam leak, foam drain.
First fire pieces, are checked if any fault occurs in the molds or e.t.c then
it can be set at a time and the normal productions starts.
SHORT FAULTS: in case short not completed
CONCLUSION:
23
Expending 6 days in the factory will get us in the new world of applied
technology and we know what is organization and organizational
behavior.
How thousands of small and large process work together in uniform
manner to gave us a thing of our desire and we get the excellent quality
product which is very reliable and long lasting and someone rightly said
“Great things come with great efforts “
And at last
Dawlance realiable hai……
24