KERALA STATE ELECTRICITY BOARD KSE Board

Work Express - 2010 PERINGODE THRITHALA PATTAMBI


LABOUR FOR ASSISTING SUB ENGINEER AE, Ele.Sec, PER 26 2019-20 06/24/2019
FOR DB WORK FOR THE MONTH OF JULY AE, Ele.Sec, PER 26 06/30/2019 ### ###### ###
2019
AEE, ESD, THRI AEE, ESD, T 26 2019-20 06/30/2019
SURABHI M, MOOLAYIL HO, PARUDUR, AE, Ele.Sec, PER 26 2019-20 06/30/2019
S No Key Qty Est Qty Meas #VALUE! Particulars 2011 Unit Rate 21230.00 21230.00
1 251 22 22 supply of labour for assisting sub engineer & dbwork day 965.00 21230.00 21230.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
-1-

Extra Item of Works 0 20/Sep/2019 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Materials Issued #VALUE! ### 0 Dec/99 1 2 3 4 5 6
282
284
286
288
290
292
294
296
298
300
302
304
306
308
310
312
314
316
318
320
322
347
349
351
353
355
357
359
361
363
365
367
369
371
373
375
377
379
381
383
385
387
389
419
421
423
425
427
429
431
-1-

433
435
Materials Taken Back 0

E T Muralimohan
9447 186 143

etmuralimohan@gmail.com

List of Contractors
1 SANKARAN.P PATTANATHPARAMBIL HOUSE KARUKAPUTHOOR P.O
2 RAJAN P.P , PATTANATHPARAMBIL HOUSE, KARUKAPUTHOOR PO
3 BISWAJTIH, CHERUKULAPURATH PADI, PILAKATRI, PERINGODE
4 dddddddddddddddddddddddddddddd
5 eeeeeeeeeeeeeeeeeeeeeeeeeeeeee
6 ggggggggggggggggggggggggggggg
7 hhhhhhhhhhhhhhhhhhhhhhhhhh
8 kkkkkkkkkkkkkkkkkkkkkkkkkkkkk
9 wwwwwwwwwwwwwwwwwwwwwww
10 qqqqqqqqqqqqqqqqqqqqqqqq
11 sssssssssssssssssssss
12 xxxxxxxxxxxxxxxxxxxxxxxxxxx
13 zzzzzzzzzzzzzzzzzzzzzzzzzzz
14 uuuuuuuuuuuuuuuuuuuuuuuu
15 ooooooooooooooooooooooooooo
-1-

PATTAMBI SHORANUR
Work Estimate
36/19

10% Remark page


-1-

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
-1-

alimohan
186 143
-1-

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
-1-
-1-

53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
-1-
-1-

0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
-1-

76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98
-1-
-1-

101 1
102 2
103 3
104 4
105 5
106 6
107 7
108 8
109 9
110 10
111 11
112 12
113 13
114 14
115 15
116 16
117 17
118 18
119 19
120 20
121 21
122 22
123 23
124 24
125 25
126 26
127 27
128 28
129 29
130 30
131 31
132 32
133 33
134 34
135 35
136 36
137 37
138 38
139 39
140 40
141 41
142 42
143 43
144 44
145 45
146 46
147 47
148 48
149 49
150 50
151 51
152 52
153 53
154 54
155 55
156 56
157 57
158 58
159 59
160 60
161 61
162 62
-1-

163 63
164 64
165 65
166 66
167 67
168 68
201 69
202 70
203 71
204 72
205 73
99 100 206 74
207 75
208 76
209 77
210 78
211 79
212 80
213 81
214 82
215 83
216 84
217 85
218 86
219 87
220 88
221 89
222 90
223 91
224 92
225 93
226 94
227 95
251 96
252 97
253 98
254 99
255 100
256 101
257 102
258 103
259 104
260 105
261 106
262 107
263 108
264 109
265 110
266 111
267 112
268 113
269 114
270 115
271 116
272 117
301 118
302 119
303 120
304 121
305 122
306 123
307 124
-1-

308 125
309 126
310 127
311 128
312 129
313 130
314 131
315 132
316 133
317 134
318 135
319 136
320 137
321 138
322 139
323 140
324 141
325 142
326 143
327 144
328 145
329 146
330 147
331 148
332 149
333 150
334 151
335 152
336 153
337 154
338 155
339 156
340 157
341 158
342 159
343 160
344 161
345 162
346 163
347 164
348 165
349 166
350 167
351 168
352 169
353 170
354 171
401 172
402 173
403 174
404 175
405 176
406 177
407 178
408 179
409 180
410 181
411 182
412 183
413 184
414 185
415 186
-1-

416 187
417 188
418 189
419 190
420 191
421 192
422 193
423 194
424 195
425 196
426 197
427 198
428 199
429 200
451 201
452 202
453 203
454 204
455 205
456 206
476 207
477 208
478 209
501 210
502 211
503 212
504 213
505 214
506 215
507 216
508 217
509 218
510 219
511 220
512 221
513 222
514 223
515 224
516 225
517 226
551 227
552 228
553 229
554 230
555 231
556 232
557 233
558 234
559 235
560 236
561 237
562 238
563 239
564 240
565 241
566 242
567 243
601 244
602 245
603 246
604 247
605 248
-1-

606 249
607 250
608
609
610
611
612
613
614
615
651
652
653
654
655
656
657
658
676
677
678
679
680
681
701
702
703
704
705
706
707
708
709
710
711
712
713
714
751
752
753
754
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
801
802
803
-1-

804
805
806
826
827
828
829
830
831
832
901
902
951
952
953
954
BO (FM) (Genl) No 867/2011 (DPC II/AE/Proposal.07 /2010) dated 29.03.2011

Key Particulars Unit Rate


101 Surveying one km 11kV line using Theodilite km 1650.00
102 Surveying one km 11kV line using Ranging Rod km 1106.00
103 Transporting one HT TW/RSJ/Rail pole by Hand cart for an average P/km 206.00
104 Transporting one HT TW/RSJ/Rail pole by Hand cart for every P/km 103.00
105 Transporting one HT PSC/RCC pole by Hand cart for an average P/km 281.00
distance of one km (limited to 1 km).
106 Transporting one HT PSC/RCC pole by Hand cart for every additional P/km 140.00
km (limited to 4 kms).
107 Transporting 'A' type special pole of all sizes by Hand cart for an P/km 347.00
108 Transporting 'A' type special pole of all sizes by Hand cart for every P/km 173.00
109 Transporting 4 legged 'A' type special pole of all sizes by Hand cart P/km 487.00
for an average distance of one km (limited to 1 km).
110 Transporting 4 legged 'A' type special pole of all sizes by Hand cart P/km 243.00
for every additional km (limited to 4 kms).
111 Transporting one HT TW/RSJ/Rail pole by Head load for an average P/km 421.00
distance of one km (Normally limited to 0.3 km)
112 Transporting one HT PSC/RCC pole by Head load for an average P/km 784.00
distance of one km (Normally limited to 0.3 km)
113 Transporting 'A' type special pole of all sizes by Head load for an P/km 916.00
average distance one km (Normally limited to 0.3 km)
114 Transporting 4 legged 'A' type special pole of all sizes by Head load P/km 1271.00
for an average distance one km (Normally limited to 0.3 km)
115 Fitting and erecting one HT TW/RSJ/Rail Pole in position including No 561.00
fitting cross arm, digging & back filling pit, drawing earth leads.
116 Fitting and erecting one HT PSC/RCC Pole in position including No 990.00
117 Fitting and erecting one HT 'A' type Pole in position including fitting No 1254.00
118 Fitting and erecting one HT 4 legged 'A' type Pole in position No 1815.00
119 Additional rate for providing one disc set on any type of HT pole for No 45.00
120 Fitting and erecting one HT DP using TW/RSJ/Rail pole in position No 1762.00
121 Fitting and erecting one HT DP using PSC/RCC pole in position No 2620.00
122 Fitting and erecting one HT DP using 'A' type pole in position No 3148.00
123 Fitting and erecting one HT DP using 4 legged 'A' type pole in No 4270.00
124 Fitting and providing one HT Stay for 11 kV pole including digging & No 408.00
125 Fitting and providing one Strut using HT TW/RSJ/Rail pole including No 495.00
126 Fitting and providing one Strut using HT PSC/RCC pole including No 924.00
127 Fitting and providing one Strut using 'A' type pole including digging & No 1188.00
128 Fitting and providing one HT Fly stay for 11 kV pole using HT No 1014.00
129 Fitting and providing one HT Fly stay for 11 kV pole using HT No 1443.00
130 Fitting and providing one HT Fly stay for 11 kV pole using 'A' type No 1707.00
131 Insertion of one HT TW/RSJ/Rail pole in existing line incl. digging & No 606.00
132 Insertion of one HT PSC/RCC pole in existing line incl. digging & No 1035.00
133 Insertion of one HT 'A' type pole in existing line incl. digging & No 1299.00
134 Insertion of one HT 4 legged 'A' type pole in existing line incl. digging No 1948.00
135 Additional rate for excavation of one Pit for HT Pole/ HT Stay in No 132.00
136 Additional rate for excavation of one Pit for HT Pole/ HT Stay in Hard No 264.00
137 Additional rate for excavation of one Pit for HT Pole/ HT Stay in Soft No 396.00
138 Additional rate for excavation of one Pit for HT Pole/ HT Stay in No 792.00
139 Additional rate for excavation of Pit for 'A' type pole in Laterite. No 198.00
140 Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. No 396.00
141 Additional rate for excavation of Pit for 'A' type pole in Soft Rock. No 594.00
142 Additional rate for excavation of Pit for 'A' type pole in Rock. No 1188.00
143 Stringing of one km 11 kV line with ACSR Raccoon (3 conductors) km 10362.00
144 Stringing of one km 11 kV line with ACSR Rabbit (3 conductors) km 8712.00
145 Fitting 5 Nos channel cross arm, AB switch, DO fuse, LA, HT & LT No 4368.00
146 Fitting 3 Nos channel cross arm, AB switch, DO fuse, LA, HT & LT No 4024.00
147 Erecting one CT-PT unit /25/50/63 kVA transformer from vehicle or No 1460.00
148 Erecting one 100/150/160 kVA transformer from vehicle or Ground No 2153.00
149 Erecting one 100/150/160 kVA transformer from vehicle or Ground No 1873.00
150 Erecting one 250/315/500 kVA transformer from vehicle or Ground No 2500.00
151 Installing One DTR Meter with box on existing poles and giving the No 1106.00
152 Fitting one additional Fuse unit and giving connection from No 101.00
153 Providing one Earth using earth pipe incl. digging separate pit at No 413.00
154 Additional rate for excavation of one Earth Pit (2.5Mt depth) in No 264.00
155 Additional rate for excavation of one Earth Pit (2.5Mt depth) in Hard No 528.00
156 Additional rate for excavation of one Earth Pit (2.5Mt depth) in Soft No 792.00
157 Providing one Coil Earth using GI earth wire, digging separate pit at No 264.00
158 Fitting One set (3 Nos) 11 kV LA and giving connections excluding No 140.00
159 Fitting One set (3 Nos) 11 kV DO Fuse and giving connection. No 140.00
160 Fitting one set AB switch, DO fuse, LA, giving connections and No 1106.00
161 Fitting one set AB Switch, giving connection and earthing the same No 1238.00
162 Conveyance of one km 11kV line materials from section store/ km/km 528.00
163 Fitting one Additional V / Angle / Channel cross arm in existing single No 140.00
164 Fitting one Additional Angle / Channel cross arm in existing 11 kV No 172.00
165 Fitting one LT 2 line cross arm on HT or LT existing poles including No 41.00
166 Fitting one LT 4 line cross arm on HT or LT existing poles including No 62.00
167 Providing Bucket type cradling for one span 11kV line including No 3696.00
168 Providing barbed wire protection (2.5m height) for one 11kV pole No 68.00
201 Transporting one LT TW/RSJ/Rail pole by Hand cart for an average P/km 96.00
202 Transporting one LT TW/RSJ/Rail pole by Hand cart for every P/km 48.00
203 Transporting one LT PSC/RCC pole by Hand cart for an average P/km 230.00
204 Transporting one LT PSC/RCC pole by Hand cart for every additional P/km 115.00
205 Transporting one LT TW/RSJ/Rail pole by Head load for an average P/km 215.00
206 Transporting one LT PSC/RCC pole by Head load for an average P/km 429.00
207 Erecting one LT TW/RSJ/Rail Pole in position including digging & No 347.00
208 Erecting one LT PSC/RCC Pole in position including digging & back No 611.00
209 Providing Stay for LT poles including digging & back filling pit. No 276.00
210 Providing Strut using LT TW/RSJ/Rail pole including digging & back No 307.00
211 Providing Strut using LT PSC/RCC pole including digging & back No 571.00
212 Providing Fly stay for LT pole using LT TW/RSJ/Rail pole including No 653.00
213 Providing Fly stay for LT pole using LT PSC/RCC pole including No 917.00
214 Additional rate for excavation of one Pit for LT Pole/ LT Stay in No 66.00
215 Additional rate for excavation of one Pit for LT Pole/ LT Stay in Hard No 132.00
216 Additional rate for excavation of one Pit for LT Pole/ LT Stay in Soft No 198.00
217 Additional rate for excavation of one Pit for LT Pole/ LT Stay in Rock No 396.00
218 Stringing one km LT S ph 2 wire line (Rabbit) incl. fitting cross arm km 5016.00
219 Stringing one km LT S ph 3 wire line (Rabbit for Ph&N, weasel for km 7046.00
220 Stringing one km LT 3 ph 4 wire line (Rabbit for Ph, weasel for N) km 9075.00
221 Stringing one km LT 3 ph 5 wire line (Rabbit for Ph and weasel for km 11105.00
222 Stringing one km LT Addl conductor (Rabbit/Weasel) incl. fitting km 2030.00
223
224
225
226
227
251 supply of labour for assisting sub engineer & dbwork No 965.00
252 supply of labour for assisting the works of senior assistant No
253 Labour for Carryout the duties of electricity worker in section as No 630.00
254 supply of labour for assisting night duty staf No
255 supply of labour for sweeping and cleaning the premises of electrical No
256 supply of labour for issuing spot bills (rural) No
257 supply of labour for issuing spot bills (remote) No
258 No
259 No

260 No
261 No
262 No
263 No
264 Constructing One span 3 Ph OH line for giving S/C using No
265 Constructing One span 3 Ph OH line for giving S/C using PSC/RCC No
266 Constructing One span 3 Ph OH line for giving S/C using No 710.00
267 Constructing One span 3 Ph OH line for giving S/C using PSC/RCC No 974.00
268 Conversion of one span S ph OH line to 3 ph incl. dismantling existing No 419.00
269 Insertion of one LT PSC pole in existing S ph OH line including No 667.00
270 Insertion of one LT PSC pole in existing 3 ph OH line including No 717.00
271 Providing WP support with PSC pole including digging & back filling No 590.00
272 Providing WP support with TW pole including digging & back filling No 326.00
301 Renewal of existing damaged /old 11 kV TW/RSJ/Rail pole with new No 934.00
302 Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new No 1363.00
303 Renewal of existing damaged /old 11 kV PSC/RCC Pole with new No 1577.00
304 Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new No 1660.00
305 Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new No 2490.00
306 Renewal of existing damaged /old 11 kV PSC/RCC Pole with new 'A' No 1874.00
307 Renewal of existing damaged /old 11 kV PSC/RCC Pole with new 4 No 2812.00
308 Renewal of existing damaged /old 11 kV 'A' type pole with new 'A' No 1907.00
309 Renewal of existing damaged /old 11 kV 4 legged 'A' type pole with No 2861.00
310 Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new No 2680.00
311 Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new No 3538.00
312 Renewal of existing damaged /old 11 kV PSC/RCC DP with new No 3967.00
313 Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new No 4066.00
314 Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new 4 No 6098.00
315 Renewal of existing damaged /old 11 kV PSC/RCC DP with new 'A' No 4495.00
316 Renewal of existing damaged /old 11 kV PSC/RCC DP with new 4 No 6742.00
317 Renewal of existing damaged /old 11 kV 'A' type DP with new 'A' No 4627.00
318 Renewal of existing damaged /old 11 kV 4 legged 'A' type DP with No 6940.00
319 Renewing damaged TW/Rail Transformer DP structure with new No 7982.00
320 Renewing damaged TW/Rail Transformer DP structure with new PSC No 8840.00
321 Renewing damaged PSC/RCC Transformer DP structure with new No 9269.00
322 Renewal of one damaged HT Pin insulator No 84.00
323 Additional rate for refitting/ redoing one Disc set while renewing any No 215.00
324 Additional rate for reinstalling LT line on the renewed 11kV pole No 215.00
325 Renewal of existing damaged /old 11 kV Stay with new stay in place No 547.00
326 Renewal of existing damaged / broken old 11kV Stay to the existing No 172.00
327 Replacing/ inserting HT stay insulator on the existing stay. No 172.00
328 Renewal of existing damaged /old 11 kV Strut with new TW/RSJ/Rail No 743.00
329 Renewal of existing damaged /old 11 kV Strut with new PSC/RCC No 1386.00
330 Renewal of existing damaged /old 11 kV Fly Stay with new Fly stay No 1521.00
331 Renewal of existing damaged /old 11 kV Fly Stay with new Fly stay No 2164.00
332 Re-Tensioning one span 11 kV line including replacing insulators, No 213.00
333 Re-joining snapped one HT conductor after removing damaged No 487.00
334 Repairing one limb of AB switch by replacing male and female No 206.00
335 Replacing one set AB switch including dismantling existing AB, No 1238.00
336 Renewal of One No 11 kV LA including conveyance, reconnecting No 70.00
337 Renewal of One No 11 kV DO Fuse including conveyance, No 70.00
338 Renewing 11 kV Jumper connection for one phase from OH line to No 215.00
339 Renewing one 11 kV Jumper using copper / ACSR conductor as per No 126.00
340 Renewing one 11 kV Jumper connection using copper / ACSR No 87.00
341 Renewing one V / angle / channel cross arm on the 11 kV Pole No 235.00
342 Renewing one Channel cross arm on the 11 kV DP including No 215.00
343 Providing stay (temporary nature) by piling Cut Ends in kole land No 429.00
344 Straightening one Slanted 11 kV pole after unbinding the line and No 338.00
345 Straightening one Slanted 11 kV Cut pole after lowering down the No 561.00
346 Dismantling CT/PTunit / 25/50/63 kVA Tr., erecting new No 2322.00
347 Dismantling 100/160 kVA Transformer, erecting new Transformer, No 3510.00
348 Dismantling 250/315/500 kVA Transformer, erecting new No 4030.00
349 Enhancing 50/63 kVA Transformer with new 100kVA transformer, No 3032.00
350 Enhancing 100/160 kVA Transformer with 250/315/500 kVA No 3725.00
351 Reconductoring one km 11 kV old line with New ACSR Raccoon km 12796.00
352 Drilling hole of various sizes on existing Channel / Cross arm. No 5.00
353 Drilling oval shape hole of various sizes on existing Channel / cross No 11.00
354 Cutting Channel / Cross arm/ Angle iron in to two pieces. No 21.00
401 Renewal of existing damaged /old LT TW/RSJ/Rail (S Ph line) pole No 656.00
402 Renewal of existing damaged /old LT TW/RSJ/Rail (S Ph line) pole No 920.00
403 Renewal of existing damaged /old LT PSC/RCC (S Ph line) pole with No 1052.00
404 Renewal of existing damaged /old LT TW/RSJ/Rail ( 3 phase line) No 771.00
405 Renewal of existing damaged /old LT TW/RSJ/Rail ( 3 phase line) No 1035.00
406 Renewal of existing damaged /old LT PSC/RCC ( 3 phase line) pole No 1167.00
407 Additional rate for refitting/ redoing one Shackle set while renewing No 112.00
408 Renewal of existing damaged /old LT stay with new stay in place and No 349.00
409 Renewal of existing damaged / broken old LT stay with existing stay No 132.00
410 Replacing/ inserting LT stay insulator on the existing stay. No 132.00
411 Renewal of existing damaged /old LT Strut with new TW/RSJ/Rail No 394.00
412 Renewal of existing damaged /old LT Strut with new PSC/RCC strut No 790.00
413 Renewal of damaged LT Fly Stay with new Fly stay including renewal No 913.00
414 Renewal of damaged LT Fly Stay with new Fly stay including renewal No 1309.00
415 Reshackling one Span LT S Ph 2 wire OH line, replacing insulators, No 77.00
416 Reshackling one Span LT 3 Ph 4 wire OH line, replacing insulators, No 145.00
417 Reshackling one Span LT OH Addl conductor, replacing insulators, No 34.00
418 Re-joining snapped one LT conductors after removing damage portion No 201.00
419 Renewing one LT Jumper using copper / ACSR conductor as per No 42.00
420 Renewing one LT Jumper connection using copper / ACSR conductor No 29.00
421 Providing/ Inserting 2 line spacer on the existing LT OH line No 25.00
422 Providing/ Inserting 3 line spacer on the existing LT OH line No 31.00
423 Transferring LT S Ph 2/3 wire OH line to newly erected HT/LT pole No 261.00
424 Transferring LT 3 Ph 4/5 wire OH line to newly erected HT/LT pole No 505.00
425 Straightening one Slanted LT pole after unbinding the line and No 309.00
426 Straightening one Slanted LT Cut pole after unbinding the line and No 421.00
427 Reconductoring one km LT S ph 2 wire OH old line with New ACSR km 4987.00
428 Reconductoring one km LT 3 Ph 4 wire OH old line with New ACSR km 10302.00
429 Reconductoring one km LT OH one old conductor with New ACSR km 2658.00
451 Dismantling and reconnecting single phase service connection from No 28.00
452 Dismantling and reconnecting three phase service connection from the No 43.00
453 Redoing S ph WP S/C complete. lowering down the guy wire portion, No 264.00
454 Redoing 3 ph WP S/C complete incl changing cut-out, neutral link No 330.00
455 Shifting One S ph metering equipment with all fittings at new location No 267.00
456 Shifting One 3 ph metering equipment with all fittings at new location No 495.00
476 Changing Faulty S ph Energy meter with new meter, giving connection No 33.00
477 Changing Faulty 3 ph Energy meter with new meter, giving connection No 60.00
478 Changing Faulty 3 ph CT meter with new meter & CT, giving No 347.00
501 Dismantling one damage 11 kV TW/RSJ/Rail pole after disconnecting No 325.00
502 Dismantling (with out damage) one No. 11 kV TW/RSJ/Rail pole No 538.00
503 Dismantling one damage 11 kV PSC/RCC pole after disconnecting No 540.00
504 Dismantling (with out damage) one No. 11 kV PSC/RCC pole after No 942.00
505 Dismantling one damaged 11 kV 'A' type pole after disconnecting No 672.00
506 Dismantling (with out damage) one No. 11 kV 'A' type pole after No 944.00
507 Dismantling one damaged 11 kV 4 legged 'A' type pole after No 1007.00
508 Dismantling (with out damage) one No. 11 kV 4 legged 'A' type pole No 1416.00
509 Dismantling one damage HT TW/RSJ/Rail Strut pole including No 248.00
510 Dismantling (with out damage) one HT TW/RSJ/Rail Strut pole No 462.00
511 Dismantling one damage HT PSC/RCC Strut pole including removal No 462.00
512 Dismantling (with out damage) one HT PSC/RCC Strut pole including No 861.00
513 Dismantling (with out damage) one km 11 kV line (3 conductors), km 4142.00
514 Dismantling (with out damage) one HT stay including back filling, and No 270.00
515 Dismantling one V cross arm / Channel cross arm from existing Pole, No 56.00
516 Dismantling one Channel cross arm from existing DP structure, and No 86.00
517 Dismantling (with out damage) one AB switch from existing structure No 495.00
551 Dismantling one damage LT TW/RSJ/Rail pole after disconnecting No 173.00
552 Dismantling (with out damage) one LT TW/RSJ/Rail pole after No 314.00
553 Dismantling one damage LT PSC/RCC pole after disconnecting stays, No 305.00
554 Dismantling (with out damage) one LT PSC/RCC pole after No 586.00
555 Dismantling (with out damage) LT stay including digging pit in all No 138.00
556 Dismantling one damage LT TW/RSJ/Rail Strut pole including No 153.00
557 Dismantling (with out damage) one LT TW/RSJ/Rail Strut pole No 284.00
558 Dismantling one damage LT PSC/RCC Strut pole including removal No 285.00
559 Dismantling (with out damage) one LT PSC/RCC Strut pole including No 482.00
560 Dismantling one LT 2 line cross arm from existing pole. No 21.00
561 Dismantling one LT 4 line cross arm from existing pole. No 31.00
562 Dismantling Single phase WP Service connection with meter & all No 264.00
563 Dismantling Three phase WP Service connection with meter & all No 396.00
564 Dismantling (with out damage) one span of HT or LT cradling and No 677.00
565 Dismantling (with out damage) one km LT S Ph 2 wire OH line, cross km 1898.00
566 Dismantling (with out damage) one km LT 3 Ph 4 wire OH line, cross km 3440.00
567 Dismantling (with out damage) one km LT Additional conductor line, km 875.00
601 Wiring and installing one new Ordinary street light / CFL/ LED No 69.00
602 Dismantling (with out damage) one Ordinary street light / CFL / LED No 42.00
603 Dismantling one ordinary street light/ CFL/ LED fitting from pole, No 104.00
604 Wiring and installing new set 2 x 40 W fluorescent tube fitting on No 124.00
605 Dismantling one set 2x40 W fluorescent tube fitting from pole, No 186.00
606 Replacing bulb/CFL on existing street light. No 19.80
607 Dismantling one ordinary street light/ CFL/ LED fitting from existing No 111.00
608 Dismantling one 2 x 40 W fluorescent tube fitting from the existing No 198.00
609 Wiring and installing new set SV/ MV/ Metal halide lamp fitting on No 442.00
610 Wiring and installing new set SV/ MV/ Metal halide lamp fitting on No 221.00
611 Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting No 708.00
612 Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting No 276.00
613 Dismantling SV/MV/Metal halide lamp fitting from the existing pole No 708.00
614 Dismantling SV/MV/Metal halide lamp fitting from the existing pole No 354.00
615 Replacing holder, fused bulb/CFL, changing wires, giving connection No 40.00
651 Clearing touchings on HT lines 11 kV, cutting tree branches, bamboo km 541.00
652 Clearing touchings on HT lines 11 kV, cutting tree branches, bamboo km 677.00
653 Clearing touchings on HT/LT lines, cutting tree branches, bamboo km 624.00
654 Clearing touchings on HT/LT lines, cutting branches of tree, bamboo km 792.00
655 Clearing touchings on 33 kV lines, cutting tree branches, bamboo km 812.00
656 Clearing touchings on 33 kV lines, cutting tree branches, bamboo km 1015.00
657 Clearing touchings on LT lines, cutting tree branches, bamboo km 508.00
658 Clearing touchings on LT lines, cutting tree branches, bamboo km 594.00
676 Cutting trees beyond 30 cm but up to and including 60 cm girth, No 138.00
677 Cutting trees beyond 60 cm but up to and including 120 cm girth, No 237.00
678 Cutting trees beyond 120 cm but up to and including 180 cm girth, No 362.00
679 Cutting trees beyond 30 cm but up to and including 60 cm girth, No 212.00
680 Cutting trees beyond 60 cm but up to and including 120 cm girth, No 385.00
681 Cutting trees beyond 120 cm but up to and including 180 cm girth, No 540.00
701 Loading HT TW/RSJ/Rail pole from the stacking place and unloading No 107.00
702 Loading HT PSC/RCC pole from the stacking place and unloading the No 233.00
703 Loading HT 'A' type pole from the stacking place and unloading the No 277.00
704 Loading HT 4 legged 'A' type pole from the stacking place and No 389.00
705 Loading LT TW/RSJ/Rail pole from the stacking place and unloading No 78.00
706 Loading LT PSC/RCC pole from the stacking place and unloading the No 147.00
707 Unloading one Transformer (up to and including 160 kVA) from No 413.00
708 Unloading one Transformer (above 160 kVA) from vehicle to ground No 693.00
709 Loading one Transformer (up to and including 160 kVA) from ground No 545.00
710 Loading one Transformer (above 160 kVA) from ground to vehicle No 825.00
711 Dismantling one Transformer up to 160 kVA from structure and No 578.00
712 Dismantling one Transformer above 160 kVA from plinth and loading No 718.00
713 Dismantling one Transformer (up to and including 160 kVA) from No 718.00
714 Dismantling one Transformer (above 160 kVA) from existing No 858.00
751 Transporting poles by hired vehicle to a distance up to 5 kms and Trip 600.00
752 Transporting poles by hired vehicle to a distance beyond 5 kms and km 25.00
753 Transporting Transformers by hired vehicle up to 5 kms and upto 2 Trip 600.00
754 Transporting Transformers by hired vehicle to a distance beyond 5 km 25.00
776 Engaging one boat man with Boat / Country Boat/ Vallam day 275.00
777 Transporting HT TW/RSJ/Rail Poles by Country boat/ Vallam up to 6 No 148.00
778 Transporting HT TW/RSJ/Rail Poles by Country boat/ Vallam beyond km 13.20
779 Transporting HT PSC/RCC Poles by Country boat/ Vallam up to 6 No 348.00
780 Transporting HT PSC/RCC Poles by Country boat/ Vallam beyond 6 km 26.00
781 Transporting 'A' type Poles by Country boat/ Vallam up to 6 kms No 410.00
782 Transporting 'A' type Poles by Country boat/ Vallam beyond 6 km km 40.00
783 Transporting 4 legged 'A' type Poles by Country boat/ Vallam up to 6 No 615.00
784 Transporting 4 legged 'A' type Poles by Country boat/ Vallam beyond km 59.00
785 Transporting LT TW/RSJ/Rail Poles by Country boat/ Vallam up to 6 No 120.00
786 Transporting LT TW/RSJ/Rail Poles by Country boat/ Vallam beyond km 10.60
787 Transporting LT PSC/RCC Poles by Country boat/ Vallam up to 6 No 292.00
788 Transporting LT PSC/RCC Poles by Country boat/ Vallam beyond 6 km 24.00
789 Transporting 63/100/160 kVA Transformer by Country boat/ Vallam No 580.00
790 Transporting 63/100/160 kVA Transformer Poles by Country boat/ km 53.00
791 Transporting 250/315/500 kVA Transformer by Country boat/ Vallam No 690.00
792 Transporting 250/315/500 kVA Transformer Poles by Country boat/ km 66.00
801 Painting the surface of pole with anti algal yellow paint and painting No 27.00
802 Preparing index register (book & soft copy) showing name of No 1.80
803 Traffic signal painting of pole 1.5 m height using black and white No 115.00
804 Supplying and fixing permanently, Screen printed consumer premises No 11.40
805 Painting 'A' pole structure with one coat Synchromate primer and two No 846.00
806 Numbering of Tree (marking for cutting the tree) using yellow enamel No 6.00
826 Excavation of cable trench 1.2m deep and 0.35m wide, conveying 3 x m 297.00
827 Doing straight joint using the cable jointing kit supplied No 1183.00
828 Doing one cable end termination using the cable jointing kit supplied No 850.00
829 Mounting the cable ends with special type cable clamps incl. cost of No 480.00
830 Excavation of cable trench (Soil surface) and digging out the cable m 100.00
831 Excavation of cable trench (tarred/concreted surface) and digging out m 199.00
832 Dismantling faulty cable end from the structure/pole and mounting the No 288.00
901 Constructing Transformer plinth inclusive of cost of all material (as No 9872.00
902 Providing concrete muffing (45cm x 45cm 1.5m) inclusive of cost of No 2400.00
951

952

953

954

Materials Rate

1 PSC Pole 7m E 1111.00


2 PSC Pole 8m E 1353.00
3 PSC Pole 9m E 2189.00
4 A Pole 10m E 12500.00
5 A Pole 11m E 13700.00
6 A Pole 12m E 15000.00
7 A Pole 13m E 16300.00
8 A Pole 14m E 34000.00
9 Pin insulator with pin and packing clamp - LT E 53.81
10 Pin insulator with pin - LT E 47.00
11 Packing clamp - LT E 26.00
12 Pin insulator with pin -11kV E 101.16
13 Tension Set with Insulator Disc - 11 kV E 454.71
14 Disc insulator – 11 kV E 254.71
15 Composite Disc Insulator -11kV E 217.88
16 Hard ware fittings – 11kV E 200.00
17 MS Cleat E 54.44
18 GI Cleat E
19 Pole top bracket - F Type -11 kV E 105.00
20 Shackle insulator with strap bolt and nut – LT E 41.99
21 Shackle insulator - LT E 46.00
22 GI Strap with bolt and nut E 31.00
23 Line spacer -2 Line E 21.00
24 Line spacer -4 Line E 35.00
25 Stay Set Complete - 11 kV E 981.53
26 Stay Set Complete - LT E 877.33
27 Stay insulator - 11 kV E 30.00
28 Stay insulator - LT E 10.00
29 Stay rod - HT E 345.00
30 Stay rod - LT E 239.00
31 Stay Tightner - HT E 427.00
32 Stay Tightner - LT E 360.00
33 RCC stayblock E 64.00
34 AB Switch 11kV 400A E 8499.67
35 Flexible copper belt for AB switch E 244.00
36 Aluminium connector for AB switch - 400A E 130.00
37 Female contact for AB switch - 400A E 438.68
38 Male contact for AB switch - 400A E 581.40
39 Insulator for AB switch - 11 kV E 468.00
40 Drop Out Fuse Unit – 11 kV E 638.60
41 Fuse Unit 63A E 125.00
42 Fuse Unit 100A E 304.44
43 Fuse Unit 200A E 570.83
44 Fuse Unit 300A E 748.71
45 HRC fuse unit E 60.00
46 Fuse wire kg 535.00
47 Lightning Arrestor – 11KV E 951.00
48 2 Line cross arm E 256.00
49 2 Line cross arm with clamp, bolt and nut E 262.00
50 4 Line cross arm E 498.00
51 4 Line cross arm with clamp, bolt and nut E 472.00
52 Clamp for 2/4 line cross arm E 67.00
53 Channel cross arm - 1.8m E 1063.20
54 Channel cross arm - 1.8m with clamp, bolt and nut E 1176.00
55 Channel cross arm - 2.4m E 1364.50
56 Channel cross arm - 2.4m with clamp, bolt and nut E 1464.00
57 Channel cross arm - 3m E 2063.50
58 Channel cross arm - 3m with clamp, bolt and nut E
59 Clamp for channel cross arm E 153.00
60 V Cross arm - 11 kV E 975.00
61 Clamp for V Cross arm E 164.00
62 GI Bolt and nut (assorted size) kg 65.20
63 PG clamp (Raccoon) E 145.00
64 ACSR Raccoon km 50820.00
65 ACSR Rabbit km 37110.00
66 ACSR Weasel km 20400.00
67 ACSR Squirrel km 13770.00
68 Aluminium armoured cable 3.5C x 150 sq.mm - LT mtr 545.00
69 PVC cable 1.5 Single Core (WP Wire 1.5 sq.mm) Coil 293.00
70 PVC cable 1/1.8 Twin Core (WP Wire 2.5 sq.mm) Coil 700.00
71 PVC cable 1/2.8 Twin Core (WP Wire 6 sq.mm) Coil 1260.00
72 PVC cable 25 sq.mm Single Core m 24.00
73 PVC cable 50 sq.mm Single core m 40.00
74 PVC cable 70 sq.mm Single core m 55.00
75 PVC cable 95 sq.mm Single core m 64.00
76 PVC cable 120 sq.mm Single core m 82.00
77 PVC cable 150 sq.mm Single core m 85.00
78 PVC cable 185 sq.mm Single core m
79 XLPE cable 25 sq.mm Single core - LT m
80 XLPE Cable 50 sq.mm Single core - LT m 27.85
81 XLPE Cable 70 sq.mm Single core - LT m 54.00
82 XLPE Cable 95 sq.mm Single core - LT m 65.90
83 XLPE Cable 120 sq.mm Single core - LT m 79.90
84 XLPE Cable 150 sq.mm Single core - LT m 92.00
85 XLPE Cable 185 sq.mm Single core - LT m 109.00
86 XLPE Cable 3 x 300 sq.mm UG Cable m 1583.28
87 End termination kit (Push on type) 300 sq.mm XLPE cable E 3500.00
88 End termination kit (Heat shrinkable type) 300 sq.mm XLPE cable E 2600.00
89 Straight joint kit (Heat shrinkable type) 300 sq.mm XLPE cable E 6600.00
90 Straight joint kit - 3X300 sq.mm XLPE cable E 5083.00
91 Aluminium Crimping socket 50 sq.mm E 5.50
92 Aluminium Crimping socket 70 sq.mm E 6.25
93 Aluminium Crimping socket 95 sq.mm E 9.25
94 Aluminium Crimping socket 120 sq.mm E 13.00
95 Aluminium Crimping socket 150 sq.mm E 17.00
96 Aluminium Crimping socket 185 sq.mm E 21.00
97 Earth pipe 2.5m - 40mm E 540.00
98 HT Stay wire E 56.02
99 GI Wire 5mm (No.6) kg 43.43
100 Transformer 25 kVA E 58350.00
101 Transformer 50/63 kVA E
102 Transformer 100 kVA E 90676.49
103 Transformer 160 kVA E 152316.00
104 Transformer 250 kVA E 207789.00
105 Transformer 315 kVA E
106 Transformer 500 kVA E 395944.00
107 Transformer 100 kVA - 3 star rated E 118044.00
108 Transformer 160 kVA - 3 star rated E 172087.00
109 Silica gel kg 86.00
110 Single phase static meter E 656.50
111 Three phase static meter E 2477.63
112 Three phase static CT meter E 3198.00
113 DTR meter E 3777.75
114 LT TOD meter E
115 CT - 100/5 E 430.00
116 CT - 150/5 E 600.00
117 CT - 200/5 E 320.62
118 CT/PT unit - 11 kV E 32820.00
119 DTR Box E 2953.00
120 Flourescent Lamp - 40W E 40.00
121 Double tube flourescent street light fitting with bracket, clamp, B&N E 1080.00
122 Pipe fittings for flourescent tube with clamp,bolt & nut E 300.00
123 Sealing Lead kg 225.00
124 Sealing wire kg 212.50
125 Polycarbonate meter seal E 7.00
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
HT LINE WORKS
LT LINE WORKS
labour contract

HT MAINTENANCE
LT MAINTENANCE
MACE OF SERVICE

METER CHANGING

DISMANTLING – HT

DISMANTLING – LT
STREET LIGHT

CLEARING

CLEARING

Tree Cutting

LOADING AND

Transportation of

Transportation of
Painting

UG Cable

Civil works

Special works

Rate mentioned in yellow


colored cells are approved by
KSERC
POLES
LINE MATERIALS
CONDUCTORS AND CABLES

TRANSFORMERS AND SPARES


METERING EQUIPMENTS

ELECTRIC LIGHT FITTINGS

OTHERS
Particulars in detail
Surveying one km 11kV line using Theodilite
Surveying one km 11kV line using Ranging Rod
Transporting one HT TW/RSJ/Rail pole by Hand cart - for an average distance of one km (limited to 1 km).
Transporting one HT TW/RSJ/Rail pole by Hand cart - for every additional km (limited to 4 km).
Transporting one HT PSC/RCC pole by Hand cart - for an average distance of one km (limited to 1 km).

Transporting one HT PSC/RCC pole by Hand cart - for every additional km (limited to 4 km).

Transporting 'A' type special pole of all sizes by Hand cart - for an average distance of one km (limited to 1 km).
Transporting 'A' type special pole of all sizes by Hand cart - for every additional km (limited to 4 km).
Transporting Four legged 'A' type special pole of all sizes by Hand cart - for an average distance of one km (limited to 1 km).

Transporting Four legged 'A' type special pole of all sizes by Hand cart - for every additional km (limited to 4 km).

Transporting one HT TW/RSJ/Rail pole by Head load - for an average distance of one km (Normally limited to 0.3 km)

Transporting one HT PSC/RCC pole by Head load - for an average distance of one km (Normally limited to 0.3 km)

Transporting 'A' type special pole of all sizes by Head load - for an average distance one km (Normally limited to 0.3 km)

Transporting Four legged 'A' type special pole of all sizes by Head load - for an average distance one km (Normally limited to 0.3 km)

Fitting and erecting one HT TW/RSJ/Rail Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, draw
sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthinging).
Fitting and erecting one HT PSC/RCC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing
Fitting and erecting one HT 'A' type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing su
Fitting and erecting one HT Four legged 'A' type Single Pole in position including fitting cross arm, digging and back filling pit in ordinary soil
Additional rate for providing one disc set, complete, per phase on any type of HT pole for making cut point.
Fitting and erecting one HT Double Pole Structure using TW/RSJ/Rail pole in position including fitting 2 Nos channel cross arm, digging and
Fitting and erecting one HT Double Pole Structure using PSC/RCC pole in position including fitting 2 Nos channel cross arm, digging and bac
Fitting and erecting one HT Double Pole Structure using 'A' type pole in position including fitting 2 Nos channel cross arm, digging and back fi
Fitting and erecting one HT Double Pole Structure using Four legged 'A' type pole in position including fitting 2 Nos channel cross arm, diggin
Fitting and providing one HT Stay for 11 kV pole, including digging and back filling pit in ordinary soil.
Fitting and providing one Strut using HT TW/RSJ/Rail pole, including digging and back filling pit in ordinary soil.
Fitting and providing one Strut using HT PSC/RCC pole including digging and back filling pit in ordinary soil.
Fitting and providing one Strut using 'A' type pole, including digging and back filling pit in ordinary soil.
Fitting and providing one HT Fly stay for 11 kV pole using HT TW/RSJ/Rail pole, including digging and back filling pits in ordinary soil draw
Fitting and providing one HT Fly stay for 11 kV pole using HT PSC/RCC pole including digging and back filling pits in ordinary soil drawing
Fitting and providing one HT Fly stay for 11 kV pole using 'A' type pole including digging and back filling pits in ordinary soil drawing sufficie
Insertion of one HT TW/RSJ/Rail pole in existing OH line including digging & backfilling pit in Ordinary Soil, fitting cross arm, insulators, bi
Insertion of one HT PSC/RCC pole in existing OH line including digging & backfilling pit in Ordinary Soil, fitting cross arm, insulators, bindi
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in Ordinary Soil, fitting cross arm, insulators, binding
Insertion of one HT Four legged 'A' type pole in existing OH line including digging & backfilling pit in Ordinary Soil, fitting cross arm, insulat
Additional rate for excavation of one Pit for HT Pole/ HT Stay in Laterite
Additional rate for excavation of one Pit for HT Pole/ HT Stay in Hard Laterite
Additional rate for excavation of one Pit for HT Pole/ HT Stay in Soft Rock
Additional rate for excavation of one Pit for HT Pole/ HT Stay in Rock
Additional rate for excavation of Pit for 'A' type pole in Laterite.
Additional rate for excavation of Pit for 'A' type pole in Hard Laterite.
Additional rate for excavation of Pit for 'A' type pole in Soft Rock.
Additional rate for excavation of Pit for 'A' type pole in Rock.
Stringing of one km 11 kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting rem
Stringing of one km 11 kV line with ACSR Rabbit (3 conductors) after fitting insulators and giving jumper connections including cutting remo
Fitting 5 Nos channel cross arm, AB switch, DO fuse, LA, HT & LT connections up to OH lines, etc. on existing DP structure, earthing the sa
Fitting 3 Nos channel cross arm, AB switch, DO fuse, LA, HT & LT connections up to OH lines, etc. on existing DP structure, earthing the sa
Erecting one CT-PT unit /25/50/63 kVA Transformer from any vehicle/Ground to existing DP/ Plinth and giving connections (including expen
Erecting one 100/150/160 kVA Transformer from any vehicle/Ground to existing DP and giving connections(including expenses for transporti
Erecting one 100/150/160 kVA Transformer from any vehicle/Ground to existing Plinth and giving connections(including expenses for transp
Erecting one 250/315/500 kVA Transformer from any vehicle/Ground to existing Plinth and giving connections(including expenses for transpo
Installing One DTR Meter with box (Normally 40x25x100 size) on existing poles and giving the complete connections including conveyance o
Fitting one additional Fuse unit and giving connection from Transformer to fuse and fuse to LT OH line.
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5 m length including digging separate pit (45cm x 45cm x 2.5 m) at standard d
Additional rate for excavation of one Earth Pit (2.5 m depth) in Laterite
Additional rate for excavation of one Earth Pit (2.5 m depth) in Hard Laterite
Additional rate for excavation of one Earth Pit (2.5 m depth) in Soft Rock
Providing one Coil Earth using No.8 GI-earth wire (50 mm dia, 115 turns) including digging separate pit (45cm x 45cm x 1.5 m) at standard d
Fitting One set (3 Nos) 11 kV LA and giving connections excluding earthing.
Fitting One set (3 Nos) 11 kV DO Fuse and giving connection.
Fitting one set AB switch, DO fuse (3 Nos), LA (3 Nos), giving all connections from HT line to Transformer bush and drawing earth leads to t
Fitting one set AB Switch, giving connection and earthing the same using one earth pipe (2.5 m) including digging pit in Ordinary Soil & back
Conveyance of one Km 11kV line materials from section store/ stacking place to the work site (excluding poles).
Fitting one Additional V / Angle / Channel cross arm in existing single pole including conveyance of materials
Fitting one Additional Angle / Channel cross arm in existing 11 kV DP including conveyance of materials
Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Providing Bucket type cradling for one span 11kV line using 8 SWG GI wire including excavation of earth pit and earthing at both ends using
Providing barbed wire anti-climbing protection 2.5Mtr height for one 11kV pole
Transporting one LT TW/RSJ/Rail pole by Hand cart - for an average distance of one km (limited to 1 km).
Transporting one LT TW/RSJ/Rail pole by Hand cart - for every additional km (limited to 4 km).
Transporting one LT PSC/RCC pole by Hand cart - for an average distance of one km (limited to 1 km).
Transporting one LT PSC/RCC pole by Hand cart - for every additional km (limited to 4 km).
Transporting one LT TW/RSJ/Rail pole by Head load - for an average distance of one km (Normally limited to 0.3 km)
Transporting one LT PSC/RCC pole by Head load - for an average distance of one km (Normally limited to 0.3 km)
Erecting one LT TW/RSJ/Rail Pole in position including digging & back filling pit in ordinary soil.
Erecting one LT PSC/RCC Pole in position including digging & back filling pit in ordinary soil.
Providing Stay for LT poles including digging & back filling pit in ordinary soil.
Providing Strut using LT TW/RSJ/Rail pole including digging and back filling pit in ordinary soil.
Providing Strut using LT PSC/RCC pole including digging and back filling pit in ordinary soil.
Providing Fly stay for LT pole using LT TW/RSJ/Rail pole including digging and back filling pit in ordinary soil.
Providing Fly stay for LT pole using LT PSC/RCC pole including digging and back filling pit in ordinary soil.
Additional rate for excavation of one Pit for LT Pole/ LT Stay in Laterite
Additional rate for excavation of one Pit for LT Pole/ LT Stay in Hard Laterite
Additional rate for excavation of one Pit for LT Pole/ LT Stay in Soft Rock
Additional rate for excavation of one Pit for LT Pole/ LT Stay in Rock
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase and Neutral, for on
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase & Neutral and ACS
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase and ACSR weasel f
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc using ACSR Rabbit for Phase and ACSR weasel f
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc for one km additional conductor (ACSR Rabbit/W
Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc, for one km additional conduc
Conversion of one km LT single phase line to LT three phase line including dismantling the existing 2 conductors, stringing 3 ACSR Rabbit co
Fitting one No Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Providing Guarding LT line using No.8 SWG GI wire one span for road crossing including earthing (using 2.5 m earth pipe) both ends.
Fitting one set (3Nos) LT lightning arrestors in three phase line and giving connections excluding earthing
Giving one single phase WP Service connection including conveyance of materials, fixing meter, drawing WP wire, with GI support wire etc. a
standards.
Giving one three phase WP Service connection including conveyance of materials, fixing meter, drawing WP wire with GI support wire etc. as
Giving one three phase WP Service Connection using CT including conveyance of materials, fixing meter, CT, drawing WP wire etc. as per st
Converting single phase WP Service connection to three phase Service Connection by replacing existing S Ph meter with 3 Ph meter, WP wire
Converting three phase WP Service connection to single phase Service Connection by replacing existing 3 Ph meter with S Ph meter, WP wire
Constructing one span single phase OH line for giving Service Connection using TW/RSJ/Rail pole with one stay including digging & back fill
Constructing One span Single phase OH line for giving Service Connection using PSC/RCC pole with one stay including digging & back fillin
Constructing One span Single phase OH line for giving Service Connection using TW/RSJ/Rail pole with TW/RSJ/Rail strut (without stay) inc
Constructing One span Single phase OH line for giving service connection using PSC/RCC pole with PSC/RCC strut (without stay) including
back filling 2 pits in ordinary soil, cutting removing tree branches, excluding WP portion and transportation of poles.
Constructing One span Single phase OH line for giving Service Connection using TW/RSJ/Rail pole without stay/strut including digging & bac
Constructing One span Single phase OH line for giving service connection using PSC/RCC pole without stay/strut including digging & back fil
Constructing One span Three phase OH line for giving Service Connection using TW/RSJ/Rail pole with one stay including digging & back fil
Constructing One span Three phase OH line for giving service connection using PSC/RCC pole with one stay including digging & back filling
Constructing One span Three phase OH line for giving Service Connection using TW/RSJ/Rail pole with TW/RSJ/Rail strut (without stay) inc
Constructing One span Three phase OH line for giving service connection using PSC/RCC pole with PSC/RCC strut (without stay) including d
Constructing One span Three phase OH line for giving service connection using TW/RSJ/Rail pole without stay/strut including digging & back
Constructing One span Three phase OH line for giving Service Connection using PSC/RCC pole without stay/strut including digging & back fi
Conversion of one span OH single phase service line to three phase service line including dismantling existing conductors, stringing new condu
Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator,
Insertion of one LT PSC pole in existing Three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator,
Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles.
Providing WP support with TW pole including digging & back filling pit in ordinary soil. excluding transportation of poles.
Renewal of existing damaged /old 11 kV TW/RSJ/Rail pole with new TW/RSJ/Rail pole in place including excavation of pole pit, erection of
Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new PSC/RCC pole in place including excavation, erection of new pole, back
Renewal of existing damaged /old 11 kV PSC/RCC Pole with new PSC/RCC pole in place including excavation, erection of new pole, backfill
Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new 'A' type pole in place including excavation, erection of new pole, backfil
Renewal of existing damaged /old 11 kV TW/RSJ/Rail Pole with new Four legged 'A' type pole in place including excavation, erection of new
Renewal of existing damaged /old 11 kV PSC/RCC Pole with new 'A' type pole in place including excavation, erection of new pole, backfilling
Renewal of existing damaged /old 11 kV PSC/RCC Pole with new Four legged 'A' type pole in place including excavation, erection of new pol
Renewal of existing damaged /old 11 kV 'A' type pole with new 'A' type pole in place including excavation of pole pit, erection of new pole, ba
Renewal of existing damaged /old 11 kV Four legged 'A' type pole with new Four legged 'A' type pole in place including excavation of pole pit
Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP (2 channel cross arm) with new TW/RSJ/Rail DP in place including excavation of
Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP (2 channel cross arm) with new PSC/RCC DP in place including excavation, erecti
Renewal of existing damaged /old 11 kV PSC/RCC DP (2 channel cross arm) with new PSC/RCC DP in place including excavation, erection
Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new 'A' type DP in place including excavation, erection of new pole, backfillin
Renewal of existing damaged /old 11 kV TW/RSJ/Rail DP with new Four legged 'A' type DP in place including excavation, erection of new po
Renewal of existing damaged /old 11 kV PSC/RCC DP with new 'A' type DP in place including excavation, erection of new pole, backfilling p
Renewal of existing damaged /old 11 kV PSC/RCC DP with new Four legged 'A' type DP in place including excavation, erection of new pole,
Renewal of existing damaged /old 11 kV 'A' type DP with new 'A' type DP in place including excavation of pole pit, erection of new pole, bac
Renewal of existing damaged /old 11 kV Four legged 'A' type DP with new Four legged 'A' type DP in place including excavation of pole pit,
Renewing one damaged TW/RSJ/Rail Transformer DP structure with a new TW/RSJ/Rail Transformer DP including excavation, dismantling
Renewing one damaged TW/RSJ/Rail Transformer DP structure with a new PSC/RCC Transformer DP including excavation, dismantling acc
Renewing one damaged PSC/RCC Transformer DP structure with a new PSC/RCC Transformer DP including excavation, dismantling accesso
Renewal of one damaged HT Pin insulator
Additional rate for refitting/ redoing one Disc set while renewing any type of 11kV cut pole.
Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.
Renewal of existing damaged /old 11 kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all item
Renewal of existing damaged / broken old 11kV Stay to the existing stay rod.
Replacing/ inserting HT stay insulator on the existing stay.
Renewal of any type of existing damaged /old 11 kV Strut with new TW/RSJ/Rail strut in place including excavation & backfilling of pit, cons
Renewal of any type of existing damaged /old 11 kV Strut with new PSC/RCC strut in place including excavation & backfilling of pit, consolid
Renewal of existing damaged /old 11 kV Fly Stay with new Fly stay including renewal of HT TW/RSJ/Rail pole in place including excavation
Renewal of existing damaged /old 11 kV Fly Stay with new Fly stay including renewal of HT PSC/RCC pole in place including excavation &
Re-Tensioning one span 11 kV line including replacing pin insulators, pin binding, jumpering, replacing insulators cross arms disc, tightening
Re-joining one snapped HT conductor after removing damaged portion including re-tensioning and conveyance of all materials complete.
Repairing one limb of AB switch by replacing male and female contacts, damaged insulators, applying petroleum jelly, lubricants etc and recon
Replacing one set AB switch including dismantling existing AB, giving connections etc.
Renewal of one No 11 kV LA including conveyance, reconnecting and dismantling old LA (excluding earthing)
Renewal of one No 11 kV DO Fuse including conveyance, reconnecting and dismantling old DO Fuse (excluding earthing)
Renewing 11 kV Jumper connection for one phase from OH line to Transformer through AB switch, DO Fuse and connection to LA using cop
Renewing one 11 kV Jumper connection using copper / ACSR conductor as per standard specification (in loop formation for tapping from line
Renewing one 11 kV Jumper connection using copper / ACSR conductor as per standard specification.
Renewing one V / angle / channel cross arm on the 11 kV Pole including dismantling and conveyance.
Renewing one Channel cross arm on the 11 kV DP including dismantling and conveyance.
Providing stay (temporary nature) by piling Cut Ends in kole land providing insulator, including fabrication of cut ends conveyance of material
Straightening one slanted 11 kV pole after unbinding the line and binding the line after work.
Straightening one slanted 11 kV Cut pole after lowering down the existing line and stringing the line after work.
Dismantling existing CT/PT unit/ 25 /50/63 kVA Transformer, erecting new CT/PT unit / 25 /50/63 kVA Transformer in place giving connec
Dismantling existing 100/160 kVA Transformer, erecting new transformer in place giving connections etc including loading / unloading of old
Dismantling existing 250/315/500 kVA Transformer, erecting new transformer in place giving connections etc including loading / unloading o
Enhancing Transformer by dismantling existing 50/63 kVA Transformer, erecting new 100kVA transformer in place giving connections etc inc
Enhancing Transformer by dismantling existing 100/160 kVA Transformer, erecting new 250/315/500kVA transformer in place giving connec
Reconductoring one km 11 kV copper/ old AAC/ACSR line of 3 conductors with New ACSR Raccoon including cutting of tree branches whe
Drilling hole of various sizes on existing Channel / Cross Arm.
Drilling oval shaped hole of various sizes on existing Channel / Cross Arm/ GI/MS cleat etc.
Cutting Channel / Cross Arm/ Angle Iron in to two pieces.
Renewal of existing damaged /old LT TW/RSJ/Rail (S Ph line) pole with new TW/RSJ/Rail pole in place including excavation of pole pit, erec
Renewal of existing damaged /old LT TW/RSJ/Rail (S Ph line) pole with new PSC/RCC pole in place including excavation of pole pit, erectio
Renewal of existing damaged /old LT PSC/RCC (S Ph line) pole with new PSC/RCC pole in place including excavation of pole pit, erection o
Renewal of existing damaged /old LT TW/RSJ/Rail ( 3 phase line) pole with new TW/RSJ/Rail pole in place including excavation of pole pit,
Renewal of existing damaged /old LT TW/RSJ/Rail ( 3 phase line) pole with new PSC/RCC pole in place including excavation of pole pit, ere
Renewal of existing damaged /old LT PSC/RCC ( 3 phase line) pole with new PSC/RCC pole in place including excavation of pole pit, erectio
Additional rate for refitting/ redoing one Shackle Set while renewing any type of LT pole.
Renewal of existing damaged /old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitt
Renewal of existing damaged / broken old LT stay in existing stay rod.
Replacing/ inserting LT stay insulator on the existing stay.
Renewal of existing damaged /old LT Strut of any type with new TW/RSJ/Rail strut in place including excavation of pit, erection of new strut,
Renewal of existing damaged /old LT Strut of any type with new PSC/RCC strut in place including excavation of pit, erection of new strut, bac
Renewal of existing damaged /old LT Fly Stay of any type of pole with new Fly stay including renewal of LT TW/RSJ/Rail pole in place includ
Renewal of existing damaged /old LT Fly Stay of any type of pole with new Fly stay including renewal of LT PSC/RCC pole in place including
Reshackling one Span LT S Ph 2 wire OH line including pin binding, jumpering, replacing insulators/ cross arms/ shackle, tightening stay, cut
Reshackling one Span LT 3 Ph 4 wire OH line including pin binding, jumpering, replacing insulators/ cross arms/ shackle, tightening stay, cutt
Reshackling one Span LT OH Additional conductor including pin binding, jumpering, replacing insulators/ cross arms/ shackle, tightening stay
Re-joining one snapped LT conductors after removing damage portion including Reshackling and conveyance of all materials complete.
Renewing one LT Jumper connection using copper / ACSR conductor as per standard specification (in loop formation for taping from line)
Renewing one LT Jumper connection using copper / ACSR conductor as per standard specification.
Providing/ Inserting 2 line spacer on the existing LT OH line
Providing/ Inserting 3 line spacer on the existing LT OH line
Transferring LT S Ph 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same
Transferring LT 3 Ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same
Straightening one slanted LT pole after unbinding the line and binding the line after work.
Straightening one slanted LT Cut Pole after lowering down the existing line and stringing the line after work.
Reconductoring (Changing) one km LT S Ph 2 wire OH copper/ old AAC/ACSR conductor line with equivalent/ higher size new ACSR condu
Reconductoring (Changing) one km LT 3 Ph 4 wire OH copper/ old AAC/ACSR conductor line with equivalent/ higher size new ACSR condu
Reconductoring (Changing) one Km LT OH copper/ old AAC/ACSR one conductor with equivalent/ higher size New ACSR conductor includ
Disconnecting and lowering down the Single phase WP service connection with guy wire from the pole and reconnecting the same after compl
Disconnecting and lowering down the Three phase WP service connection with guy wire from the pole and reconnecting the same after compl
Redoing Single Phase WP Service connection complete including lowering down the guy wire portion, repairing or changing WP wire ,GI wir
Redoing 3 Phase WP Service connection complete including lowering down the guy wire portion ,repairing or changing WP wire ,GI wire ,Fu
Shifting One No. Single phase Service Connection Metering equipment with all fittings including lowering down the WP service wire, dismant
Shifting One No. Three phase Service Connection Metering equipment with all fittings including lowering down the WP service wire, dismant
Changing Faulty single phase energy meter including Dismantling of old meter, connecting of new meter/ giving electric connection including
Changing Faulty three phase energy meter including Dismantling of old meter, connecting of new meter/ giving electric connection including
Changing Faulty three phase CT energy meter including Dismantling of old meter, replacing CTs, renewing PT connection, connecting new m
Dismantling one damaged 11 kV TW/RSJ/Rail pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one No. 11 kV TW/RSJ/Rail pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling one damaged 11 kV PSC/RCC pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one No. 11 kV PSC/RCC pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling one damaged 11 kV 'A' type pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one No. 11 kV 'A' type pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling one damaged 11 kV Four legged 'A' type pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one No. 11 kV Four legged 'A' type pole after disconnecting stays, strut etc attached thereon and stacking the s
Dismantling one damage HT TW/RSJ/Rail Strut pole including removal of clamps and stacking.
Dismantling (with out damage) one HT TW/RSJ/Rail Strut pole including removal of clamps and stacking.
Dismantling one damage HT PSC/RCC Strut pole including removal of clamps and stacking.
Dismantling (with out damage) one HT PSC/RCC Strut pole including removal of clamps and stacking.
Dismantling (with out damage) One km 11 kV line (Three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper
Dismantling (with out damage) One HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store
Dismantling (with out damage) one V cross arm / Channel cross arm from existing Pole and bringing back to section store.
Dismantling (with out damage) one Channel cross arm from existing DP structure and bringing back to section store.
Dismantling (with out damage) one AB switch from existing structure and bring back to section store.
Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one LT TW/RSJ/Rail pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) one LT PSC/RCC pole after disconnecting stays, strut etc attached thereon and stacking the same.
Dismantling (with out damage) LT stay including digging pit in all classes of soil and backfilling
Dismantling one damaged LT TW/RSJ/Rail Strut pole including removal of clamps and stacking.
Dismantling (with out damage) one LT TW/RSJ/Rail Strut pole including removal of clamps and stacking.
Dismantling one damage LT PSC/RCC Strut pole including removal of clamps and stacking.
Dismantling (with out damage) one LT PSC/RCC Strut pole including removal of clamps and stacking.
Dismantling one LT 2 line cross arm with clamp from existing pole and stacking.
Dismantling one LT 4 line cross arm with clamp from existing pole and stacking.
Dismantling Single phase WP Service connection with meter & all accessories and bring back to section store
Dismantling Three phase WP Service connection with meter & all accessories and bring back to section store
Dismantling (with out damage) one span of HT or LT cradling and stacking the same neatly and in good condition for re-use.
Dismantling (with out damage) one km LT S Ph 2 wire OH line conductor by dismantling cross arms insulators and stacking the conductors in
Dismantling (with out damage) one km LT 3 Ph 4 wire OH line conductor by dismantling cross arms insulators and stacking the conductors in
Dismantling (with out damage) one km LT Additional conductor line by dismantling cross arms insulators and stacking the conductors in rolls
Wiring and installing one new Ordinary street light/ CFL / LED fitting on existing pole and giving connections
Dismantling (with out damage) one Ordinary street light / CFL / LED fitting from the pole and stacking.
Dismantling one ordinary street light/ CFL / LED fitting from existing pole cleaning, rewiring, repairing/ replacing the holder, changing bulbs
Wiring and installing new set 2 x 40 W fluorescent tube fitting on existing poles including giving connection.
Dismantling one set 2 x 40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refit
Replacing bulb / CFL on existing street light.
Dismantling one ordinary street light / CFL / LED fitting from existing pole and refitting the same on newly erected pole including disconnecti
Dismantling one 2 x 40 W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting a
Wiring and installing new set Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting on existing poles including giving connection (witho
Wiring and installing new set Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting on existing poles including giving connection (using
Dismantling one Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting from existing pole cleaning, rewiring, repairing/replacing holder
Dismantling one Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting from existing pole cleaning, rewiring, repairing/replacing holder
Dismantling one Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting from the existing pole and refitting the same on newly erected po
Dismantling one Sodium Vapour/ Mercury Vapour/ Metal Halide lamp fitting from the existing pole and refitting the same on newly erected po
Replacing holder, fused bulb / CFL, changing wires, giving connection etc. of street light including conveyance of all materials.
Clearing touchings on 11 kV HT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.
Clearing touchings on 11 kV HT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.
Clearing touchings on HT/LT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8 m
Clearing touchings on HT/LT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8 m
Clearing touchings on 33 kV lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0 m
Clearing touchings on 33 kV lines, cutting branches of tree, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0 m
Clearing touchings on LT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc from above the lines for a distance of 1.8 mtr fr
Clearing touchings on LT lines, cutting branches of tree, bamboo clusters, coconut cudjans etc from above the lines for a distance of 1.8 mtr fr
Cutting trees having girth beyond 30 cm but up to and including 60cm (felling trees including cutting of trunks and branches) and removing th
Cutting trees having girth beyond 60 cm but up to and including 120 cm (felling trees including cutting of trunks and branches) and removing
Cutting trees having girth beyond 120 cm but up to and including 180 cm (felling trees including cutting of trunks and branches) and removing
Cutting Trees having girth beyond 30 cm but up to and including 60cm, in between the line and Buildings where space for falling trees is not
Cutting Trees having girth beyond 60 cm but up to and including 120 cm, in between the line and Buildings where space for falling trees is not
Cutting Trees having girth beyond 120 cm but up to and including 180 cm in between the line and Buildings where space for falling trees is no
Labour charges for loading HT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Labour charges for loading HT PSC/RCC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Labour charges for loading HT 'A' type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Labour charges for loading HT Four legged 'A' type pole from the stacking place and unloading the same at work site (transportation by any ve
Labour charges for loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Labour charges for loading LT PSC/RCC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Unloading one Transformer (up to and including 160 kVA) from any vehicle to ground including conveyance up to 25m at site
Unloading one Transformer (above 160 kVA) from any vehicle to ground including conveyance up to 25m at site
Loading one Transformer (up to and including 160 kVA) from ground to any vehicle including conveyance up to 25m at site
Loading one Transformer (above 160 kVA) from ground to any vehicle including conveyance up to 25m at site
Dismantling one Transformer (up to and including 160 kVA) from existing structure and loading to any vehicle directly, including disconnectin
Dismantling one Transformer (above 160 kVA) from existing plinth and loading to any vehicle directly, including disconnecting HT/LT/Earth
Dismantling one Transformer (up to and including 160 kVA) from existing structure to ground, including disconnecting HT/LT/Earth connect
Dismantling one Transformer (above 160 kVA) from existing plinth to ground, including disconnecting HT/LT/Earth connections.
Transporting poles by hired vehicle to a distance up to 5 kms and carrying up to 4 numbers of poles excluding loading& unloading charges.
Transporting poles by hired vehicle to a distance beyond 5 kms and carrying up to 4 numbers of poles. (Running km)
Transporting Transformers by hired vehicle to a distance up to 5 kms and carrying up to 2 numbers of 63/100/160/250kVA Transformers excl
Transporting Transformers by hired vehicle to a distance beyond 5 kms and carrying up to 2 numbers of 63/100/160/250kVA Transformers (R
Engaging one boat man with Boat / Country Boat/ Vallam
Transporting HT TW/RSJ/Rail Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Countr
Transporting HT TW/RSJ/Rail Poles by Country boat/ Vallam beyond 6 km
Transporting HT PSC/RCC Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Country b
Transporting HT PSC/RCC Poles by Country boat/ Vallam beyond 6 km
Transporting 'A' type Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Country boat/ Va
Transporting 'A' type Poles by Country boat/ Vallam beyond 6 km
Transporting Four legged 'A' type Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Cou
Transporting Four legged 'A' type Poles by Country boat/ Vallam beyond 6 km
Transporting LT TW/RSJ/Rail Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Countr
Transporting LT TW/RSJ/Rail Poles by Country boat/ Vallam beyond 6 km
Transporting LT PSC/RCC Poles by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of Country b
Transporting LT PSC/RCC Poles by Country boat/ Vallam beyond 6 km
Transporting 63/100/160 kVA Transformer by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of
Transporting 63/100/160 kVA Transformer Poles by Country boat/ Vallam beyond 6 km
Transporting 250/315/500 kVA Transformer by Country boat/ Vallam up to 6 kms including loading and unloading charges and hire charge of
Transporting 250/315/500 kVA Transformer Poles by Country boat/ Vallam beyond 6 km
Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular background, with a dimensio
Preparing index register (book & soft copy) showing name of Transformer, post numbers, consumer numbers (in separate column of excel she
Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for a height of 1.5 m from ground level using approved quality primer one
Supplying and fixing permanently, Screen printed consumer premises identification Number Card of size 10x7 cm using screw/adhesives. (Con
Painting 'A' pole structure with one coat Synchromate primer and two coat grey enamel paint/ aluminium paint including cost of paint.
Numbering of Tree (marking for cutting the tree) using yellow enamel paint as specified including cost of paint.
Excavation of cable trench in all classes of soil, 1.2m deep and 0.35m wide, conveying 3 x 300 sqmm HT XLPE UG cable from Sub Regional
Doing straight joint on 3 x 300 sqmm HT XLPE UG cable using the cable jointing kit supplied departmentally as per specification after provid
Doing one cable end termination on 3 x 300 sqmm HT XLPE UG cable using the cable jointing kit supplied departmentally after making
Mounting 3 x 300 sqmm HT XLPE UG cable ends with special type cable clamps, bolts, nuts etc.including cost of extra materials if needed an
Excavation of cable trench (Soil surface) and digging out the faulty portion of the cable from the trench for redoing straight through joint, relay
Excavation of cable trench (tarred/concreted surface) and digging out the faulty portion of the cable from the trench for redoing straight throug
Dismantling the faulty cable end from the structure/pole after disconnecting 11 kV jumper connections and mounting the same after redoing E
Constructing Transformer plinth of size 1.5m x 1.5m x 1.5m on 1.8m x 1.8m x 0.75m basement inclusive of cost of all material. [Excavation 1
Providing concrete muffing of size 45cm x 45cm 1.5m (0.5m above GL and 1m below GL). Excavation 0.45m x 0.45m x1m, Concrete (1:3:6
ORS AND CABLES

MERS AND SPARES


EQUIPMENTS

LIGHT FITTINGS
KERALA STATE ELECTRICITY BOARD
Work Estimate
Name of work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF
JULY 2019 under Ele.section, PERINGODE.
Ele.SubDivision : THRITHALA
SNo Key Particulars Unit Rate Add Qty Amount
1 251 supply of labour for assisting sub engineer & dbwork day 965.00 22 21230.00

TOTAL 21230.00

Rs.21230 /- ( Rupees TwentyOne Thousand Two Hundred and


Thirty Only )

Estimate sanctioned for Rs.21230/- wide WE/26 / 2019-20 / dt. 24-


6-2019

Asst. Engineer

Assistant Engineer,
Ele.Section, PERINGODE
KERALA STATE ELECTRICITY BOARD
Office of The Assistant Engineer,
Ele.Section, PERINGODE

Proceeding of The Assistant Engineer,


Ele.Section, PERINGODE
Sub : Estimate sanction - LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR
THE MONTH OF JULY 2019 under Ele.section, PERINGODE - reg.

ORDER No. DB / WE / 26 / 2019-20 / dt. 24-6-2019

Ref : Letter No. ..................... of ............................

ORDER
Sanction is hereby accorded to the working estimate amounting to Rs.21230/-( Rupees
TwentyOne Thousand Two Hundred and Thirty Only ) towards the labour and transporting portion
of the subject work.Funds to the extent may be met from :-

1- Current years budget provision of Electrical Division, PATTAMBI under O&M/ Capital Service
and charged to A/c No. ........................

2- Amount remitted by the party/ local body/ department/ others, towards the execution of subject
work and charged to A/c No. .............................

Assistant Engineer,
Ele.Section, PERINGODE
Acc:-Copy of the sanctioned estimate.

Copy submitted to:-


1- Asst.Executive Engineer,
Ele.Sub Division, THRITHALA
2-

Copy to:-
1-

2-
KERALA STATE ELECTRICITY BOARD
Office of The Assistant Engineer,
Ele.Section, PERINGODE

QUOTATION / TENDER NOTICE

No. DB / Quotation / 26 / 2019-20 / dt. 30-6-2019

Sealed quotations by REGISTERED POST / COURIER are invited for LABOUR FOR
ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY 2019 under
Ele.section, PERINGODE as per conditions stated below.
Time limit
Estimate
Quotation EMD Cost of for
Name of work Amount
No.& Date (Rs) Tender form completing
(Rs)
the work

LABOUR FOR ASSISTING SUB


26 91312355
30-6-2019
ENGINEER FOR DB WORK FOR 21230/- 43013/-
0/-
THE MONTH OF JULY 2019
ORDER
1- Quotations should be addressed to the undersigned and should be received at Office of the Assistant
Engineer,
Ele.Section, PERINGODE on or before …..AM/PM on …...........(Date).

2- Quotations shall be opened at ........AM/PM on the same day or any day fixed by the undersigned.
3- Quotations from Contractors/suppliers/Agencies within the state of Kerala will be preferred.
4- If ordered, an agreement in stamp paper worth Rs.100/- will have to be executed if necessary after
furnishing the required security deposit.

5- All other conditions prevalent in the KSE Board for the contract work shall be binding for the
contractors as per this quotation.

6- Rate quoted should be based on the total estimate amount.


7- This quotation will be firm for three months from the date of receipt.

8- The undersigned reserves the right to accept or reject any Quotation without assigning any reason there
of.
9- Further details can be obtained from the office of the AE, Ele.Sec, PERINGODE during working hours.

10 The Key and description in the Work Estimate/ Schedule of work represents the detail description of
- work given in the Labour Data approved vide. BO (FM) (Genl) No 867/2011 (DPC II/AE/Proposal.07 /
2010) dated 29.03.2011

Assistant Engineer,
Ele.Section, PERINGODE
Acc:-Copy of the sanctioned estimate.
KERALA STATE ELECTRICITY BOARD
QUOTATION
Name of work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF
JULY 2019 under Ele.section, PERINGODE.
Ele.SubDivision : THRITHALA
SNo Key Particulars Unit Rate Add Qty Amount
1 251 supply of labour for assisting sub engineer & dbwork day 965.00 22 21230.00

TOTAL ###

Rs.21230 /- ( Rupees TwentyOne Thousand Two Hundred and


Thirty Only )

I agree to carry out the work at .............% Above/ Below Estimate


rate

Name & Signature of Contractor


KERALA STATE ELECTRICITY BOARD
Office of The Assistant Engineer,
DB/........ / 2019-20/......... / dt. .................
Ele.Section, PERINGODE

To
SURABHI M, MOOLAYIL HO, PARUDUR,

Sub : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY
2019 under Ele.section, PERINGODE - Orders issued - reg.

Work Order No. DB / WO / 26 / 2019-20 / dt. 30-6-2019


Ref :
1 - Work Estimate sanction No. DB / WE / 26 / 2019-20 / dt. 24-6-2019 of Assistant Engineer,
Ele.Section, PERINGODE

2 - Your Quotation / Tender No. 26 Dated. 30-6-2019

ORDER
Your offer to carryout the subject work at the quoted rate of at 'Estimate Rate' is hereby accepted and
the work is awarded in your favour subject to the following conditions.
1- You are requested to execute the contract agreement in non judicial stamp paper worth Rs.100/- for the full
fillment of the contract within .................. days.
2- You are requested to remit an amount of Rs...................../- either by DD/Cash in this office towards the security
deposit .The EMD remitted by you for this work will be released for the part of security deposit.
3- The work may be started in consultation with the undersigned and should be completed within ............. days.
4- The safety of the workmen engaged by You is at your risk and cost. No compensation will be paid by the KSE
Board
5- You are responsible for the safe custody of the KSE Board's materials/equipments issued to you for this work till
the completion of work.
6- All terms and conditions in force pertaining to contract work in KSE Board will be applicable to this work also.

7- The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in
the Labour Data approved vide. BO (FM) (Genl) No 867/2011 (DPC II/AE/Proposal.07 /2010) dated 29.03.2011

Yours faithfully,

Assistant Engineer,
Copy submitted to:-
Ele.Section, PERINGODE
1- Executive Engineer,
Ele.Division, PATTAMBI
2- Asst.Executive Engineer,
Ele.Sub Division, THRITHALA
Copy to:-
1-

2-
AGREEMENT
No. 26/ 2019-20/ Dated. 30-6-2019

ARTCLES OF AGREEMENT made this 30th day of Jun 2019 between the Assistant Engineer,
Ele.Section, PERINGODE acting for and on behalf of the KERALA STATE ELECTRICITY BOARD (hereinafter
refered to as the 'KSE Board' which expression shall,where the context so admits or implies be deemed to include their
successors in office and assignees) of the one part AND

Sri/Smt SURABHI M, MOOLAYIL HO, PARUDUR, (hereinafter called the 'contractor') which expression shall
where the context so admits or implies be deemed to include his/her successors interest,legal representatives and
assignees as well) of the other part.

WHERE AS the contractor has agreed with the KSE Board for the performance of the work set forth in the
quotation/ tender and accompaniments here unto annexed and marked as 'Schedule A' up on the conditions herein
mentioned.

AND WHERE AS the performance of the said work is an act in which the public are interested and is entered into
under the orders of the KSE Board.
AND WHERE AS the Contractor has deposited in cash/DD amounting to Rs....................
(Rupees.................... .......................... .......................... .....................) at this office vide Receipt No...............
Dated.................... as Security Deposit for the due performance of this contract.

NOW THESE PRESENTS WITNESS that in consideration of the payment to be made by the KSE Board herein
after mentioned, the contractor will duly perform the said works in the said schedule set forth and will complete the
same
in accordance with plans and specifications thereon to annexed on or before the day(date) ..................
and will observe fulfill and keep all the conditions therein mentioned ( which shall be deemed and taken to be a part of
this contract as if the same had been fully set out therein ) and the KSE Board both hereby agree that if the contractor
shall duly perform the said work in the manner aforesaid and observe and keep the said terms and conditions,

the KSE Board will pay or cause to be paid to the contractor at the times and in the manner in the said conditions set
forth the sum of Rs.21230/- ( Rupees TwentyOne Thousand Two Hundred and Thirty Only ) as payment for the said
work.
It is also agree that the KSE Board will in no way be liable to pay compensation as per workmen's compensation act, to
the workmen engaged by the contractor should they met with accidents, if any during the execution of the contracts
work.
The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the
Labour Data approved vide. BO (FM) (Genl) No 867/2011 (DPC II/AE/Proposal.07 /2010) dated 29.03.2011

Signature of (1)
Assistant Engineer,
Ele.Section, PERINGODE

(On behalf of the KSE Board.)

Signature of (2)
SURABHI M, MOOLAYIL HO,
PARUDUR,

(Contractor )

Signature of witness to the (1) .........................................................


.........................................................

Signature of witness to the (2) .........................................................


.........................................................
KERALA STATE ELECTRICITY BOARD
Schedule to the Agreement
Name of work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY 2019
under Ele.section, PERINGODE.
Ele.SubDivision : THRITHALA
SNo Key Particulars Unit Rate Add Qty Amount
1 251 supply of labour for assisting sub engineer & dbwork day 965.00 22 21230.00

TOTAL ###

Rs.21230 /- ( Rupees TwentyOne Thousand Two Hundred and


Thirty Only )

I agree to execute the work at Estimate rate

Asst. Engineer

SURABHI M, MOOLAYIL HO, PARUDUR,


-3-

Estimate for Additional/ Extra work


Name of Work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY 2019
under Ele.Section, PERINGODE.
SNo Key Particulars Unit Rate Add Qty Amount

Estimate sanctioned for Rs. ................/- vide order No.


WE/ ............/ ............/ dt. ............
Est
im Asst.Engineer
ate
Su Ele.Section, PERINGODE
for
ppl
Ad
em Assistant Engineer,
diti
ent Ele.Section, PERINGODE
ona
ary
l/
Sc
Ext
hed
ra
ule
wo
to
rk
the
Ag
ree
me
nt
for
Name of work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY 2019
under Ele.section, PERINGODE

Pole wise/ Consumer wise


schedule

Consumer / Pole No
282 284 286 288 290 292 294 296 298 300 302 304 306 308 310 312 314
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
316 318 320 322 347 349 351 353 355 357 359 361 363 365 367 369 371 373 375 377 379 381
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
383 385 387 389 419 421 423 425 427 429 431 433 435
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
KERALA STATE ELECTRICITY BOARD
Location wise details of work : LABOUR FOR ASSISTING SUB ENGINEER FOR DB WORK FOR THE MONTH OF JULY 2019 under Ele.s

Bring Total to - Rs. 21230.00


Ele.SubDivision : THRITHALA Total : 0.00
Sl
No
Key Qty Km Particulars Amount Key Qty Materials Location / Collection particulars

1 0 0 #N/A

0 TOTAL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
-1-

KERALA STATE ELECTRICITY BOARD

Ele. Cicle / Ele. Division : PATTAMBI Bill Register No


Ele. Sub Division : THRITHALA
36/19-20
Electrical Section : PERINGODE
-825 ME PETTY CONTRACT Bill No : AD
Debit to ( Name of Work ) Sanctioned Estimate No. Budget Provision
LABOUR FOR ASSISTING SUB Rs. 21230/ -
26/ 2019-20/ Dt. 24-6-2019 of AE, Ele.Sec,
ENGINEER FOR DB WORK FOR THE PERINGODE
MONTH OF JULY 2019
Work Order No:
26/ 2019-20/ Dt. 30-6-2019 of AE, Ele.Sec,
PERINGODE
Sub-head: .....................
Agreement No: 26/ 2019-20/ Dt. 30-6-2019 of AE, Ele.Sec, PERINGODE
Name of Contractor :
SURABHI M, MOOLAYIL HO, Amount of contract : Rs. 21230/-
PARUDUR,
Official date of commencement of w
s 01/07/2019
Date of completion as per Agreement : 31/07/2019
Actual date of commencement of work : 01/07/2019
Entered in Actual date of completion of work : 29/07/2019
(1).Detailed work ledger or work abstract Sanctioned Estimate No.
(2).Contractor's ledger for the month of
……………………………………………….
ACCOUNTANT ACCOUNTANT
Cash book Voucher Forwarded to CAO as enclosure to the ……………………………………….
Division Office No……………………………………… Signed
No:…………………………..
DIVISIONAL ACCOUNTANT DIVISIONAL OFFICER
NOTES
[ 1 ].This contract certificate will be in four parts. [ 4 ]. In the case of payees who can neither read nor
Part I comprising the body of the bill will show the write, their mark or seal should be attested by two
quantities and value of work done: Part II embodies competent witnesses in whose presence the nature of
certificates and signatures of various officers payments should be fully explained.

responsible for measuring,checking and payment.


Part III comprises the detailed memorandum of
payment. Part IV gives the account of materials received [ 5 ]. The account for which the materials are purchased,
and issued for the work billed for. whether for stock or for work must always be stated and
name of the officer who took over the materials must be
entered, unless he is the officer who signs the certificate
[ 2 ].This form is not to be used for payments on
[ 6 ]. The Officer measuring and preparing the bill
account or for settlement of running account or for
should be careful to note in the columns of "remarks" in
settlement of running accounts. Works should be
the body of the bill the quantity of material issued to
promtply measured up and paid for, running accounts the contractor the value of which is to be deducted at the
being avoided as much as possible. time of payment

[ 7 ]. If the officer who prepares the bill has authority to


[ 3 ].When the payee signs in Vernacular, the amount make payment only one signature at the foot of the bill is
acknowledged should be noted in Vernacular as well as necessary
in English.
[ 8 ]. A receipt stamp is required for every payment
exceeding Rs.5000/-
-2-
PART - I ( Description Quantities and value of work done or supplies made )
Ref. to
Estimate As per Agreement M Book Value at
Quantities Agreement
Item
Number/ Number/
Rate Per Description of work done or supplies made Book Page
of work rate of work Remarks
Key Quantity/ Quantity/ done done
No Rs Ps Unit No No
Weight Weight Rs Ps

1 2 3 4 5 6 7 8 9 10 11 12
1 251 22 22 965.00 day supply of labour for assisting sub engineer & dbwork 0 22 21230.00

Carried over Rs: 21230.00


-3-

1 2 3 4 5 6 7 8 9 B/F Rs: 21230.00 12

Carried over Rs: 21230.00


- 4 (a)-
Ref. to
Estimate As per Agreement M Book Value at
Quantitie
Agreement
Pag s of
Item
Number/ Number/
Rate Per Description of work done or supplies made Book work
rate of work Remarks
No
Key Quantity/ Quantity/
Rs Ps Unit e done
Weight Weight No done
No Rs Ps
1 2 3 4 5 6 7 8 9 B/F 21230.00 12

Carried over Rs: 21230.00


- 4 (b) -

1 2 3 4 5 6 7 8 9 B/F Rs. 21230.00 12

Carried over Rs: 21230.00


- 4 (c)-

Ref. to
Estimate As per Agreement M Book Value at
Quantitie
Agreement
s of
Number/ Number/ Description of work done or supplies made Pag work rate of work Remarks
Item Rate Per Book done
No
Key Quantity/ Quantity/
Rs Ps Unit e done
Weight Weight No Rs Ps
No
1 2 3 4 5 6 7 8 9 B/F 21230.00 12

Total Value of work done : 21230.00


Amount to be Added/Subtracted as per agreement : 0.00
Total Value of work done as per agreement : 21230.00
-5-

Extra Items of Work


1 2 3 4 5 6 7 8 9 10 11 12
certified that the work has been completed satisfactorily, there is no
liability outstanding against the contractor as far as the work is
concerned, due to the lack of permanent staf , contract stafs were
provided for the work. The bill has not been preferred previously.

Total Value of extra items of work done : 0.00


Added / Subtracted as per Supplementary Schedule : 0.00
0.00
Grand Total of the value of work done : ( 21230 + 0) : Rs. 21230.00
Rs.21230 /- ( Rupees TwentyOne Thousand Two Hundred and Thirty Only )
-6-
* Submitted as Petty Contractor Bill No. .............. to the section officer for payment. The accounts of
receipts and issues of the items of materials for the work as per this bill are embodied in the statement given in part
IV of this bill.

(Dated signature or left hand thumb impression of contractor)


PART - II ( CERTIFICATES AND SIGNATURES )
( A ) Bill Preparation Section

Certified that the measurement made by


Checked calculations and verified quantities, rates,
...................on.....................................and are recorded
receipts and issues against agreement and sanctioned
in the pages ...............to..................of measurement
provisions
book no............................................
and that work has been executed satisfactorily
and that bill as claimed above represents a correct
Asst. Accountant account of the contractor's claims and liabilities
…………………. Senior Accountant
Officer Dated signature …………………..
( Bill preparation section ) preparing the bill
Rank ………………………………

(B) Remarks by Check - Measuring officers


Here enter the nature of the check measurements taken or other examination of work and the result of such
examination.

Sub. Division officer Division Officer


C .Audit Section
Checked again the calculation and verified the rates against the contract schedule, quantities against Estimate
provisions and receipts and issues against sanctioned date

Vide I Sub Division Audit Slip No ………………… Vide II Division Audit Slip No …………………
attached attached
………………………………Accountant ………………………….………Asst. Accountant
……………………………...Head Clerk ………………...………………Senior Accountant

* This column need be filled in only when the contractor submits the bill
-7-

Figures for PART - III MEMORANDUM OF PAYMENTS


Rs Ps
works abstract 1.Total value of work done as per part I column 9
Rs. Ps
Details of Payments made

By recovery amounts creditable to the work Rs Ps

i ) Value of departmental materials or stock


supplied and used up as per Col.4 of Part IV
(materials accounts) of this bill.
(a)
ii ) Work done departmentally on account of
the Contractor as per C . B . V . No.

By recovery of amounts creditable to other


works head of accounts
(b)
(i) Hire on account of special tools and
plant(b) issued to the contractor(b)
(ii) ……………………………………………
( c ) By cheque
TOTAL 2 ( b ) and ( c )
The Total value of work is admitted and passed for Rupees (in words)………………………..
………………………………………………………………………………………………………..
…………………………………………………………………………………………………………
as detailed in item ( 2 ) of the memorandum of payment

Certified that the bill as Officer authorising


passed above has been Dated signature
payment
The payee's acknowledgment should be for the gross

ledgered
…………………………… Rank
amount as per item 2 ie ( a + b + c )

Senior Divisional Accountant


Pay in cash………………. pay in cheque……………………………………….

Paid in cash……………… paid in cheque………………………………………


Paid by me ……………………………...…………………………………….
Received Rupees (in words)……………………………………………………………….
….……………………………………………………………………………………………………
as per above memorandum in settlement of all my claims and liabilities.
( amount in vernacular )
Left hand thumb impression
Dated……………………… of ………………………………………..

Rs (in figures)…………………………………………………………… Stamp


Left hand thumb impression
Witness……………………
Full Signature of Contractor.
-8-

PART - IV Materials Account. MCS No:


Receipt as Issue as
Sl No Description Balance in hand Remarks
per this bill per this bill
1 2 3 4 5 6
TAKEN BACK

Verified Signature of Contractor ………………………


Accountant measuring Signature (at the time of payment)
Audit Section the work and Rank ………………..
preparing the Bill Date :………….……….
M Book Audit Note
A. The Following details are to be recorded in the M.Book and bills.
Name of Section : PERINGODE
1- Full name of work as given in the sanctioned estimate : LABOUR FOR ASSISTING SUB
ENGINEER FOR DB WORK FOR
THE MONTH OF JULY 2019
2- AS No. Amount of AS and : 0
Name of authority who issued the AS

3- TS No. Amount of TS and : 0


Name of authority who issued the TS

4- Working estimate sanction No, amount of working : 26/ 2019-20/ 24-6-2019


estimate and name of authority who sanctioned the of AE, Ele.Sec, PERINGODE
working estimate
5- Work order No and name of authority who issued work : 26/ 2019-20/ 30-6-2019
order of AE, Ele.Sec, PERINGODE

6- Number and date of Agreement : 26/ 2019-20/ 30-6-2019


of AE, Ele.Sec, PERINGODE

7- Name and address of contractor : SURABHI M, MOOLAYIL HO,


PARUDUR,

8- Actual date of commencement of work : 12/30/1899

9- Actual date of completion of work need be filled up : 12/30/1899


only after entire work is completed.

10- Date(s) of measurement : 12/30/1899

11- Bill No : 30/12/99

12- Account No. : 0

13- In case of Deposit work/ PPS(KDP)/ MP LAD/ MLA :


LAD/ OYEC/ Other funded work-Details of
remittance.
14- In the Certificate, the MCS No. And MASA No. In :
which the materials booked to be mentioned.
B. The following conditions are to be satisfied for passing the bill Put tick mark

1- Whether the work is covered by budget sanction and valid contract : Yes No NA
agreement.
2- Whether a deviation statement has been prepared and attached , showing : Yes No NA
the reason for deviation.
3- Whether there is sanction for excess over estimate and proper explanation : Yes No NA
furnished for the deficiency (In case where there is deficiency).
4- Whether measurement has been done as required in para 316 & 317 of : Yes No NA
K.P.W.A code.
5- Whether acceptance of measurement of the contractor has been obtained : Yes No NA
in M.Book and proper Acknowledgement obtained in Part III of the bill.
6- Whether the work has been check measured by the AEE. : Yes No NA

7- Whether NLC of the contractor has been furnished in the M Book and : Yes No NA
bill.
8- Whether prescribed certificated have been furnished in the M Book and : Yes No NA
Bills.
9- Whether first page of the bill has been properly filled up with required : Yes No NA
details.
10- Whether material account have been properly written up in part IV and : Yes No NA
reconciled with MRCI/Debit slips/Devolution Notes etc. and whether
copies of MRCI enclosed for verification.
11- Whether recovery of materials have been efected as per agreement. : Yes No NA

12- Whether penal recovery for materials not returned have been efected : Yes No NA
from the bill.
13- Whether income tax at 2% and surcharge at 5% of income tax have been : Yes No NA
deducted from the bill.
14- Whether retention has been recovered as per rule. : Yes No NA

15- Whether Pole/ consumer wise Schedule attached. : Yes No NA

16- Whether CRCS part I and II attached. : Yes No NA

17- Whether material account furnished in the bill/M.Book. : Yes No NA

18- Whether two copies of Estimate sanction (of AS, Working estimate etc.), : Yes No NA
work order, agreement etc attached.
19- Whether corrections in the PC Bill and M Book is properly attested. : Yes No NA

20- Whether security deposit @ 5% of total amount is collected and copy of : Yes No NA
receipt is attached.
21- Whether proper tender procedure is followed. : Yes No NA
22- Whether pre measurement is done for HT/LT touching works. : Yes No NA