Prepared By
Md Aminul Islam
Reliability Engineer
SADAF-SABIC.
PURPOSE
RECORDED IN KY GATHER
TOOLBOX DISCUSSION AT WORK
MEETING AT SITE PLACE
&SAFETY
MEASURE
TAKEN
3. WORKING ENVIRONMENT.-
a)VENTILATION. b) NOISE. c) TEMPERATUR.
d) POSTURE.
CORRECTIVE MEASURES.
1. PLACING & SIGNALING SHOULD
NOT BE AT A TIME. 2.
SAME PERSON SHOULD NOT DO
PLACING & SIGNALING.
CORRECTIVE MEASURE--
1. CONFINED SPACE PAINTING
PROCEDURE TO BE FOLLOWED .
2.SPOTTER SHOULD PRESENT.
3.NO MATERIAL KEEP NEAR
OPENING.
CORRECTIVE MEASURES.
1. SCAFFOLDING FOR HEIGHT JOB
SHOULD BE DONE AS MCPI STANDARD.
2. PROPER PPE & THEIR USE TO BE
MAINTAINED.
3. PAINT COTAINER TO BE KEPT NEAR
BY SO THAT HANDLING WILL BE EASY
& PAINT DROPS WILL BE MINIMUM.
CORRECTIVE MEASURES--
1. SCAFFOLDING TO BE MADE AS
PER MCPI STANDARD.
2. MINIMUM 2 PERSON REQUIRED
FOR HANDLING THE HEAVE TYPE
PLTFORM JALLI.