Documente Academic
Documente Profesional
Documente Cultură
Completions
Schlumberger Private
Catalyst Specialised ESP Completions
Access to Reservoir
Schlumberger Private
Rate Limitation
Head Limitation
High Workover Costs
Unable to Control Zonal Production
Nov. 06
Y - Tool
Nov. 06
Schlumberger Private
Y - Tool
Nov. 06
By-Pass Systems
Nov. 06
Auto Y - Tool
Auto Y-Tool*
Auto access below your
ESP
Schlumberger Private
Nov. 06
Schlumberger Private
Nov. 06
Auto Diverter Valve
Schlumberger Private
Nov. 06
Auto Diverter Valve
Schlumberger Private
Nov. 06
Parallel Pumping System
Higher Production
Rates
• Increased Production
• Two separate ESPs producing from one
zone simultaneously
• Especially high productivity wells
• Overcome surface HP limitation
Nov. 06
Parallel Pumping System
Higher Production
Rates
Schlumberger Private
Nov. 06
Increased Lift Systems
UltraHi ™ Systems
To deal with;
• Declining reservoir pressure
Schlumberger Private
Nov. 06
Schlumberger Private
High HP
Nov. 06
Back Up Systems
DuaLife ™ Systems
Nov. 06
REDACoil
Nov. 06
Typical ESP System
The submersible pump
MLE Cable
consists of an electric
Submersible
motor attached to a Pump
pump and protector with
other key component Intake
Schlumberger Private
parts as described in
Protector
this section which are
run into the well on
production tubing.
Motor
Nov. 06
Conventional Pumping System
Production
Power Cable Tubing
Schlumberger Private
Cable Band
Nov. 06
Schlumberger Private
Nov. 06
Cable Deployed Pumping System (CDPS)
Nov. 06
Cable Deployed Pumping System History
Nov. 06
Coiled Tubing & Cable deployed ESP
Schlumberger Private
Nov. 06
CT Deployed - External Cable
Advantages
Faster deployment method
Mainly standard CT unit and equipment
Rigless operations
Disadvantages
• Limited to shallow depths and low
Schlumberger Private
Nov. 06
CT Deployed ESP
(cable external) Cable
Clamps around CT and
Power Cable
Schlumberger Private
Nov. 06
PDO Cable External
Shell/Reda
4 PDO (Shell) production wells
Oman
3.5" CT, 5.5" ESP
5,000 bpd
Cable clamped to the outside of the
Schlumberger Private
CT
Reached Average Run Life
No significant cost savings
Proved Connector Systems
Nov. 06
The Question was then asked:
*Mark of REDA
Nov. 06
Development of REDACoil
Mechanical anchors
Do not work well enough
CT will always deform during a
workover
Schlumberger Private
Nov. 06
Development of REDACoil
2. How to deploy the power cable?
Magnetic anchors
Complicated
Unproven
Schlumberger Private
Nov. 06
Development of REDACoil
Nov. 06
Development of REDACoil
years ago
CT structural strength retained
CT corrosion resistance not
compromised
Overall, a good idea, easy to perfect
However: not sufficient for complete
Nov. 06 cable support
Cable Suspension Solution – Friction
Deployed Solution
Side view
Lh2
5,000'
Schlumberger Private
Lh1
Disadvantages / Challenges
• Weight of coiled tubing reel
• Platform / Crane space / load
limitations
• Annular production
• All the production needs to go
Schlumberger Private
Nov. 06
CT Deployed ESP
Reda/Schlumberger/ Pentex
The worlds first annulus produced CT
deployed ESP
Pentex test well in Stockbridge, UK
2.375" CT, 50hp 4.5" ESP
2,930´ pump setting depth
Schlumberger Private
1,400 bpd
Failed due to well pump off and motor
overheating after 18 months
Nov. 06
History – REDACoil THUMS
Nov. 06
Qatar – Cable Internal
1st Coiled Tubing ESP Field Development
(started in 1996)
Currently 12 REDACoil systems operating
Run Life Incentive (800+ days) Inclusive of
Intervention!
Schlumberger Turn Key Contractor:
wellhead
Nov. 06
REDACoil at BSP - Magpie
BSP/Camco/Reda
Two systems (+one backup)
Operational January 1999
140 hp, 4.5" ESP
8,000 bpd
Pump setting depth 3,600´
Schlumberger Private
2.0", 90,000psi CT
Floating cable system
Off shore permanent platform
Still runs flawlessly 1650+ days & one
cable external +VGSA+AGH
conversion
Nov. 06
Comparison of all ESP Deployed Methods
Activity Day 1 Day 2 Day 3 Day 4 Day 5
Well kill
Pull completion
Reinstall wellhead
Jointed tubing
CT with external cable
R EDA Coil
Nov. 06
Multi-Zone Systems
Prevent crossflow
Improve your reservoir management
Reduce water production
Schlumberger Private
• Zone/lateral management
• Water management
• Production measurement/allocation
• Less Wells
• Prevent cross-flow
Nov. 06
Multi-Zone Systems
Commingled Production
zones
• Production continues after first failure
• No cross-flow during production shut down
• Ability to test each zone individually
Bottom Discharge System
Schlumberger Private
Typical GasStar System
Protector
Motor
Schlumberger Private
Protector
Injection Pump
Packer
Nov. 06
Injection Below Producing Formation
Schlumberger Private
Nov. 06
Why install a GasStar? the Benefits….
Nov. 06
Catalyst Advanced Lift Systems