Sunteți pe pagina 1din 4

TABLA DE DATOS

SECCION DE SECCION DE ALTURA ALTURA COEFICIENTE FRECUENCIA INTENSIDAD TIEMPO


LA CUNETA INUNDADA
LA CUNETA (m) C/PRINC DE LA INUNDADA DE DE MINIMO DE
DE LLUVIA DISEÑO
(m) C/ PRINC V5-V8 Y CUNETA (cm) LA CUNETA (cm) PRESIPITACIO CONCENTRA

S
O
DEMAS cuneta de 0,60

AT
D
V1-V5 CALLES m cuneta de 0,40 m ESCORRENTIA (años) N (lts/s/ha) CION (min)

0.60 0.40 4.20 3.80 0.55 5.00 425.00 10.00

PERIMETRO PERIMETRO RADIO RADIO SUPERFICIE SUPERFICIE COEFICIENTE PENDIENTE LIMITE DE


MOJADO HIDRAULICO HIDRAULICO
MOJADO (m) MOJADA (m2) MOJADA (m2) DE INUNDACION
(m) cuneta (m) cuneta 0,60 (m) cuneta
cuneta 0,60 m 0,40 m m 0,40 m cuneta 0,60 m cuneta 0,40 m MANNING TRANSVERSAL (m)

2.142 1.938 0.021 0.019 0.0441 0.0190 0.012 2.00% 1.50

TABLA DE RESULTADOS
VERTICES LONGITUD ANCHO DEL PENDIENTE CAPACIDAD VELOCIDAD DE TIEMPO COEFIECIENTE AREA TRIBUTARIA CAUDA DE CAUDAL DISTANCIA

UBICACIÓN
(SENTIDO CALLE DE DE CALCULADA PARA
DEL LONITUDINAL TRASLADO ESCORRENTIA
CALLE POSITIVO SECCION ESCURRIMIENTO DEL ESCORRENTIA UNITARIO UBICACIÓN DE
TRAMO UNITARIA GASTO POR TRAMO
DE LA LLENA POR SUMIDERO POR
MAXIMO
PENDIENTE) (m) TRAMO (m) (%) (lts/s) (m/s) (mim) ZONA AL TRAMO (Ha) (L/S) (L/S/m) TRAMO (m)

L1 0.40 0.02 0.70 0.09 157.04


CALLE PRINCIPAL V9-V8 7.50 6.90 0.33 14.62 0.34 0.37
L2 0.80 0.00 0.19 0.02 591.73
L1 0.40 0.18 6.56 0.09 157.04
CALLE PRINCIPAL V8-V7 70.50 6.90 0.33 14.62 0.34 3.47
L2 0.80 0.02 1.74 0.02 591.73
L1 0.40 0.09 3.26 0.09 157.04
CALLE PRINCIPAL V7-V6 35.00 6.90 0.33 14.62 0.34 1.72
L2 0.80 0.01 0.86 0.02 591.73
L1 0.40 0.08 2.93 0.09 157.04
CALLE PRINCIPAL V6-V5 31.50 6.90 0.33 14.62 0.34 1.55
L2 0.40 0.03 1.13 0.04 408.30
L1 0.40 0.08 2.70 0.09 157.04
CALLE PRINCIPAL V5-V4 29.00 7.50 0.33 14.62 0.36 1.34
L2 0.80 0.01 0.78 0.03 544.39
L1 0.40 0.14 4.89 0.09 205.07
CALLE PRINCIPAL V4-V3 52.50 7.50 0.33 19.09 0.36 2.42
L2 0.80 0.02 1.41 0.03 710.92
L1 0.40 0.14 4.84 0.09 205.07
CALLE PRINCIPAL V3-V2 52.00 7.50 0.33 19.09 0.36 2.40
L2 0.80 0.02 1.40 0.03 710.92
L1 0.40 0.07 2.42 0.09 205.07
CALLE PRINCIPAL V2-V1 26.00 7.50 0.33 19.09 0.36 1.20
L2 0.80 0.01 0.70 0.03 710.92
L1 0.40 0.25 8.89 0.09 186.83
CALLE 1 V12-V2 95.50 6.90 0.46 17.39 0.43 3.70
L2 0.40 0.25 8.89 0.09 186.83
L1 0.40 0.28 10.01 0.09 174.22
CALLE 2 V11-V3 107.50 6.90 0.40 16.22 0.40 4.47
L2 0.40 0.28 10.01 0.09 174.22
L1 0.40 0.31 11.08 0.09 165.51
CALLE 3 V10-V4 119.00 6.90 0.36 15.41 0.38 5.20
L2 0.40 0.31 11.08 0.09 165.51
L1 0.40 0.03 1.18 0.01 1,244.70
CALLE 4 V8-V6 94.50 6.90 0.37 15.60 0.39 4.08
L2 0.40 0.03 1.18 0.01 1,244.70
L1 0.80 0.02 1.44 0.03 499.72
CALLE 5 V9-V10 51.25 7.85 0.30 14.04 0.32 2.63
L2 0.80 0.02 1.44 0.03 499.72
L1 0.80 0.02 1.50 0.03 499.72
CALLE 5 V10-V11 53.50 7.85 0.30 14.04 0.32 2.74
L2 0.80 0.02 1.50 0.03 499.72
L1 0.80 0.02 1.50 0.03 496.37
CALLE 5 V11-V12 53.50 7.85 0.30 13.95 0.35 2.58
L2 0.80 0.02 1.50 0.03 496.37
ELEMENTOS APORTES LONGITUD DEL TRAMO CAUDAL TRIBUTARIO (l/s)
LATERAL DERECHO CALLE TODOS LOS CAUDALES
PRINCIPAL COMPLETA (V1- 304.50 66.17
V2) FINAL UNITARIOS ENTRE VERTICES
LATERAL IZQUIERDO CALLE TODOS LOS CAUDALES
305.50 227.49
UNITARIOS ENTRE VERTICES
FINAL LATERAL DERECHO TODOS LOS CAUDALES 306.50 87.56
CALLE PRINCIPAL UNITARIOS ENTRE VERTICES
FINAL LATERAL DERECHO TODOS LOS CAUDALES 307.50 228.98
COMPLETA (V1-V2)
CALLE PRINCIPAL UNITARIOS ENTRE VERTICES
COMPLETA (V1-V2)

DISPOSITIVO O ELEMENTOS DE DRENAJES NECESARIOS


CAUDAL TRIBUTARIO AL LONGITUD PENDIENTE
DISPOSITIVOS DE TRANSMISION APORTES LONGITUDINAL OBSERVACION
ELEMENTO (L/S) (m) (%)
TRANSVERSAL 1A ENTRE V10A-V9A Y V9A-V7A
BATEA 1 13.76 5.40 8.99 VER DETALLLE EN PLANO
OESTE CON CALLE 2A NORTE
BATEA B-1A MAS CALLE 2A SUR
BATEA 2 24.84 6.40 3.00 VER DETALLLE EN PLANO

TRANV 1A V7A-V4A OESTE MAS TRANSV 2A ESTE


BATEA 3 #VALUE! 5.40 8.57 VER DETALLLE EN PLANO
Y CALLE 1A V6A-V5AY V5A-V4A NORTE Y V5A-V4A

FINAL CALLE

S-ar putea să vă placă și