Sunteți pe pagina 1din 3

SITE VISIT REPORT

Name of Project: Construction of 3 Sty-12 CL School Building


Project Location: Maasin City SPED Center
Project Cost: ₱ 40, 525, 369.00
Project Started: December 3, 2019
Project Duration: 360 C.D.

I. ACTIVITIES
a. Welding 400 rods/day
b. Tiling of Lavatories 20x20cm unglazed tiles
c. Skim Coating 20 bags/day of skim coat
d. Painting 16-L Boysen Paint
e. Cement Mixing for the Catch Basin Cover 1:2:3 proportion
f. Installation of Electrical Wirings 6 box, 150m./box
g. Plastering of Column
h. Clearing of Excavated Soil

II. WEATHER CONDITION

Weather Condition
8:00 9:00 10:00 11:00 12:00
Time A.M. A.M. A.M. A.M. NN
Description

Legend:
- Sunny
- Cloudy
- Showery
- Stormy
III. MATERIALS

MATERIAL UNIT QUANTITY REMARKS


Cement Bag 8 For Columns
Sand Cu. M. 0.204 For Columns
Skim Coat Bags 20 Coating for Finished Concrete
Welding Rod Kg. 2.5 For Fencing
Electrical
Wire Box 6 For Electrical Wirings
Boysen Paint Container 1 For Coated Concrete
IV. MANPOWER
NO. NO. OF
DESIGNATION PERSONNEL HOURS REMARKS
Safety Engineer 1 10 For Monitoring
Site Engineer 1 12 For Monitoring
Foreman 1 12 For Monitoring
Works including welding, fabrication of
Skilled Worker 18 12
rebar,plastering and driving heavy equipments
Laborer 4 12 For Excavation and Concrete Pouring

V. EQUIPMENTS
NO. OF
MACHINE SCECS HOURS REMARKS
Bar Cutter 8 For Cutting RSB
Dump Truck 8 To carry and transport escavated soil
Backhoe 8 To transfer escavated soil to dump truck
Wielding
Machine 8 Used for wielding

VI. PROBLEMS ENCOUNTERED/SOLUTION


So far, on that day we visit the site (August 29, 2019), they don’t have any problems
concerning construction. All is well.

VII. DOCUMENTATION
PREPARED BY:
JAN ARTH G. CADAVOS
STUDENT ENGINEER

APPROVED BY:
ENGR. LUZANNE A. BAKUNAWA
INSTRUCTOR