CALL SIGN
OFF NO
Title: Risk Assessment Register
Note: For each identified hazard, assess the associated risks under each category, i.e.: Health & Safety, Operations, Environmental and Charter
Impact. Use additional pages (copy/paste the below table) for each additional hazard identified for the job that is to be done.
Tool Box Meeting (compulsory):
Vessel: S.N.LANKA Date: 12.09.2019 Overall In Charge: MASTER
YES
Location: MUMBAI Team Members: Permit To Work (if applicable):
POSN: CH. ENGR, CH. OFF, AB & WORK SHOP TEAM (2 MEN) Hot work permit
RISK ASSESSMENT OF OPERATION TO BE REVISITED EACH TIME CONSIDERING ANY CHANGE IN CONDITION INCLUDING WEATHER
(2)
(2) (2) (2)
Minor
Medical Minor
(< 42 Gallons/155
Low 2 4 6 8 10
Treatment (<$10,000)/(< = 1 day) (< 12 hour delay)
liters)
(3)
(3) (3) (3)
Medium
Lost Time/ Rest. Medium
(<420
Medium 3 6 9 12 15
Injury (<$100,000)/(> 1 day) (< 24 hour delay)
Gallons/1550 liters
(4)
(4) Major (4)
(4)
Single Fatality
Major (<4,200 Fairly High 4 8 12 16 20
(<$1,000,000)/(> 1 wk) Gallons/15500 (1 to 7 days delay)
liters)
(5)
(5)
Massive (5)
(5) Extensive
Multiple Fatality (>$1,000,000)
(>4,200 Very High 5 10 15 20 25
Gallons15500 (> 7 days delay)
(> 1 month)
liters)
1-6 Low Risk May be acceptable; however, review task to see if risk can be reduced further.
Job should only proceed with appropriate authorisation after consultation with QHSSE/Operations Personnel. Where possible, the
8-12 Medium Risk
job shall be redefined to take account of the hazards involved or the risk shall be reduced further prior starting the job.
The job must not proceed until it has been redefined or additional control measures put in place to reduce risk. The controls shall be
15-25 High Risk
re-assessed for adequacy prior to starting the job.