TOC of COGEN ITB for UGCE Project

Sections Description

Section 1-1: General Instructions


Section
Section 1-2: Requirements for Technical Proposal
1
Section 1-3: Requirements for Commercial Proposal
Part A: General Terms & Conditions
Part B: Specific Terms & Conditions
Exhibit I – Scope of Work
Part 1: General Information
Part 2: Design Philosophy and Basis & Technical Scope of Work
2.1 Design Philosophies
2.2 Design Basis

2.3 Technical Scope of Work

Part 3: Project Management


3.1 General Information

3.2 Design and Engineering Requirements

3.3 Materials and Procurement Management


Requirements
Section 3.4 Construction Requirements
2
3.5 Commissioning and Acceptance Requirements

3.6 Quality Requirements


3.7 Project Control Requirements
3.8 Contractor Organization and Project Team Key
Personnel
3.9 Risk Management Requirements
3.10 Interface Management Requirements
3.11 Training Requirements
3.12 Final Documentation
3.13 Performance Guarantee
Part 4: Supplementary Information
4.1 Soil Investigation Report
4.2 Environmental Impact Assessment Report
4.3 Other Documents
Exhibit II - Specification
Part 1: Project Specification and Datasheets
Part 2: Drawings
2.1 Overall Site Plan, Layouts and Plot Plans
2.2 Technical drawings
Part 3: Standards
3.1 Malaysian Codes & Regulations
3.2 PETRONAS Technical Standards and Amendments
3.3 International Codes & Standards
3.4 PETRONAS Standard Drawings
Exhibit III – Contract Price
Exhibit IV – Additional Obligations of Parties
Part 1 : Obligations Of The Contractor
Part 2 : Obligations And Rights Of The Company
Exhibit V – Project HSE requirements
Exhibit VI – Administrative Procedure
Part 1 : Format For Performance Security
1.1 Bank Guarantee
1.2 Parental/Principal Guarantee
Part 2 : Process Flow For E-Invoicing
Part 3 : Change Order Format
Part 4 : Administrative Correspondence Details
Part 5 : Company Representative
Part 6 : Contractor Representative